CDL_SRQ_Draft_CDRLs.pdf
PDF 353 KB Posted
- Attached to
- Draft CDL SRQ-4 Presolicitation Federal contract opportunity
- Solicitation number
- N00019-16-R-3001
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
CM
C. CATEGORY
CMAN
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM01
2. TITLE OF DATA ITEM
Contractor's Configuration Management Plan
3. SUBTITLE
Configuration Management Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80858B (See Block 16)
5. CONTRACT REFERENCE
SOW para 3.1.8.1
6. REQUIRING OFFICE
AIR-1.3.2J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Contractors format is acceptable. The CM Plan shall address software and shall be consistent with the Software Development Plan.
BLOCK 8: & 13: For each submission, the Government has forty-five
(45) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 14: Deliverable shall be submitted in digital format compatible with Microsoft Office.
The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/CM01.
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR- 1.3.2J
H. DATE
5/8/2015
I. APPROVED BY
Mark Lysaght
J. DATE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
CM
C. CATEGORY
CMAN
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM02
2. TITLE OF DATA ITEM
Configuration Status Accounting Information
3. SUBTITLE
Configuration Status Accounting Report
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-81253A (See Block 16)
5. CONTRACT REFERENCE
SOW para 3.1.8.2
6. REQUIRING OFFICE
AIR 1.3.2J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Contractor format is acceptable.
BLOCKS 8: & 13: For each submission, the Government has ninety
(90) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/CM02.
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR- 1.3.2J
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
CM
C. CATEGORY
CMAN
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM03
2. TITLE OF DATA ITEM
Specification Change Notice (SCN)
3. SUBTITLE
Proposed Specification Change Notice
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80643C (See Block 16)
5. CONTRACT REFERENCE
SOW para 3.1.8.3
6. REQUIRING OFFICE
AIR 1.3.2J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
ASREQ
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ (See Block 16)
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: The Document shall be prepared using Microsoft Office products. Contractor format is acceptable in accordance with Contractor's Configuration Management Plan.
BLOCKS 8: & 13: For each submission, the Government has ninety
(90) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/CM03.
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR- 1.3.2J
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
CM
C. CATEGORY
CMAN
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM04
2. TITLE OF DATA ITEM
Request for Deviation (RFD)
3. SUBTITLE
Deviation Request
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80640C (See Block 16)
5. CONTRACT REFERENCE
SOW para 3.1.8.4
6. REQUIRING OFFICE
AIR 1.3.2J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
ASREQ (See block 16)
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ (See Block 16)
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Contractor format is acceptable in accordance with Contractor's Configuration Management Plan. This report shall be prepared and submitted in a digital format compatible with Microsoft Office.
BLOCKS 8: & 13: For each submission, the Government has ninety
(90) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 12: Request for Deviations shall be generated as needed in the production program.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/CM04.
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR- 1.3.2J
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
CM
C. CATEGORY
CMAN
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM05
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
Engineering Change Proposal
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80639C [see block 16]
5. CONTRACT REFERENCE
SOW para 3.1.8.5
6. REQUIRING OFFICE
AIR 1.3.2J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
ASREQ [See Block 16]
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
[See Block 16]
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Contractor format acceptable. (The DID provides data format and preparation instructions. The intent is for the CDRL to include the essential information from the DID and to allow the Contractor to eliminate the document boilerplate.)
BLOCKS 8:, 12:, & 13: For each submission, the Government has ninety (90) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 12: The Contractor shall submit ECPs as necessary during the production program.The ECP inspection and approval are dependent on the NAVAIR Configuration Control Board (CCB) schedule and review. The Conractor has 30 days for re-submittal if accepted with comments or if rejected as stated in the CCB minutes.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/CM05.
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR- 1.3.2J
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
CM
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
CM06
2. TITLE OF DATA ITEM
Configuration Audit Plan
3. SUBTITLE
PCA and FCA Audit Plans
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81646B (See Block 16)
5. CONTRACT REFERENCE
SOW para 3.1.8.6
6. REQUIRING OFFICE
1.3.2J
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
3TIME/R
12. DATE OF FIRST
SUBMISSION
60DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Contractor shall submit in digital format IAW their Configuration Management Plan.
BLOCKS 8: & 13: For each submission, the Government has ninety
(90) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 10: & 12: Initial delivery IAW block 12. Final deliveries due 90 days prior to the respective Audit, i.e., FCA and PCA.
BLOCK 14: The deliverable shall be in digital format as a .pdf document. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/CM06.
An e-mail notification of the CDRL posting shall be delivered to:
PMA-299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Ken Kratz, AIR- 1.3.2J
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
TM
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR01
2. TITLE OF DATA ITEM
Manuals, Technical: Aircraft Maintenance Instructions, Technical Content Requirements
3. SUBTITLE
AN/SRQ-4 Source Data for IETMs
4. AUTHORITY (Data Acquisition Document No.)
MIL-DTL-81928C (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.2, 3.3.2.1, 3.3.3
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY (See Block 16)
12. DATE OF FIRST
SUBMISSION
90DAC (See Block 16)
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: MIL-DTL-81928C and MIL-DTL-81927C shall be used for format and content. Two copies of "source data for IETMs" text shall be delivered: one in digital format compatible with Adobe Portable Document Format (PDF) and the other in Microsoft Office.
All figures, graphics and schematics shall be delivered in Computer Graphics Metadata (CGM) format.
BLOCKS 8: & 13: For each submission, the Government has 45 calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCKS 10: 12: and 13: A complete delivery of IETM source data shall be made at the end of January, April, July, and September.
Changes to IETMs source data that occur as a result of Engineering Changes (prior to PCA), CLASS I and/or CLASS II ECPs shall be delivered within 30 days of the approved change.
BLOCK 11: The IETM Source Data shall be current as of the date delivered.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor Name}/{Contract}/LR01.
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Francis Shade
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
CMAN
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR02
2. TITLE OF DATA ITEM
Validation Report
3. SUBTITLE
IETMS Source Data Validation Report
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80792A (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.2.1
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Contractor format is acceptable. Prepare and submit in digital format compatible with Microsoft Office.
BLOCKS 8: & 13: For each submission, the Government has 45 calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCKS 10: and 12: SRQ-4 Validation report shall be submitted 15 days after Government Acceptance of CDRL LR01.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor Name}/{Contract}/LR02.
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Francis Shade
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR03
2. TITLE OF DATA ITEM
Logistics Product Data
3. SUBTITLE
Logistics Management Information Database
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81758A (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.4
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
SEMI-A (See Block 16)
12. DATE OF FIRST
SUBMISSION
180DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: The LMI database shall be capable of printing all summaries listed in SAE-GEIA-STD-0007. In order to accomplish this, the database shall document the analyses to support:
maintenance planning/design interface, supply support, support equipment, technical data, facilities, packaging/handling/ storage & transportation, manpower and personnel, computer resources support, and training. DD Form 1949-1(A) (Attachment (09)) identifies the fields in the LMI database which are to be populated.
BLOCKS 8: & 13: For each submission, the Government has forty-five (45) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCKS 10: and 13: Semiannual submissions to be delivered in March and September.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/LR03.
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Francis Shade
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR04
2. TITLE OF DATA ITEM
Logistics Product Data Summaries
3. SUBTITLE
Provisioning Parts List (PPL)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81759A (See Block 16
5. CONTRACT REFERENCE
SOW Para 3.3.5.1
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
R/ASR (See Block 16)
12. DATE OF FIRST
SUBMISSION
180DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Prepare and submit report from ICAPS software program using input data from the LMI database. Contractor can obtain ICAPS software from https://icaps.nmci.navy.mil. Content for this data item shall be provided in accordance with the Attachment (10).
BLOCKS 8: & 13: For each submission, the Government has ninety
(90) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 10: The PPL shall be updated and delivered when changes to the LMI database change the PPL.
BLOCK 14: The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/LR04.
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.milAdditionally, one copy shall be delivered on CD-ROM to the following address:
Commander Naval Inventory Control Point 700 Robbins Avenue Philadelphia, PA 19111 Attn: Jim Prawdzik, Code 03621.17
See Block 16
NAVICP
15. TOTAL
G. PREPARED BY
Francis Shade
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR05
2. TITLE OF DATA ITEM
Logistics Product Data Summaries
3. SUBTITLE
Engineering Data for Provisioning
(EDFP)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81759A (See Block 16
5. CONTRACT REFERENCE
SOW Para 3.3.5.2
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
R/ASR (See Block 16)
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: The DID provides data format and preparation instructions. Prepare and submit in digital format compatible with Microsoft Office. Content for this data item shall be provided in accordance with the Attachment (11).
BLOCKS 8: & 13: Approval is for content and format. Government has 45 calendar days to review and provide acceptance or rejection.
Contractor has 30 days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 10: The EDFP shall be updated and delivered when changes to the LMI database change the EDFP.
BLOCK 14:The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/LR05.
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil
See Block 16
15. TOTAL
G. PREPARED BY
Francis Shade
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR06
2. TITLE OF DATA ITEM
Logistics Product Data Summaries
3. SUBTITLE
Statement of Prior Submission
(SPS)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81759A (See Block 16
5. CONTRACT REFERENCE
SOW Para 3.3.5.3
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
ASREQ
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: The Statement of Prior Submission (SPS) is submitted to certify that Provisioning Technical Documentation (PTD) has previously been furnished to the Government. Prepare and submit in digital format compatible with Microsoft Office. Contractor format is acceptable.
The SPS shall be in a letter format and shall contain the following:
A. Contract or purchase order # B. Contracts/exhibit line item # C. End Item/component type or model #/reference # D. Item Name E. Manufacturers name and cage code F. Provisioning activity receiving the (PTD) and data prepared G. NSN (if available) H. Interchangeability information e.g. eletrical, mechanical, physical, dimensional I. Change information; # or percent of change required to update (PTD) to required end item configuration being procured and brief description of changes J. Minor differences in parts configuration should be documented in the SPS with interchangeability and change information specified.
BLOCKS 8: & 13: For each submission, the Government has forty-five (45) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/LR06.
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil
See Block 16
15. TOTAL
G. PREPARED BY
Francis Shade
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
ILSS
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR07
2. TITLE OF DATA ITEM
Logistics Management Information (LMI) Summaries
3. SUBTITLE
Interim Support Items List (ISIL)
4. AUTHORITY (Data Acquisition Document No.)
DI-ALSS-81530 (See Block 16)
5. CONTRACT REFERENCE
SOW para 3.3.5.4
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
90 DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Contractor format is acceptable. The DID provides data format and preparation guidance. Prepare and submit in digital format compatible with Microsoft Office.
BLOCK 8:, & 13: Government has 45 days to review and acceptance (with or without comments) or rejection. Contractor has 30 days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/LR07.
An e-mail notification of the CDRL posting shall be delivered to PMA -299OPS@navy.mil.
See Block 16
15. TOTAL
G. PREPARED BY
Francis Shade
H. DATE
6/2/2015
I. APPROVED BY
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR08
2. TITLE OF DATA ITEM
Logistics Product Data Summaries
3. SUBTITLE
Packaging, Handling, Storage, and Transportation (PHS&T)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81759A (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.6
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
R/ASR (See Block 16)
12. DATE OF FIRST
SUBMISSION
180DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ (See Block 16)
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: The document shall be delivered in digital format compatible with Microsoft Office. Mandatory use of the DID is required.
All items considered candidates for accomodation by specifically designed reusable containers shall be identified and data shall be provided in accordance with MIL-PRF-49506. Data shall be sufficient detail to allow the design of a specialized container and dummy load without having to obtain additional data. The Contractor shall provide the following for all items:
Unit dimensions (U.S. Standards):
* Unit weight
* Special shipping requirements
* Drawings showing envelope dimensions
* Detailed drawings showing mounting points
* Item material and surface finishes
* Item fragility
For large items greater than sixty inches long or over one hundred and fifty pounds in weight, the following additional information shall be provided:
* Center of gravity
* Radii of Gyration
* Moment of inertia
Items requiring special marking requirements for shelf life items, constant power source needs, special attitude, controlled storage, hazardous materials and classified items shall be identified.
Submittal shall include Packaging Requirement Codes (PRC) for all new system peculiar procurable source code items.
BLOCKS 8: & 13: For each submission, the Government has forty-five (45) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract
See Block 16
15. TOTAL
G. PREPARED BY
Francis Shade
H. DATE
5/8/2015
I. APPROVED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR08
2. TITLE OF DATA ITEM
Logistics Product Data Summaries
3. SUBTITLE
Packaging, Handling, Storage, and Transportation (PHS&T)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81759A (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.6
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
R/ASR (See Block 16)
12. DATE OF FIRST
SUBMISSION
180DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ (See Block 16)
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 10: The PHS&T shall be updated and delivered when changes to the LMI database change PHS&T.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/LR08
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil
G. PREPARED BY
Francis Shade
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
SDMP
D. SYSTEM/ITEM
AN/SRQ-4(Ku)
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR09
2. TITLE OF DATA ITEM
Parts Management Plan
3. SUBTITLE
DMSMS Parts Management Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-SDMP-81748 (See Block 16)
5. CONTRACT REFERENCE
SOW Para 3.3.7
6. REQUIRING OFFICE
AIR-4.11.2.2
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Contractor format is acceptable. Prepare and submit in digital format compatible with Microsoft Office.
BLOCKS 8:, 10: & 13: For each submission, the Government has forty-five (45) calendar days for review and acceptance (with or without comments) or rejection. Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 14: The deliverable shall be in digital format using Microsoft Office. The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/LR09.
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil
See Block 16
15. TOTAL
G. PREPARED BY
Francis Shade
H. DATE
5/8/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
0010, 0110, 0210, 0310, 0410
B. EXHIBIT
LR
C. CATEGORY
SESS
D. SYSTEM/ITEM
CDL Hawklink
E. CONTRACT/PR NO.
N00019-16-R-3001
F. CONTRACTOR
TBD
1. DATA ITEM NO.
LR0A
2. TITLE OF DATA ITEM
Logistics Product Data Summaries
3. SUBTITLE
Master Obsolesence Provisioning Parts List (MOPPL)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81759A (See Block 16
5. CONTRACT REFERENCE
SOW Para 3.3.7
6. REQUIRING OFFICE
AIR-6.6.1.10.R
7. DD 250
REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D (See Block 16)
11. AS OF DATE
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
PID: 15-P1-PMA-299-0097
BLOCK 4: Prepare and submit Master Obsolescence Parts Provisioning List (MOPPL) forty five (45) days prior to the end of the period of performance (PoP) of the initial base and one list (update) for each Option Year Contract that is exercised. The Contractor shall provide the same content of technical part information and data as in the Contractor delivered Bills of Material (BOM). A Contractor developed format that is editable is acceptable.
BLOCKS 8: & 13: For each submission, the Government has thirty
(30) calendar days for review and acceptance (with or without comments) or rejection. The Contractor has thirty (30) calendar days for resubmittal if accepted with comments or if rejected.
BLOCK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD Contractors only; (Critical Technology) {Contract Award Date}. Other requests shall be referred to the Program Executive Officer (PMA 299), Air ASW Assault and Special Mission Programs.
BLOCK 10: The MOPL shall be updated only if the Government review comments require additional information before completion and closeout of the contract.
BLOCK 14: The deliverable shall be placed on the PMA-299 server at:
https://pma299.navair.navy.mil/deliverables/{Contractor}/{Contract Number}/LR0A.
An e-mail notification of the CDRL Posting shall be delivered to:
PMA-299OPS@navy.mil
PMA-299 (See Block…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .