Amend_05.pdf

PDF 469 KB Posted

Attached to
P-8A Airframe and Engine Depot Maintenance Competition Federal contract opportunity
Solicitation number
N00019-15-R-2004
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

N00019-15-R-2004 AMEND 05

View the file

Other files for this federal contract opportunity

Other files attached to P-8A Airframe and Engine Depot Maintenance Competition, newest first.
File Type Posted
Attachment_12_DD254Rev_001.pdf PDF
Att_L-9_Prime_Contractor_Tech_Directives_FFP.xlsx XLSX spreadsheet
Att_L-9_Prime_Contractor_Tech_Directives_FFP_Amendment_0007.xlsx XLSX spreadsheet
Att_L-9_Prime_Contractor_Tech_Directives_FFP_Amendment_0006.xlsx XLSX spreadsheet
Exhibit_D_RAAF-OY1_Part_A_CDRLs.docx DOCX document
Exhibit_L_NAVY-OY5_Part_A_CDRLs.docx DOCX document
Exhibit_Z_RAAF-OY3_Part_B_CDRLs.docx DOCX document
Exhibit_AL_FMS-OY2_Part_B_CDRLs.docx DOCX document
Exhibit_AH_FMS-OY1_Part_B_CDRLs.docx DOCX document
Exhibit_AA_NAVY-OY4_Part_B_CDRLs.docx DOCX document
Exhibit_M_RAAF-OY5_Part_A_CDRLs.docx DOCX document
Exhibit_AQ_FMS-OY4_Part_B_CDRLs.docx DOCX document
Exhibit_S_NAVY-IDIQ_Part_B_CDRLs.docx DOCX document
Exhibit_W_NAVY-OY2_Part_B_CDRLs.docx DOCX document
Exhibit_AB_RAAF-OY4_Part_B_CDRLs.docx DOCX document
Exhibit_AS_FMS-OY5_Part_B_CDRLs.docx DOCX document
Exhibit_E_NAVY-OY2_Part_A_CDRLs.docx DOCX document
Question_306_for_posting.docx DOCX document
Q_287-295_for_posting.pdf PDF
Att_L-5_Price_Matrix_Amendment_2.xlsx XLSX spreadsheet
Att_L-7_Prime_Contractor_Cost_Summary_FFP_Amendment_2.xlsx XLSX spreadsheet
USN_Engine_EGTM_Trend_Summary.pdf PDF
Q_255-284_for_posting.pdf PDF
Att_L-5_Price_Matrix_Amendment_1.xlsx XLSX spreadsheet
Exhibit_V_RAAF-OY1_Part_B_CDRLs.pdf PDF
Exhibit_Z_RAAF-OY3_Part_B_CDRLs.pdf PDF
Exhibit_M_RAAF-OY5_Part_A_CDRLs.pdf PDF
Exhibit_K_RAAF-OY4_Part_A_CDRLs.pdf PDF
Exhibit_U_NAVY-OY1_Part_B_CDRLs.pdf PDF
Exhibit_F_RAAF-OY2_Part_A_CDRLs.pdf PDF
Exhibit_W_NAVY-OY2_Part_B_CDRLs.pdf PDF
Exhibit_C_NAVY-OY1_Part_A_CDRLs.pdf PDF
Exhibit_AD_RAAF-OY5_Part_B_CDRLs.pdf PDF
Exhibit_AC_NAVY-OY5_Part_B_CDRLs.docx DOCX document
Exhibit_S_NAVY-IDIQ_Part_B_CDRLs.docx DOCX document
Attachment_16_DD_Form_1921.xls XLS spreadsheet
Attachment_1__P-8A_SOW.docx DOCX document
Exhibit_M_RAAF-OY5_Part_A_CDRLs.docx DOCX document
Att_L-2_Vol_2_T-1_SB_Goals_Combined.xlsx XLSX spreadsheet
Exhibit_T_RAAF-IDIQ_Part_B_CDRLs.docx DOCX document
Attachment_10_DD_Form_1921-5.xlsx XLSX spreadsheet
Exhibit_N_NAVY-OY6_Part_A_CDRLs.docx DOCX document
Attachment_11_Engine_Part_Condition_Assessment_Template.docx DOCX document
Exhibit_AA_NAVY-OY4_Part_B_CDRLs.docx DOCX document
N00019-15-R-2004.pdf PDF
Exhibit_F_RAAF-OY2_Part_A_CDRLs.docx DOCX document
Att_L-9_Prime_Contractor_Tech_Directives_FFP.xlsx XLSX spreadsheet
Att_L-1_Vol_1_ES_Tables_Combined.xlsx XLSX spreadsheet
Exhibit_V_RAAF-OY1_Part_B_CDRLs.docx DOCX document
Exhibit_C_NAVY-OY1_Part_A_CDRLs.docx DOCX document
Show all 50

P-8A Airframe and Engine Depot Maintenance Competition has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00019-15-R-2004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been added by full text:

The PID has been revised to capture the following changes:

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The purpose of this modification is to:

Section J.

1. Revise Attachment 1- SOW (See redlines within document)

2. Revise Airframe CDRL N00G- Phase Out Transition Plan

Section L

3. Revise 4.2.1 Price Proposal Instructions, Section 2 Contractor Rates, Wrap Rates to include (FMS CLINS

X045, X108, and X110) in program management

4. Revise Attachment L-8 Prime Contractor Cost Summary T&M Amendment 0005

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L

PART A GENERAL INSTRUCTIONS

GENERAL

Offerors are required to submit sufficient information concerning all evaluation factors to enable Government personnel to fully assess the capabilities of the Offeror to perform all requirements. The proposal must be sufficient in detail and scope to enable evaluation and provide the evaluators a clear understanding of the Offeror’s approach, expertise, experience and capability as required by the solicitation. All proposals must clearly and convincingly demonstrate that the Offeror has a thorough understanding of all requirements and associated risks; is able, willing, and competent to devote the resources necessary to meet all requirements; and has valid and practical solutions for all requirements and potential risk areas. The Offeror shall not alter or rearrange the solicitation. The burden of proof for all substantiation within the proposal rests with the Offeror. Offerors are advised that the Government may incorporate any part of the Offeror’s proposal deemed beneficial to the Government, into the final contract. With the exception of Volume 4 Price, no price should appear in any other volume. Alternate proposals are not acceptable.

In presenting material in the proposal, the Offeror is advised that quality of information is more important than quantity. Clarity, brevity, and logical organization should be emphasized during proposal preparation. The Offeror is responsible for presenting enough information to allow the Government to evaluate the proposed work effort, support, and approach, as well as the price proposal, without opening discussions. Statements that the prospective

Offeror understands, or can and/or will comply with, the specifications, and paraphrasing the requirements or parts thereof without supporting information are considered inadequate by the Government, and may result in a rating of unacceptable.

The Offeror shall include any data necessary to illustrate the adequacy of the various assumptions, approaches, and solutions to problems. Failure to address a specific factor or sub-factor clearly may be considered a deficiency.

There is no need to repeat information in more than one volume if overlap exists. The detailed information must be included in the most logical place and summarized and referenced in other areas if an overlap exists. Unnecessarily elaborate brochures or other presentation beyond that sufficient to present a complete and effective proposal is neither necessary nor desired.

The Offeror is expected to comply with all requirements of the Request for Proposal (RFP). The Government advises the Offeror that taking exception or deviating from any term or condition of the RFP may make an offer unacceptable, and the proposal unawardable, unless the RFP expressly authorizes such an exception or deviation with regard to that specific term or condition. The Government may consider any exception or deviation to any term or condition of the RFP that is not expressly authorized by the RFP to be a deficiency as defined in FAR 15.001.

Throughout these instructions, Offeror is defined as the prime contractor with its CAGE code identified in Block

15A on Standard Form (SF)-33Solicitation, Offer, and Award. “Principal Subcontractors” are defined as a subcontractor who provides at least 20% of the proposed total price for the contract. A “Joint Venture” (JV) is a partnership or teaming arrangement that is formed for the purpose of responding to this solicitation when the prime contractor consists of more than one legal entity. “JV Team Members” are the entities that make up a Joint Venture.

“Critical Subcontractors” are subcontractors that perform a critical function, whether technical or financial, and/or have important roles in any high or medium risk areas identified in the performance of the resulting contract. The term entity is used to mean any or all of the following: Prime, Principal Subcontractor, Critical Subcontractor, JV, and/or each JV team member or other subcontractor.

Questions: Offerors may submit questions requesting clarification of solicitation requirements by emailing Ms.

Magdalena Guerra, Mr. Rodney Flowers, and Mr. Adam Caudle, at magdalena.guerra@navy.mil, rodney.flowers@navy.mil, and adam.caudle@navy.mil.

PROPOSAL FORMAT AND SUBMISSION

Proposals must be formatted using a Times New Roman 12 point normal font (no reduction permitted), single-spaced with 1-inch margins all around, and formatted for/printed on standard 8.5 x 11 inch paper. All pages should be numbered with volume, paragraph, and page numbers. When fold-out pages are used, they must not exceed 11 x

17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size but should be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. Graphs and tables shall be presented in no smaller than a 10 pt. font. Graphs should contain a grid, which allows values to be read directly from the graph to the same detail that a 10 x 10 to the ½ inch grid provides. Graphic resolution should be consistent with the purpose of the data presented. Text utilized in charts, figures, and graphics shall also be no smaller than a 10pt font and may use a font type selected by the Offeror. Each volume, book, or annex shall be provided separately in a 3-ring binder. The binders should be of an appropriate thickness for the number of pages it contains (e.g., a 30-page book shall not be placed in a 2-inch binder).

In addition to the hard copies as explained above and requested below, the Offeror should submit all volumes of its proposal electronically on CD-ROM(s) compatible with the operating system and applications defined in Section

2.1.2 below. The Offeror should put as much proposal material as possible on each CD-ROM, keeping the portions of the proposal that contain pricing information on separate CD-ROM(s) from the portions of the proposal that do not contain pricing information. For this solicitation, Annex A, Small Business Subcontracting Plan and Table T-1, Small Business Utilization Strategy; Volume 4 Price; and Volume 5 Contract Administration contain price information and should be delivered on separate CD-ROM(s) from the remainder of the proposal. The Offeror mailto:magdalena.guerra@navy.mil mailto:rodney.flowers@navy.mil mailto:jonathan.groeschel@navy.mil should submit two sets of its proposal on CD-ROMs that contain its proposal. One set of CD-ROM disks should be marked "Master," the other should be marked "Back-Up." Both sets of CD-ROM disks should be clearly marked with the Offeror’s name and address, the point of contact's name and phone number, and proposal volumes contained therein. The Offeror is responsible for ensuring electronic proposals are virus free in accordance with

Section 2.1.4. If a discrepancy exists between the original paper copy of the proposal and the disk copy, the original paper copy shall take precedence.

The proposals will be accessed utilizing the Microsoft Windows 7 Operating System. The Offeror shall submit two identical proposals in separate, electronic versions: one version in Portable Document Format (.pdf) and one version in Microsoft Office 2010 Applications (Microsoft Word, Microsoft Excel, Microsoft PowerPoint, and Microsoft

Project). The .pdf document must be fully searchable. The Offeror is responsible for ensuring that the .pdf and the appropriate Microsoft Office 2010 applications versions contain identical information. The Government shall have the discretion to use the information in either version, and shall not be responsible for any differences in content between the two proposal formats submitted by the Offeror. Use of other application software for submission of proposals is prohibited except where specific instructions for non- PDF or Office 2010 applications are provided.

Offerors may use hyperlinks within and among proposal volumes that do not include price information. However, there shall be no links from any other volume into Volume 4 Price or any portion of the proposal that contains price information.

Offerors are responsible for ensuring that the electronic proposal is virus free. The Offeror shall certify, in its proposal cover letter, that all electronic proposal information has been checked for viruses, and specify the software, version, and virus definition used to check the data. With each subsequent submission of proposal information (e.g., responses to Evaluation Notices, Final Proposal Revisions, etc.), the Offeror shall ensure and certify that its files are virus free.

The Offeror should not embed sound or video (e.g., MPEG) files within the proposal submission.

Large files require greater computer system resources and are discouraged. The Offeror is encouraged to:

Simplify the color palette used in creating figures;

Minimize size of graphics files; and

Avoid scanned images.

There is no limit to the number of files that may be submitted. However, it is preferable that each volume, book, or annex not be broken up into multiple electronic files. Valid extensions for files using their associated applications follow:

Type of Application/Files Valid Extensions

Portable Document Files .pdf

Microsoft Word documents .docx

Microsoft Excel documents .xlsx

Microsoft Power Point .pptx

Microsoft Project .mpp

Files should have the following naming convention ("#" represents the sequential numbering of files and the suffix is for illustration, and may be .pdf, .docx, .xlsx, .pptx, or .mpp). For electronic file submissions (e.g. proposal volumes, annexes, appendices, enclosures) the Offeror should follow the basic structure of the file naming convention suggested in Table G-1 “Offeror Electronic File Naming Convention.” Offerors shall keep the file name as short as possible (under 40 characters) so that it is accessible on Government share drives. The Offeror shall ensure that the electronically submitted file names are directly traceable to hard copy submittals. In general, the

Offeror should provide each binder (e.g. volume, book, or annex) as one separate file (i.e. do not provide each section/paragraph as separate files).

Table G-1 Offeror Electronic File Naming Convention

Volume

Number

Title File naming convention

1 Executive Summary Vol 1 ES#.pdf and Vol 1 ES#.docx

Table ES-1 Offeror Summary

Table ES-2 Relevant Contract Summary

Vol 1 ES Tables.xlsx and Vol 1 ES

Tables.pdf

2 Technical Vol 2 Tech#.pdf and Vol 2 Tech#.docx

2A Book 1: Part A: Airframe Vol 2 PartA#.pdf and Vol 2

PartA#.docx

2B Book 2: Part B: Engine Vol 2 PartB#.pdf and Vol 2

PartB#.docx

General

Instructions Cross Reference Matrix

GenInst Tech CRM.xlsx and GenInst

Tech CRM.pdf

3 Past Performance Vol 3 PP#.pdf and Vol 3 PP#.docx

Table PP-1 Past Performance Contract Data Vol 3 PP-1 PP Con Data.pdf and Vol 3

PP-1 PP Con Data.xlsx

Release of Adverse Past Performance Authorization Letters;

and/or Past Performance Point of Contact Information for

Subcontractors and Joint Venture Team Members

Rel Ad PP Ltr#.pdf and Rel Ad PP Ltr

#.docx; and/or PP POC Info#.pdf and

PP POC Info#.docx

4 Price Vol 4 Price#.pdf and Vol 4

Price#.docx

4A Book 1: Part A: Airframe Vol 4 PricePartA#.pdf and Vol 4

PricePartA#.docx

4B Book 2: Part B: Engine Vol 4 PricePartB#.pdf and Vol 4

PricePartB#.docx

5 Contract Administration Vol 5 CA#.pdf and Vol 5 CA#.docx

Annexes

Annex A Small Business Subcontracting Plan AnnA SBP.docx

Annex B 14 CFR Part 145 Certificate AnnB CFR PT145.docx

Annex C Relevant Portions of Final Versions of Previous SOW/PWSs for Past Performance

AnnC Rel SOW PWSs#.pdf and AnnC

Rel SOW PWSs #.docx

3.0 PROPOSAL CONTENT AND VOLUMES

Each volume of the proposal shall be submitted as one original and additional copies as specified in the table below.

All volumes of the original proposal shall be delivered to the address provided in Section 4.0 prior to the closing date/time stated in this solicitation Suggested page count for each volume are also specified in the table below;

annexes, title and table of contents pages do not count towards suggested page count.

The Offeror shall present its proposal information in a manner that facilitates a one for one comparison between the information presented and these proposal instructions. Proposal information must be structured such that its paragraph numbers/letters correspond to the proposal instructions paragraph numbers/letters, although the Offeror may add lower tier sub paragraphs. The Offeror must provide reasons why it will not provide information for a particular paragraph.

In addition to the electronic copies requested in paragraph, 2.1, “Electronic Submission of Proposals,” each volume, book, and annex of the proposal shall be submitted as one paper original and additional paper copies as specified in

Table G-2 Proposal Structure. The Offeror shall submit all paper and electronic copies of the proposal to the address provided in section 4.0. Suggested page counts for each volume, if any, are also specified in Table G-2

Proposal Structure (title and table of contents pages are not included in the suggested page count). Annexes do not have suggested page counts.

Information submitted as an Annex to a particular proposal volume could include manuals, specifications, plans, procedures, and company policies, as well as other information requested in Section B Specific Instructions and do not count towards the page count. Additionally, the individual subcontracting reports for the past performance volumes are not included in the page count.

Table G-2 Proposal Structure

Volume

Number Volume Title

Suggested Page

Count Copies Required

1 EXECUTIVE SUMMARY 10

1 Original / 1 Copy /1 CD-ROM

Master and 1 CD_ROM Back-up

2* TECHNICAL

2A* Book 1: Part A – Airframe 50

1 Original / 1 Copy /1 CD-ROM

Master and 1 CD_ROM Back-up

2B* Book 2: Part B – Engine 50 1 Original / 1 Copy /1 CD-ROM

Master and 1 CD_ROM Back-up

3 PAST PERFORMANCE

3A Part A - Airframe 50 1 Original / 1 Copy/1 CD-ROM Master and 1 CD_ROM Back-up

3B Part B - Engine 50 1 Original / 1 Copy /1 CD-ROM

Master and 1 CD_ROM Back-up

4 PRICE As Needed 1 Original / 1 Copy / 1 CD-ROM

Master and 1 CD_ROM Back-up

4A Part A - Airframe As Needed 1 Original / 1 Copy / 1 CD-ROM

Master and 1 CD_ROM Back-up

4B Part B - Engine As Needed 1 Original / 1 Copy / 1 CD-ROM

Master and 1 CD_ROM Back-up

CONTRACT

ADMINISTRATION

1 Original / 1 Copy / 1 CD-ROM

Master and 1 CD_ROM Back-up

Annex A**

SMALL BUSINESS

SUBCONTRACTING PLAN

AS REQUIRED

1 Original/ 1 Copy/ 1 CD-ROM Master and 1 CD_ROM Back-up

Annex B

14 CFR Part 145 Certificate for

Airframe and 14 CFR Part 145

Certificate for Engine

AS REQUIRED

1 Original/ 1 Copy/ 1 CD-ROM Master and 1 CD_ROM Back-up

Annex C

Relevant Portions of Final

Versions of Previous

SOW/PWSs for Past

Performance

AS REQUIRED

Electronic Only 1 CD-ROM Master and 1 CD_ROM Back-up

* If proposing a combined Part A - Airframe and Part B - Engine, please provide Part A - Airframe and Part B -

Engine in separate 3 ring binders to ensure they are separate stand-alone volumes.

** If proposing a combined Part A - Airframe and Part B - Engine, please provide 3 separate Small Business

Subcontracting Plans; 1 for Part A – Airframe, 1 for Part B – Engine, and 1 for the Part A - Airframe and Part B –

Engine combined proposal.

Each binder must contain the following information:

Cover and title page to include Part A: Airframe or Part B: Engine;

Title of proposal and proposal number as applicable;

Offeror’s name, address and POC;

Solicitation number;

Proposal volume/book/annex number;

Copy number;

Table of Contents (The table of contents must provide sufficient detail to easily locate important elements). At a minimum it must include the paragraphs identified in the CRM; and

Use Tabs and dividers.

The following table contains the attachments to Section L:

Section L Attachment: Section L Attachment Name:

Section L Attachment (1) Executive Summary Tables

Section L Attachment (2) Small Business Goals

Section L Attachment (3) Past Performance Questionnaire

Section L Attachment (4) Past Performance Contract Data

Section L Attachment (5) Price Matrix

Section L Attachment (6) Prime Contractor Rates

Section L Attachment (7) Prime Contractor Cost Summary FFP

Section L Attachment (8) Prime Contractor Cost Summary T&M

Section L Attachment (9) Prime Contractor Tech Directives FFP

Section L Attachment (10) Sample Technical Directive

The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the Offeror’s proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information.

The Offeror’s CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments. The CRM does not count against any of the proposal page limitations

Table G-3 Cross Reference Matrix (CRM)

Section L – Proposal

Instructions

Airframe/Engine

Depot SOW

AEPD

Specification

Section M –

Evaluation

Factor

CLIN

Reference

Proposal

Reference

2.0 Vol. 2 Technical

2.1 Book 1: Part A -

Airframe

2.1.1 Facilities/Equipment

3.0, 4.0, 5.0, 6.0, 8.0, 9.0, 10.0, 11.0, 13.0

2-1.19

II.A X001, X002,

X003,X004, X005, X007, X008, X009, X010, X012, X013, X014, X016, X018, X019, X020, X021, X023, X025, X026, X027, X028, X030, X031, X032, X033, X034, X035, X036, X039, X040, X041

2.1.2 Manpower /

Management

3.0, 4.0, 5.0, 6.0, 7.0, 8.0. 9.0, 10.0, 11.0, 12.0, 13.0

II.A X001, X002,

X003, X004, X005, X006, X007, X008, X009, X010, X011, X012, X013, X014, X016, X017, X018, X019, X020, X021, X022, X023, X025, X026, X027, X028, X029, X030, X031, X032, X033, X034, X035, X036, X037, X038, X039, X040, X041

2.1.3 Material

8.0, 9.0

AEPD Spec

(Att. 5)

2-1.13

II.A X002, X003,

X004, X007, X008, X009, X012, X013, X014, X018, X019, X020, X021, X023, X025, X026, X027, X028, X030, X031, X033, X034, X035, X036,X039

2.1.4 Workload Fluctuation

3.0, 4.0, 5.0, 6.0 II.A X002, X003,

X004, X007, X008, X009, X012, X013, X014, X017, X018, X019, X020, X021, X023, X030, X031, X033, X034, X035, X036, X038, X039, X041

2.1.5 Technical Processes

8.0

AEPD Spec

(Att. 5) 2-

1.34

II.A X002, X003,

X004, X005, X007, X008, X009, X010, X012, X013,X014, X015, X016, X018, X019, X020, X021, X023, X025, X026, X027, X030, X031, X032, X033, X034, X035, X036, X039, X040, X041, X042

2.1.6 Quality System

8.2

AEPD Spec

(Att. 5) 2-1.1

II.A X002, X003,

X004, X005, X007, X008, X009, X010, X012, X013, X014, X016, X018, X019, X020, X021, X023, X025, X026, X027, X030, X031, X032, X033, X034, X035, X036, X039,

2.1.7 Turn-Around-

Time(TAT) for AEPD I and AEPD II

3.0 AEPD Spec

(Att. 5) 2-1.8

II.A X002, X003,

X007, X008, X030

2.1.8 Small Business

II.A

2.1.9 Sample Task for

incorporation of a

Technical Directive

5.1 II.A

Section L – Proposal

Instructions

Airframe/Engine

Depot SOW

AEPD

Specification

Section M –

Evaluation

Factor

CLIN

Reference

Proposal

Reference

2.0 Vol. 2 Technical

2.2 Book 2: Part B -

Engine

II.A

2.2.1 Facilities/Equipment

1.0, 3.5, 3.6.2, 7.2, 11.0, 12.0, 16.1

II.A X060, X061,

X062, X064, X065, X066, X067, X068, X069, X070, X071, X073, X074, X075, X077, X078, X079,X080, X081, X082, X088, X089, X090, X091, X092, X093, X094, X095, X096, X097, X098, X104

2.2.2 Manpower /

3.2 II.A X060, X061,

X062, X064, X065, X066, X067, X068, X069, X070, X071, X073, X074, X075, X077, X078, X079, X080, X081, X082, X083, X084, X087, X088, X089, X090, X091, X092, X093, X094, X095, X096, X097, X098, X104, X106, X107

2.2.3 Material

1.0, 3.5, 3.7, 4.0, 5.0, 16.0

II.A X060, X061,

X062, X064, X065, X066, X067, X068, X069, X070, X071, X074, X075, X076., X080, X081, X082,, X088, X089, X090, X091, X092, X093, X094, X095, X096, X097, X098, X104

2.2.4 Workload Fluctuation

3.6 II.A X060, X061,

X062, X063, X064, X065, X066, X067, X068, X069, X070, X071, X073, X074, X075, X076, X077, X078, X079, X080, X081, X082, X083, X084, X085, X086, X087, X088, X089, X090, X091, X092, X093, X094, X095, X096, X097, X098,

2.2.5 Technical Processes

3.4, 3.5, 3.7, 4.0, 5.1, 5.2, 5.3, 5.4

II.A X060, X061,

X062, X064, X065, X066, X067, X068, X069, X070, X071, X073, X074, X075, X077, X078, X079, X080, X081, X082, X083, X084, X087, X088, X089, X090, X091, X092, X093, X094, X095, X096, X097, X098,

2.2.6 Quality System

7.0 II.A X060, X061,

X062, X064, X065, X066, X067, X068, X069, X070, X071, X073, X074, X075, X077, X078, X079, X080, X081, X082, X083, X084, X087, X088, X089, X090, X091, X092, X093, X094, X095, X096, X097, X098, X104, X106, X107

2.2.7 Turn-Around-

Time(TAT)

1.1, 3.5.2 II.A X060, X061,

X062, X064, X065, X066, X067, X068, X069, X070, X071, X073, X074, X075, X077, X078, X079, X080, X081, X082, X083, X084, X087, X088, X089, X090, X091, X092, X093, X094, X095, X096, X097, X098,

2.2.7.1 Projections

3.5.2 II.A X060, X061,

X062, X064, X065, X066, X067, X068, X069, X070, X071, X073, X074, X075, X077, X078, X079, X080, X081, X082, X083, X084, X087, X088, X089, X090, X091, X092, X093, X094, X095, X096, X097, X098,

2.2.7.2 Risk

1.1 II.A X060, X061,

X062, X064, X065, X066, X067, X068, X069, X070, X071, X073, X074, X075, X077, X078, X079, X080, X081, X082, X083, X084, X087, X088, X089, X090, X091, X092, X093, X094, X095, X096, X097, X098, X104, X106, X107

2.2.8 Small Business

II.A

No price information, (e.g., Dollar Values and/or Hourly Rates) shall be included in any volume other than Annex A

(Small Business Subcontracting Plan) and Table T-1 (Small Business Utilization Strategy); Volume 4 Price, Volume

5 Contract Administration.

4.0 PROPOSAL SUBMISSION:

Clearly mark all packages with the solicitation number N00019-15-R-2004. The submission date for all volumes shall be no later than the date and time specified in the solicitation. However it is requested that one hard copy and one electronic copy on a CD-ROM of Volume 3 Past Performance, Table PP-1 (Past Performance Contract Data); as well as Volume 1 Executive Summary, Table ES-1 (Offeror’s Summary); and Volume 1 Executive Summary, Table

ES-2 (Relevant Contract Summary) be submitted four weeks prior to the submission date/time specified on Standard

Form 33.

Method of delivery, such as by hand, United States Postal Service or commercial carrier, shall be coordinated with

Ms. Magdalena Guerra, Mr. Rodney Flowers, and Mr. Adam Caudle, at magdalena.guerra@navy.mil, rodney.flowers@navy.mil, and adam.caudle@navy.mil.. Proposals shall be submitted using the address provided below. Initial and Final Proposals shall not be submitted by facsimile or electronically via email.

Naval Air Systems Command

Code: AIR- 2.3.3.2.1 (Attn: Mr. Rodney Flowers) Solicitation Number: N00019-15-R-2004

47123 Buse Road

BLDG 2272

Room 155

Patuxent River, MD 20670-1547

5.0 PROPOSAL PACKAGING:

The Offerors shall package the proposal volumes in cartons or equivalent packaging containers in the most efficient manner possible grouping like volumes to the maximum extent possible. Each box should identify its contents by including a packing slip detailing each volume/book number and title, and copy number. Each carton should be double wrapped. The outside of the carton should be plain and the inside carton shall be stamped or marked ― “For

Official Use Only; and Source Selection Information – See FAR-2.101 and 3.104,” marked for the intended recipient as identified below, and should only contain those proposals intended for that person. The Master set of proposals and set No. 1 copy will be marked for NAVAIR, AIR-2.3.2.3.1. The Master set shall include all original proposal volumes, all proposal volumes on CD-ROM, a completed and original signed Standard Form 1449;

acknowledgement of all solicitation amendments, if applicable; and Representations, Certifications and Other

Statements of Offerors or Respondents (Section K of this RFP) and other applicable fill-ins. Note: Any documents which contain cost data shall be separated, by binder or disk, from the other volumes.

mailto:magdalena.guerra@navy.mil mailto:adam.caudle@navy.mil

6.0 CLASSIFIED DATA

All proposals must be UNCLASSIFIED.

7.0 CHANGES TO SOLICITATION

All amendments to this solicitation shall be posted at https://www.fbo.gov/. If this solicitation is amended, all terms and conditions that are not amended remain unchanged and in full force and effect. Offerors shall acknowledge receipt of any amendment and provide confirmation upon submission of the Offeror’s proposal. Any unacknowledged amendments in the Offeror’s proposal will be considered as non-acceptance and may result in a proposal being found unacceptable.

Search the database for the solicitation number N00019-15-R-2004.

https://www.fbo.gov/

PART B SPECIFIC INSTRUCTIONS

VOLUME 1 – EXECUTIVE SUMMARY

Note: This volume shall not contain any reference to cost or price aspects of the offer.

The following is a list of L Attachments that the Offeror shall utilize to provide information for this volume:

Attachment L-1 Executive Summary Tables

The purpose of the Executive Summary is to provide the Government with an overview of the Offeror’s entire proposal, excluding price. Each section within the Executive Summary shall contain the salient points contained in each of the proposal volumes. In addition, this volume should be used by the Offeror to identify and highlight significant features of its proposal. The Executive Summary volume should be divided into the areas outlined below:

Offeror Summary Table

The Offeror shall complete Table ES-1 (Offeror Summary), provided in Attachment L-1 (Executive Summary

Tables), according to the instructions within the attachment, and submit it within this section and as a separate electronic file.

The Offeror shall provide a written explanation if multiple CAGE codes/DUNS for the same physical location are provided in Table ES-1 (Offeror Summary). The written explanation shall detail the distinct roles and responsibilities for entities with different CAGE codes/DUNs at the same physical location for where the work is being performed or from where the work is being directed. The description shall include all changes in the organization as a result of a corporate acquisition, reorganization, merger, or other administrative reason.

Note: Place of Performance for this solicitation pertains to the physical location of the prime, all subcontractors, and

Joint Venture (JV) team members who will perform the work.

ES-1 Offeror Summary Table

Relevant Contract Summary Table

The Offeror shall complete the Table ES-2 (Relevant Contract Summary) provided in Attachment L-1 (Executive

Summary Tables), for all contracts proposed as relevant for Past Performance for the Prime, subcontractors, and

Joint Venture (JV) team members. Complete the table according to the instructions within the attachment and submit it within this section and as a separate electronic file. The contract references designated in Table ES-2 (Relevant

Contract Summary) shall be used in completing Volume 3 Table PP-1 (Past Performance Contract Data).

ES-2 Relevant Contract Summary Table

Offeror:

Contractor Name Place of Performance CAGE Codes/DUNs Work Description % of Total

Proposed

Cost/Price

100%Total Proposed Price (must add up to 100%)

Technical Summary

The Offeror shall provide a summary of the effort and identify how its approach addresses the requirements of this solicitation as well as the salient features of the Offeror’s management approach. If proposing for both Part A –

Airframe and Part B – Engine, please address Part A: Airframe and Part B: Engine as applicable;

Contract Administration Summary

The Offeror shall provide a summary of any exceptions or deviations, and proposed special clauses addressed in

Volume 5 Contract Administration.

Combined Airframe and Engine Synergies

If proposing for both part A: Airframe and part B: Engine, please provide a summary of the advantages and benefits gained as a result of combining the airframe and engine depot maintenance activities.

VOLUME 2 – TECHNICAL

The Technical Volume is divided into two books: Book 1: is for Part A - Airframe and Book 2: is for the Part B -

Engine. The proposal instructions for each book are provided below. If proposing a combined proposal for Part A -

Airframe and Part B - Engine, please provide the Technical proposals in separate stand-alone 3-ring binders.

Throughout the Technical Volume the Offeror should identify any proposed capability, approach or feature that exceeds a requirement or provides merit associated with a performance or operational benefit to the Government.

The Offeror should also identify proposed capability, approach or feature that reduces risk inherent in the program.

Specifically, explain the benefits to the Government in technical terms and the degree of impact it will have to performance, operations and/or risk. Offerors are advised that any offer to exceed a requirement or to provide a feature with performance and/or operational benefits may be included in the resulting applicable Contract/Task

Order/Delivery Order within the proposed price.

Book 1: Part A – Airframe

Offeror:

Contractor Name Contract

Reference Contract Number

Contract

Type Contract Title

P1

P2

P3

T1

T2

T3

T4

JV team member N

(where applicable) T5

S1

S2

S3

S4

S5

Subcontractor N S6

JV team member A

(where applicable)

Subcontractor A

Subcontractor B

Prime or Joint

Venture Company

The Offeror shall provide a valid 14 CFR Part 145 Certificate for any facility performing repair or maintenance for the P-8A Airframe. The Offeror’s submission shall include the Air Agency Certificates and related Ops

Specifications with a current Capabilities listing. Please provide the 14 CFR Part 145 Certificate in Annex B.

Facilities/Equipment - The Offeror shall describe the facilities, including space and equipment, to be utilized to meet the requirements of this solicitation. The Offeror shall provide a listing of all equipment to be utilized, including but not limited to: welding, plating, cleaning and Non-Destructive Inspection (NDI) process requirements. If facilities or equipment are not currently available, the Offeror shall provide a plan to obtain the necessary facilities or equipment to meet the schedule and capacity requirements of this Contract. The Offeror shall demonstrate it has warehouse storage space and hangar space of adequate size to disassemble, inspect and repair the P-8A airframe aircraft. The plan shall include information on dates and lead times for each item or process that the Offeror does not currently possess. Additionally, the Offeror shall provide a strategy for protecting Government Furnished Property

(GFP) from damage or loss while in their custody.

Manpower/Management - The Offeror shall describe the projected manpower requirements, including management, engineering, artisan, and administrative support to be utilized to meet the requirements of this solicitation and the plan to meet those requirements. Identify necessary manning & staffing levels for the trades/skills needed and provide a rationale for how the manpower requirements and personnel qualifications were determined, and describe the processes used in hiring, recruiting, retention and replacement of personnel that meet the requirements of the solicitation.

Material Management – Offeror shall provide its approach to material management and parts supply support which will be compatible with the solicitation support requirements and shall specifically address the process(es) to be used to accomplish these tasks. The Offeror shall describe their ability to provide parts, material, property to comply with the SOW supporting the airframes in depot. This approach must also include procedures and methods of control related to the following areas:

Material Control Records

Repairables & Consumables

Transportation and Shipping

Control and Reporting of Parts Management, Disposal, Record Adjustment and parts that are Beyond Economical

Repair (BER), Critical Items List

Non-conforming parts

Aircraft on Ground (AOG) Parts Support: Demonstrate the approach to material and parts support for unscheduled airframe field maintenance support, AOG aircraft in the Continental United States (CONUS) and Outside

Continental United States (OCONUS) locations.

The Offeror shall provide a strategy for supporting the contractor furnished material requirements of the solicitation and their plan to meet those requirements. The Offeror shall provide information on projected parts utilization and strategies to address parts constraints, consumable shelf stock, parts management, or other means. In addition, the

Offeror shall provide a strategy on how its vendors, subcontractors and remanufacturing capability will support the maximum inductions identified in Section B of the solicitation.

Workload Fluctuation - The Offeror shall address its ability to meet workload fluctuation for scheduled and unscheduled maintenance requirements. Specifically, the Offeror shall address the ability, including projected lead-time requirements, to handle a fluctuation of inductions, along with accommodating unscheduled Airframe inductions and AOG field repairs.

Technical Processes - The Offeror shall describe its plan to comply with the technical documentation requirements listed in this solicitation per Attachment 5, P-8A Integrated Maintenance Program Depot Specification. Where technical documentation does not exist, the Offeror shall describe how and when specific work instructions will be approved, developed and implemented. The Offeror shall demonstrate how the critical repair processes (plating, coating, heat treatment, welding, NDI) will be accomplished and illustrate each critical repair process by means of a flow or block diagram in accordance with slide format herein. For each critical repair process the Offeror shall:

Identify, how the process is monitored to ensure compliance with quality requirements;

Identify, any process, or portion of a process, which will be accomplished at a vendor or satellite facility;

Describe the quality measures taken to ensure the integrity of the effort or service performed by the vendor or satellite facility; and

Include a description of the documentation and controls at the point in the process where a part is sent to a vendor or satellite facility for additional work or inspection, and at the point in the process where these parts are returned to the in-house manufacturing process. The Offeror shall provide a list of all vendors or satellite facilities to be used for each critical repair process.

Quality System - The Offeror shall describe the quality management system, certifications and practices for the proposed effort, including principal subcontractors, team members, or critical team members. The Offeror shall describe its systems and methods for continuous process improvement.

Turn-Around Time (TAT) for AEPD I and II Inspections

The Offeror shall provide the projected TAT for AEPD I and AEPD II inspections listed in Section H of this solicitation. The Offeror’s proposed TAT will be incorporated into the resultant contract as stated in SOW

Attachment 1 of this solicitation. The TAT breakout shall include estimated hours per task card.

Small Business Management

Small Business (SB) Utilization Strategy - All Offerors (Large and Small Businesses) shall address their strategies for utilizing SB Concerns in the performance of this contract, whether as a joint venture, teaming arrangement or subcontractor. SB Offerors may meet this requirement using work they perform themselves. For purposes of this solicitation, the term SB Concern shall also include the subcategories of Small Disadvantaged Business, Women-

Owned Small Business, HUB Zone Small Businesses, Veteran-Owned Small Business, Service-Disabled Veteran-

Owned Small Business concerns and Historically Black Colleges/Universities and Minority Institutions

(HBCU/MI), each subcategory of SB shall be addressed. This strategy is separate from, but shall be consistent with, the SB Subcontracting Plan, if such a Plan is required. In describing its SB Utilization Strategy for this solicitation, the Offeror shall, as applicable:

Describe its approach to identifying SB Concerns;

Describe the extent of participation of SB Concerns on this contract, including a detailed description of the supplies and services for each SB Concern subcategory, and the complexity and variety of the work SB Concerns are to perform. For each SB Concern specifically identified in the proposal, provide the SB Concern's CAGE Code, or, if the SB Concern is not registered in the System for Award Management (SAM), at a minimum provide evidence of self-certification in accordance FAR 19.703(b) as an SB Concern. Where possible, provide documentation regarding enforceable commitments to utilize each SB Concern.

Identify processes to correct inabilities to meet proposed goals with corresponding improvements that will be used on this contract;

Provide goals, expressed as dollars and percentages of total contract value and percentages of total subcontract value for SB Concerns and each subcategory of SB, using the format depicted below and provided electronically in

Attachment L-2 (Table T-1 Small Business Utilization Strategy). The Offeror shall provide Table T-1 as part of

Annex A ((Small Business Subcontracting Plan) and Table T-1 (Small Business Utilization Strategy)). This table does not replace the Subcontracting Plan requirements in FAR 19.7. Use tab 1 for the prime and tab 2 etc. for each

Tier One subcontractor as goals for each subcontractor must be listed separately;

Table T-1 Small Business Utilization Strategy

Offeror Name

Total Proposed Contract Value (including option periods) $

Total Amount to be Subcontracted

$ to be

Subcontracted

% of Total

Contract Value

% of Total

Amount to be

Subcontracted

Large Business

Small Business

Total 100%

Small Business Concern Subcategories

(the sum of these Small Business subcategories will not necessarily equal the

Small Business total above):

$ to be

Subcontracted

% of Total

Contract Value

% of Total

Amount to be

Subcontracted

VOSB

SDVOSB

HUBZone

SDB

WOSB

Describe its specific efforts and new, contract-specific initiatives to ensure the resulting contract meets or exceeds proposed goals. These efforts shall include, but are not limited to: sponsoring program specific outreach events and industry conferences, establishing Mentor-Protégé relationships and market research using websites such as the

NAVAIR Office of Small Business Programs website (http://www.navair.navy.mil/osbp ) to locate Small Business concerns.

Demonstrate (Large Businesses only) that it’s SB Utilization Strategy is consistent with its SB Subcontracting Plan.

If the Offeror is a participant in the DoD Comprehensive Subcontracting Test Program specified in DFARS 219.7, or if the Offeror submits a Commercial Subcontracting Plan for this proposal, then the Offeror shall describe how

SB participation on this contract will contribute to its overall Comprehensive or Commercial Subcontracting Plan goals.

Small Business (SB) Subcontracting Plan - Large Business Offerors shall provide a current Small Business

Subcontracting Plan conforming to the requirements of FAR 19.7 and DFARS 219.7 as part of Annex A. The SB

Subcontracting Plan of the successful Offeror(s) shall be reviewed and approved by the PCO prior to contract award.

See FAR 19.702(a) (1) Statutory requirements, regarding failure of the apparent successful Offeror to negotiate and submit a SB Subcontracting Plan or submit a Comprehensive or Commercial SB Subcontracting Plan acceptable to the Contracting Officer. The successful Offeror’s approved Subcontracting Plan will be incorporated into the resultant contract.

http://www.navair.navy.mil/osbp

Sample Task for incorporation of a Technical Directive - Attachment L-10 sets forth the requirements for Sample

Tasks and is for evaluation purposes only. The Sample Tasks are for the incorporation of all three Technical

Directives into a single aircraft concurrent with an AEPD. The Offerors shall provide a detailed narrative and work flow analysis to include the approaches, schedule, resources, skill mix and business controls required to successfully perform the effort and any impact to the proposed AEPD turnaround time. Workflow shall be illustrated by means of a flow or block diagram or description of work sequencing and identify the critical points in the process that will be monitored to measure process efficiency and quality. Attachment L-10 will be provided with the technical data per instructions in the solicitation.

Book 2: Part B – Engine

The Offeror shall provide a valid 14 CFR Part 145 Certificate for any facility performing repair or maintenance for the CFM56-7 engine. The Offeror’s submission shall include the Air Agency Certificates and related Ops

Specifications with a current Capabilities listing. Please provide the 14 CFR Part 145 Certificate in Annex B.

The Offeror or its team member(s) responsible for maintenance and repair of the CFM56-7 engine shall provide an

OEM certified test cell correlation summary report as described in the SOW Attachment 1.

Facilities/Equipment - The Offeror shall describe the facilities, including space and equipment, to be utilized to meet the requirements of this solicitation. Specifically, the Offeror shall describe the environmental controls for each shop, including temperature, humidity, and particulate controls. The description of the facilities shall address storage of units prior to and after repair. The Offeror shall provide a listing of all equipment to be utilized, including but not limited to: welding, plating, cleaning and NDI process requirements. If facilities or equipment are not currently available, the Offeror shall provide a plan to obtain the necessary facilities or equipment to meet the schedule and capacity requirements of this Contract. The Offeror shall demonstrate it has warehouse storage space of adequate size to store not less than 6 complete CFM-56-7 demountable power plants while awaiting induction and/or shipment after repair. The plan shall include information on dates and lead times for each item or process that the

Offeror does not currently possess. Additionally, the Offeror shall provide a strategy for protecting GFP from damage or loss while in their custody.

Manpower/Management - The Offeror shall describe the projected manpower requirements, including management, engineering, artisan, and administrative support to be utilized to meet the requirements of this solicitation and the plan to meet those requirements. Identify necessary manning & staffing levels for the trades/skills needed and provide a rationale for how the manpower requirements and personnel qualifications were determined, and describe the processes used in hiring, recruiting, retention and replacement of personnel that meet the requirements of the solicitation.

Material Management – Offeror shall provide its approach to material management and parts supply support which will be compatible with the solicitation support requirements and shall specifically address the process(es) to be used to accomplish these tasks. The Offeror shall describe their ability to provide commercially furnished parts, material, property to comply with the SOW performance metrics and schedule supporting the Engine requirements in depot and during AOG situations. The Offeror shall provide its approach to on-wing field maintenance and support list of all current field repair services they provide. In addition, the Offeror shall detail how they shall meet the SOW performance metrics Total TATs for the requisition shipment, delivery and repair of controlled items. This approach must also include procedures and methods of control related to the following areas:

Material Control Records

Repairables & Consumables

Transportation and Shipping

Control and Reporting of Scrap, Parts Management, Disposal, and Record Adjustment

Critical Items List

Non-conforming parts

AOG Parts Support: Demonstrate the approach to material and parts support for unscheduled engine field maintenance support, AOG aircraft in the CONUS and OCONUS locations.

The Offeror shall provide a strategy for supporting the contractor furnished material requirements of the solicitation and their plan to meet those requirements. The Offeror shall provide information on projected parts utilization and strategies to address parts constraints, including internal repairable pools, consumable shelf stock, parts management, or other means. In addition, the Offeror shall provide a strategy on how its vendors, subcontractors will support the maximum quantities identified in Section B of the solicitation.

Workload Fluctuation - The Offeror shall address its ability to meet workload fluctuation for scheduled and unscheduled maintenance requirements. Specifically, the Offeror shall address the ability, including projected lead-time requirements, to handle a fluctuation of scheduled inductions, along with accommodating unscheduled Engine inductions and Engine Field Assessment and Repairs.

Technical Processes - The Offeror shall describe its plan to comply with the technical documentation requirements listed in this solicitation CFMI work scope planning guide. Where technical documentation does not exist, the

Offeror shall describe how and when specific work instructions will be approved, developed and implemented. The

Offeror shall demonstrate how the critical repair processes (plating, coating, heat treatment, welding, NDI, rotor balancing, and bearing processing inspection capability) will be accomplished and illustrate each critical repair process by means of a flow or block diagram in accordance with slide format herein. For each critical repair process the Offeror shall:

Identify, how the process is monitored to ensure compliance with quality requirements;

Identify, any process, or portion of a process, which will be accomplished at a vendor or satellite facility;

Describe the quality measures taken to ensure the integrity of the effort or service performed by the vendor or satellite facility; and

Include a description of the documentation and controls at the point in the process where a part is sent to a vendor or satellite facility for additional work or inspection, and at the point in the process where these parts are returned to the in-house manufacturing process. The Offeror shall provide a list of all vendors or satellite facilities to be used for each critical repair process.

Quality System - The Offeror shall describe the quality management system, certifications and practices for the proposed effort, including principal subcontractors, team members, or critical team members. The Offeror shall describe its systems and methods for continuous process improvement.

Turn-Around Time (TAT)

Projections - Offeror shall provide description of mechanisms to ensure TAT does not exceed 60 days. The TAT breakout shall include Awaiting Maintenance and Awaiting Parts contributions and shall address the total TAT from induction to Government signature of the DD250.

Risk - The Offeror shall provide a risk mitigation plan that addresses potential risks to achieving the TAT in paragraph 2.2.2.1 above.

Small Business Management

Small Business (SB) Utilization Strategy - All Offerors (Large and Small Businesses) shall address their strategies for utilizing SB Concerns in the performance of this contract, whether as a joint venture, teaming arrangement or subcontractor. SB Offerors may meet this requirement using work they perform themselves. For purposes of this solicitation, the term SB Concern shall also include the subcategories of Small Disadvantaged Business, Women-

Owned Small Business, HUB Zone Small Businesses, Veteran-Owned Small Business, Service-Disabled Veteran-

Owned Small Business concerns and Historically Black Colleges/Universities and Minority Institutions

(HBCU/MI), each subcategory of SB shall be addressed. This strategy is separate from, but shall be consistent with, the SB Subcontracting Plan, if such a Plan is required. In describing its SB Utilization Strategy for this solicitation, the Offeror shall, as applicable:

Describe its approach to identifying SB Concerns;

Describe the extent of participation of SB Concerns on this contract, including a detailed description of the supplies and services for each SB Concern subcategory, and the complexity and variety of the work SB Concerns are to perform. For each SB Concern specifically identified in the proposal, provide the SB Concern's CAGE Code, or, if the SB Concern is not registered in the System for Award Management (SAM), at a minimum provide evidence of self-certification in accordance FAR 19.703(b) as an SB Concern. Where possible, provide documentation regarding enforceable commitments to utilize each SB Concern.

Identify processes to correct inabilities to meet proposed goals with corresponding improvements that will be used on this contract;

Provide goals, expressed as dollars and percentages of total contract value and percentages of total subcontract value for SB Concerns and each subcategory of SB, using the format depicted below and provided electronically in

Attachment L-2 (Table T-1 Small Business Utilization Strategy). The Offeror shall provide Table T-1 as part of

Annex A ((Small Business Subcontracting Plan) and Table T-1 (Small Business Utilization Strategy)).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .