Text version
Case Sheet Instructions:
Fill out the top sections of the form to row 16 (Solution Required). If a solution is required and parts can still be procured, Fill out Table 1. Table 1 will automatically fill in the Life of Type Buy blocks. If other options should be considered, fill out the additional option blocks as needed.
Brief Title Priority CDRL # Case Sheet # Related Case Sheets OMIS Case Log #
Date Submitted Last Time Buy Date Action Needed by Date NHA Impact Date
| OEM Company Name | OEM Technical POC | ||
| Name | Phone |
| PMA299 IPT Program Impacted | PMA299 IPT Program POC | ||
| Name | Phone |
Next Higher Assy (P/N & Nomenclature) QTY WRA Affected (P/N & Nomenclature) QTY System Affected (P/N & Nomenclature) QTY
| Original P/N Data | ||||||||
| P/N | NSN/NIIN | Cage Code | Manufacturer | |||||
| SCD Part: | ||||||||
| Vendor Part: | ||||||||
| Part Description: | ||||||||
| Sourcing Issues: | [Discuss the nature of the obsolescence problem and delineate any assumptions made.] | |||||||
| Recommended Action | ||||||||
| Solution Required (Select YES/NO) | Yes | Select Recommended Solution (From Pull Down Menu) | ||||||
| Can Parts Be Procured (Select YES/NO) | Yes | |||||||
| Quantity and Cost are autofilled from the Procurement Calculator Worksheet | Quantity | Cost | Order Date | Received Date | Span of Coverage Part Buy is Good For | |||
| Part Procurement: | 0 | $ - 0 | ||||||
| Recommended Action Description: | ||||||||
| Recommended Action Advantages: | ||||||||
| Recommended Action Disadvantages: | ||||||||
| Recommended Action Cost Summary: | ||||||||
| Recommended Action P/N Data (Note: If recommended action is for a new P/N fill in the following information:) | ||||||||
| P/N | NSN/NIIN | Cage Code | Manufacturer | |||||
| SCD Part: | ||||||||
| Vendor Part: | ||||||||
| Part Description: | ||||||||
| Additional Options Considered | ||||||||
| Option 1: | Select Option Solution (From Pull Down Menu) | |||||||
| Quantity | Unit Price | Testing Cost (If Needed) | Part buy Cost | NRE COST | Total Cost |
| Option 1 Description: | ||||||
| Option 1 Advantages: | ||||||
| Option 1 Disadvantages: | ||||||
| Option 1 Cost Summary: | ||||||
| Option 1 P/N Data (Note: If Option 1 is for a new P/N fill in the following information:) | ||||||
| P/N | NSN/NIIN | Cage Code | Manufacturer | |||
| SCD Part: | ||||||
| Vendor Part: | ||||||
| Part Description: | ||||||
| Option 2: | Select Option Solution (From Pull Down Menu) | |||||
| Quantity | Unit Price | Testing Cost (If Needed) | Part buy Cost | NRE COST | Total Cost |
| Option 1 Description: | |||||||
| Option 1 Advantages: | |||||||
| Option 1 Disadvantages: | |||||||
| Option 1 Cost Summary: | |||||||
| Option 2 P/N Data (Note: If Option 2 is for a new P/N fill in the following information:) | |||||||
| P/N | NSN/NIIN | Cage Code | Manufacturer | ||||
| SCD Part: | |||||||
| Vendor Part: | |||||||
| Part Description: | |||||||
| Distribution Reviewers: (To be filled in by the people involved in reviewing the case sheet submittal. For a list of possible reviewers see the distribution worksheet. | |||||||
| CDRL Reviewer Name: | Phone: | E-Mail: | COMMENTS |
Stage 1 Reviewer Name: Phone: E-Mail: COMMENTS
Stage 2 Reviewer Name: Phone: E-Mail: COMMENTS
Stage 3 Reviewer Name: Phone: E-Mail: COMMENTS
| From the list below select either PRI, PR2, PR3 or PRI4 and insert into the priority cell in row 3. | |
| PRI 1 – Emergent Requirements - Time sensitive issue. Requires a formal 30 day review cycle time. | PRI 1 – These are complex time sensitive issues that require an expedited review cycle in order to prevent a significant near-term impact and/or to place a purchase by the LTB date. Any issue that has a LTB date less than 60 days of the EOL notice with no suitable alternatives would qualify as a PRI 1. In most PRI 1 cases the alternative to LTB will involve re-design or a similar complex resolution. All PRI 1’s require a full review cycle. |
| PRI 2 – Expedite Requirements. Requires a formal 30 day review cycle time. | PRI 2 – These are complex time sensitive issues that require an expedited review cycle in order to prevent a significant near-term impact and/or to place a purchase by the LTB date. Any issue that has a LTB date between 60 and 90 days of the EOL notice with no suitable alternatives would qualify as a PRI 2. In most PRI 2 cases the alternative to LTB will involve re-design or a similar complex resolution. All PRI 2’s require a full review cycle. |
| PRI 3 – AoA/Case Sheet Long Lead and/or NRE Requirements | PRI 3 – These are issues where enough time is available to identify a solution without any immediate impacts. These can be complex issues and may have a LTB date greater than 90 days of the EOL notice and/or present no immediate impact to production and existing contracts. In most cases consideration needs to be given to more complex resolutions that may involve redesign, re-qualification and similar activities or require additional time to investigate options for a cost effective long-term solution. All PRI 3’s require a full review cycle. This is the default priority for most Case Sheets. |
| PRI 4 – Notification only. - Normal Routing Requirements | PRI 4 – These are issues that have standard/routine solutions and are provided primarily for notification only. These issues do not present any impact to in-process or near-term pending contracts. This information is provided mainly for awareness of issues and limitations to aid in strategic planning and long-term sustainment considerations. PRI 4’s require distribution to affected parties but no formal review process is required. |
| Priority Boundaries for Case Sheets (Examples of Assignment of Priority) |
| Priority 1 - Emergent Requirements |
| - EOL notice for LTB is 0-60 days and/or part is high demand |
| - Spares/Repair stock depleted (reported by OEM, NAVSUP, DLA) |
| - Fleet requirement for a mission readiness issue |
| - Long lead items of a mission critical nature that are needed in a EOL LTB |
| Priority 2 - Expedite Requirements |
| - EOL notice for LTB is 60-90 days |
| - Spares/Repair stock is nearly depleted and a solution needs to be identified |
| - Fleet has identified an DMSMS Sustainment issue that needs to be addressed |
| - Long lead items of a mission critical nature that are needed in a EOL LTB |
| Priority 3 - AoA/Case Sheet Long Lead and/or NRE Requirements |
| - Although options were considered, no solution has been identified and we have time to work the issue |
| - NRE is required for a solution |
| - Long term requirements/efforts have been identified |
| - Where PMA-299 has time to assess the situation and identify possible ideas for solutions |
| Priority 4 - Normal Routing Requirements |
| - Case Sheet is for Information Only and only for notification |
| - An FFF no cost alternative part has been identified and implemented |
| - RoHS part substitution (engineering assessment is completed and part is OK for use) |
| - Lower priority issue where broker market parts available in great quantity |
| - EOL notice for LTB is greater than 120 days and part is in low demand |
| The contents of this form are protected to enable form functions. To unprotect the form, select Tools, Protection, Unprotect Sheet. There is no password. |
| CDRL Reviewer Name: | |
| See the "Reviewer & Distribution" Tab. The Obsolescence SME (Subject Matter Expert) name(s) who reviewed the case sheet. | |
| Stage 1 Reviewer Name: | |
| See the "Reviewer & Distribution" Tab. The PMA-299 Technical and Engineering name(s) who reviewed the case sheet. | |
| Stage 2 Reviewer Name: | |
| See the "Reviewer & Distribution" Tab. The Leadership name(s) who Acknowledged, Reviewed and Concurred with the options listed on the case sheet. | |
| Stage 3 Reviewer Name: | |
| See the "Reviewer & Distribution" Tab. The Program Manager(s) who gave Final Approval of Recommended DMSMS Solution. | |
| Select Recommended Solution (From Pull Down Menu) | |
| 1.) There is an approved alternate part on the BOM or SCD. | |
| 2.) OEM has Sufficient Stock on Hand (See Table 1). | |
| 3.) DLA has stock on hand. | |
| 4.) Life of Type Buy (LOT Buy) or Bridge Buy can be done. | |
| 5.) Continue to Manufacture (Extend Production). | |
| 6.) Another approved manufacturer makes this part. | |
| 7.) There is Aftermarket Production Capability - testing may be required. | |
| 8.) Parts are available from the Broker Market - testing may be required. | |
| 9.) Reclamation is available - testing may be required. | |
| 10.) There is a ROHS P/N Change. | |
| 11.) A FFF alternate part exist - testing may be required. | |
| 12.) A substitute part (not quite FFF) exists - testing may be required. | |
| 13.) Part can be emulated - testing may be required. | |
| 14.) A prior emulated part exists - testing may be required. | |
| 15.) Resolution requires redesign – testing is required. | |
| 16.) There is a Tech Refresh / Tech Insertion planned that will solve the obsolescence problem at the SRU and WRA levels. | |
| 17.) An obsolescence health check has been performed at the NHA/SRU level and there are other obsolescence issue on the NHA/SRU that require further study to come up with the best resolution for solving the obsolecence problems. | |
| 18.) An obsolescence health check has been performed at the WRA level and there are other obsolescence issue on the WRA that require further study to come up with the best resolution for solving the obsolecence problems. | |
| 19.) COTS - DMSMS Options to support extended production are available from the vendor. | |
| 20.) COTS - Extended Warranty or Repair Period is available. | |
| 21.) COTS - Third Party Repair is Available. | |
| 22.) COTS - A New Source is available. | |
| 23.) COTS - Data Rights can be purchased. | |
| 24.) Other (details in comments). |
| Yes |
| No |
| Select Option Solution |
| Select Option Solution (From Pull Down Menu) |
| 1.) There is an approved alternate part on the BOM or SCD. |
| 2.) OEM has Sufficient Stock on Hand (See Table 1). |
| 3.) DLA has stock on hand. |
| 4.) Life of Type Buy (LOT Buy) or Bridge Buy can be done. |
| 5.) Continue to Manufacture (Extend Production). |
| 6.) Another approved manufacturer makes this part. |
| 7.) There is Aftermarket Production Capability - testing may be required. |
| 8.) Parts are available from the Broker Market - testing may be required. |
| 9.) Reclamation is available - testing may be required. |
| 10.) There is a ROHS P/N Change. |
| 11.) A FFF alternate part exist - testing may be required. |
| 12.) A substitute part (not quite FFF) exists - testing may be required. |
| 13.) Part can be emulated - testing may be required. |
| 14.) A prior emulated part exists - testing may be required. |
| 15.) Resolution requires redesign – testing is required. |
| 16.) There is a Tech Refresh / Tech Insertion planned that will solve the obsolescence problem at the SRU and WRA levels. |
| 17.) An obsolescence health check has been performed at the NHA/SRU level and there are other obsolescence issue on the NHA/SRU that require further study to come up with the best resolution for solving the obsolecence problems. |
| 18.) An obsolescence health check has been performed at the WRA level and there are other obsolescence issue on the WRA that require further study to come up with the best resolution for solving the obsolecence problems. |
| 19.) COTS - DMSMS Options to support extended production are available from the vendor. |
| 20.) COTS - Extended Warranty or Repair Period is available. |
| 21.) COTS - Third Party Repair is Available. |
| 22.) COTS - A New Source is available. |
| 23.) COTS - Data Rights can be purchased. |
| 24.) Other (details in comments). |
24 August 2015 Attachment 15 DMSMS Case Sheet RFP: N00019-16-R-3001
PID: N00019-15-P1-PMA299-0097
Table 1 Procurement Calculator Instructions:
Fill out the quantities and costs for the items for which you have information. Please leave all other cells blank. If the info does not reflect the entire life cycle of the platform, the solution will be considered a bridge buy until additional info can be gathered.
| Table 1 Procurement Calculator | |||||||
| CASE SHEET TRACKING INFORMATION | |||||||
| CDRL # | Case Sheet # | OMIS OCL # | SCD P/N | Vendor P/N | NHA P/N | WRA P/N | System P/N |
| FY (Fiscal Year) Part Quantities | ||||||||||||
| FY | QTY per System | # of Production Systems | Parts Needed for Production | # of Spare Systems | Parts Needed for Spares | Parts Needed for Field Repairs (Default 10%) | Anticipated Fallout | |||||
| (Default 15%) | Total Parts Required for USA Navy | Parts Needed for FMS | Total Parts Required. USA Navy + FMS | |||||||||
| FY-15 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-16 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-17 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-18 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-19 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-20 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-21 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-22 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-23 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-24 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-25 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-26 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-27 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-28 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-29 | 0 | 0 | 0 | 0 | 0 | |||||||
| FY-30 | 0 | 0 | 0 | 0 | 0 | |||||||
| Totals | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Part Buy Quantities ( USA Navy) | ||||||||||||
| LTB Date | Total Parts Required | # of Production Systems | # of Spare Systems | Parts On Hand | Shortfall | Testing Cost (If Needed) | Unit Price | Procurement Cost | ||||
| 0 | 0 | 0 | 0 | $ - 0 | ||||||||
| Part Buy Quantities (FMS) | ||||||||||||
| LTB Date | Total Parts Required | # of Production Systems | # of Spare Systems | Parts On Hand | Shortfall | Testing Cost (If Needed) | Unit Price | Procurement Cost | ||||
| 0 | 0 | 0 | 0 | $ - 0 | ||||||||
| Part Buy Quantities ( USA Navy + FMS) | ||||||||||||
| LTB Date | Total Parts Required | # of Production Systems | # of Spare Systems | Parts On Hand | Shortfall | Testing Cost (If Needed) | Unit Price | Procurement Cost | ||||
| 0 | 0 | 0 | 0 | $ - 0 | ||||||||
| Note: Parts Needed for Repairs is calculated by using a default of 10% of total fleet assets will fail and then 10% of these assets will require a new part. Total fleets assets is based on how many aircraft/systems are projected to be in the fleet at the beginning of a particular fiscal year. | ||||||||||||
| Note: Parts Needed for Anticipated Fallout is calculated by using a Default of 15% of the total number of parts projected to be used in a given year. Total Number of Parts used in a Year = (Total Parts Needed for Production) + (Total Parts needed for Spares Production) + (Total Parts needed for Repairs). | ||||||||||||
| The contents of this form are protected to enable form functions. To unprotect the form, select Tools, Protection, Unprotect Sheet. There is no password. |
&A
Table 3 System Calculator
| Table 3 System Calculator | ||
| SYSTEM P/N | ITEM DESIGNATOR | SYSTEM NOMENCLATURE |
| FY | US NAVY | FMS | ||||||
| IS THERE A CONTRACT IN PLACE FOR FY (YES OR NO) | # of Production Systems | # of Spare Systems | Total Systems Required for USA Navy | IS THERE A CONTRACT IN PLACE FOR FY (YES OR NO) | # of Production Systems | # of Spare Systems | Total Systems Required for FMS Navy | |
| FY-15 | 0 | 0 | ||||||
| FY-16 | 0 | 0 | ||||||
| FY-17 | 0 | 0 | ||||||
| FY-18 | 0 | 0 | ||||||
| FY-19 | 0 | 0 | ||||||
| FY-20 | 0 | 0 | ||||||
| FY-21 | 0 | 0 | ||||||
| FY-22 | 0 | 0 | ||||||
| FY-23 | 0 | 0 | ||||||
| FY-24 | 0 | 0 | ||||||
| FY-25 | 0 | 0 | ||||||
| FY-26 | 0 | 0 | ||||||
| FY-27 | 0 | 0 | ||||||
| FY-28 | 0 | 0 | ||||||
| FY-29 | 0 | 0 | ||||||
| FY-30 | 0 | 0 | ||||||
| Totals | 0 | 0 | 0 | 0 | 0 | 0 |
| 15 April 2015 | LR0D Attachment 15 |
| &A | RFP: N00019-16-R-3001 |
PID: N00019-15-P1-PMA-299-0097