N0001924R0007Amendment0004.pdf
PDF 370 KB Posted
- Solicitation number
- N0001924R0007
About this file
This document is a contract modification (Amendment 0004) for Solicitation N0001924R0007 issued by the Naval Air Systems Command (NAVAIR) for the procurement of services to support the upgrade of T56-A-16 Power Section Engine Modules to the T56-A-16A (Series 3.5) configuration for C/KC-130T aircraft.
The key changes in this amendment include: extending the proposal due date from June 27, 2024 to July 5, 2024; replacing the previous versions of the Performance Work Statement (PWS) and Contract Data Requirements List (CDRL) with updated versions; posting questions and answers from industry; and revising Section J to reference the updated attachments. The solicitation is a total small business set-aside for an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract with a 4-year ordering period. The planned award timeframe is October 2024 - May 2025.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Proposal due date is hereby updated as 2:00 PM local (Eastern) time from 27 June 2024 to 5 July 2024. All questions to the solicitation shall be received by 2:00 PM 14 June 2024. Attachment 1 PWS dated 20 May 2024 is replaced w ith Attachment 1 PWS dated 6 June 2024 to clarify paragraphs 5.1, 6.0 and 6.1. Exhibit A dated 14 February 2024 is replaced w ith Exhibit A dated 6 June 2024, specif ically all CDRLs w ere updated to incorporate a new email address for Block 14 and A004 included an update Block 5. Section J of Solicitation N0001924R0007 is revised to reference the updated Attachment 1 PWS dated 6 June 2024 and Exhibit A dated 6 June 2024. Questions 1 – 33 from industry are posted to the PIEE Solicitation Module w ith Amendment 0004.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jun-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0001924R0007
X 9B. DATED (SEE ITEM 11)
04-Apr-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jun-2024
CODE
NAVAL AIR SYSTEMS COMMAND
AIR-2.3.2.5
21936 BUNDY ROAD BLDG 442
PATUXENT RIVER MD 20670
N00019 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0001924R0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Jun-2024 02:00 PM to 05-Jul-2024 02:00 PM.
The number of offeror copies required has increased by 1 from 0 to 1.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
EXHIBITS AND ATTACHMENTS
DOCUMENT
TYPE
DESCRIPTION DATE
Exhibit A Contract Data Requirements List 6 Jun 2024 Attachment 1 PWS 6 June 2024 Attachment 2 Draft TD 3.5 Upgrade 14 Feb 2024 Attachment 3 Annual Unit Prices by Contract Year and Annual Labor Hour Wrap
Rates for Over and Above CLINs TBD- To Be Inserted at Contract Award
Attachment 4 Estimated Annual Ordering Quantities by Contract Year 14 Feb 2024 Attachment 5 Contract Cost and Software Data Reporting (CSDR) Plan (DD Form
2794) (draft) 28 Nov 2023
Attachment 6 Contract Resource Distribution Table (RDT) (draft) 14 Feb 2024 Attachment(s)1 Area Wage Determination(s) (AWDs) and Collective Bargaining
Agreement(s) (CBAs)1 TBD- To Be Inserted at Contract Award
1Each relevant AWD and CBA will become a Section J attachment. The Contractor shall perform in compliance with the current version of each relevant AWD and CBA.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .