Att_(05)_FRACAS_Failure_Determination.doc

DOC document 33 KB Posted

Attached to
Draft CDL SRQ-4 Presolicitation Federal contract opportunity
Solicitation number
N00019-16-R-3001
Issued by
Department of the Navy Naval Air Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Draft CDL SRQ-4 Presolicitation, newest first.
File Type Posted
DRAFT_CDL_SRQ_RFP_Q A.docx DOCX document
Att_(07)_CDRL_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attch_L2_Past_Performance_Questionnaire.docx DOCX document
Att_(11)_EDFP_CDRL_LR05.docx DOCX document
Att_(14)_DMSMS_Quarterly_Report__CDRL_LR0C__Rev_L_2013.02.15.docx DOCX document
Att_(02)_CSDR_Plan.xls XLS spreadsheet
Att_(15)_DMSMS_Case_Sheet_(CDRL_LR0D)_Rev_E_2015.05.06.xlsx XLSX spreadsheet
Att_(06)_GFE-GFP.xlsx XLSX spreadsheet
Att_(08)_Contractor's_Small_Business_Plan.doc DOC document
Att_(16)_DD254.pdf PDF
Att_(10)_PPL_CDRL_LR04.docx DOCX document
CDL_SRQ_Draft_CDRLs.pdf PDF
Att_(12)_PHST_CDRL_LR08.docx DOCX document
Attch_L4_Cost-Price_Summary_Table _4_Dec_2015.xls XLS spreadsheet
Attch_L5_GFE _GFP _GFF _GFI_List-(Blank_Form).xls XLS spreadsheet
Att_(09)_LMI_CDRL_LR03.xls XLS spreadsheet
Att_(04)_Contractor_Data_Assertions.docx DOCX document
Att_(03)_TEMPEST_Control_Plan_Description.doc DOC document
Att_(13)_BOM_Template_(CDRL_LR0B)_w_Macros_rev_3_1.10.2014_0221.xlsx XLSX spreadsheet
N00019-16-R-3001_draft.docx DOCX document
Attch_L3_CPAR_Update_Questionnaire _18_Dec_2015.doc DOC document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: N00019-16-R-3001

PID: N00019-15-P1-PMA-299-0097

24 August 2015

Attachment (05) FRACAS Failure Determination Relevant Failures are defined as:

a. Intermittent failures.

b. Unverified failures (failures that cannot be duplicated, that are still under investigation, or for which no cause could be determined).

c. Verified failures not otherwise excluded under these requirements.

d. Pattern failures.

Non-relevant failures are defined as:

a. Installation damage.

b. Accident or mishandling.

c. Failures of the test facility or test-peculiar instrumentation.

d. Equipment failures caused by an externally applied overstress condition, in excess of the approved test requirements.

e. Normal operating adjustments (non-failures) specified in the approved equipment operating instructions.

f. Secondary failures within the equipment, which are directly caused by non-relevant or relevant primary failures. The secondary failures must be proved to be dependent on the primary failure.

g. Failures caused by human errors.

Chargeable Failures are defined as follows:

a. Relevant Failures

b. Independent failures.

1. Equipment design.

2. Equipment manufacturing.

3. Part design.

4. Part manufacturing.

5. Software errors identified, corrected, and verified during the pretest, the system verification, and the test, shall not be chargeable as equipment failures.

6. Contractor-furnished equipment (CFE) (operating, maintenance, or repair procedures that cause equipment failures).

Non-chargeable failures are defined as follows:

a. Non-relevant failures.

b. Failures induced by GFE operating, maintenance, or repair procedures.

c. Failures of items having a specified life expectancy and operated beyond the specified replacement time of the item.

File details come from the government source that posted it. Updated .