N00019-15-R-4000_MQ-8C_RADAR_Industry_Day_FBO_20150727.pptx

PPTX presentation 6 MB Posted

Attached to
MQ-8C Maritime Search Radar
Solicitation number
N00019-15-PMA266-0029
Issued by

About this file

Presentation slides for MQ-8C RADAR Industry Day.

View the file

Other files

File Type Posted
Q A_4NOV2015.docx DOCX document
Industry_Day_Q A_FBO_13_Oct_2015.pdf PDF
MQ-8C_Maritime_Search_RADAR_Industry_Day_Attendees_09Oct2015.pdf PDF
Industry_Day_Q A_Unsorted_FBO_13_Oct_2015.pdf PDF
WP_CDRLs.pdf PDF
Attachment_5_Manufacturing_Readiness_Level_(MRL)_Users_Guide.xls XLS spreadsheet
RADAR_OEM_RFP_20150923.pdf PDF
TE_CDRLs.pdf PDF
Attachment_9_CPI_Work_Breakdown_Structure_(WBS).xls XLS spreadsheet
LG_CDRLs.pdf PDF
Attachment_3_DD_Form_254_Security_Classification_Specification.pdf PDF
Attachment_1_RADAR_POR_SOW.pdf PDF
Attachment_12_Priced_Bill_of_Material_Data_Item.docx DOCX document
Attachment_4_RADAR_PWBS_Index_Dictionary.xlsx XLSX spreadsheet
Attachment_6_Technology_Readiness_Assessment_(TRA).pdf PDF
CM_CDRLs.pdf PDF
PM_CDRLs.pdf PDF
Attachment_8_DD1921_Cost_Data_Summary_Report.xls XLS spreadsheet
Attachment_7_TRA_Critical_Technology_Element.xlsx XLSX spreadsheet
Attachment_11_CDRL_Submittal_Approval_Rejection_Form.docx DOCX document
Attachment_2_RADAR_POR_Perf_Spec.pdf PDF
SE_CDRLs.pdf PDF
N00019-15-R-4000_Exhibit_A_DD1423_CDRL_DRAFT_20150717.pdf PDF
N00019-15-R-4000_Att_8_DON_CPI_WBS_ToolV1_01_(12_Aug_2008)_20150717.xls XLS spreadsheet
N00019-15-R-4000_Att_2_PBS_DRAFT_FBO_20150717.docx DOCX document
N00019-15-R-4000_Att_7_DD1921_CDSR_20150717.xls XLS spreadsheet
N00019-15-R-4000_RADAR_OEM_RFP_DRAFT_FBO_20150717.docx DOCX document
N00019-15-R-4000_Att_6_TRA_Guide_2011_20150717.pdf PDF
N00019-15-R-4000_Att_5_MRL_Users_Guide_V12.5.16_20150717.xls XLS spreadsheet
N00019-15-R-4000_Att_4_RADAR_PWBS_Index_Dictionary_20150717.xlsx XLSX spreadsheet
N00019-15-R-4000_Att_1_SOW_DRAFT_FBO_20150717.docx DOCX document
N00019-15-R-4000_Att_3_DD254_For_Bidding_Purposes_Only_20150717.pdf PDF
Registration_Sheet.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MQ-8C RADAR Source Selection Industry Day 29 July 2015

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Unclassified NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Agenda

PhaseBrieferTime
Check-inEntry Tables/SMHEC08:00 – 08:30
Ground Rules/Admin08:30 – 08:35
PM’s Opening Comments08:35 – 08:50
Operational Need08:50 – 09:00
Program Overview09:00 – 09:30
Procurement Strategy Overview09:30 – 09:45
Source Selection Overview09:45 – 10:15
Break10:15 – 10:30
Technical Overview10:30 – 11:00
Summary11:00 – 11:05
Wrap-Up, QuestionsAs Required11:05 – 11:30
Lunch11:30 – 13:00
Scheduled One-on-One Meetings13:00 – 17:00

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited From BWI ----- To Southern Maryland Higher Education Center (SMHEC)

Start: Baltimore/Washington International Thurgood Marshall Airport Baltimore, MD 21240

Follow Service Rd Lower Level and Elm Rd to MD-170 N Take I-97 S, Solomons Island Rd, MD-2 S, MD-4 S, and MD-235 N to Airport Rd in 8, Bay Turn left onto Airport Rd Destination will be on the left

End: 44219 Airport Rd, California, MD 20619

Directions to SMHEC

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Building Admin

Industry Day Conference Room RM 119: Break Out Room

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Building Admin (continued)

119 Break Out Room

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

The remarks today of Government officials involved in the MQ-8C RADAR procurement should not be considered a guarantee of the Government’s course of action in proceeding with the project or of a future contract award.

The information shared today reflects current Government intentions and is subject to change based on a variety of circumstances, including internal and external comments.

The formal solicitation is the only document that should be relied upon in determining the Government’s requirements.

Disclaimer

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Primary Purpose -Ensure clear understanding of the planned contract action All attendees must sign-in Please silence cell phones and pagers (all electronic devices) No recording No classified information will be shared at this time This is an informational briefing only No information exchanged at this briefing or during follow-on one-on-one meetings will be considered “Bid and Proposal Information” or “Source Selection Sensitive Information” Please hold questions to the end of each briefing section Submit questions in writing on question submittal forms (provided at the sign-in table). Questions will be collected during each briefing segment Presentation, questions & responses, and a list of attendees will be posted on the FedBizOpps website via NAVAIR FBO Solicitation# N00019-15-PMA-266-0029 http://www.fbo.gov All communications shall be directed through the Contracting Office POC: Mr. Raymond Cannon Email: Raymond.C.Cannon@navy.mil Ground Rules

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited All questions from today’s briefing’s and one-on-one’s must be written and submitted on the provided forms After today the Government will entertain additional questions via email to Mr. Ray Cannon, NAVAIR Contracting Specialist, at the following e-mail address: raymond.c.cannon@navy.mil The cutoff date for follow-on questions will be Wednesday, 12 August.

The Government will post germane responses to FedBizOpps (www.fbo.gov).

Attendee list from Industry day will be publicized. Information publicized may be used for potential subcontracting opportunities.

Questions

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited PM’s Opening Comments

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited MQ-8 Program Information

MQ-8B

Milestone “C” (2007) 1st FFG deployment (1QFY10) Initial Operational Capability (IOC) (2QFY14) 1st LCS deployment (1QFY15) Total of 30 Avs; all procured MQ-8B RADAR (Telephonics ZPY-4) MQ-8B Weapons (Advanced Precision Kill Weapons System – APKWS II)

MQ-8C

Began as Rapid Deployment Capability (RDC) MS C planned for 3QFY16 Dynamic Interface (DI) testing on DDG-109 1QFY15 Initial Operational Test & Evaluation (IOT&E) on LCS planned 1QFY17 443 Flt Hrs Total procurement: 40 AV; 19 under contract

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Pioneer POR tied to LCS Schedule delays FFG afforded the program opportunity to field the system in the interim while waiting for LCS to deliver

JUON => JEON (2012)

3 orbits MRMUAS – AoA => Effort cancelled the program. MQ-8C is a suitable interim solution UON => FAC/FIAC (RADAR / Weapons) Generated three rapid deployment capabilities, and afforded the acquisition to accelerate procurement and fielding vice going through the slower deliberate acquisition process

MQ-8 System Current Activities MQ-8B has flown over 15,365 flight hours since 2006 MQ-8C has flown over 443 flight hours since 2013

LCS-1 Dynamic Interface (DI) testing on LCS-1, LCS-3, and LCS-4 COBRA MCM Capability land testing (Apr 2013) LCS-3 Deployment (1QFY15) MQ-8 Support to Small Surface Combatants Coast Guard MQ-8B 10th FFG deployment complete aboard USS Simpson Maritime ISR Support to SOF (MQ-8B) Flying qualities testing Safe Separation shots Land-based QRA (Jun 2013)

- 12 APKWS shots LCS testing still required Weapons Provides wide-area maritime search capability QRA 3QFY15 (Late May)

MQ-8B RADAR

Demonstration of MQ-8B on WMSL 750 (December 2014)

Support LCS Missions in Conjunction with the MH-60

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Updated to match CPD Brief 12/12/2014. Flight hours updated on 4/30/2015

MQ-8 UAV

MQ-8B/MQ-8C Comparison

MQ-8C: 3 ft Longer (folded), 1 ft Taller, 2.5 ft Wider & 1200# Heavier than MQ-8B

31.5

MQ-8BParameterMQ-8C
85 ktsMaximum Speed135 kts
80ktsCruise Speed115kts
12,500 ftService Ceiling16,000ft
5.5 hrsStd Day Maximum Endurance (with 300lb payload)12 hrs
4.5 hrsHot Day Maximum Endurance (with 300lb payload)10 hrs
2,000 lbsEmpty Weight3,200 lbs
3,150 lbsStd Day Fuel & Payload6,000 lbs
31.5 ftLength (folded)34.7 ft

(folded) (folded)

7.58 ft 27.5 ft

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

PMA-266 Product Roadmap

MQ-8B S/W Baseline

TCS Solaris MQ-8C S/W Baseline

B/C Common S/W TCS Linux

Linux Fleet Release MQ-8 Air Vehicle Mission Control System MQ-8 Mission Systems 2014 2016 2018 2020

Software

MQ-8B EO/IR/LDRF

MQ-8C EO/IR/LDRF

MQ-8C RADAR

MQ-8B RADAR RDC

MQ-8C Weapons MQ-8B Weapons RDC MQ-8B COBRA Demo

MQ-8C COBRA, DMP

Linux-Based MCS

MCS/CCS

Solaris-Based MCS

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Operational Need

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Validated Capability Requirements The MQ-8 System addresses sea-based ISR capability gap

NAVCENT Urgent Operational Needs Statement (UONS) dated 15 May 2011 (Armed-Sea Based, Multi-INT, Unmanned Aerial Systems)* RADAR requirement

The “draft” Capability Production Document (CPD) For MQ-8C Fire Scout System captures the requirements for the MQ-8C Endurance Baseline, Surface Warfare (SUW) and Mine Countermeasures (MCM) Increments*

*Note: Internal Government Documents will not be made available to Offerors. Requirements are flowed into PBS and SOW provided to Offerors through FBO.

Requirements

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Overview:

The MQ-8C System will provide an organic persistent ISR capability to LCS or Suitably-Equipped Air Capable Ship (SEACS) supporting SUW missions as assigned or tasked.

The MQ-8C System will operate as a component of a composite aviation detachment (AVDET) employing the MH-60 and MQ-8.

With integrated RADAR, MQ-8C will dramatically increase maritime search, detection and localization capability and extend the area of influence for LCS or SEACS.

Tasking originates either from the host platform commander in support of independent steaming operations or from external sources, such as the daily collection plan from the numbered fleet or task force commander articulated in the air tasking order.

SUW Mission:

Conduct missions with a variety of payloads (EO/IR, LDRF, AIS, APKWS II, and RADAR) due to increased endurance and payload capacity.

Maritime RADAR and the EO/IR/LRDF afford the platform to cross cue and expand the utility of the MQ-8C as a surface surveillance coordination asset.

Expanded capabilities of RADAR can provide increased situational awareness and targeting information in support of surface units.

Integrated with APKWS II, the MQ-8C is capable of defeating soft to light armor moving and stationary small surface craft in defense of host platform or other surface vessels.

Concept of Operations

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

OV-1

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited MQ-8C RADAR Program Overview

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

SRR

Integration & Test (RADAR OEM Directed subk Radar POR Schedule

FY15FY16FY17FY18FY19FY20
1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q
RadarContracts
Radar OEM
NGC
RAY
SETR
SIL
Test & Evaluation
AV Mods

Phase 1

SRR

Integration & Test (RADAR OEM Directed subk Phase 2

DT

OT

Eng & Int

FQT/SIT

COD

OA

RFP

CDR

SRR

PDR

TRR

CA

CA

CA

CA

CA

FRR

EMD2

OTRR

EMD1

P2

P1 OEM base OEM Option 1 OEM Option 2 OEM Option 3

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Competitively select Non-Developmental Item (NDI) maritime RADAR for integration into the MQ-8C Fire Scout System Multiple phases:

Phase I Contract Award through System Requirements Review (SRR) close-out, Phase II SRR through completion of Follow-On Test & Evaluation (FOT&E)

RADAR Original Equipment Manufacturer (OEM) will collaborate with MQ-8 Fire Scout prime (Northrop Grumman Corporation) and Tactical Control System (TCS) prime (Raytheon Company) to integrate selected RADAR into the MQ-8C Fire Scout System through Associate Contractor Agreement (ACA) and subcontracting relationships Complete integration and FOT&E within (3) three years

Utilize standardized interfaces/messaging

Result of RADAR Competition:

Competitive award winner will enter into three contracts:

Prime RADAR OEM Contract (Includes SRR) Integration Contracts (x2, 1e@ with NGC and RAY) MQ-8C RADAR Program Strategy

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Phase I:

NGC AS & Raytheon will be awarded “SRR” contracts concurrently with the award of the RADAR OEM contract All three vendors (NGC AS, Raytheon, & RADAR OEM) work collaboratively (ACA) to prepare and present an SRR

Phase II:

NGC AS & Raytheon will be awarded “Integration” contracts to complete the integration of the selected RADAR with the MQ-8C Fire Scout system RADAR OEM will be a directed subcontractor, as required, on these efforts Hardware deliveries from the RADAR OEM contract will be used to support Systems Integration Laboratory (SIL) and Air Vehicle (AV) modification for ground and flight test activities Other Contract Actions

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited MQ-8C RADAR Procurement Overview

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Target DateEvent
22 Jul 2015Draft RFP Release
29 Jul 2015Industry Day
12 Aug 2015Industry Day Follow-on question cut-off
19 Aug 2015Final RFP Release
5 Oct 2015Proposals Due: Close of Business (4pm Eastern)
4 Mar 2016Planned Contract Award

MQ-8C RADAR Key Events

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Contract-related information is posted to this website:

http://www.fbo.gov NAVAIR FBO Solicitation# :

N00019-15-PMA-266-0029

All official information and updates to this solicitation will be posted here FedBizOpps Website

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Contracts Team:

Procuring Contracting Officer: Erik Barkhimer (Erik.Barkhimer@navy.mil) Contracts Specialist: Raymond Cannon (Raymond.C.Cannon@navy.mil)

Contract Vehicle New contract Firm Fixed Price (FFP) CLINs for Non-Recurring Engineering (NRE) and Production Units Anticipated Travel should be included in FFP CLINs

Product and Service Code: 5841 – RADAR Equipment, Airborne

POP: Base and three options

Estimated formal solicitation release 19 August 2015

Estimated Contract Award March 2016

Contracts Remarks

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

CLIN 0001

Successful conduct of an Systems Requirements Review (SRR)

CLIN 0002

RADAR Weapons Replaceable Assemblies (WRAs) Qualification for the Fire Scout

CLIN 0003

RADAR OEM Tactical Control System (TCS) Non-Recurring Engineering (NRE)

CLIN 0004

Production of RADAR B-kits for the HITL, ground, and flight test; Five (5) complete RADAR B-Kits (1 Qualification, 4 SIL/AV/Spare)

CLIN 0005

Data for CLINs 0001 through 0004 CLINs 0006, 0008, and 0010 Options for production B-kits. Four (4) complete RADAR B-kits per CLIN CLINs 0007, 0009, and 0011 Data for CLINs 0006, 0008, and 0010 (Options for Production B-Kits)

RADAR OEM Contract Structure

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

U.S. Prime Contractor Submits Approved DSP-5 and Technical Assistance Agreement (TAA) Which Authorizes Release of MQ-8C RADAR PBS to Foreign Subsidiary Ensure that U.S. Navy is a Party to the DSP-5/TAA so that NAVAIR can discuss MQ-8C RADAR PBS with Foreign Subsidiary PCO to submit DSP-5/TAA to NAVAIR Security (AIR-7.4) for Review AIR-7.4 Notifies PCO of Concurrence with Release to Foreign Subsidiary PCO notifies U.S. Prime Contractor via e-mail of AIR-7.4 Concurrence U.S. Prime Contractor can then release MQ-8C RADAR PBS to Foreign Subsidiary

Procedures for Release of MQ-8C RADAR PBS to Foreign Subsidiaries DO NOT RELEASE MQ-8C RADAR PBS TO FOREIGN SUBSIDIARY UNTIL YOU RECEIVE PCO E-MAIL AUTHORIZING RELEASE!!

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

CLINDelivery Date/RangeLocation
0001Feb 2016 – Aug 2016Patuxent River, MD
0002Feb 2016 – Feb 2017Patuxent River, MD
0003Feb 2016 – Apr 2017Patuxent River, MD
0004Jul 2017- Jul 2017Pt. Mugu, CA
0005Feb 2016 – Jul 2017Patuxent River, MD
0006Jul 2018Pt. Mugu, CA
0007Jul 2018Patuxent River, MD
0008Jul 2019Pt. Mugu, CA
0009Jul 2019Patuxent River, MD
0010Jul 2020Pt. Mugu, CA
0011Jul 2020Patuxent River, MD

Period of Performance/Delivery Schedule Notional Delivery Schedule

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Deliveries, Continued

Propose reasonable timeframe to perform in accordance with Statement of Work

Displayed schedule range in RFP is for bidding purposes only.

Contractor proposed schedule and Integrated Master Schedule (IMS) will be incorporated into the contract.

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Document No.Description
Exhibit ACDRLs/ Work Products
Attachment 1Statement of Work
Attachment 2Radar Performance Specification for the VTUAV (MQ-8C)
Attachment 3DD254 Security Classification Specification
Attachment 4Radar PWBS Index Dictionary (excel spreadsheet)
Attachment 5Manufacturing Readiness Level (MRL) Users Guide (excel spreadsheet)
Attachment 6Technology Readiness Assessment (TRA) Guide
Attachment 7DD1921 Cost Data Summary Report (excel spreadsheet)
Attachment 8CPI Work Breakdown Structure (WBS) (excel spreadsheet)
Attachment 9Data Assertions List (To be provided by Offeror within Proposal )

Attachments The following attachments are available on FBO to assist in development of Offeror proposals:

NAVAIR FBO Solicitation# N00019-15-PMA-266-0029

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Allocated Internal Volume and WeightGFI
MQ-8C Aircraft Drawings and Outer Mold LinesGFI
Government Work Breakdown StructureGFI
Sample Chart A and Chart EGFI
MQ-8C Environmental EnvelopeGFI

Government Furnished Information The following Government Furnished Information (GFI) will be made available to Offeror’s for purposes of proposal development:

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Data Rights Clauses to Highlight DFAR 252.227-7013 Data, Unlimited Rights DFAR 252.227-7014, Software, Unlimited Rights

Data Assertions List (DAL) to be provided with Offeror’s proposal as Attachment 9 to the model contract

Data Rights The Government requires explicit identification of Data Rights

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Source Selection: Overview

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Government intends to award on a best-value basis Offerors are cautioned that their initial offers shall contain the Offeror’s best terms from a technical and price standpoint.

Government reserves the right to conduct discussions and request proposal revisions if it is determined to be in the best interest of the Government.

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Support your statements with facts, analysis (if appropriate) and substantiating data to illustrate that your approach is realistic and reasonable Provide clear and concise descriptions / justifications Offerors must meet all Minimum Technically Acceptable subfactor elements to be considered Acceptable Can an evaluator quickly find what he/she needs?

Is it clear?

Is it well organized?

Drawings and diagrams complement narrative, but don't replace it Proposal Preparation Guidance

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Substantiate, do not simply make claims Making statements such as "we understand, we are committed, we are capable, our experience ensures, we comply” are not acceptable Don’t exceed page limits Additional Information that exceeds page limits will not be evaluated Proposal Preparation Guidance (Cont.)

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Proposal Structure (Volume Submission) Pay close attention to Page Count Limits

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Evaluation Factors Technical Factor Minimum Technically Acceptable Subfactor Desired Technical Subfactor Price Factor Past Performance Factor Aero Performance

MFHBOMF

Add’l RADAR Modes System Growth Simultaneous Modes

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Technical Factor Minimum Technically Acceptable Subfactor 31 Elements Failure to meet will result in the proposal being deemed Unacceptable and no further evaluation of the Proposal will be made Desired Technical Subfactor 5 elements For each a Technical Rating and Technical Risk Rating will be assigned In order to receive credit for a Desired Technical Subfactor element, the Offeror must provide substantiation for meeting a TRL 6+ maturity at a minimum for each element

For proposals which receive a Minimum Technically Acceptable Rating of Technically Acceptable, their overall Technical Rating will be adjusted to match the Technical rating received from the evaluation of the Desired Technical Subfactor elements Evaluation: Technical

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Evaluation Factors Technical Factor Minimum Technically Acceptable Subfactor Desired Technical Subfactor Price Factor Past Performance Factor Aero Performance

MFHBOMF

Add’l RADAR Modes

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited The total evaluated price will be the sum of the Base Period CLINs plus the sum of any option Period CLINs Understatements / Overstatement / Inconsistencies between the Technical and Price proposals may reflect a lack of understanding of the work and could impact the technical rating and/or risk assessment Government Incurred Costs:

Govt. Production & Research Property Govt. Furnished Property Adjustments will be made to Offeror’s proposal for all Government incurred costs associated with accomplishing the Offeror’s proposed program, except where costs are equal among Offerors Evaluation: Price

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Reasonableness and Consistency between the Technical and Price Volumes Show traceability with the CLINS, SubCLINs, the PWS, proposed effort, proposed manning levels, and the prices Provide Contractor Work Breakdown Structure (CWBS) that aligns with Program WBS (PWBS) Provide completed DD 1921 Evaluation: Price (cont.)

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Evaluation Factors Technical Factor Minimum Technically Acceptable Subfactor Desired Technical Subfactor Price Factor Past Performance Factor Aero Performance

MFHBOMF

Add’l RADAR Modes

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Offeror shall identify any contracts performed within five years of this proposal submission date, which contain efforts similar to those performed by Offeror For each contract identified, provide contract data, relevancy, past performance, and systemic improvement information For contracts that have CPARS Reports that are more than six months old, the Offeror shall forward a copy of the CPARS Update Questionnaire (Attachment 1) to that contract customer’s Program Manager For all contracts identified that do not have CPARS Reports, the Offeror will forward a copy of the Past Performance Questionnaire (Attachment 2) to that contract customer’s PCO, Administrative Contracting Officer, and Program Manager Evaluation: Past Performance

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Government will evaluate the Offerors’, and (if applicable) it’s principal and critical subcontractors’ and JV team members’ demonstrated past performance in delivering quality products and services similar to the solicitation requirements

Currency and relevance of the contract and past performance information, source of the information, context of the data, and general trends in contractor’s performance will be considered Evaluation: Past Performance (Cont.)

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Evaluation:

Overall Weighting of Factors

TECHNICAL

(Rating & Proposal Risk) Minimum Technically Acceptable Key:

> (more important) = (equal);

>> (significantly more important)

PAST

PERFORMANCE

(Performance Risk)

COST/PRICE ($$$)

Desired

TECHNICAL

(Rating & Proposal Risk) Minimum Technically Acceptable Desired

COST/PRICE ($$$)

PAST

PERFORMANCE

(Performance Risk)

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Evaluation:

Weighting of Desired Technical Subfactors

Aero Performance Reliability

Additional Radar Modes Provisions for Radar System Growth Simultaneous Operation of Radar Modes Key:

> (more important) = (equal);

>> (significantly more important)

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Technical Overview

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Evaluation Factors Technical Factor Minimum Technically Acceptable Subfactor Desired Technical Subfactor Price Factor Past Performance Factor Aero Performance

MFHBOMF

Add’l RADAR Modes

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Technical Overview

Radar Overview Factors Spec Highlights

MQ-8C

Air Vehicle MQ-8 System Interfaces / Standards

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited MQ-8C Radar system conceptually includes:

A maritime radar set consisting of an antenna system, receiver-transmitter, and a data processor A radome to protect the antenna system Software residing on the host vehicle for interfacing to the radar set Software residing in the TCS for display of radar information and radar control for the operator Considered a permanent installation

MQ-8C Radar System Overview <DRAFT> Radar System Performance Specification for the VTUAV (MQ-8C) 17 July 2015.

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Evaluation Factors Technical Factor Minimum Technically Acceptable Subfactor Desired Technical Subfactor Price Factor Past Performance Factor Aero Performance

MFHBOMF

Add’l RADAR Modes

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Consists of two Subfactors Minimum Technically Acceptable Subfactor 31 mandatory elements Desired Technical Subfactor 5 prioritized elements Technical Factor

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Evaluation Factors Technical Factor Minimum Technically Acceptable Subfactor Desired Technical Subfactor Price Factor Past Performance Factor Aero Performance

MFHBOMF

Add’l RADAR Modes

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

CriteriaPBSSOW
RADAR Field of Regard3.2.2N/A
Long Range Search Mode3.2.3.3N/A
Short Range Search Mode3.2.3.2N/A
Inverse Synthetic Aperture RADAR (ISAR) Mode3.2.4N/A
Synthetic Aperture RADAR Spot/Strip Mode3.2.11.1 3.2.11.2 3.2.11.3N/A
Provisions for High Range Resolution Mode3.2.6N/A
RADAR System Volume (External)3.11.2.2N/A
RADAR System Volume (Internal)3.11.2.1N/A
System Weight3.11.1N/A
System Power3.3.2
3.3.2.1-11N/A

Min Technically Acceptable Elements

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

CriteriaPBSSOW
Datalink Downlink BandwidthA.1.2.3N/A
System Manufacturing Readiness LevelMRL Users Guide 10 Dec 2014
System Technology Maturity LevelTRA Guide April 2011
RADAR Message/Data Formats3.2.10.1.1.22N/A
Cybersecurity ComplianceN/A4.6.3
Cybersecurity Defense-in-DepthN/A4.6.3
Critical Program InformationN/A4.6.6
Anti-TamperN/A4.6.4
All-Weather Capable3.7.11.1.1-2
3.7.11.1.2.1-2N/A
Fire Scout-RADAR Integration/AirworthinessN/A4.7

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

CriteriaPBSSOW
Mean Flight Hours Between Operational Mission Failure3.8.1.26.8.1
Shipboard Compatibility/Environmental Qualification3.7,
3.7.21-264.1.3.6
Integrated Master ScheduleN/A3.1

8.2.1 9.2.1 10.2.1

Systems Engineering Management Plan4.3.1
Test & Evaluation Approach4.0,
4.1-25.1-6
Risk ManagementN/A3.3
Production, Manufacturing, and Quality Assurance ApproachN/A4.4.4

4.4.5 7.1-4

Subcontract ManagementN/A3.6
Integrated Logistics SupportN/A6.1-6
Small Business Subcontracting PlanN/AN/A
Red-Lined SOWN/AN/A

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Evaluation Factors Technical Factor Minimum Technically Acceptable Subfactor Desired Technical Subfactor Price Factor Past Performance Factor

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Minimizes external MQ-8C weight/volume provide min of 240 deg forward looking coverage azimuth range may be varied to improved external SWaP Ability to exceed reliability requirements emphasis on the ability to exceed Mean Flight Hours Between Operational Mission Failures Additional RADAR modes e.g. Weather detection, air-to-air, Ground Moving Target Indicator, and/or Identification Friend or Foe System attributes to accommodate future growth e.g. Additional WRA card slots, CPU/memory utilization below 50%, system architecture, etc.

Simultaneous/Multi-Mode operation e.g. Track-While-Scan, simultaneous surface and air search, simultaneous surface search and weather, etc.

Desired Technical Elements

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Size, Weight, and Power (SWaP) Int: GFI Ext: < 12” below the belly of the aircraft & diam < 30” Airborne portion not more than 150 pounds 28VDC and < 1,500 Watts Downlink Bandwidth Approx. 2 MB/S Constrained by TCDL bandwidth capability RF Transmit Safety Interlock Convection air cooled

PBS Considerations

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Phase II NGC AS & Raytheon will integrate the selected RADAR with the MQ-8C Fire Scout system RADAR OEM will be a directed subcontractor Exact installation location determined by NGC during Phase II Allowable internal volume dependent on location Navy seeks to Minimize external volume Eliminate / reduce added equipment in AV nose

Radar Installation

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

System - Components Encrypted, Digital Data Links; Land & Sea Ops Control Station with Tactical Control System (TCS) software integrated

GCCS-M, JDISS, AFATDS, CCTV & JSIPS-N

NATO STANAG 4586 Compliant Multi-Vehicle control

Mission Control System (MCS) Airframe Dual Redundant Control System and C2 links

COBRA

Radar (Maritime Surface Search/ISAR/SAR) Weapons

AIS

TACISR / Vortex BriteStar II EO/IR/LR/LD Payloads in Test Phase Operational Payloads UCARS-V2 for Ship Launch/Recovery

Tactical Control Data Link (TCDL)

Autonomous Aircraft

MQ-8B

MQ-8C

Open System Architecture facilitates integration and testing

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Interfaces PARVUS Router (2) (Switch)

Navigator (Ethernet)

TCDL (2)

(Ethernet)

EO/IR

RS-422 (C2)

RS-170 (Video)

Twister (Ethernet)

AIS

(Ethernet)

PIU

Radar (TBD)

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited System Block Diagram 2-66

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Standards

SpecificationsDocument No.
Payload Element Specification
Communication Element Specification
Air Communications Subsystem Specification
Mission Management Subsystem Specification
EO/IR Subsystem Specification
Payload Interface Unit SRS
System Specification for the Wideband Line Of Sight (WB-LOS) System
Digital ICD
Digital Rader ICD Reference Document
Java and C++ files

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Wrap-Up

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited A Best Value Source Selection MTA Go-No Go for Continued Proposal Review Desired Technical Rating will become final Technical Rating NDI Maritime Radar in support of MQ-8C Fire Scout UAS Phase I is to SRR Associate Contractors: NGC/Raytheon Phase II is Integration/Test Radar OEM Directed Sub to NGC/Raytheon Main Competitive Radar OEM Contract intended to continue through both Phases (+) Directed Sub to Standalone Govt. Contracts with NGC & Raytheon Summary

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Today’s remarks by Government officials are not a guarantee of the Government’s course of action in proceeding with the project or of a future contract award.

The information shared today reflects current Government intentions and is subject to change based on a variety of circumstances, including internal and external comments.

Reminder The formal solicitation is the only document that should be relied upon in determining the Government’s requirements

Check FedBizOpps www.fbo.gov:

NAVAIR Solicitation #: N00019-15-PMA-266-0029

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

Questions?

MQ-8C Radar OEM Source Selection

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Attendees

Company
Rockwell Collins
General Atomics Aeronautical Systems
RDRTec, Inc.
Northrop Grumman AS
Northrop Grumman ES
Ball Aerospace & Technology
EDO Corporation
Silver Bulletin Solutions, Inc.
L-3 Mustang Technology
SELEX Galileo, Inc.
Curtiss-Wright Defense Solutions
Cypress International
Telephonics Corporation
Raytheon Company
Harris Corporation
L-3 Communications

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited For Informational Purposes Only (Non Source Selection)

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited Systems Engineering Technical Review (SETR) Process All NAVAIR programs conduct major engineering technical reviews in accordance with NAVAIR INSTRUCTION 4355.19D Ensures Systems Engineering processes are followed throughout the acquisition phases Imposes entrance and exit criteria for major technical reviews Requires completion of checklists to meet expectations for reviews Can be tailored to some degree based on acquisition approach Normally Chaired by a senior Systems Engineering person and augmented by panel members of other engineering disciplines

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited

NAVAIR Public Release Authorization SPR-2015-651. Distribution Statement A- Approved for Public Release; distribution is unlimited image4.png image3.png image6.gif image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.jpeg image16.jpeg image17.png image18.png image19.jpeg image20.jpeg image21.emf image22.jpeg image23.jpeg image24.jpeg image25.emf image26.emf image27.emf image28.png image29.png image30.png image31.emf oleObject1.bin

Vendor Proposals

Evaluate Against 31 Minimum Technically Acceptable Subfactor Elements

Proposal Meets All MTA Criteria?

Evaluate Proposal Against 5 Desired Technical Subfactor Elements

Yes

Proposal not considered for further evaluation

No

Evaluate Proposal Price/Conduct Price Adjustments

Evaluate Vendor’s Past performance

Compile Results based on Technical being significantly more important than Cost being significantly more important than Past Performance

Best value?

Select Offeror for Award

Do not Select

Yes

No image32.emf

Microsoft_Word_Document1.docx Volume Number

Volume Title

Page Limit

Copies Required

EXECUTIVE SUMMARY

1 Original/8 Copies

TECHNICAL

90 (Exclusive of Offeror SOW)

1 Original/8 Copies

2 Annex A

Completed SF33/Model Contract

N/A

2 Annex B

Small Business Subcontracting Plan

N/A

PAST PERFORMANCE

1 Original/8 Copies

PRICE

1 Original/8 Copies image33.jpg image41.png image34.jpeg image35.jpeg image36.jpeg image37.jpeg image38.jpeg image39.jpeg image40.jpeg image42.jpg image43.png image5.png image7.png image2.png