Att L-5 Vol 4 P-1 Price 20240214.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
C/KC-130T T56 Series 3. 5 Engine Kit Installation Upgrade
Solicitation number
N0001924R0007
Issued by

About this file

This document appears to be an attachment titled "Att L-5 Vol 4 P-1 Price 20240214.xlsx" that provides pricing instructions and a pricing sheet for Solicitation N0001924R0007, a competitive solicitation issued by the Naval Air Systems Command (NAVAIR) for the procurement of services to support the upgrade of U.S. Navy T56-A-16 Power Section Engine Modules to the T56-A-16A (Series 3.5) configuration for C/KC-130T aircraft.

The pricing sheet includes unit prices for specified contract line items (CLINs) and sub-line items (SLINs) over a 4-year ordering period, as well as estimated labor hours, labor rates, and material costs for over and above CLINs. The document also includes instructions for completing the pricing sheet and indicates that the annual unit prices and labor rates from this attachment will be incorporated into the contract as attachments. Proposals for this total small business set-aside IDIQ contract are due by 2:00 pm Eastern Time on June 6, 2024, with a planned award timeframe of October 2024 through May 2025.

View the file

Other files

File Type Posted
N0001924R0007Amendment0008.pdf PDF
N0001924R0007ConfThruAmendment0008.pdf PDF
N0001924R0007Amendment0007.pdf PDF
N0001924R0007ConfThruAmendment0007.pdf PDF
N0001924R0007ConfThruAmendment0006.pdf PDF
N0001924R0007Amendment0006.pdf PDF
Q-A 1-37_Amend 0006.pdf PDF
N0001924R0007ConfThruAmendment0005.pdf PDF
N0001924R0007Amendment0005.pdf PDF
Q-A 1-34_Amend 0005.pdf PDF
Exhibit A_20240606.pdf PDF
Q-A 1-33_Amend 004.pdf PDF
Att (1) PWS 20240606 with Enclosures.pdf PDF
N0001924R0007ConfThruAmendment0004.pdf PDF
N0001924R0007Amendment0004.pdf PDF
Q-A 1-13.pdf PDF
Att(1) PWS 20240520 with Enclosures.pdf PDF
N0001924R0007Amendment 0003.pdf PDF
N0001924R0007ConforThruAmendment0003.pdf PDF
N0001924R0007ConfThruAmendment0002.pdf PDF
N0001924R0007Amendment0002.pdf PDF
Att L-3 Vol 3 PPQ 20240430.docx DOCX document
Q-A 1-8.pdf PDF
N0001924R0007ConfThruAmendment0001.pdf PDF
Att (1) PWS 20240430 with Enclosures.pdf PDF
N0001924R0007Amendment0001.pdf PDF
Att L-2 Vol 2 T-1 CRM 20240214.xlsx XLSX spreadsheet
N0001924R0007.pdf PDF
Att L-6 Vol 5 KA Tables 20240214.xlsx XLSX spreadsheet
Exhibit A 20240214.pdf PDF
Att L-3 Vol 3 PPQ 20240214.docx DOCX document
Att L-1 Vol 1 ES Tables 20240214.xlsx XLSX spreadsheet
Att L-4 Vol 3 PP-1 PP Cont Data 20240214.xlsx XLSX spreadsheet
ATT 6 Contract RDT 20240214.pdf PDF
Att (1) PWS 20240214 with Enclosures.pdf PDF
Att 4 Est Annual Ordering Qty by Contract Year 20240214.pdf PDF
Att L-7 DOD Safe File List 20240308.pdf PDF
Att 5 CSDR Plan 20231128.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions: For the purposes of this table, the Offeror shall provide the following information for this solicitation:

Row 2 Fill in the Offeror's Name.

Columns
E, F, I, J, M, N, Q, and REnter unit prices for SLIN 0001AA, SLIN 0001AB, and CLIN 0003, rounded to the whole cent, for each year into the yellow cells (For SLIN 0001AA insert a unit price in Contract Year 1 only). Enter the labor category title ("wrap rate title") for each Over and Above CLIN (0002 and 0004) under Contract Year 1 (wrap rate titles will autimatically populate for Contract Years 2-4). Enter the fully-burdened labor hour rate ("wrap rate"), rounded to the whole cent, for Over and Above CLINs 0002 and 0004 for each contract year into the yellow cells. Estimated labor hours and material prices are provided for Over and Above CLINs 0002 and 0004 for each year. The wrap rates inserted by the Offeror within Tab "Att. L-5 Pricing Sheet", are applied to the estimated labor hours per year to develop the estimate labor prices for Over and Above CLINs 0002 and 0004. The sum of the estimated labor prices and estimated material prices for Over and Above CLINs 0002 and 0004 for each year will automatically populate in the CLIN pricing table of Tab "Att. L-5 Pricing Sheet" as the Lot value for CLINs 0002 and 0004 for each year.

The annual unit prices by contract year and annual labor hour wrap rates/ wrap rate titles for CLINs 0002 and 0004 from Tab "Att. L-5 Pricing Sheet", will automatically populate into Tab “Attachment 3”. This will become the Basic IDIQ Contract Attachment (3), "Annual Unit Prices by Contract Year and Annual Labor Hour Wrap Rates for Over and Above CLINs". The estimated annual ordering quantities by contract year and CLIN/SLIN from Tab "Att. L-5 Pricing Sheet", automatically populates into Tab “Attachment 4”. This will become the Basic IDIQ Contract Attachment (4), "Estimated Annual Ordering Quantities by Contract Year”.

&"Cambria,Regular"Attachment L-5 Volume 4 P-1 Price&"Cambria,Bold"&14Price Attachment
InstructionsSolicitation: N0001924R0007

v20240214

Instructions

Att. L-5 - Pricing Sheet Attachment L-5 Volume 4 P-1 Price

Offeror:
Insert proposed unit prices in the yellow blocks, rounded to whole cent, for SLIN 0001AA, SLIN 0001AB, and CLIN 0003 for each Contract Year (SLIN 0001AA has a unit price in Contract Year 1 only).
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Total Estimated SLIN/CLIN PriceContract Years 1-4
CLIN/SLINTitleCLIN
TypeConst.Unit
PriceQtyUnit of MeasureTotal
PriceUnit
PriceQtyUnit of
MeasureTotal
PriceUnit
PriceQtyUnit of
MeasureTotal
PriceUnit
PriceQtyUnit of
MeasureTotal
PriceAverage
Unit PriceTotal
QuantityUnit of

Issue

0001AASeries 3.5 Power Section Upgrade & Technical Directive Val/VerFFP1Each$0.00$0.00$0.00001Each
0001ABSeries 3.5 Power Section UpgradeFFP10Each$0.0019Each$0.0020Each$0.0025Each$0.00$0.00$0.000074Each
0002Over and Above for Power Section under CLIN 0001FFPNTE$200,000.001Lot$200,000.00$200,000.001Lot$200,000.00$200,000.001Lot$200,000.00$200,000.001Lot$200,000.00$800,000.00$800,000.00001Lot
0003Series 3.5 QECK Inspection, Quick Engine Change Assembly (QECA) Reassembly and TestFFP11Each$0.0019Each$0.0020Each$0.0025Each$0.00$0.00$0.000075Each
0004Over and Above for Quick Engine Change Kit (QECK) under CLIN 0003FFPNTE$440,000.001Lot$440,000.00$760,000.001Lot$760,000.00$800,000.001Lot$800,000.00$1,000,000.001Lot$1,000,000.00$3,000,000.00$3,000,000.00001Lot
0005Contract Data Requirements List (CDRL)FFPNSP1LotNSP1LotNSP1LotNSP1LotNSPNSPNSP1Lot
Contract Year 1$640,000.00Contract Year 2$960,000.00Contract Year 3$1,000,000.00Contract Year 4$1,200,000.00$3,800,000.00Contract Years 1-4
CLIN 0002 and CLIN 0004 OVER & ABOVE NTE VALUE CALCULATION
Insert labor category title ("wrap rate title") for each CLIN under Contract Year 1 (wrap rate titles will autimatically populate for Contract Years 2-4). Insert proposed fully-burdended labor hour rate ("wrap rate"),rounded to whole cent,for each CLIN and each Contract Year. Only one wrap rate or labor category title may be inserted in each yellow block.
CLIN 0002 OVER and ABOVE NTE VALUE CALCULATIONContract Year 1Contract Year 2Contract Year 3Contract Year 4
WRAP RATE TITLEWRAP RATE $/HOUREST HOURS PER CLINTOTAL LABOR EST PRICEWRAP RATE TITLEWRAP RATE $/HOUREST HOURS PER CLINTOTAL LABOR EST PRICEWRAP RATE TITLEWRAP RATE $/HOUREST HOURS PER CLINTOTAL LABOR EST PRICEWRAP RATE TITLEWRAP RATE $/HOUREST HOURS PER CLINTOTAL LABOR EST PRICE
0002Over and Above for Power Section under CLIN 0001 (Labor Est)2000$0.0002000$0.0002000$0.0002000$0.00
TOTAL MATERIAL EST PRICETOTAL MATERIAL EST PRICETOTAL MATERIAL EST PRICETOTAL MATERIAL EST PRICE
0002Over and Above for Power Section under CLIN 0001 (Material Est)$200,000.00$200,000.00$200,000.00$200,000.00
CLIN 0002 NTE VALUE (Year 1)$200,000.00CLIN 0002 NTE VALUE (Year 2)$200,000.00CLIN 0002 NTE VALUE (Year 3)$200,000.00CLIN 0002 NTE VALUE (Year 4)$200,000.00
CLIN 0004 OVER and ABOVE NTE VALUE CALCULATIONContract Year 1Contract Year 2Contract Year 3Contract Year 4
WRAP RATE TITLEWRAP RATE $/HOUREST HOURS PER CLINTOTAL LABOR EST PRICEWRAP RATE TITLEWRAP RATE $/HOUREST HOURS PER CLINTOTAL LABOR EST PRICEWRAP RATE TITLEWRAP RATE $/HOUREST HOURS PER CLINTOTAL LABOR EST PRICEWRAP RATE TITLEWRAP RATE $/HOUREST HOURS PER CLINTOTAL LABOR EST PRICE
0004Over and Above for Quick Engine Change Kit (QECK) under CLIN 0003 (Labor Est)1000$0.0001000$0.0001000$0.0001000$0.00
TOTAL MATERIAL EST PRICETOTAL MATERIAL EST PRICETOTAL MATERIAL EST PRICETOTAL MATERIAL EST PRICE
0004Over and Above for Quick Engine Change Kit (QECK) under CLIN 0003 (Material Est)$440,000.00$760,000.00$800,000.00$1,000,000.00
CLIN 0004 NTE VALUE (Year 1)$440,000.00CLIN 0004 NTE VALUE (Year 2)$760,000.00CLIN 0004 NTE VALUE (Year 3)$800,000.00CLIN 0004 NTE VALUE (Year 4)$1,000,000.00

&"-,Bold"Attachment L-5 Volume 4 Price &"-,Bold"Solicitation: N0001924R0007

Attachment 3 Attachment 3 - Annual Unit Prices by Contract Year and Annual Labor Hour Wrap Rates for Over and Above CLINs

Annual Unit Prices by Contract Year
CLIN/SLINDESCRIPTIONContract Year 1Contract Year 2Contract Year 3Contract Year 4
0001AASeries 3.5 Power Section Upgrade & Technical Directive Val/Ver
$0.00N/AN/AN/A
0001ABSeries 3.5 Power Section Upgrade$0.00$0.00$0.00$0.00
0002Over and Above for Power Section under CLIN 0001$200,000.00$200,000.00$200,000.00$200,000.00
0003Series 3.5 QECK Inspection, Quick Engine Change Assembly (QECA) Reassembly and Test$0.00$0.00$0.00$0.00
0004Over and Above for Quick Engine Change Kit (QECK) under CLIN 0003$440,000.00$760,000.00$800,000.00$1,000,000.00
0005Contract Data Requirements List (CDRL)NSPNSPNSPNSP
Annual Labor Hour Wrap Rates for Over and Above CLINs
CLINDESCRIPTIONWRAP RATE TITLEContract Year 1Contract Year 2Contract Year 3Contract Year 4
WRAP RATE $/HOURWRAP RATE $/HOURWRAP RATE $/HOURWRAP RATE $/HOUR
0002Over and Above for Power Section under CLIN 00010$0.00$0.00$0.00$0.00
0004Over and Above for Quick Engine Change Kit (QECK) under CLIN 00030$0.00$0.00$0.00$0.00

Attachment 4 Attachment 4 - Estimated Annual Ordering Quantities by Contract Year (14 Feb 2024)

CLIN/SLINDescriptionContract Year 1Contract Year 2Contract Year 3Contract Year 4TOTAL
0001AASeries 3.5 Power Section Upgrade & Technical Directive Val/Ver
1EachN/AN/AN/AN/AN/AN/A1Each
0001ABSeries 3.5 Power Section Upgrade10Each19Each20Each25Each74Each
0002Over and Above for Power Section under CLIN 00011Lot1Lot1Lot1Lot1Lot
0003Series 3.5 QECK Inspection, Quick Engine Change Assembly (QECA) Reassembly and Test11Each19Each20Each25Each75Each
0004Over and Above for Quick Engine Change Kit (QECK) under CLIN 00031Lot1Lot1Lot1Lot1Lot
0005Contract Data Requirements List (CDRL)1Lot1Lot1Lot1Lot1Lot

File details come from the government source that posted it. Updated .