Attachment_2_POT-TS1147_-_Alignment_for_LARS.PDF

PDF 261 KB Posted

Attached to
Malaysian SITS Federal contract opportunity
Solicitation number
N00024-13-R-4406
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Attachment 2 Alighment for LARS

View the file

Other files for this federal contract opportunity

Other files attached to Malaysian SITS, newest first.
File Type Posted
13R4406_Amend_0002.pdf PDF
Malaysian_SITS_Bidder's_QA_9-30-13.pdf PDF
NAVSEA_ltr_Ser_391r-0164_29OCT12.pdf PDF
NAVSEA_ltr_Ser_394-0815_01DEC11.pdf PDF
NAVSEA_Ltr_Ser_394-0010_08JAN10.pdf PDF
13R4406_Amend_0001.docx DOCX document
Attachment_6_-_Table_L.xlsx XLSX spreadsheet
N00024-13-R-4406_SITS_RFP_Final.docx DOCX document
SITS_CDRLs.pdf PDF
Attachment_2_POT-TS1149_-_Load_Test.pdf PDF
Attachment_2_POT-TS1148_-_Alignment_for_ATP.PDF PDF
Attachment_2__POT-TS1146_-_Weight_and_Center_of_Gravity.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Test Procedure POT-TS1147

SRS ELEMENT INTEGRATION VERIFICATION CHECK

of the

LARS Base Load Spreading Engineering Change (LSEC)

OII Document TM305123, Rev A for the

SUBMARINE RESCUE DIVING AND

RECOMPRESSION SYSTEM (SRDRS) PROGRAM

Prepared for:

NAVAL SEA SYSTEMS COMMAND

ADVANCED UNDERSEA SYSTEMS, PMS-394RR

SUBMARINE RESCUE DIVING AND RECOMPRESSION SYSTEM

Contract Number N00024-05-C-4208

Prepared by:

Oceaneering International, Inc.

7001 Dorsey Road

Hanover, MD 21076

SRDRS Document

DISTRIBUTION STATEMENT A;

Approved for public release; distribution is unlimited.

LARS Base LSEC SRS Element Integration Check

TM305123 Revision A

Change Record ECO # Revision OQE Date 04144 - 2/24/10 04557 A 12/17/10

1.0 Purpose

1.1 The purpose of this test is to verify the critical interface dimensions for both the RCS and TUP configurations.

2.0 References and Prerequisites

2.1 References

NOTE

The most current revision of the referenced document shall be used to ensure up-to-date information is used for the performance of this test procedure. Indicate document revision in space provided.

2.1.1 NAVSEA Drawing 7412876 (-), Rev: _____; LARS Base LSEC General Arrangement

2.2 Prerequisites

The following prerequisites, or the applicable portions of, shall be satisfactorily completed prior to starting the performance of this test procedure.

2.2.1 Verify all equipment has been installed in accordance with reference 2.1.1 and is ready to test.

Signature Date

3.0 General Notes

3.1 All data observed during the performance of this test must be regarded as significant. If sufficient space is not provided for the recording of required test data, it should be made on an attachment to the test procedure.

3.2 Completed test procedures shall be completely filled in, dated, signed and/or initialed at each entry as indicated. If certain data called for is not recorded, an entry shall be made in Section 6.0 explaining the missing information.

3.3 Any substitution of components or equipment during the course of the test must carry complete documentation, i.e. cleanliness, calibration information, etc. This information shall be recorded in the applicable sections of the test procedure.

3.4 Discrepancies and/or omissions encountered during the performance of this test shall be reported to the engineer responsible for the component/system. The discrepancy or omission shall be recorded in Section 6.0.

3.5 Deviations from this test procedure or changes in the installation from approved drawings shall not be made without prior approval from the engineer responsible for the system. Deviations must be recorded in Section 6.0 and ultimately must be approved by all reviewers of the test procedure.

3.6 Where tolerances are specified for the test data, every effort shall be made to meet such tolerances. Where not possible, the engineer responsible for the system shall be notified immediately. Any changes to the specified tolerances will require concurrence from the engineer responsible for the system.

3.7 All minor changes made during the performance of the test must be recorded in Section

6.0. Actual changes shall be initialed and dated by the engineer responsible for the system.

4.0 Test Equipment, Consumables and Miscellaneous Topics

4.1 Calibrated Test Equipment

4.1.1 None.

4.2 General Test Equipment

4.2.1 Measuring device capable of measuring up to 37’ +/- 1/16” or better.

4.2.2 50’ of fluorescent string or laser device to hold a straight line between points.

4.2.3 2-3’ flat metal square to aid in measuring from a recessed edge.

4.2.4 ISO latch datum aids as shown in Section 7.1 in the amounts shown in the BOM and detail (12 total).

4.3 Test Consumables

4.3.1 None.

4.4 Safety Precautions

4.4.1 All applicable company safety regulations and requirements shall be followed during the performance of this test.

4.5 Hazardous Material/Waste Notes

4.5.1 None.

5.0 Test Procedure

Use reference 2.1.1 and attached figures to locate components and sub-assemblies.

See Figure 4 for identification of the ISO latch datum aids.

Dimensions taken from ISO latch mounts are to be from the tip of the ISO latch datum aids.

5.1 Install the ISO latch datum aids into their respective bolt patterns (i.e. install the HPU datum aids into where the HPU ISO latch mounts, etc.)

5.2 Create/find a horizontal reference plane using the ISO latch datum aids SDC2, SDC4 and DC6.

5.3 Create a global centerline plane which runs through center of 4 inch block on aft fixture and midway between innermost alignment pins on forward fixture and is perpendicular to the horizontal reference plane.

5.4 Measure and record all dimensions in Table 1. Use Figure 1 through Figure 5 as a reference to where the specific dimensions are taken from. See notes below for information regarding the measurement of each dimension.

Table 1 Dimension Measurement (Inches) Requirement

(Inches) Ai FORWARD: AFT: N/A Ao FORWARD: AFT: N/A

Aave FORWARD: AFT: 192.0 +/- .25 Bi FORWARD: AFT: N/A Bo FORWARD: AFT: N/A

Bave FORWARD: AFT: 96.0 +/- .25

C PORT: STBD: 16.8 +/- .75

D PORT: STBD: 73.56 +/- .41

E PORT: STBD: 219.00 +/- .41

F PORT: STBD: 48.6 +/- .19

G FORWARD: MIDDLE:

AFT: HPU:

89.00 +/- .34

H FORWARD: MIDDLE:

AFT: HPU:

44.50 +/- .25

I APORT: ASTBD:

FPORT: FSTBD:

<.125

J PORT: STBD: Difference < .125

K PORT: STBD: Difference < .125 L 94.0 +/- .13 M 47.0 +/- .13

N STBD (TUP): PORT (TUP):

STBD (RCS): PORT (RCS):

141.35 +/- .47

156.53 +/- .68

O 365.0 +/- .34

P PORT: STBD: 182.52 +/- .25

Q PORT: STBD: 89.00 +/- .34

R PORT: STBD: 67.35 +/- 0.5

S PORT: STBD: Difference < .125

T PORT: STBD: 231.6 +/- .13

U DC1: DC4:

DC2: DC5:

DC3:

0.0 +0/-.13

V SDC1: SDC3: 0.0 +/- .19

W HPU1 (RCS): HPU2 (RCS):

HPU1 (TUP): HPU2 (TUP):

0.0 +/- .19

X HPU3: HPU4: 2.00 +.19/-0

Y 0.0 +/- .25

Z PORT: STBD: 0.0 +/- .35

AA 387.3 +/- 1.0

BB PORT OUTBRD: STBD OUTBRD:

PORT INBRD: STBD INBRD:

384.3 +/- .75

CC PORT: STBD: 92.9 +/- 0.25

DD PORT: STBD: 88.8 +/- 0.25

EE 435.9 +/- 1.0

Signature Date

Ai. Dimension between inside of port and starboard bearing block bosses (measure 2 times:

forward, aft).

Ao. Dimension between outside of port and starboard bearing block bosses (measure 2 times:

forward, aft).

Aave. Calculate as (Ai + Ao)/2 (evaluate 2 times: forward, aft)

Bi. Distance from global centerline to inside of bearing block bosses (measure 2 times: forward, aft).

Bo. Distance from global centerline to outside of bearing block bosses (measure 2 times: forward, aft).

Bave. Calculate as (Bi + Bo)/2 (evaluate 2 times: forward, aft)

C. Distance from edge of bearing block boss to deck cradle ISO latch datum aids (DC6 & DC5)

D. Distance between deck cradle ISO latch datum aids (port: DC6 to DC3, stbd: DC5 to DC4)

E. Distance between deck cradle ISO latch datum aids (port: DC6 to DC2, stbd: DC5 to DC1)

F. Distance from forward deck cradle ISO latch datum aids to SDC ISO latch datum aids (line Z) (measure 2 times: DC2 to Z, DC1 to Z – see note Z).

G. Distance between deck cradle ISO latch datum aids, distance between HPU ISO latch datum aids (measure 4 times: DC1-DC2, DC4-DC5, DC5-DC6, HPU1-HPU2)

H. Distance between deck cradle ISO latch datum aids and global centerline, distance between HPU ISO latch datum aids and global centerline (measure 4 times: forward, middle, aft, HPU)

I. Measure straightness of bearing blocks by drawing straight line along forward edge of hole from the most outboard edges (measure 2 times each for forward bearing blocks and aft bearing blocks)

J. Diagonal distance between aft and forward deck cradle ISO latch datum aids (measure 2 times:

port: DC6-DC1, stbd: DC5-DC2). Requirement is based on the difference between port and stbd measurements.

K. Diagonal distance between middle and forward deck cradle ISO latch datum aids (measure 2 times: port: DC3-DC1, stbd: DC4-DC2) Requirement is based on the difference between port and stbd measurements.

L. Distance between HPU clamp brackets (measured from midpoint between mounting holes)

M. Distance between HPU clamp bracket and global centerline (measured from midpoint between mounting holes)

N. Distance between forward deck cradle ISO latch datum aids (DC1/DC2) and HPU support beam ISO latch datum aids (HPU1 & HPU2) (measure 4 times: TUP stbd, TUP port, RCS stbd, RCS port)

O. Distance between SDC ISO latch datum aids (SDC2 and SDC4)

P. Distance between outboard SDC ISO latch datum aids and global centerline (measure 2 times:

port, stbd)

Q. Distance between SDC ISO latch datum aids (measure 2 times: port, stbd)

R. Distance from forward deck cradle ISO latch datum aids to HPU clamp bracket bolting holes (measure 2 times: port, stbd)

S. Diagonal distance between bearing blocks (measure 2 times). Requirement is based on the difference between port and stbd measurements.

T. Distance between bearing block axis. Measure from forward edge of hole – same edges as line

(I) is measured from (measure 2 times: port, stbd).

U. Deck cradle ISO latch datum aid elevation variation (measured from reference plane).

V. Difference in elevation between inboard SDC ISO latch datum aids (SDC1 & SDC3) with respect to reference plane.

W. Difference in elevation between reference plane and HPU support beam ISO latch datum aids

(HPU1 & HPU2).

X. Difference in elevation between reference plane and HPU support beam pads (HPU3 & HPU4

– center of pad).

Y. Measure straightness of forward fixture bosses by drawing straight line between outermost bosses. Measure from stbd to port.

Z. Measures straightness of SDC ISO latch datum aids by drawing a straight line between the outermost port/stbd SDC ISO latch datum aids (SDC2 & SDC4).

AA. Overall width of bases as installed.

BB. Overall length of each base (4 bases).

CC. Width of outboard bases (port and starboard).

DD. Width of inboard bases (port and starboard).

EE. Overall length as installed.

6.0 Notes and Test Review

6.1 Notes. List any changes or deviations from this test procedure, along with justification.

6.2 Reviewer Notes. Test reviewer shall verify the test performed has met the objectives of the test procedure.

Reviewing Engineer’s Signature Date

Figure 1

Figure 2

Figure 3

Figure 4

Figure 5

7.1 ISO latch mount datum aid detail

Notes: Tolerances are 0.005 for 3 place and 0.03 for two place dimensions.

Test Procedure POT-TS1147
SRDRS Document