0005_-_Conformed.pdf
PDF 979 KB Posted
- Attached to
- USS MITSCHER (DDG 57) FY15 ESRA(d) Execution
- Solicitation number
- N00024-15-R-4406
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP-RFQ_Q_AND_A_-__130-131.pdf | ||
| Amendment_8_-_MOD.pdf | ||
| Amendment_8_-_Conformed.pdf | ||
| RFP-RFQ_Q_AND_A_-__129.pdf | ||
| RFP-RFQ_Q_AND_A_-__127-128.pdf | ||
| MITSCHER_RFP_Conformed_Amendment_7.pdf | ||
| Amendment_7.pdf | ||
| RFP-RFQ_Q_AND_A_-__122-126.pdf | ||
| J-4_Work_Item_Index_-_3_MAR_2015.xlsx | XLSX spreadsheet | |
| Amendment_6_-_Modification_Copy.pdf | ||
| Amendment_6_-_Conformed_Copy.pdf | ||
| Attachment_J-8_Award_Fee_Intra-Availability_Milestones.docx | DOCX document | |
| J-4_Work_Item_Index_-_2_MAR_2015.xlsx | XLSX spreadsheet | |
| 0005.pdf | ||
| RFP-RFQ_Q_AND_A_-__97-121.pdf | ||
| 0004-_Conformed.pdf | ||
| 0004-_MOD.pdf | ||
| N00024-15-R-4406-0003.pdf | ||
| RFP-RFQ_Q_AND_A_-__91-96.pdf | ||
| N00024-15-R-4406-0002.pdf | ||
| RFP-RFQ_Q_AND_A_-__46-90.pdf | ||
| RFP-RFQ_Q_AND_A_-__46-90.pdf | ||
| RFP-RFQ_Q_AND_A_-__1-45.pdf | ||
| N00024-15-R-4406-0001.pdf | ||
| MITSCHER_RFP.zip | ZIP file |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 16 Mar 2015
X
A
X B
X C X D
EX
X
G
F 75 - 83
84 - 97
X H 98 - 104
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 104
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
(See Schedule) conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 10
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
11 - 33
34 - 35
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
36 - 38
39 - 40 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 41 - 45 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 46 - 52 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
53 - 73
PART II - CO NTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
16 Jan 2015
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N00024-15-R-4406
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
TYCOM Repair and Alterations
FFP
1 Lot
Prepare for and accomplish TYCOM repair and (Title D) alterations on board USS
MITSCHER (DDG 57) during FY15 Extended Selected Restricted Availability with docking (ESRA(d)) SSP NSSARM-501-15
FOB: Origin
NET AMT
NAVSEA Program Alterations
Prepare for and accomplish NAVSEA program (Title K) alterations onboard USS
MITSCHER (DDG 57) during FY15 Extended Selected Restricted Availability with docking (ESRA(d)) SSP NSSARM-501-15
Prorated Work Items
Prorated work items. Onboard USS MITSCHER (DDG 57) during FY15 Extended
Selected Restricted Availability with docking (ESRA(d)) SSP NSSARM-501-15
NSP Data
Contract Data Requirements List (CDRLs) for ITEM 0001 through 0003, and (if exercised) option ITEMS 0006 through 0012 (See exhibits A, B and C - CDRLs attached)
RESERVED
MK 82 Director Foundations
OPTION Specification 150-11-003; Replace MK 82 Director Foundations
Sonar Dome Rubber Window (SDRW)
OPTION Specification 165-11-001; Inspect and Repair SDRW
VLS Fairing Plate Corrosion
OPTION Specification 630-80-001; Accomplish Ship Alt. DDG51-64155D, VLS Fairing Plate
Corrosion Modification
Underwater Hull Preservation
OPTION Specification 631-11-001; Accomplish Underwater Hull Preservation
Debris Boom
OPTION Specification 992-11-004; Install Oil Spillage and Floating Sandblasting Debris Boom
Fuel Oil Tank
OPTION Specification 123-11-010; Fuel Oil Tank, Group 3 and 4; repair and preserve
Forepeak Tank
OPTION Specification 123-22-001; Forepeak Tank, Accessible Void and Cofferdam; preserve
LABOR AND MATERIAL RATES
SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
1.1. The Contractor’s fully loaded man-hour rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of man hours included in its price proposal for contract modifications shall include only direct production man hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production as exemplified by the following functions:
Abrasive cleaning/blasting
Fire Watch
Burning
Brazing
Carpentry
Electrical Work
Lagging
Ship-fitting
Boiler-making
Painting
Sheet-metal
Work Pipefitting
Machinists (inside and outside)
General Labor
Staging/scaffolding
Diesel Mechanics
Rigging
Welding (including aluminum welding)
1.2. Direct production man hours will include those functions (whether charged directly or indirectly by the Offeror’s accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the Offeror’s fully burdened Ship Repair Labor Rate for direct production man hours. Examples of support functions include:
Testing
Quality Assurance
Planning
Cleaning (except tank Cleaning)
Material handling & Warehousing
Security
Surveying
Administration
Transportation
Purchasing staff
Proposal Preparation
Lofting
Other indirect support
Supervision
Safety/Environmental
1.3 The fully burdened Ship Repair Labor Rate is a fixed hourly rate that includes all wages, overhead, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened Ship Repair
Labor Rate represents a blended rate to be performed by the offeror, including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control, and all subcontractors. As the fully burdened Ship
Repair Labor Rate is intended to be all inclusive, subcontractors proposed to complete efforts under the trade rate schedule may not be proposed as separate material or ODC charges. This does not apply to the procurement of work performed by Original Equipment Manufacturers (OEMs) and Government directed subcontractors.
1.4 Costs for consumable materials such as office supplies, paper, rags, vehicles or equipment fuel costs, etc., shall be included in contractor’s Ship Repair Labor Rate and not separately priced.
1.5 The material mark-up rates applies to materials to be provided to the ship as part of the repair that will sail away with the ship. Materials consumed or used in the process of repair are part of the contractor’s overhead and not subject to the mark-up. The mark-up will be applied to the actual cost of the material. Actual cost does not include handling charges, general and administrative cost, overhead, profit or any other indirect cost.
“Sail away material” – Material that is not specifically consumable material, that will sail away with the ship (e.g.
equipment, replacement steel, pipes, fasteners, etc.)
“Consumable material” – Material consumed or used in the process of repair (e.g. welding rods, paint buckets, paint brushes, and protective clothing, etc.)
1.6 Definitions:
1. Straight Time Hours – Work performed during an employee’s scheduled 8 hour day.
2. Overtime Hours - Hours worked in excess of eight hours up to and including 12 hours in any work day, and for the first eight hours worked on the seventh consecutive day of work in a work week.
3. Double Time - Hours worked in excess of 12 hours in any workday and for all hours worked in excess of eight on the seventh consecutive day of work in a workweek.
Base Year
Straight Time Base Year
Overtime Base Year Double
Time Ship Repair Labor Rate Material Mark Up Rate
1.7. The Contracting Officer may:
a. Use the Fixed Trade and Material rates shown in the table above to negotiate all change orders and supplemental agreements, including changes due to growth, supplemental, emergent and new work.
b. Disregard the fixed rates shown in the table above and negotiate with the offeror/s in accordance with FAR 15.4.
CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)
This entire contract is fixed price.
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the
Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
Section C - Descriptions and Specifications
SCOPE OF WORK
1. GENERAL REQUIREMENTS
1.1 The Contractor under the direction of the Regional Maintenance Center (RMC) and as an independent Contractor and not as an agent of the Government, shall furnish the material, support
(electrical, crane, rigging, etc.) and facilities (except those furnished by the Government under express provisions of this contract) and provide the management, technical, procurement, production, testing and quality assurance necessary to prepare and accomplish the repair and alteration of the
FY15 USS MITSCHER ESRA(d) in accordance with the requirements stated in this Section, the
Work Item Specifications and Work Item Plans, Drawings, and Other References, the Delivery
Schedule, and all other terms and conditions set forth in this contract. Category I NAVSEA FY15
CHG_1 or latest revision Standard Items are applicable to all items without further reference.
Category II FY15 CHG_1 or latest revision Standard Items are applicable when invoked and/or referenced in individual work items specified in NSSARM-501-15. NAVSEA Standard items may be found at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/default.aspx
1.2 The Contractor shall accomplish planning and scheduling to ensure a rational, integrated and timely plan for receipt, storage and installation of Government Furnished Material as identified in work item specifications, and for accomplishment of production work.
1.3 The Contractor shall provide an integrated milestone plan for the availability. These milestones will include a schedule of key events necessary to meet the contract delivery dates. A critical path analysis (if required) and a milestone schedule shall be used to measure schedule accomplishment of the functions and elements required to successfully complete the repair and alteration of FY15 USS
MITSCHER ESRA(d) within the availability dates herein.
1.4 Reserved
1.5 The Contractor shall completely and thoroughly check and review for technical accuracy and compliance with the provisions of specifications and assignments all drawings, data and other work products created by the contractor in the course of completing the FY15 USS MITSCHER ESRA(d).
Any corrections to drawings or other work products found necessary due to error or omission by the contractor shall be promptly accomplished by the contractor. The Government is the ultimate approval authority for specifications and drawings. The Contractor shall account for government approval in their scheduling time line. The contractor shall be responsible for ensuring that interference-free, technically accurate drawings are received and for calling to the attention of the
Supervisor, orally and in writing, any interface and interference problems requiring revision to drawings.
1.6 The Contractor shall report and recommend corrective action during contract performance for those deficiencies discovered which are not covered by the work specifications. As found conditions, needed repairs and corrective action reports will be submitted to the Government in the form of a
Condition Found Report (CFR). The Contractor's conditions found reporting shall be in accordance with that set forth in Standard Item 009-01.
1.7 Provide the data in accordance with 009-99, to close all completed 2-Kilos and generate the Ship
Departure Report.
http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/default.aspx
1.8 GOVERNMENT FURNISHED MATERIAL: Government Furnished Material (GFM) cited in the solicitation will be shipped to the contractor’s facility. The successful offeror is to coordinate delivery of Government Furnished Material with the Project Manager. Government property permanently removed from a vessel that requires a Property Administrator's disposition instructions shall be properly prepared for shipment and be delivered as directed by the Property Administrator.
GFM will be listed in paragraph 5 of the Work Item(s).
1.9 QUALITY ASSURANCE PROGRAM - The Contractor shall provide and maintain a quality assurance program acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that program to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. The Contractor's quality assurance program shall be in accordance with that set forth in Standard Item 009-04. In addition to its rights under Clause 252.217-7005, the
Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality assurance program and, as such, the Contractor shall not be entitled to progress payments for said work and material.
1.10 REQUEST FOR CONTRACT CHANGES (RCC) TIMELINE - The contractor shall provide all
Change Order Price Analysis (COPA) proposals in response to Request for Contract Changes (RCC) within three business days. If circumstances arise where the contractor is unable to submit a COPA within three business days, the contractor shall notify the Government in writing of the specific circumstances and provide a date in which a COPA will be submitted. The contractor’s timeliness in submitting COPAs in response to RCCs will be evaluated in CPARS and utilized for past performance ratings on future proposal evaluations. Notification of late submission of COPA does not exempt the contractor from meeting the three business day requirement, but will be considered by the Government when conducting a CPARS evaluation. In addition, pricing of contractor proposals submitted in response to RCCs shall not expire for a period of less than two business days after submission to the Government to allow sufficient time for evaluation and if required negotiations.
1.11 AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER – No order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract. The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the
Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer's. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.
1.12 NAVY MAINTENANCE DATABASE (NMDr): The Contractor shall use NMDr for the submission of Condition Found Reports throughout the administration of this contract.
1.13 ORGANIZATION CHART AND EMPLOYEE ROSTER:
1.13.1 ORGANIZATION CHART - Within 30 days of contract award, submit a chart detailing each management, technical, engineering and production position from the highest company level to the lowest supervisory level. Include descriptions of each position describing the duties, responsibilities, authority and names of the individuals filling the positions. The organizational chart must represent the facility that will perform the work.
1.13.2 EMPLOYEE ROSTER: After receipt of award and prior to starting work aboard the vessel, the contractor must submit a list of employees who will work aboard ship to the
Commanding Officer of the ship via the NSA Security Office. The list should be on company letterhead, include each employee's name and security clearance when required, and bear the signature of a company official.
2. LOCATION: Government facilities are not available for this requirement. All work shall be completed at the contractor’s facilities.
2.1 DRYDOCK CERTIFICATION - The dry-docking of all vessels shall be accomplished in dry docks certified in accordance with MIL-STD-1625D(SH) dated 27 August 2009.
3. SCHEDULE: USS MITSCHER must be delivered, mission-ready, no later than 15 Jul 2016.
3.1: MILESTONES: In addition to the contract completion date of 15 Jul 2016, the Government has established execution dates for the following milestones:
EVENT A + DAY DATE WEEKDAY REMARKS
Enter Dock *** *** *** ***
25% CONFERENCE *** *** *** ***
50% CONFERENCE *** *** *** ***
VCHT *** *** *** ***
Undock *** *** *** ***
FIREMAIN/AFFF/HALON *** *** *** ***
SEA WATER SERVICE *** *** *** ***
75% CONFERENCE *** *** *** ***
POTABLE WATER *** *** *** ***
LP/HP AIR *** *** *** ***
VENT SYSTEM *** *** *** ***
CHILL WATER/AIR CONDITIONING PLANTS *** *** *** ***
400HZ AVAILABLE *** *** *** ***
Start testing of 77052 temp ac Fwd aft IC *** *** *** ***
Turnover 1 *** *** *** ***
Fiber Testing begins *** *** *** ***
Turnover 2 *** *** *** ***
Turnover 3 *** *** *** ***
Turnover 4 *** *** *** ***
HABTURNOVER / MOVE ABOARD
COMMENCE
EVENT A + DAY DATE WEEKDAY REMARKS
Turnover 5 *** *** *** ***
AEGIS LIGHT OFF *** *** *** ***
PCD *** *** *** ***
SHIP LOA PREP *** *** *** ***
LOA *** *** *** ***
DOCK TRIALS *** *** *** ***
FAST CRUISE *** *** *** ***
HM&E SEA TRIALS *** *** *** ***
END OF AVAIL *** *** *** ***
3.1.1 - ***Offerors (Prime Contractors) shall contact to Brian Kimm, Contracting Officer, and LT
Danilo Meulener, Contract Specialist, at brian.kimm@navy.mil and danilo.meulener@navy.mil to receive the established dates, included as Attachment J-6. These milestones will not be distributed publically on NECO or FBO.
3.1.2 - If any milestone event is not accomplished by the date provided, and the failure to accomplish any such milestone event does not arise from a cause beyond the control and without fault or negligence of the Contractor, such failure may be deemed to constitute a failure to perform this contract in accordance with its terms within the meaning of subparagraph (a)(1)(ii) of the clause of this contract entitled "DEFAULT” (DFARS 252.217-7009).
3.2. DELAYS / DISRUPTIONS: The contractor shall coordinate the work effort with the NSA Project
Manager on a daily basis to prevent changing situations from causing delays and disruptions. Disruption due to minor delays in obtaining access to spaces and operation of equipment are to be expected. A minor delay is defined as eight hours or less. These disruptions are considered normal rather than unusual occurrences during the performance of tasks ordered under this contract. If, during contract performance, delays greater than those indicated above are encountered, the Contractor shall immediately verbally notify the Project Manager and Contracting Officer, followed by a written statement within 24 hours after occurrence of delay, stating time of impact, reason for delay, duration of impact, number of people affected, action taken to properly schedule the work, action taken to minimize impact, and the names of the
Government person(s) contacted.
3.3 - SCHEDULE AND ASSOCIATED REPORTS: The report provided by the Contractor in accordance with Standard Item 009-60 shall match the Schedule and Associated Reports provided in the Contractor’s technical proposal in response to Factor 4 – Resource Capacity. While the report provided by the contractor in accordance with Standard Item 009-60 may provide additional detail, it shall not be materially different from the Schedule and Associated Reports provided in the Contractor's proposal in accordance with Factor
4 - Resource Capacity at the level of detail required by Factor 4.
4. SAFETY:
4.1 SAFETY INSPECTOR / FIRE MARSHALL: In addition to the safety standards provided in the specifications, the contractor is responsible for providing an experienced Safety Inspector/Fire Marshall who will accomplish daily inspections of the Contractor's entire work area on the ship, together with the mailto:brian.kimm@navy.mil
Contracting Office’s Safety Representative. This Inspector or Fire Marshall shall not be one of the
Contractor's supervisors or superintendents normally assigned to the ship and shall be identified in the contractor’s approved Safety Plan.
4.2 PERSONAL PROTECTIVE EQUIPMENT: Whenever work is performed aboard U.S. Naval Ships or vessels at piers or dry docks of a Naval Shipyard or Naval Station, Contractor employees (including management personnel) shall have and use at all times the following personal protective equipment:
(a) Protective hard hats that meet the following specifications:
(1) Protective helmets purchased after July 5, 1994 shall comply with ANSI Z89.1-1986, "American National Standard for Personnel Protection-Protective Headware for Industrial Workers-
Requirements," or shall be demonstrated to be equally effective.
(2) Protective helmets purchased before July 5, 1995 shall comply with ANSI Standard
"American National Standard Safety requirements for Industrial Head Protection," Z89.1-1969, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CFR 1910.135 Head Protection]
(b) Approved type Plano or prescription glasses meeting the following specifications:
(1) Protective eye and face devices purchased after July 5, 1994 shall comply with ANSI standard Z87.1-1989, "American National Standard Practice for Occupational and Educational Eye and
Face Protection", or shall be demonstrated by the employer to be equally effective.
(2) Protective eye and face devices purchased before July 5, 1994 shall comply with
ANSI "USA standard for Occupational and Educational Eye and Face Protection", Z87.1-1968, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CRF 1910.133 Protective eye and face devices.]
(c) Safety toe shoes, with built-in protective toe box that meet the following specifications:
(1) Protective footwear purchased after July 5, 1994 shall comply with ANSI Standard
Z41-1991, "American National Standard for Personal Protection-Protective Footwear", or shall be demonstrated by the employer to be equally effective.
(2) Protective footwear purchased before July 5, 1994 shall comply with the ANSI standard "USA Standard for Men's Safety Toe Footwear", Z41.1 1967, or shall be demonstrated by the employer to be equally effective [Ref. 29 CFR 1910.136 Protective eye and face devices.]
4.3 BLACK OXIDE COATED THREADED FASTENERS (BOCTFs): Due to safety concerns, use of
BOCTFs is not authorized when installing or replacing threaded fasteners in the accomplishment of any work required by any Work Item in this contract.
5. OTHER REQUIREMENTS
5.1 USE/POSSESSION OF PERSONAL ELECTRONIC DEVICES (PED'S) - The possession and use of portable electronic devices (PED's) within the confines of any naval vessel, or in the contractor's facility where equipment removed from the vessel is being worked, is strictly controlled. Cellular phones with digital imaging capabilities are strictly prohibited. PED's may not be connected to any Navy-owned or controlled network. PED's may not be used to store or process any digital information associated with the conduct of the contract without written authorization from the Naval Supervising Activity (NSA). PED's include:
mobile computing devices such as personal digital assistants (PDA's);
hand-held or laptop computers;
mobile telephone devices such as data-enabled cellular telephones;
two-way pagers, including those with e-mail capability;
analog and digital sound recorders; and digital cameras, including cellular phones with digital imaging capabilities.
5.2 NON SMOKING POLICY - For bidding purposes, contractors are advised that in light of the Navy's policy regarding smoke-free facilities, the entire vessel, topside and below decks, is to be considered a "No
Smoking Area" unless otherwise indicated by shipboard policy.
5.3. CITIZENSHIP REQUIREMENTS - The contractor shall comply with the Department of Defense
Industrial Security Manual (DoD 5220.22), and any revisions to that manual as of the Bid Opening Date prescribed, for verification of all U. S. Citizens. Prospective offerors shall refer all questions pertaining to the above to MARMC, Security Manager ( Code 1123, 757-443-3872, ext 1013).
CLIN DESCRIPTIONS
0001 PREPARE FOR AND ACCOMPLISH TYCOM REPAIR AND (TITLE D) ALTERATIONS ONBOARD
USS MITSCHER (DDG 57) DURING FY15 EXTENDED SELECTED RESTRICTED AVAILABILITY WITH
DOCKING (ESRA(d)) SSP NSSARM-501-15
The Contractor shall prepare for and accomplish TYCOM repair and (Title D) alterations during the Extended
Selected Restricted Availability with docking (ESRA(d)) onboard USS MITSCHER (DDG 57) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP
NSSARM-501-15 drawings, test procedures, and other detailed data as included in the following specifications:
042-11-002
General Requirements for Work Within Naval Station Norfolk and Joint Expeditionary
Base (JEB) Little Creek - Fort Story; accomplish
042-11-003 Accountability of Manhour and Material Reservation; accomplish
042-67-001 Work Completion Certification Data; provide
113-11-001 Bilge Drain Well; repair and preserve
123-11-001 Fuel Oil Tank, Group One, 2, 3, 4, 5, and 6; repair and preserve
123-11-002 Contaminated Oil and Waste Water Tanks; inspect, repair and preserve
123-11-003 JP-5 Service Tanks; inspect, repair and preserve
123-11-004 Chain Lockers; repair and preserve
123-11-005 Machinery Room Structural Repair; accomplish
123-11-006 Fan Room Structure; repair and preserve
123-11-007 Engine Rm. No. 2 Stack Structure; repair and preserve
123-11-008 Engine Rm. No. One Stack Structure; repair and preserve
123-11-009 Fuel Oil Tank; repair
131-11-001 Platform; replace
136-11-001 Radar Cross Section (RCS) Plating; replace and preserve
150-11-001 04, 05, 06 Level Deck and Bulwark; Repair and Preserve
150-11-002 Waterway Bar Coaming and Deck; repair and preserve
150-11-004 Deck Coaming; replace and preserve
150-11-005 Exhaust Trunk Structure; repair
150-11-006 Bulkhead Paint Repair; accomplish
150-11-007 Harpoon Blast Pad Corrosion; repair
150-11-008 Escape Truck Structural Longitudinal; repair and preserve
150-11-009 04 Level Coaming and Bulwark; repair
150-11-010 Bulkhead Plating; repair
150-80-001 ShipAlt DDG51-64214D (Partial), Torpedo Tube, Corrosion Modifications; accomplish
167-11-001 Bolted Equipment Removal Plate (BERP) Repair; accomplish
167-80-001 ShipAlt DDG51-72424D, MAFO-Holtkamp Door Installation; accomplish
167-80-002 ShipAlt DDG51-76258D, MAFO-Holtkamp Door Installation (Partial); accomplish
167-80-003 ShipAlt DDG51-64162D, Raised Scuttle, Corrosion Modification; accomplish
167-80-004
SHIPALT DDG51-79662D 1A and 1B Gas Turbine Module (GTM) Access Manhole
Relocation; accomplish
180-11-001 Communications Box Foundation; replace
259-11-001 Gas Turbine (GTRB) Exhaust Duct Collector; repair
259-80-001 ShipAlt DDG51-76087D, GTRB & SS GTRB Bliss Cap Modification; accomplish
259-80-002
SHIPALT DDG-51-79474D, Install Rain Caps on Engine Room Number One and Number
2 Uptakes; accomplish
262-11-001 Main Reduction Gear (MRG) Lube Oil Cooler; open, clean and inspect
311-31-001 Ship Service Gas Turbine Generator (SSGTG) Air Cooler; clean and inspect
320-80-001 ShipAlt DDG51-64231D, Automatic Bus Transfer (ABT) Relocation; accomplish
321-11-001 Shore Power Trunk, Receptacles and Indicator Lights; repair, replace and preserve
321-80-001 DDG51 Class AER 64201D, Stuffing Tube Replacement (Partial); accomplish
324-11-002 Automatic Bus Transfer (ABT) Switch; repair
436-80-001 ShipAlt DDG-51-83419D, Removal Halocarbon Monitoring System; accomplish
437-21-001
Fuel Oil Service and Waste Water Drain Tank Level Indicating (TLI) Systems Cabling and
Bushings; replace and test
442-11-001 TR-232(B)/WQC-2A, Low Frequency (LF) Transducer; replace
452-11-001 Dry Air Layup for All Pressurized Waveguide and Transmission Lines; provide
472-11-001 CIWS Platform Composite Radar Cross Section (RCS) Plating; install
512-11-001 Medical Ventilation Cleaning; accomplish
512-11-002 Galley and Laundry Ventilation Cleaning; accomplish
520-11-001 Rodmeter Flange Cap; repair
521-11-001 Firemain Pressure Regulating Control Valve; replace and test
521-80-001 ShipAlt DDG51-76721D, TOTS Valves In Chilled Water System; Install
521-80-002 ShipAlt DDG51-73738, Installation of Additional Bulkhead Cutout Valves; accomplish
523-80-001
Shipalt DDG-51-79575D, Countermeasure Washdown (CMWD) Piping Relocation to
Interior and ML; accomplish
528-80-001 ShipAlt DDG51-77691D, Weather Deck Drain and Trough Modifications; accomplish
528-80-002 ShipAlt DDG51-77690D, 02 Level Intake And Uptake Drains; accomplish
529-11-001 AFT VLS Eductor to Gage, Firemain Pressure, Gage Line; replace
541-80-001 ShipAlt DDG51-80246D, F-76 Small Boat Refueling Station Installation; accomplish
551-51-001 High Pressure Air Compressor; Overhaul Industrial Assist; accomplish
551-60-001 Bleed Air Check Valve; repair
551-61-001 Masker Air Emitter Belt Cleanout Cover Plate; repair
551-61-002 Masker Air Cooler Seawater Inlet Piping; replace
562-11-001 Rudder; repair and preserve
562-11-002 Rudder Stool Access Plates; repair
582-80-001 ShipAlt DDG51-76564D, AFT Capstan Controller Modification; accomplish
583-80-001 ShipAlt DDG51-81675D, Cres Dual and Single Liferaft Cradles; replace
593-11-001
Vacuum, Collecting, Holding, and Transfer (VCHT) and Plumbing Drain Tanks; repair and preserve
593-11-002 Vacuum, Collecting, Holding and Transfer (VCHT) Pump Motor Controller; repair
593-11-003 Plumbing Drains Waste, Soil and Vent Piping; replace
612-21-001 Helo Safety Nets Removal, Inspection and Load Testing; accomplish
622-12-001 Nomex Deck Panel; replace
622-80-001 ShipAlt DDG51-64143D, Relocate Pilot Ladder Station; accomplish
623-21-001 Accommodation Ladder and Stowage; Replace
624-11-001 Balanced Joiner Door; remove, store, repair and install
624-11-002 Metal Joiner Door; replace
631-11-001 Collective Protection System (CPS)and General Housekeeping; clean, inspect and preserve
631-11-002 Machinery Space Bilge; repair and preserve
633-11-001 Impressed Current Cathodic Protection (ICCP) System; inspect and repair
634-21-001 Flight Deck Nonskid; replace
634-21-002 Small Arms Magazine Nonskid Deck; replace
643-11-001 Berthing Habitability Project (HCPO-S0286) Installation; accomplish
643-11-002 Berthing Habitability Project (BCPO-S0276) Installation; accomplish
644-11-001 Ward Bath Corrosion Repairs; accomplish
655-80-001 ShipAlt DDG-51-79196D, Self Service Laundry Transition; Accomplish
751-11-001 Torpedo Loading Chalk Foundation Bolt Holes; repair
837-11-001 Antenna Photographs; provide
838-11-001 Combat Systems Waterfront Liaison Engineering Services (TYCOM); provide
865-91-001 Industrial Hygienist/Marine Chemist/Competent Person Support; provide
868-71-001 Work Authorization Form (WAF) Coordination Requirements; accomplish
980-11-001 Light-Off Assistance (LOA) Deficiency Corrections; provide
980-11-002 TYCOM and MARMC Office Space; provide
982-11-001 Machinery Trial Discrepancy Correction; accomplish
982-31-001 Dock Trial, Fast Cruise, and Sea Trial; accomplish
992-11-002 Temporary Air Conditioning; provide
992-11-003
Temporary Flammable Liquid Storage and Hazardous Material Storage Unit, 320 Square
Feet per Unit; provide
992-11-005
Temporary Service, Equipment and Systems Test, Inspection and Repair in Contractor
Plant, Barge; accomplish
992-11-006 Temporary Refrigerated Storage Facility, 7000 Cubic Feet; provide
992-11-007 Pierside T-1 Line; provide
992-11-008 Barge Tow Service; provide
992-11-009 Ship's Force Parking; provide
992-11-010 Ship's Force Security Support Services; provide
992-12-001 Hull, Mechanical and Electrical (HM&E) Discrepancy; correct
992-12-002 Hurricane Preparation; provide
992-21-001 Vertical Launcher System (VLS) Deck Resurfacing Support Services; provide
992-31-001 Cleaning and Pumping; accomplish
992-31-002 Off-Load and Testing of Ships Petroleum Fuels and Lubricants; accomplish
992-31-003 Routine Maintenance Standard; provide
993-11-001 Rigging, Crane and Transportation Service; provide
993-11-002 Ship's Force Warehouse Storage Space; provide
993-31-001 AN/SPY-1D Antenna Protective Cover; install
993-31-003 Temporary Main Reduction Gear (MRG) Dehumidifier System; provide
997-11-001 Drydocking and Undocking; accomplish
0002 PREPARE FOR AND ACCOMPLISH NAVSEA PROGRAM (TITLE K) ALTERATIONS ONBOARD
USS MITSCHER (DDG 57) DURING FY15 EXTENDED SELECTED RESTRICTED AVAILABILITY WITH
DOCKING (ESRA(d)) SSP NSSARM-501-15
The Contractor shall prepare for and accomplish NAVSEA Program (Title K) alterations during the Extended
Selected Restricted Availability with docking (ESRA(d)) onboard USS MITSCHER (DDG 57) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
NSSARM-501-15, drawings, test procedures, and other detailed data as included in the following specifications:
264-90-001
ShipAlt DDG51-85973K, DDG Lube Oil Purifier Heat Exchanger Modifications;
accomplish
411-90-001 ShipAlt DDG51-78511K, AWS:ACB12/TI12 CIC Display Upgrade for DDGS; accomplish
415-90-001 SHIPALT DDG51-79526K, AN/USG-2B Installation; accomplish
456-90-001 ShipAlt DDG51-78512K, AWS:ACB12/TI12 MMSP Upgrade for DDGS; accomplish
456-90-002
ShipAlt DDG51-77615K, ACB12/TI12 OA Computing Plant Upgrade for DDG;
accomplish
456-90-003 SHIPALT DDG51-78513K, ACB12/TI12 KAS WDRC Upgrades for DDGS; accomplish
468-90-001 ShipAlt DDG51-78391K, AN/SQQ-89A(V)15 for DDG Modernization; accomplish
472-90-001 Shipalt 80156K AN/SLQ-32(V)6 SEWIP BLOCK 2 UPGRADE W/ Shipalts
512-90-001 Shipalt DDG51-74012K, VLS Magazine Ventilation Upgrade; accomplish
522-90-001 ShipAlt DDG51-80255, Replace Magazine Fire Detection System; accomplish
721-90-001 ShipAlt DDG51-79584K, ACB 12 Vertical Launching System (VLS) Upgrade; accomplish
980-90-001
SA DDG51-70430K MKXIIA Mode 5, Alteration Installation Team (AIT) Support
Service; provide
980-90-002
SA 81443K/NMT AN/WSC-9(V)1-X/Ka, Alteration Installation Team (AIT) Support
Service; provide
980-90-005
DDG-51 SCD-79813/BEWT ACB 12 Upgrade, Alteration Installation Team (AIT) Support
Services; provide
980-90-006
OA and SA 79362 AWS Seawater Flow Meter, Alteration Installation Team (AIT) Support
Service; provide
980-90-007
DDG 51 SCD-79975/BFTT Build 4.1 Alteration Installation Team (AIT) Support Services;
provide
980-90-008
MK-45 GMT ORDALTS 70227, 70289 and 70920 Alteration Installation Team (AIT)
Support Services; provide
980-90-009 NAVSEA (PHD) Office Space; provide
980-90-010 OA 74588 Mk99 FCS/KAS, Alteration Installation Team (AIT) Support
980-90-011 O/A 83135 CIWS BLK-1B, Cable Reliability Improvement, Alteration
980-90-012
SA-84134 K NIPR NCVI CLO, Alteration Installation Team (AIT) Support Service;
provide
980-90-013
ShipAlt DDG-51-75913K, BFTT T46D Upgrade, Alteration Installation Team (AIT)
Support Service; provide
980-90-014
ShipAlt DDG51-00151.01K and DDG51-00151.02K, Air Conditioning Plants No. One, 2, 3 and 4 Upgrade Industrial Support; provide
980-90-015
ShipAlt DDG51-80315K Replace AFFF and CMWD SOPVS, Alteration Installation Team
(AIT) Support Services; provide
980-90-016
SHIPALT 76829K, 78819K, 77052K, 76869K, 79256K, 82635K Industrial Support
Services: provide
980-90-017 OA 74603, 78778 and 79024 Alteration Installation Team (AIT) Industrial
980-90-018 OA 74435, 79353 and 80083, AIT Industrial Support Services; accomplish
0003 PRORATED WORK ITEMS. ONBOARD USS MITSCHER (DDG 57) DURING FY15 EXTENDED
SELECTED RESTRICTED AVAILABILITY WITH DOCKING (ESRA(d)) SSP NSSARM-501-15
The Contractor shall prepare for and accomplish the following work items alterations during the Extended Selected
Restricted Availability with docking (ESRA(d)) onboard USS MITSCHER (DDG 57) as specified in the statement of work provided herein and in accordance with standard items, work item specification package NSSARM-501-15, drawings, test procedures, and other detailed data as included in the following specifications:
042-11-001 Marine Coatings Containing Heavy Metals Material; remove and dispose
077-01-001 Hazardous Waste Produced on Naval Vessels; control
813-11-001 Compartment Closeout Schedule; provide
991-11-001 Temporary Mast and Superstructure Staging; provide
992-11-001 Temporary Service; provide
993-11-003 Government Materials Warehouse Storage Space; provide
993-31-002 Temporary Deck Covering; install
0004 CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ITEM 0001 THROUGH 0003, AND (IF
EXERCISED) OPTION ITEMS 0006 THROUGH 0012 (SEE EXHIBITS A, B and C – CDRLs ATTACHED)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD
Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.
0005 RESERVED
0006 Through 0012 APPLICABLE TO ALL OPTION ITEMS
For each exercised option, the Contractor shall prepare for and accomplish the work set forth in the work specification(s) identified, during the Extended Selected Restricted Availability with docking (ESRA(d)) onboard
USS MITSCHER (DDG 57) as specified in the statement of work provided herein and in accordance with standard items, work item specification package NSSARM-501-15, drawings, test procedures, and other detailed data as provided within the following specification:
150-11-003 MK 82 Director Foundations; replace
165-11-001 Sonar Dome Rubber Window (SDRW); inspect and repair
630-80-001 ShipAlt DDG51-64155D, VLS Fairing Plate Corrosion Modification, accomplish
631-31-001 Underwater Hull Preservation; accomplish
992-11-004 Oil Spillage and Floating Sandblasting Debris Boom; install
123-11-010 Fuel Oil Tank, Group 3 and 4; repair and preserve
123-22-001 Forepeak Tank, Accessible Void and Cofferdam; preserve
HQ C-2-0003 ACCESS TO THE NAVY SUPPLY SYSTEM (NAVSEA) (MAR 2011)
(a) In compliance with the comparability requirement of 10 U.S.C. 7314, Public and Private Shipyards will be provided equal access to the Naval Supply System. Use by private yards is permissive, not mandatory.
(b) Pursuant to the clause of this contract entitled "GOVERNMENT SUPPLY SOURCES" (FAR 52.251-1) the
Contracting Officer hereby authorizes the Contractor to place orders with the Navy Supply System for materials and equipment or other supplies necessary to perform the required work. The Naval Supply System shall process such orders in the same manner as it would for any other Navy supply user, and the Contractor shall make payment on account of materials and equipment and other supplies ordered and/or received in accordance with the normal requirements of the Naval Supply Systems Command, but in no event shall payment in full be any later than 30 days after receipt by the Contractor of each order. The Contractor shall pay the Naval Supply System any costs for materials, equipments, or other supplies obtained including any surcharges normally charged to any other Naval
Supply System user.
(c) This job order has been priced on the basis that, except as specifically provided elsewhere in this contract with regards to Government furnished property, the Contractor shall provide all necessary materials, equipments and supplies for performance of this contract. If the Contractor uses the Naval Supply System, it has elected to use the system for its own convenience to meet its contractual obligations to perform the work under this contract. The
Naval Supply System is considered to be an alternate source or vendor of contractor furnished material; therefore materials, equipments, or other supplies ordered and/or obtained from the Naval Supply System are specifically not considered to be Government furnished material, but are considered to be contractor furnished material. The
Government makes no representation as to the availability of materials, equipments, or other supplies for the performance of the work required under this contract, nor shall unavailability, late delivery, delivery of non-conforming supplies, higher costs of the Naval Supply System (if any), or any failure of the Naval Supply System to meet the expectations or requirements of the Contractor constitute excusable delay or grounds for equitable or any other adjustment to the contract or relief from the requirement to perform in accordance with the terms of the contract.
HQ C-2-0004 ACCESS TO THE VESSEL(S) (AT) (NAVSEA) (JAN 1983)
Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.
HQ C-2-0005 ACCESS TO VESSELS BY NON U.S. CITIZENS (NAVSEA) (DEC 2005)
(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by
COMNAVSEA or his designated representative that such access should be permitted in the best interest of the
United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST
5500.3 (series) in effect on the date of this contract or agreement.
(b) If the Contractor desires to employ non U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control
Plan (ACP) which shall contain as a minimum, the following information:
(1) Badge or Pass oriented identification, access, and movement control system for non U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.
(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.
(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.
(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.
(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.
(2) Contractor’s plan for ascertaining citizenship and for screening employees for security risk.
(3) Data reflecting the number, nationality, and positions held by non U.S. citizen employees, including procedures to update data as non U.S. citizen employee data changes, and pass to cognizant CAO.
(4) Contractor’s plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.
(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.
(c) To request approval for non U.S. citizens of hostile and/or communist controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22 M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by
Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for above group. Approval of ACP's for access of non-
U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non-
U.S. citizens of hostile and/or communist-controlled countries.
(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved
ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the
CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated or default in accordance with the clause entitled "DEFAULT (FIXED-PRICE SUPPLY AND SERVICE)" (FAR
52.249-8), "DEFAULT (FIXED-PRICE RESEARCH AND DEVELOPMENT)" (FAR 52.249-9) or
"TERMINATION (COST REIMBURSEMENT)" (FAR 52.249-6), as applicable.
(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.
(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.
(g) The same restriction as in paragraph (g) above applies to other non-U.S. citizens who have access to the
Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.).
HQ C-2-0006 ADDITIONAL PROVISIONS RELATING TO GOVERNMENT PROPERTY (NAVSEA) (SEP 2009)
(a) For purposes of paragraph (h) of the clause entitled "GOVERNMENT PROPERTY" (FAR 52.245-1) in addition to those items of property defined in that clause as Government Property, the following shall also be included within the definition of Government Property:
(1) the vessel;
(2) the equipment on the vessel;
(3) movable stores;
(4) cargo; and
(5) other material on the vessel
(b) For purposes of paragraph (b)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .