14R5352_0004.pdf
PDF 184 KB Posted
- Attached to
- SEWIP Block 1B3 FY15-19 Full Rate Production
- Solicitation number
- N00024-14-R-5352
About this file
Amendment 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 14R5352_0003.pdf | ||
| 14R5352_0002.pdf | ||
| 14R5352_0001.pdf | ||
| CDRLs.pdf | ||
| Attachment_13_-_Question_Submittal_Form.xlsx | XLSX spreadsheet | |
| N0002414R5352.pdf | ||
| N0002414R5352_Attachments.zip | ZIP file | |
| N0002414R5352_Attachments.zip | ZIP file | |
| DRAFT_N0002414R5352.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002414NR42045
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment incorporates changes resulting from responses to bidders' questions. Furthermore, the doucments "First Article Test Plan and Procedures" and "Factory Acceptance Test Plan and Procedures" have been removed from Section 2.1 of Section C and Attachment J-7. The offer due date is unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 27
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jan-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-14-R-5352
X 9B. DATED (SEE ITEM 11)
02-Dec-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jan-2015
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-14-R-5352
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SOW
This statement of work applies to CLINs 0001, 0002, 0003, 0100, 0200, 0300, 0400, 0500-0504, 0600-0601, 0700-0704, and 8000.
1. Scope
This Statement of Work (SOW) defines the effort required for manufacturing, assembly testing, and engineering support of the SEWIP Block1B3 High Gain High Sensitivity (HGHS) system. The Contractor shall build this system in accordance with the Technical Data Package (TDP), provided as Government Furnished Information (GFI) and as referenced in Section J. The efforts defined by this SOW are in support of FY15 through FY19 Full Rate
1.1 Hardware Production (CLINs 0001, 0100, 0200, 0300, and 0400)
The Contractor shall provide all the personnel, facilities, equipment, and fixtures required to manufacture and or assemble and test all of the Configuration Items required to construct and test HGHS systems that meet the Technical Data Package (TDP) requirements in Section J, Attachment 6. Production shall comply with the quantities specified by individual CLIN orders and delivery dates specified by Attachment 2, Shipping Instructions Data. The Contractor shall submit an As Built Configuration List (ABCL) for each delivered HGHS system IAW
CDRL A025.
1.2 Security Requirements
Work performed under this contract shall not exceed the SECRET level and shall be performed in accordance with Department of Defense, Contract Security Classification Specification, DD Form 254, included as Attachment 3 to this contract.
2 Applicable Documents
The following documents of issue in effect on the execution date of the contract are applicable to this Statement of Work and attached appendices to the extent specified herein or as modified under the contract:
2.1 Government Furnished Information (Attachment J-7)
SEWIP Block 1B3 Technical Data Package – Provided as Attachment J-6 Physical Configuration Audit Plan SEWIP Block 1B3 Operational Software SEWIP Block 1B3 System User’s Manual (SUM)
2.2 Military Standards
MIL-STD-129P Standard Practice for Military Packaging MIL-STD-130N Identification Marking of U.S. Military Property MIL-STD-2073-1D Standard Practice for Military Packaging MIL-STD-881C Work Breakdown Structure for Defense Material Items
2.3 Military Specifications
MIL-PRF-49506 Logistics Management Information
2.4 Military Handbooks
MIL-HDBK-61A Configuration Management Guidance MIL-HDBK-2164A Environmental Stress Screening Process for Electronic Equipment
2.5 Other Government Documents
NAVSOP 6071 Best Practices for Manufacturing Planning AN/SLQ-32 SEWIP CMP Configuration Management Plan DoD Guide DoD Guide to Uniquely Identifying Items Version 1.1 DoD DIR 8500.1 Information Assurance, dated 24 October 2002 TE000-AB-GTP-020 Government Stress Screening of Hardware (for guidance only) Jan 92 SCG 080-38.5 Security Classification Guide for AN/SLQ-32(V) SEWIP, June 2011
2.6 Non-Government References
EIA 649B National Consensus Standard for Configuration Management ISO 9001 Quality Management Standard Y14.38M Abbreviations & Acronyms Y14.100 Engineering Drawing Practices Y14.24 Types & Applications of Engineering Drawings Y14.35M Revision of Engineering Drawings Y14.34M Associated Lists
3 Production Management
The tasks required for the Production Management are: 1) Program Management, 2) Production Facilities, Personnel, and Equipment, 3) Testing Facilities, Personnel, and Equipment, 4) Documentation, and 5) Security.
These tasks shall be performed integral to, and in support of, CLINs 0001 through 8000 as applicable. The Contractor’s facilities shall include appropriate classified document storage and control as identified by Attachment 3 – Security Classification Specification, DD Form 254. The Contractor shall maintain Internet and Secure Internet Protocol Router Network access within their facility. The Contractor shall have key personnel cleared for Secret information required to maintain knowledge of the current HGHS threat environment and any related improvements discovered by operational forces. The following Production Management functions are further defined and require data deliveries under the Data CLIN, CLIN 8000 of this contract:
3.1 Program Management Support
The Production Management Support functions are defined as follows:
3.1.1 Contract Management
The Contractor shall assign a qualified Program Manager (PM) who shall have complete responsibility for the planning, execution, control and reporting of all aspects of the program, and for directing in-house and subContractors’ efforts. The PM shall ensure that all requirements are applicable to the components/parts as specified herein for all items procured. The PM shall ensure that subContractors’, suppliers’ or vendors’ procedures are compliant with all SEWIP requirements.
The Contractor shall deliver an initial Integrated Master Schedule (IMS) IAW CDRL A001 within 60 days of contract award. The Contractor shall maintain the IMS as a management document from each CLIN award/exercise through its period of performance. The Contractor shall provide status updates to the IMS that describes the status of the planned IMS events and milestones, accomplishments, activities, and current and potential issues, if any, from CLIN award through its period of performance. The IMS shall provide most likely start dates and durations for each IMS activity and event, but shall also identify significant risk factors and their potential schedule impacts, when applicable. IMS updates shall be submitted IAW CDRL A002.
3.1.2 Government Furnished Information (GFI) /Government Furnished Property (GFP)/ Government Furnished Material (GFM)
The Contractor shall be provided with the Government Furnished Information (GFI) identified in Attachment 7.
GFI is provided as a baseline for Contractor efforts and for updating as required in order to meet the requirements of this contract. The Contractor shall be provided with the Government Furnished Property (GFP) identified in Attachment 5. Contractor compliance with Government Furnished Property requirements (see FAR 52.245-1) shall be reviewed periodically by Defense Contracts Management Agency, DCMA, which is the designated Government Property Administration Office. The Contractor shall be provided with the Government Furnished Material (GFM) identified in Attachment 14 for incorporation into production units. The Contractor shall inspect GFI/GFP/GFM within thirty (30) working days of receipt and maintain a status of and report deficiencies within any GFP IAW CDRL A003, GFI Deficiency Report. Upon contract completion, all GFP shall be accounted for by the Contractor via letter to the Contracting Officer’s Representative (COR).
3.1.3 Integrated Digital Data Environment
The Contractor shall use the Government furnished Integrated Digital Data Environment (IDDE) to transmit unclassified CDRLs and documents including the system design, integration and test engineering efforts, the Contractor's system engineering efforts, integrated logistics support efforts, and the Contractor's program management effort. The Contractor shall have its own private section within the IDDE that only Government personnel may access. These personnel shall be allowed access for program execution, CDRL and other document handling duties. All Contractor source data submitted in the IDDE shall be in native format unless otherwise specified.
3.1.4 Information Assurance Strategy
The Contractor shall implement Information Assurance processes in accordance with DoD Instruction 8500.2 “Information Assurance Implementation,” 6 FEB 2003 and comply with the guidance and technologies described in DoD Directive 8500.01E, "Information Assurance (IA)," 24 OCT 2002.
3.1.5 Configuration Management
The Contractor shall maintain a Configuration Management (CM) Program guided by MIL-HDBK-61A, and EIA- 649A. The Contractor shall identify obsolete components during procurement of material and document the results IAW CDRL A004 Source Data for Forecasting Diminishing Manufacturing Sources and Material Shortages (DMSMS). The Contractor shall install nomenclature and identifications plates in accordance with the drawings provided by the Government. The Contractor shall submit a request for Serial Number assignment for all production units per MIL-STD-196E. All necessary hardware items and system components shall be assigned a Unique Identification (UID).
3.1.5.1 Design Changes
In the event that the design of the system has to be permanently changed, an Engineering Change Proposal (ECP) IAW CDRL A005, Class I Engineering Change Proposal for Class 1 ECPs and CDRL A006, Class II Engineering Change Proposal for Class II ECPs will need to be submitted for approval. All ECPs shall be prepared IAW the approved Contract CM and requirements.
3.1.5.2 Notice of Revision (NOR)
The Notice of Revision is an ancillary document to the ECP. This form is used to document the drawing changes associated with the ECPs. NORs shall be submitted IAW CDRL A007, Notice of Revision (NOR).
3.1.5.3 Request for Deviation/Waiver
The Contractor shall submit a Request for Waiver (RFW) or a Request for Deviation (RFD), only as required. The request for waivers shall be submitted IAW CDRL A008, Request for Waiver (RFW). Requests for deviations shall be submitted IAW CDRL A009, Request for Deviation (RFD). These requests are called non-permanent design changes because they are only approved for a specific set of serial numbered Configuration Items and Systems.
Deviations are used to document specific Configuration Items and Systems that have components that do not meet the documented drawing requirements. Waivers are used to document Configuration Items and Systems that do not meet the documented Test Requirements, but are considered useful with degraded performance. Deviations and Waivers require approval by the Contracting Officer and will require contract consideration from the Contractor.
The Contractor shall submit proposed consideration with each RFD/RFW.
3.1.5.4 Software Trouble Reports
Software Trouble Reports shall be submitted IAW CDRL A010, Software Trouble Report Failure Analysis and Corrective Action Report (FACAR). This CDRL defines the forms that must be filled out in the event that the system software or firmware may need to be changed. Software Trouble Reports shall be generated for any HGHS software or firmware performance issue experienced.
3.1.6 Production Documentation Support
The Contractor shall deliver a Quality Assurance Plan IAW CDRL A011. The Contractor shall deliver a Configuration Management Plan IAW CDRL A012. The Contractor shall deliver a Handling Procedures for Electrostatic Discharge (ESD) Sensitive Devices IAW CDRL A013. The Contractor shall deliver a Counterfeit Prevention Plan IAW CDRL A014.
3.1.7 Post Award Conference
This conference shall take place within thirty (30) days after award of the contract at the manufacturer’s facilities.
The purpose of this conference is to acquaint the Contractor and government teams and to review the initial production plans. The Contractor shall deliver an agenda IAW CDRL A015 at least one (1) week before the date of the post award conference. The Contractor shall deliver meeting minutes IAW CDRL A016 not later than one (1) week after completion of the post award conference.
3.1.8 Production Readiness Review (PRR)
This review shall be held no later than 30 days after final Government acceptance of the last of the following documentation: CDRL A002, CDRL A004, CDRL A011, CDRL A012, CDRL A013, CDRL A014, CDRL A017, CDRL A018, CDRL A019, CDRL A021, and CDRL A022. The PRR shall demonstrate that the Contractor has accomplished adequate production planning without incurring unacceptable risks that breach thresholds of schedule, performance, cost, or other established criteria. The PRR also assesses the readiness of manufacturing processes, inspection and test process, and quality systems, including associated plans and procedures. The Production and test facilities will be toured by the Government and processes reviewed during this event. The Contractor shall deliver an agenda IAW CDRL A015 at least one (1) week before the date of the PRR. The Contractor shall deliver meeting minutes IAW CDRL A016 no later than one (1) week after completion of the PRR.
3.1.9 Physical Configuration Audit (PCA)
The Contractor shall conduct a Government-witnessed PCA. The PCA shall be held after the first production unit has completed First Article Testing, or Factory Acceptance Testing, as applicable. The PCA shall be conducted at the Contractor facility. The purpose of the PCA is to verify the as-built configuration matches the technical documentation and validate supporting processes. The PCA requires major disassembly of the first unit to a level which will allow for verification of all drawing defined configuration items and an in-depth review of the associated Product Drawings/Models and Associated Lists in comparison with the first unit. Any conflict between the Product Drawings/Models and Associated Lists and the first unit shall be identified, documented, and corrected. The Contractor shall develop and deliver a Physical Configuration Audit (PCA) Plan, based on EIA-649 and MIL- HDBK-61A, IAW CDRL A027, and shall conduct the PCA as defined by the Government accepted plan. The Contractor shall use the PCA Plan delivered as GFI as a baseline for the preparation of CDRL A027, updating only as required for successful PCA completion. The Contractor shall propose a PCA date at least sixty (60) days in advance and that is at a time when drawings, nomenclature, associated manuals, acceptance test plans and production representative hardware are available. The Contractor shall perform the approved PCA Plan on the first FRP unit produced. The Contractor shall report the results of the PCA IAW CDRL A028.
3.1.10 Quarterly Status Meeting/Conference
This meeting shall be held to update the Government on production progress and discuss any issues. This meeting shall be conducted via a phone conference call. The Contractor is responsible for setting up the phone conference facilities. If the discussion is classified, an on-site conference at the Contractor’s facilities is acceptable. The Contractor shall deliver an agenda IAW CDRL A015, at least one (1) week before the date of the meeting. The Contractor shall deliver meeting minutes IAW CDRL A016, no later than one (1) week after completion of the meeting.
3.1.11 Closeout Meeting
This meeting shall be held after the last production unit has been delivered and accepted. The Contractor shall deliver an agenda IAW CDRL A015 at least one (1) week before the date of the meeting. The Contractor shall deliver meeting minutes IAW CDRL A016 not later than one (1) week after completion of the meeting.
3.2 Engineering and Test Support
The Production Program Manager shall ensure that the associated Test Personnel, Equipment, and Facilities are used for all the required Production Tests: First Article Test Event, Qualification Tests, Factory Acceptance Tests, and Environmental Stress Screening Tests.
3.2.1 Environmental Stress Screening (ESS)
The Contractor shall prepare Environmental Stress Screening (ESS) Procedures and Implementation Plan IAW CDRL A017, Environmental Stress Screening (ESS) Procedures and Implementation Plan. The Contractor plan shall optimize finding and correcting defects beginning at the component level of assembly. One-hundred percent (100%) of the electrical/electronic hardware delivered shall be screened. A stress screen shall not be applied through a stress barrier (i.e., vibration screen through a shock mount). The Contractor shall perform Environmental Stress Screening IAW the approved Environmental Stress Screening Procedures and Implementation Plan. Results of ESS testing shall be documented IAW CDRL A020, Environmental Stress Screening Test Report.
3.2.2 Factory Acceptance Test
Factory Acceptance Test shall be conducted on all items delivered under the CLINs 0001, 0100, 0200, 0300, and 0400 (or any associated SLINs). The Contractor shall perform Factory Acceptance Testing IAW the approved Factory Acceptance Test Plan and Procedures. The Contractor shall own or have access to equipment and facilities capable of performing Factory Acceptance Testing. GFP identified in Attachment 5 shall be used in support of Factory Acceptance Testing. The Contractor shall use the Factory Acceptance Test Plan and Procedures provided as GFI as a baseline, updating only as required for successful Factory Acceptance Test completion. The Contractor shall submit desired updates to the Factory Acceptance Test Plan IAW CDRL A021. The Contractor shall submit desired updates to the Factory Acceptance Test Procedure IAW CDRL A022. The Contractor shall document the results of the Factory Acceptance Test Report IAW CDRL A023.
3.2.3 Failure Analysis/Corrective Action Report (FACAR) Generation
A FACAR shall be generated IAW CDRL A024 for each Configuration Item that fails during First Article or Factory Acceptance test events.
4 Provisioned Item Orders (PIO) (CLIN 0002) (NAVSEA) (APR 1999)
(a) General. The Contractor agrees that it will furnish the supplies or services ordered by the Government in accordance with the procedures specified herein. Orders will be placed by the Contracting Officer, Provisioning Activity or Administrative Contracting Officer as unilateral or bilateral modifications to this contract on SF 30, Amendment of Solicitation/Modification of Contract. Any amounts shown in Section B at time of award of the initial contract for each provisioned line item are estimated amounts only and are subject to upward or downward adjustment by the issuing activity. If no amounts are shown, funding will be obligated before or at time of order issuance. It is understood and agreed that the Government has no obligation under this contract to issue any orders hereunder.
(b) Priced Orders. For each proposed order, the Contractor agrees that it will submit such cost or pricing data as the Contracting Officer may require. Promptly thereafter, the Contractor and the Contracting Officer shall negotiate the price and delivery schedule for the proposed order. Upon execution and receipt of the priced order, the Contractor shall promptly commence the work specified in the order.
(c) Undefinitized Orders. Whenever the Contracting Officer determines that urgent demands or requirements prevent the issuance of a priced order, he/she may issue an unpriced order. Such order may be unilateral or bilateral and shall establish a limitation of Government liability, a maximum ceiling amount, and a schedule for definitization, as described in subparagraph (e)(2) below. Upon request the Contractor shall submit a maximum ceiling amount proposal before the undefinitized order is issued. The maximum ceiling amount is the maximum price at which the order may be definitized. The Contractor shall begin performing the undefinitized order upon receipt, except as provided in paragraph (d) below. The clause entitled "CONTRACT DEFINITIZATION" (DFARS 252.217-7027) shall be included in any undefinitized order.
(d) Rejection of Unilateral Orders. The Contractor may reject any unilateral order if the Contractor determines that it cannot feasibly perform the order, or if the Contractor does not concur with the maximum ceiling amount.
However, each unilateral order shall be deemed to have been accepted by the Contractor unless within fifteen days of issuance of the order, the Contractor notifies the Contracting Officer in writing of its rejection of the order.
(e) Definitization of Undefinitized Orders.
(1) The Contractor agrees that following the issuance of an undefinitized order, it will promptly begin negotiating with the Contracting Officer the price and terms of a definitive order that will include: (A) all clauses required by regulation on the date of the order; (B) all clauses required by law on the date of execution of the definitive order; and, (C) any other mutually agreeable clauses, terms and conditions. No later than sixty (60) days after the undefinitized order is issued, the Contractor agrees to submit a cost proposal with sufficient data to support the accuracy and derivation of its price; and, when required by FAR, cost or pricing data. If additional cost information is available prior to the conclusion of negotiations, the Contractor shall provide that information to the Contracting Officer. The price agreed upon shall be set forth in a bilateral modification to the order. In no event shall the price exceed the maximum ceiling amount specified in the undefinitized order.
(2) Each undefinitized order shall contain a schedule for definitization which shall include a target date for definitization and dates for submission of a qualifying proposal, beginning of negotiations and, if appropriate, submission of make-or-buy and subcontracting plans and cost or pricing data. Submission of a qualifying proposal in accordance with the definitization schedule is a material element of the order. The schedule shall provide for definitization of the order by the earlier of:
(i) a specified target date which is not more than 180 days after the issuance of the undefinitized order.
However, that target date may be extended by the Contracting Officer for up to 180 days after the Contractor submits a qualifying proposal as defined in DFARS 217.7401; or
(ii) the date on which the amount of funds expended by the Contractor under the undefinitized order exceed fifty percent (50%) of the order's maximum ceiling amount, except as provided in subparagraph (f)(3) below.
(3) If agreement on a definitive order is not reached within the time provided pursuant to subparagraph (e)(2) above, the Contracting Officer may, with the approval of the Head of the Contracting Activity, determine a reasonable price in accordance with Subpart 15.8 and Part 31 of the FAR, and issue a unilateral order subject to Contractor appeal as provided in the "DISPUTES" clause (FAR 52.233-1). In any event, the Contractor shall proceed with completion of the order, subject to the "LIMITATION OF GOVERNMENT LIABILITY" clause
(FAR 52.216-24).
(f) Limitation of Government Liability.
(1) Each undefinitized order shall set forth the limitation of Government liability, which shall be the maximum amount that the Government will be obligated to pay the Contractor for performance of the order until the order is definitized. The Contractor is not authorized to make expenditures or incur obligations exceeding the limitation of Government liability set forth in the order. If such expenditures are made, or if such obligations are incurred, they will be at the Contractor's sole risk and expense. Further, the limitation of Government liability shall be the maximum Government liability if the order is terminated. The "LIMITATION OF GOVERNMENT LIABILITY" clause shall be included in any undefinitized order.
(2) Except for undefinitized orders for Foreign Military Sales; purchases of less than $25,000; special access programs; and Congressionally-mandated long-lead procurements; and except as otherwise provided in subparagraph (f)(3) below, the limitation of Government liability shall not exceed fifty percent (50%) of the ceiling amount of an undefinitized order. In the case of orders within these excepted categories, however, the procedures set forth herein shall be followed to the maximum extent practical.
(3) If the Contractor submits a qualifying proposal (as defined in DFARS 217.7401) to definitize an order before the Government has obligated fifty percent (50%) of the ceiling amount, the Contracting Officer may increase the limitation of Government liability to up to seventy-five percent (75%) of the maximum ceiling amount or up to seventy-five percent (75%) of the price proposed by the Contractor, whichever is less.
(4) If at any time the Contractor believes that its expenditure under an undefinitized order will exceed the limitation of Government liability, the Contractor shall so notify the Contracting Officer, in writing, and propose an appropriate increase in the limitation of Government liability of such order. Within thirty (30) days of such notice, the Contracting Officer will either (i) notify the Contractor in writing of such appropriate increase, or (ii) instruct the Contractor how and to what extent the work shall be continued; provided, however, that in no event shall the Contractor be obligated to proceed with work on an undefinitized order beyond the point where its costs incurred plus a reasonable profit thereon exceed the limitation of Government liability, and provided also that in no event shall the Government be obligated to pay the Contractor any amount in excess of the limitation of Government liability specified in any such order prior to establishment of firm prices.
(g) Initial Spares. The limitations set forth in paragraph (c) and subparagraphs (e)(2), (f)(2) and (f)(3) do not apply to undefinitized orders for the purchase of initial spares.
(h) Terminal Date for Placement of Orders. The Contractor shall not be obligated to accept any orders placed hereunder beyond 180 days after delivery of the last end item.
(i) Segregation of Costs. The Contractor shall segregate the costs of performance of each undefinitized order from the cost of any other work performed by the Contractor.
5 First Article Test (CLIN 0003 - Option Item, If Exercised)
Exercise of this CLIN shall be at the discretion of the Government. If the option is exercised, the Contractor shall conduct a First Article Test (FAT) on the first unit produced on CLIN 0001. Production of subsequent units under
CLIN 0001 shall proceed in advance of FAT, as required in order to meet contract delivery requirements. The Contractor shall prepare and deliver the First Article Test Plan IAW CDRL A018. The Contractor shall prepare and deliver the First Article Test Procedures IAW CDRL A019. The Contractor shall prepare First Article Test Plan and Procedures using the First Article Test Plan and Procedures provided as GFI as a baseline, updating only as necessary to successfully complete FAT.FAT shall include all Factory Acceptance tests, as well as other additional testing deemed appropriate to ensure no negative system performance impacts result from the Contractor’s production and test processes. At a minimum, FAT will include Antenna Field of View Testing, System Sensitivity Testing and a 25 Hour Endurance Test. The Contractor shall conduct a FAT according to the approved First Article Test Plan (delivered as CDRL A018) and the approved First Article Test Procedures (delivered as CDRL A019).
The Contractor shall own or have access to equipment and facilities capable of performing the required First Article Testing. GFP identified in Attachment 5 shall be used in support of First Article Testing. The approved First Article Test Procedure will serve as the manufacturing standard for all units produced and delivered under this contract.
The Contractor shall correct all deficiencies found as a result of First Article Testing, by correcting all hardware delivered or in production subsequent to discovering the deficiencies. The Contractor shall document results of the First Article Test and report IAW CDRL A026.
6 Engineering Services (CLINs 0500, 0501, 0502, 0503, and 0504 - Option Items, if exercised)
The Contractor shall provide engineering services in support of the SEWIP Block 1B3 HGHS system. Engineering services may apply to hardware procured on this contract, or to software provided as GFI. Engineering services include, but are not limited to the following activities:
Providing engineering support services to the Government for land-based and shipboard test events;
Providing engineering support to update software after hardware acceptance, including information assurance requirements;
Providing support for system Trouble Report adjudication and repairs resulting from hardware, firmware and software issues;
Providing support to the Government for development and update of ship specific installation drawings and industrial test procedures;
Providing support in the use and maintenance of land-based systems
Software updates, if required, shall use the operational software, software version description and software user’s manual delivered as GFI as a baseline. Updates shall be delivered IAW CDRLs A036, A037 and A038, respectively.
Engineering services tasking may include a requirement for a technical report at the conclusion of the effort.
Reporting, if required, shall be delivered IAW CDRL A039.
7 Field Engineering Services (CLIN 0600, 0601, 0602, 0603 and 0604 - Option Items, if exercised)
The Contractor shall provide Field Engineering Services in support of the SEWIP Block 1B3 HGHS systems. Field Engineering Services include, but are not limited to the following activities:
Support for installation of SEWIP Block 1B3 HGHS units to be installed at a Government land-based facility or on a ship platform;
Providing engineering support services to the Government for land-based and shipboard test events.
Field engineering services tasking may include a requirement for a technical report at the conclusion of the effort.
Reporting, if required, shall be delivered IAW CDRL A039.
8 Travel in Support of CLINs 0500 and 0600 series (CLIN 0700, 0701, 0702, 0703 and 0704 – Option Items, if Exercised)(COST ONLY)
The Contractor shall be reimbursed for its actual transportation costs incurred in the performance of CLINs 0500, 0501, 0502, 0503, 0504, 0600, 0601, 0602, 0603, and 0604.
9 Data (CLIN 8000)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto. The Government shall retain Government Purpose Data Rights on all Contractor delivered data.
The Contractor shall update the Technical Data Package, originally provided as GFI, as required to account for differences identified as a result of the PCA or from other configuration changes approved during FRP. The Contractor shall deliver the updated Technical Data IAW CDRLs A029 – A039. Updates to the TDP shall be in accordance with MIL-STD-31000A and ANSI/ASME Y14, including native CAD File updates, as applicable.
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
252.219-7004 Small Business Subcontracting Plan (Test Program) OCT 2014
The following have been deleted:
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-14 Limitations On Subcontracting NOV 2011 52.222-29 Notification Of Visa Denial JUN 2003
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been added by reference:
252.234-7004 Cost and Software Data Reporting System--Basic (Nov 2014) NOV 2014
Section L - Instructions, Conditions and Notices to Bidders
1.0 GENERAL
The Government intends to award a contract that results from this solicitation to the responsible offeror whose proposal is the most advantageous to the Government under the selection criteria set forth in Section M of the solicitation. The Government may reject any or all proposals if such action is in the Government’s interest.
Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
The offeror shall submit all information required by this RFP. Failure to comply with the terms and conditions of the RFP may result in the offeror being removed from consideration for award. The offeror’s proposal shall be based on the requirements contained in this RFP (including those documents, exhibits, and other attachments to the RFP identified in Section J).
The Government intends to evaluate proposals and award one contract. In accordance with the clause FAR 52.215- 1, Instructions to Offerors - Competitive Acquisition, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. At the end of discussions, if they occur, the Government will request Final Proposal Revisions (FPRs) from all Offerors still within the competitive range. Each Offeror is required to complete Attachment J- 17, Contractor Award Information, in its entirety and provide it along with the proposal submission. Attachment J-17 will not count against the proposal page count limitations.
The solicitation will be announced on FEDBIZOPPS and be made available only through the internet at:
https://www.fbo.gov/
Offerors are hereby notified that from time to time, the Government may post additional information to the website relating to this solicitation (e.g. responses to questions, amendments, etc.). It is the offeror’s responsibility to check the web site for any such information.
All questions shall be submitted in accordance with Attachment 13 and sent via email to dana.cahill@navy.mil and mike.kilbane@navy.mil, subject line should contain: N00024-14-R-5352 RFP Questions. All such questions shall be submitted electronically, in writing within thirty (30) days after release of the RFP to allow the Navy adequate time to prepare and issue responses to all offerors prior to the date and time set for receipt of proposals. Only questions transmitted electronically will receive a response. It is the Government's intention that questions and responses will be provided via an amendment to the solicitation or posted directly to FEDBIZOPPS. The Navy will continue to accept questions up to the closing date and time of the solicitation; however, time may not permit responses to be issued prior to receipt of proposals for questions received after the time set forth above.
PRE-AWARD SITE SURVEYS
The Government may schedule Pre-Award Site Surveys of the facilities identified in any or all Offerors' proposals following the proposal submission date.
USE OF NAVY SUPPORT CONTRACTORS
The Government plans to use selected support contractor personnel to assist in providing Subject Matter technical expertise. These support contractors will be bound by appropriate non-disclosure agreements (NDA) to protect proprietary and source-selection information.
Government Support Contractors may assist the Source Selection Organization. The Source Selection Advisory Council (SSAC), Source Selection Evaluation Board (SSEB), and Cost/Price Analysis Team (CPAT) will be composed of Government employees only. The Government Support Contractors may participate as Advisors (Subject Matter Experts) to the SSEB and the CPAT.
The Offeror may wish to enter into non-disclosure agreements with Solutions Development Corporation and Technomics, Inc. If the Offeror does so, it must provide copies of any such agreements with its proposal. A list of the Contractor organizations that may participate and their intended source selection support role is as follows:
Solutions Development Corporation – Technical and Engineering Advisors
Technomics, Inc. – Cost Advisors
2.0 INSTRUCTIONS FOR SUBMISSION OF OFFERS:
The solicitation response will be contained in four (4) separate volumes:
Volume I Executive Summary
Volume II: Technical Proposal (Factor 1 including Subfactors 1-3 and Factor 2) Volume III: Past Performance (Factor 3) Volume IV: Price Proposal (Factor 4)
For each volume, the number of copies required and the page limits are shown in the table below. Instructions for paper and electronic files are detailed below in sections 2.1.1 and 2.1.2, respectively. Offerors are hereby notified that the content of electronic copies of the proposal must be identical to the original hard copy proposal submitted in response to this solicitation. In the event of discrepancies between the two, the content of the original hard copy will prevail. All data submitted shall be unclassified.
2.1 PROPOSAL FORMAT AND DELIVERY:
Volume Title Page
Limit Paper Copies
(ORG/COPY)
Electronic File(s) on
CD-ROM
(ORG/COPY)
I Letter of Transmittal
1 1/1 1/2
I Executive Summary 5 1/1 1/2 II Technical Proposal 100 1/1 1/2 III Past Performance 12 1/1 1/2 IV Price Proposal None 1 /1 1/2
Offerors must comply with the detailed instructions for the format and content of the proposals. Proposals that do not comply shall be considered nonresponsive, and shall render the offeror ineligible for award. In order to maximize efficiency and minimize the effort involved in the Proposal evaluation process, all offerors shall submit their proposals in accordance with the format presented below.
The title page of each volume shall contain:
Cover and title page Title of proposal and proposal number as applicable Offeror’s name, address and POC Date of Submittal RFP Number Volume Number and Title (e.g., Volume II – Technical Proposal (Part 1)) Copy Number DUNS Number and CAGE Code of the offeror
The Proposal Volumes I through IV shall include the following information (as well as using tabs and dividers), which is not included in the page limit:
Description Title Page Table of Contents (The table of contents must provide sufficient detail to enable easy location of important elements)
List of Figures List of Tables Glossary of Abbreviations and Acronyms
Duplicated information within a given factor may be included in full once and referenced thereafter, as long as there is a clear reference to the duplicated information. If the duplicated information is for different evaluation factors then it must be included in full text individually under each factor.
2.1.1 Paper Format:
Each volume shall be bound separately and shall not exceed the page limitation cited above. Each volume of the proposal shall be bound in three ring binders to permit removal of sections with each major part tabbed. The offeror’s company name shall appear at the top of each page in the header section. Legibility, clarity, and compliance with the requirements of the solicitation are essential. Failure to provide the requested information may adversely affect the Government’s evaluation of the offeror.
The material in all four (4) Volumes of the offeror’s proposal shall be typed or printed in a font with the type no smaller than size 12 Times New Roman font on standard 8-1/2 by 11 inch paper. Text line spacing shall be one (1) line. One-inch margins on each side, including top and bottom are required. Text within tables, diagrams, pictorial charts, or graphic material may use 8-point font. Fold-out pages may be used for diagrams, charts or graphic material only and may not exceed 11 inches by 17 inches. Fold-out pages will be counted as two (2) pages; double-sided fold-out pages will be counted as four (4) pages.
Unless otherwise specified, fold out pages may only include narrative sufficient to describe the diagram, chart or graphic material. Every figure and table shall be numbered. Paragraphs shall be clearly formatted. Proposal material shall be presented on double-sided pages only. Each double-sided page counts as two (2) pages.
A date shall be placed on each page of the proposal corresponding to the date of the initial proposal in the footer section. Any pages that may be revised as a result of discussions or correspondence (if required) shall contain revision numbers and dates.
The page count shall include all material (printed matter and figures) except where explicitly stated and does not include cover pages, title pages, Table of Contents (TOC), lists of figures and tables, tab pages, index pages, Integrate Master Schedule (IMS), Glossary of Abbreviations and Acronyms, and the Cross Reference Matrix (CRM). Pages excluded from the page count must contain only material pertinent to the page heading or be blank and marked "Intentionally Left Blank." Index pages and Tabs are required and shall be cross-referenced to the TOC.
Every page, except those marked as blank, shall be numbered. Pages exceeding the page count shall be removed from the end of the Volume that exceeds the page count and will not be evaluated.
The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the Offeror’s proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information. The Offeror’s CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments. The CRM does not count against any of the proposal page limitations.
Each factor and volume shall be written to the greatest extent possible on a stand-alone basis so that its content may be evaluated with a minimum of cross-referencing to other factors and volumes of the proposal. Cross-referencing within a given factor is permitted where its use would conserve space without impairing clarity. In the event an offeror decides to cross reference information, it is the responsibility of the offeror to include the information in full and provide clear references to that information in other portions of the factor where the offeror would like the evaluators to consider any duplicated information. Nevertheless, offerors are reminded of their burden to present its capability in a manner that is clear for evaluators.
EXAMPLE OF A CROSS REFERENCE MATRIX (CRM)
Section L – Proposal Instructions Government SOW
Section M – Evaluation Factor Offeror’s Proposal Reference
CLIN
Reference
Volume II Technical
Example: Section C, SOW, Para 4.0, First Article Test
Note: This column shall address applicable paragraphs within the SOW.
Factor 1, Subfactor 2
Provide reference to Offeror’s Proposal Volume II – Technical.
Example: Refer to appropriate page number in Offeror’s written proposal.
2.1.2 Electronic Files:
The electronic files shall be uncompressed and shall be submitted on CD-ROM formatted for Microsoft Office; text shall be prepared using Microsoft Word compatible applications; and spreadsheets, worksheets, or workbooks shall be prepared using Microsoft Excel compatible applications. Electronic files shall only consist of the following extensions:
….docx for Microsoft Word 2010 files, and ….xlsx for Microsoft Excel 2010 files ….pptx for Microsoft PowerPoint 2010 files ….pdf for Adobe Acrobat 9.0 files ….mppx for Microsoft Project 2010 files
Graphics, tables, photographs, and other data beyond the capability of Microsoft Word ; or Microsoft PowerPoint may be submitted in Adobe Acrobat 9.0 format. A directory listing of the disk shall accompany the submission with a listing of file names and content of each file. Pricing data and technical data must be provided on separate CD-ROMs. A separate folder shall be used for each proposal volume. Three (3) electronic submissions of each volume shall be provided on CD-ROM. Each disk shall be labeled as follows:
Date Volume # Offeror Company Name, City, State Offeror POC Offeror POC Phone # Date of Submission Appropriate Security Classification markings and handling instructions.
Note that the electronic files shall be unclassified.
Three (3) complete sets of Compact Disc (CD) shall be provided, one (1) marked “ORIGINAL” and the other two
(2) marked “BACKUP 1” and “BACKUP 2,” respectively. Offeror shall not embed sound or video files into the electronic files. Offerors shall certify that Compact Disc(s) are virus-free in the letter of transmittal.
Videos shall not be submitted. Video shall not be embedded on the CD-ROM.
The electronic spreadsheets shall not be compiled or password protected; all cells and formulas shall be visible, editable, and unprotected. Offerors shall not establish links referencing other spreadsheet files not included with the proposal.
2.1.3 Proposal Submission:
Proposal submission shall be as follows:
(1) All copies of all proposal volumes shall be submitted to the following address at or before the date and time in Block 9 of the SF 33.
All offers should be marked as follows:
Commander ATTN: Dana Cahill Naval Sea Systems Command SEA 02534 Washington Navy Yard 1333 Isaac Hull Avenue S.E.
Washington, D.C. 20376
RFP#:N00024-14-R-5352
DO NOT OPEN IN MAIL ROOM
Proposal shall not be submitted via fax or email. No pricing information shall be included in the offeror's Letter of Transmittal, Executive Summary, or in any part of its submitted volumes, except the Price Proposal Volume IV.
Letters of Transmittal are merely instruments for submitting proposals; they are not part of the page count and will not be evaluated.
Although legible, neat, orderly, and comprehensive proposal(s) are required, elaborate brochures or other presentations beyond that to present a complete and effective explanation are not desired. Elaborate artwork, expensive visual or other presentation aids are neither necessary nor desired.
The proposal shall contain all the pertinent information in sufficient detail to permit evaluation. Information shall be confined to the appropriate volume to facilitate independent evaluation. The proposal shall be detailed and complete as to clearly demonstrate that the offeror has a thorough comprehension of all management, technical, and other requirements. The proposal should be clear and concise, logically assembled and indexed and cross-indexed to applicable parts of this Solicitation/Request for Proposals as appropriate. If an offeror fails to comply with content requirements, its proposal may be downgraded for failure to follow instructions.
Offerors hand carrying proposals shall call Ms. Dana Cahill at (202) 781-5162 and Mr. Mike Kilbane at 202- 781-1395 at least 48 hours prior to arriving at the Naval Sea Systems Command, Washington Navy Yard, to make delivery arrangements. Packages should not be sealed as they are subject to inspection.
2.2 SOLICITATION PACKAGE PROPOSAL CONTENT:
(a) The offer shall include the following in the cost volume:
Standard Form 33, “Solicitation, Offer, and Award,” with blocks 12 through 18…
This is the start of the file's text. The full file is on GovTribe.