Program Work Breakdown Structure Index

View the file

Other files

File Type Posted
Q A_4NOV2015.docx DOCX document
Industry_Day_Q A_FBO_13_Oct_2015.pdf PDF
MQ-8C_Maritime_Search_RADAR_Industry_Day_Attendees_09Oct2015.pdf PDF
Industry_Day_Q A_Unsorted_FBO_13_Oct_2015.pdf PDF
WP_CDRLs.pdf PDF
Attachment_5_Manufacturing_Readiness_Level_(MRL)_Users_Guide.xls XLS spreadsheet
RADAR_OEM_RFP_20150923.pdf PDF
TE_CDRLs.pdf PDF
Attachment_9_CPI_Work_Breakdown_Structure_(WBS).xls XLS spreadsheet
LG_CDRLs.pdf PDF
Attachment_3_DD_Form_254_Security_Classification_Specification.pdf PDF
Attachment_1_RADAR_POR_SOW.pdf PDF
Attachment_12_Priced_Bill_of_Material_Data_Item.docx DOCX document
Attachment_6_Technology_Readiness_Assessment_(TRA).pdf PDF
CM_CDRLs.pdf PDF
PM_CDRLs.pdf PDF
Attachment_8_DD1921_Cost_Data_Summary_Report.xls XLS spreadsheet
Attachment_7_TRA_Critical_Technology_Element.xlsx XLSX spreadsheet
Attachment_11_CDRL_Submittal_Approval_Rejection_Form.docx DOCX document
Attachment_2_RADAR_POR_Perf_Spec.pdf PDF
SE_CDRLs.pdf PDF
N00019-15-R-4000_MQ-8C_RADAR_Industry_Day_FBO_20150727.pptx PPTX presentation
N00019-15-R-4000_Exhibit_A_DD1423_CDRL_DRAFT_20150717.pdf PDF
N00019-15-R-4000_Att_8_DON_CPI_WBS_ToolV1_01_(12_Aug_2008)_20150717.xls XLS spreadsheet
N00019-15-R-4000_Att_2_PBS_DRAFT_FBO_20150717.docx DOCX document
N00019-15-R-4000_Att_7_DD1921_CDSR_20150717.xls XLS spreadsheet
N00019-15-R-4000_RADAR_OEM_RFP_DRAFT_FBO_20150717.docx DOCX document
N00019-15-R-4000_Att_6_TRA_Guide_2011_20150717.pdf PDF
N00019-15-R-4000_Att_5_MRL_Users_Guide_V12.5.16_20150717.xls XLS spreadsheet
N00019-15-R-4000_Att_4_RADAR_PWBS_Index_Dictionary_20150717.xlsx XLSX spreadsheet
N00019-15-R-4000_Att_1_SOW_DRAFT_FBO_20150717.docx DOCX document
N00019-15-R-4000_Att_3_DD254_For_Bidding_Purposes_Only_20150717.pdf PDF
Registration_Sheet.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWBS_Index

PWBS CodeProgram Work Breakdown Structure IndexProgram: Fire Scout Radar SUW IncrementRFP NO: XXXXXContract Plan No: xxxxxx
Contractor Name:
Contract No: xxxx
Date:
Name of Preparer:
Phone Number:
Email Address:
PWBS ELEMENTPWBS ELEMENT NAME
LEVEL
123456
1.0XFire Scout Radar
1.1XPrime Mission Product (PMP)
1.1.1XExpeditionary Radar Assembly (ERA)
1.1.1.1XERA Hardware
1.1.1.1.1XRadome
1.1.1.1.2XAntenna Frame, Structure, Mounting
1.1.1.1.3XVertical Assembly & Radiating Elements
1.1.1.1.4XPower Suppliers at TR Modules
1.1.1.1.5XBeam Steering Control Module
1.1.1.1.5.1XBeam Steering Control Module Hardware
1.1.1.1.5.2XBeam Steering Control Module Software Release
1.1.1.1.5.3XBeam Steering Control Module Integration, Assembly, Test & Checkout
1.1.1.1.6XReceiver Exciter Control Modules and RF Receivers
1.1.1.1.7XReceiver Exciter
1.1.1.1.7.1XReceiver Exciter Hardware
1.1.1.1.7.2XReceiver Exciter Software Release
1.1.1.1.7.3XReceiver Exciter Integration, Assembly, Test & Checkout
1.1.1.1.8XProcessor
1.1.1.1.9XIFF
1.1.1.1.10XPower/Active Recifier
1.1.1.1.11XRotating Enclosure Mechanical
1.1.1.1.12XIMP/Stationary Enclosure
1.1.1.1.13XERA Integration, Assembly, Test & Checkout
1.1.1.2XERA Firmware
1.1.2XSystem Support Equipment Pallet (SSEP) - Hardware
1.1.3XPMP Application Software
1.1.4XPMP System Software
1.1.4.1XSoftware Product Engineering
1.1.4.2XRadar CSCIs
1.1.4.2.1XRadar Control and Signal Processing (RCSP)
1.1.4.2.2XCommunications (COMMS)
1.1.4.2.3XMission Planner (MP)
1.1.4.2.4XNet Centricity (NC)
1.1.4.2.5XOperator Command and Control (OCC)
1.1.4.2.6XPower and Health Monitor (PHM)
1.1.4.2.7XRadar Adaptation Manager (RAMS)
1.1.5XSystem Level Integration, Assembly, Test & Checkout
1.2XPlatform Integration, Assembly, Test & Checkout
1.3XSystems Engineering
1.4XProgram Management
1.5XSystem Test and Evaluation
1.5.1XDevelopment Test and Evaluation (DT&E)
1.5.2XOperational Test and Evaluation (OT&E)
1.5.3XMock-ups / System Integration Labs (SILs)
1.5.4XTest and Evaluation Support
1.5.5XTest Facilities
1.6XTraining
1.7XData
1.7.1XTechnical Publications (DEF)
1.7.2XEngineering Data
1.7.3XManagement Data
1.7.4XSupport Data
1.7.5XData Depository
1.8XPeculiar Support Equipment
1.9XCommon Support Equipment
1.10XOperations/Site Activation
1.11XIndustrial Facilities
1.12XInitial Spares & Repair Parts

PWBS_Dictionary

PWBS CodeProgram Work Breakdown Structure IndexProgram: Fire Scout Radar SUW IncrementRFP NO: XXXXXContract Plan No: xxxx
Contract No: xxxx
Date:
Name of Preparer:
Phone Number:
Email Address:

PWBS ELEMENT NAME PWBS DEFINITION

1.0Fire Scout RadarPre-EMD phase of the 3DELRR program with focus on establishing TRL and MRL 6 in order to gain milestone B approval to release the RFP for a FFP acquisition for EMD, LRIP & FRP of 35 3DELRR systems. The pre-EMD phase of the program will generate CDRLS along with periodic updates as contractually required, conduct a PAC, SRFR & PDR comprehensive system reviews. Additionally the program phase will conduct a series of technology maturation events in support of declaring our 3DELRR system to be at TRL 6. These maturation events will culminate in a Demonstration C in which a full size, partially GaN populated prototype system will be demonstrated. The program phase will be managed utilizing the full complement of NGC program management tools including an Integrated Master Schedule.
1.1Prime Mission Product (PMP)The hardware and software used to accomplish the primary mission of the defense materiel item. This WBS element includes the design, development, and production of complete units (i.e., the prototype or operationally configured units, which satisfy the requirements of their applicable specifications, regardless of end use) and is comprised of the sub elements listed below.
1.1.1Expeditionary Radar Assembly (ERA)The hardware and associated resource components of the specific electronic/automated software subsystem.
1.1.1.1ERA HardwareThe hardware and associated resource components of the specific electronic/automated software subsystem
1.1.1.1.1RadomeTask that covers all design and development of the radome, including definition of the interfaces with the array. This task covers all modeling and design efforts, including the generation of all design documentation required to manufacture and test this component. Task includes material costs associated with the procurement of the radome from the selected vendor. (This WBS element is not applicable to the 3DELRR Pre-EMD contract)
1.1.1.1.2Antenna Frame, Structure, MountingThe Antenna Frame Structure Assembly is affixed to the Rotating Mechanical Enclosure through an Elevation pivot joint and supports the following antenna hardware: Radome, Vertical Assembly & Radiating Element Duct assemblies, Azimuth Power/Logic and RF Distribution Networks, Azimuth Air Distribution Plenums used in the Antenna Cooling System, Antenna Cooling Fans, Array Support Electronics (ASE) Enclosure, and all Power/Control/RF Interfaces to the Rotating Mechanical Enclosure. The TR Quadpack Modules (TRQ's), Micro Power Supplies, and the Antenna Support Electronics LRU modules are part of the next higher assembly and are not part of this development task. Tasks included in this development effort will include the Mechanical / Structural / Thermal/Power & RF distribution component and assembly design, modeling, analysis and documentation for all hardware in the assembly. The task also includes all costs for material and labor required to perform the design, analysis, procurement, manufacturing, assembly, tooling development, as well as the integration and testing of all hardware developed for this assembly.
1.1.1.1.3Vertical Assembly & Radiating ElementsThe Vertical Assembly & Radiating Element hardware is a modular assembly of a single antenna main air duct assembly that provides the structural mounting and cooling mechanism for the TR Quadpacks (TRQ) and Micro Power supplies it supports, a set of Power Logic boards which distribute 270 VDC and Command Logic to the TRQ/Micro PS sites on the duct, a set of RF manifolding and Tx Divider/Rx Combiner boards for the RF signal distribution to each TRQ, and the Circulator/Isolator/Radiating Element/Filter assemblies (CIRFS) which provide the bi-directional RF interface with filtering from the each TRQ channel to freespace. The duct assembly supports 30-TRQ's and Micro Power supplies and is installed as a single assembly in the array on 22 - parallel Vertical Assemblies making up the aperture. This task supports the development of the design, analysis, and design documentation required manufacture and test these components and also includes all costs for labor and material required design, procurement, manufacturing, integration and testing of all hardware developed under it.
1.1.1.1.4Power Suppliers at TR ModulesThe Micro Power supply provides a highly reliable distributed power system for the TR Quadpack (TRQ) Modules. A single Micro is assigned to each TRQ and mounts in a stacked configuration above it at each TRQ site on the air duct assembly. The Micro Power Supplies are conduction cooled through four mounting posts which are part of the duct assembly. Both Micro Power Supply and TRQ assemblies are field replaceable. The Micro Power Supply provides the three operating voltages made from 270 VDC provided through the Duct Assembly's Power Logic Board and up through a flex circuit at each TRQ site. Control logic signals for the Micro and TRQ are also passed up through the flex circuit assembly from the Power Logic Board. Development of the Array Micro Power Supply assembly is inclusive of requirements definition, design, engineering design verification test, and manufacturing support of the design. This task supports the design effort, the production of all design documentation required manufacture and test the hardware comprizing this assembly, and includes all costs for material and labor to design, procure, manufacture, assemble, integrate and test all hardware developed under it.
1.1.1.1.5Beam Steering Control ModuleThe Beam Steering Control Module (BSCM) provides the calculations for the elemental transmit and receive phase, attenuation, and mode control commands for all of the TR Modules within the AESA. There are two BSCM's per antenna, with each responsible for 1/2 the array. The BSCM's are 6U VME style air cooled removable module assemblies that reside in the Array Support Electronics (ASE) chassis, located just below the antenna aperture face on the antenna structure.The BSCM's receive beam steering commands from, and provide status to theAntenna Control Module (ACM) also located in the ASE. Development of the BSC module assembly includes requirements definition, design, engineering design verification test, and manufacturing support of the design. This task also supports the development of the design with supporting analysis, along with the supporting the design documentation required manufacture and test these components and includes all costs for material and labor to design, procure, manufacture, assemble, integrate and test all hardware developed under it.
1.1.1.1.5.1Beam Steering Control Module HardwareThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.1.1.1.5.2Beam Steering Control Module Software ReleaseTask includes integration and testing of the Beam Steering Control (BSC) CSCI Code to ensure that its meets the requirements of the SRS. Also includes the correction and retest of defects indentified in SCRs and SPRs during software and system release I&T. Effort also includes the planning, dry runs, and performance of Software Qualification Test for the BSC CSCI, including the development and delivery of the Software Test Description and Software Test Report.
1.1.1.1.5.3Beam Steering Control Module Integration, Assembly, Test & CheckoutThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.1.1.1.6Receiver Exciter Control Modules and RF ReceiversThe Receiver Exciter Control Module (RECM), RF Receiver, and Distributed Waveform Generator (DWFG) hardware provide the control and timing for all Receiver/Exciter functions in the ERA as well as the transmit waveform generation and first receive down conversion function. LRUs are located in the Array Support Electronics (ASE) chassis and include one RECM, 7 quad-channel RF Receiver LRUs, and 7 Distributed Waveform Generation LRUs. In addition, there is a Common Bus Interface and Synchronizer (CBI/Sync) LRU that provides timing and communication interfaces between the Receiver Exciter LRUs and the RECM. Several power supplies including two High Current Power Supplies, two Multi-voltage power supplies, and two Linear Regulators provide conditioned power to the RE LRUs and to the two BSCMs and the ACM, also located int he ASE. With the exception of the RECM, these LRUs are of the 6U VME style module with the RECM and the ACM being Curtiss Wright SBCs. All of the LRUs are air-cooled and removable LRUs. Development of the Receiver Exciter modules and power supplies within the ASE includes requirements definition, design, engineering design verification test, and manufacturing support of the design. This task supports the development of the design with supporting analysis, along with the supporting the design documentation required manufacture and test these components, and includes all costs for material and labor to design, procure, manufacture, assemble, integrate and test all hardware developed under it. (This WBS element is not applicable to the 3DELRR Pre-EMD contract)
1.1.1.1.7Receiver ExciterThe IF Receiver/Exciter (IREX) provides the IF signal generation as well as the analog to digital conversion, preprocessing, and packetization of the receive channel data, and it provides CW RF reference signal generation and master clock generation for all functions in the ERA. The IREX includes 14 dual-channel IF Receiver LRUs, one fiber mux interface LRU, one reference generator LRU, and one distribution module LRU. The LRU also contains three high current power supplies, two multi-voltage power supplies, and two linear regulator power supplies to provide conditioned power to the IREX. These LRUs are located within the IREX chassis that is located in the rotating enclosure with the Pedestal Electronics Assembly (PEA). All of the IREX LRUs are 6U VME style air-cooled removable LRUs. Development of the IF Receiver/Exciter includes requirements definition, design, engineering design verification test, and manufacturing support of the design. This task produces all design documentation required manufacture and test this component and includes all costs for material and labor to design, procure, manufacture, assemble, integrate and test all hardware developed under it.
1.1.1.1.7.1Receiver Exciter HardwareThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.1.1.1.7.2Receiver Exciter Software ReleaseIncludes definition, design, code, test, integration and support of the Receiver / Exciter software that executes in the controller located in the R/E and sets up the R/E hardware to make data collection measurements every beam position.
1.1.1.1.7.3Receiver Exciter Integration, Assembly, Test & CheckoutThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.1.1.1.8ProcessorTask for the Design, Fabrication, Integration, Engineering Test, Factory Test, Support, and Factory NRE Tooling and Test Equipment for the Processor Chassis Assembly, PPC/RACE Processing CCA, FPGA/RACE Processing CCA, Dual Power PC Single Board Computer, Ethernet Switch and the Power Supply. Task for the effort associated with replacing the proposed Mercury Race++ processor, which is approaching end-of-life, with a Serial RapidIO processor. Task includes efforts to specify, solicit proposals, and evaluate/select either Curtiss Wright or Mercury to provide the processor hardware to support the program. Includes all costs for material and labor to procure, manufacture, assemble, integrate and test all hardware developed under this task. (This WBS element is not applicable to the 3DELRR Pre-EMD contract)
1.1.1.1.9IFFCosts associated with the procurement of the IFF interrogator. Includes the specification and development of the modified power supply to comply with the ERA interface requirements. Procurement of the IFF hardware is to be performed by NGC. Task also includes costs associated with the procurement of the IFF Antenna to meet the defined specification. (This WBS element is not applicable to the 3DELRR Pre-EMD contract)
1.1.1.1.10Power/Active RecifierDevelopment of the Active Rectifier assembly inclusive of requirements definition, design, engineering design verification test, and manufacturing support of the design. Task includes costs for material and labor to manufacture, assemble, integrate and test the hardware developed under this task. To be performed by NGC. (This WBS element is not applicable to the 3DELRR Pre-EMD contract)
1.1.1.1.11Rotating Enclosure MechanicalProcurement / fabrication and design labor to complete the rotating enclosure design which includes requirements definition, preliminary design, detailed design, analysis, and drafting. The rotating enclosure is part of the Pedestal Electronics Assembly (PEA) and houses all electornics that rotate with the array, including the processor, IREX, bulk capacitors, and power distribution panels. This structure is a stiffness driven design and includes interfaces for backstays that mate to the array to meet the mechanical beampointing allocation. Includes all costs for material and labor to procure, manufacture, assemble, integrate and test all hardware developed under this task.
1.1.1.1.12IMP/Stationary EnclosureTask associated with the design and development of a trailer which is integrated with the Expeditionary Radar Assembly mechanical structure. Weight concerns drove the design away from standard trailer manufactured components to a weight-optimized Integrated Mobile Pallet (IMP). The IMP consists of a Mobile Pallet, which is a custom aluminum trailer structure whose design is primarily weight and stiffness driven, along with a Stationary Enclosure which houses the ERA electronics. Task includes labor and material to procure, manufacture, assemble, integrate and test the Integrated Mobile Pallet. (This WBS element is not applicable to the 3DELRR Pre-EMD contract)
1.1.1.1.13ERA Integration, Assembly, Test & CheckoutThis is the SRU/ Module preliminary and detailed design and breadboard/brassboard prototype activity which can be kept as a summary level charging structure. This effort would also include any subassembly design verification test (DVT). This includes all design labor (e.g., electrical, mechanical, structural, thermal, RF, etc...). Does not include drafting. The effort to elaborate the allocated system requirements into Firmware requirements, develop the Firmware architecture, partition the architecture into devices, and design the Firmware work products. Design includes coding, simulation, and verification at the device, module, subsystem, and system level. (Firmware = FPGAs, CPLDs, PROMs, etc.)
1.1.1.2ERA FirmwareFirmware Configuration Item (FWCI) development effort that includes requirements derivation and allocation, conceptual, preliminary and detailed design, fabrication and assembly, design verification and test, and production support associated with the 3DELRR FPGAs that reside in the Antenna, Active Rectifier, IREX, and RSP. These are for Non-Recurring Engineering activities associated with FPGA development and test; they do not including tooling, quality control, or manufacturing. This process was established to ensure a common, comprehensive design process is followed for all designs, with the intent of increasing design quality, and reducing development cost and time. All work is to be performed by Northrop Grumman employees.
1.1.2System Support Equipment Pallet (SSEP) - HardwareThe System Support Equipment Pallet (SSEP) houses all required ERA support eqpuipment, implacement components, and spares for the system. This is the reqmts definition, HW follow, product integrity, test design, drafting, RN incorporation, SRU/ Module preliminary and detailed design and breadboard/brassboard prototype activity which can be kept as a summary level charging structure. This effort would also include any subassembly design verification test (DVT). This includes all design labor (e.g., electrical, mechanical, structural, thermal, RF, etc...). Does not include drafting.
1.1.3PMP Application SoftwareThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.1.4PMP System SoftwareThe Prime Mission Product System Software is the effort to perform all software engineering activities associated with the development, test, and support of the Prime Mission Product System Software.
1.1.4.1Software Product EngineeringAll of the resources associated with the PMP software product engineering efforts. Software product engineering is focused on process maturity and continuous improvement. Sound software product engineering is a systematic framework, which breaks down the software development process by relating each level to a knowledge domain and localizing exactly on those qualities that become visible in that knowledge domain.
1.1.4.2Radar CSCIsThe Radar CSCIs comprise all software functionality required to perform target detection, tracking, communications, system health monitoring and fault isolation, calibration, operator interfaces, and mission planning.
1.1.4.2.1Radar Control and Signal Processing (RCSP)Includes definition, design, code, test, integration and support associated with the software execution in the ERA Signal Processor that performs two primary functions. It accepts mode and waveform adaptation controls from the Data Processor, schedules radar measurements at the beam position level, and issues commands to the hardware controllers to make the measurements.
1.1.4.2.2Communications (COMMS)Includes definition, design, code, test, integration and support associated with the management of interfaces external to the system. This includes providing a translation of data between a 3DELRR internal format and the Interface Control Document (ICD) defined format for each external interface, and the monitoring of the health of each external interface.
1.1.4.2.3Mission Planner (MP)CSCI development effort that includes definition, design, code, test, integration and support associated with the 3DELRR System Mission Planner. The CSCI is responsible for tailoring / enhancing radar performance via the Operator/Maintainer Workstation interface based on the assigned mission and the battlefield threats.
1.1.4.2.4Net Centricity (NC)CSCI development effort that includes definition, design, code, test, integration and support associated with the 3DELRR Net-Centric capabilities. This CSCI represents the core functionality and capabilities for content discovery and published data generated by 3DELRR system. NC subscribes internally to 3DELRR for data and products generated by the system. The most important feature of NC is its ability to stream product/data updates to external clients which have requested (registered) in advance for the data. The CSCI shall configure itself to receive all relevant products and data available internally on the 3DELRR system. The CSCI creates and manages a list of subscribers for each product/data type.
1.1.4.2.5Operator Command and Control (OCC)CSCI development effort that includes definition, design, code, test, integration and support associated with the 3DELRR System command and control user interface. This CSCI provides menus and controls for user login, system setup data, radar control and support, IFF control support, PMFL support; record and playback support; and data collection. This CSCI provides for management of menu data, controls and generic features.
1.1.4.2.6Power and Health Monitor (PHM)CSCI development effort that includes definition, design, code, test, integration and support associated with the power management, operator interface support, pedestal structure monitoring, pedestal health monitoring, system health collection. and is the performance monitoring/fault location (PM/FL) information focal point
1.1.4.2.7Radar Adaptation Manager (RAMS)CSCI development effort that includes all efforts associated with Command/Data Interface between the Communications and the ERA, IFF Interrogator Interface/Scheduling, Terrain Mask computations, control/monitoring of antenna motion, and training capability.
1.1.5System Level Integration, Assembly, Test & CheckoutThe resources specifically related to evaluating the CSCIs and hardware operation as a subsystem.
1.2Platform Integration, Assembly, Test & CheckoutThe effort involved in providing technical and engineering services to the platform manufacturer or integrator during the installation and integration of the PMP into the host system
1.3Systems EngineeringTask for Systems Engineering Integration and Test in support of the 3DELRR Pre-EMD program. Includes efforts to establish and maintain an effective systems engineering program IAW Institute of Electrical and Electronics Engineers (IEEE) 1220-1998 and provide an interdisciplinary approach governing the total effort to transform the 3DELRR requirements into a system solution, including Technical Performance Measures (TPM), integration of design engineering, engineering specialties, manufacturing, test and logistics support to satisfy operational performance, safety, cost and schedule objectives. Includes efforts to develop and maintain a requirements database and the efforts to apply the database for the development of the required CDRL technical specifications. Provide SE support to all program elements, and support efforts associated with preparing for programmatic reviews (e.g. PDR, CDR, etc.) and modeling/simulation. Includes planning, documentation and execution of a System Integration and Test Plan. Includes System Engineering Management, Requirements Definition, Modeling and Simulation, Architecture Definition, System Design, Affordability, and EMI/EMC/EMP. Includes elements for EDM Supportability; Reliability, Maintainability, Performance Monitoring (BIT), Human Systems Integration, and Environmental Safety and Health efforts.
1.4Program ManagementTask for Program Management office and Product IPT Management in support of the 3DELRR Pre-EMD Program. Includes Program and Risk Management efforts, Business Management (Finance, Scheduling, Contracts), Material Management, Quality, Data Management, Configuration Management, Manufacturing Operations, Program Security, Engineering Management, and ILS/PBL Management. Program Management includes responsibility for cost, schedule and technical performance of NGC and its subcontractors. Includes informal and formal reporting of program progress and issues to the USAF PMO. Tasks include development of a Contractor Work Breakdown Structure (CWBS) and a Performance Measurement Baseline (PMB). Task includes efforts to plan, host, attend, coordinate, support and conduct meetings, formal reviews, conferences, and audits in conjunction with the Government. Includes efforts to manage the submission and applicable responses to formal CDRL submissions to the USAF. Cost associated with establishing, maintaining and execution of a Cost reporting process which ensures that all labor and material expenditures are accrued against the proper contract line items; that cost performance is measured (value for completed tasks); planned and actual costs to date; and that a reliable cost and schedule status is reported to the Government. Also captures costs associated with the product IPT leads responsible for the cost, schedule and technical performance of the product IPT organizations.
1.5System Test and EvaluationThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.5.1Development Test and Evaluation (DT&E)This WBS element is not applicable to the 3DELRR Pre-EMD contract
1.5.2Operational Test and Evaluation (OT&E)This WBS element is not applicable to the 3DELRR Pre-EMD contract
1.5.3Mock-ups / System Integration Labs (SILs)This WBS element is not applicable to the 3DELRR Pre-EMD contract
1.5.4Test and Evaluation SupportThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.5.5Test FacilitiesThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.6TrainingTasks to develop training materials support of training requirements. This WBS element is not applicable to the 3DELRR Pre-EMD contract
1.7DataTasks to develop data in support training. Northrop Grumman will investigate differential configurations and capabilities regarding the 3DELRR system in order to explore potential export opportunities within Technical Publications. The reamining children tasks do not apply to the 3DELRR Pre-EMD contract.
1.7.1Technical Publications (DEF)Northrop Grumman (NG) shall recommend differential protections and/or differential capabilities needed to protect critical program information against foreign collection threats. NG shall investigate the necessity and feasibility (from cost, engineering, and exportability perspectives) of the design and development of differential capability and enhanced protection of exportable versions of the system or subsystem for exports to our closest allies and friendly nations not among our closest allies. NG shall provide the Government with the analyticial basis for their recommendations. After final Government review and approval of these recommendations, NG shall develop statements of work sufficient to design and test the approved differential protections and/or capabilities along with an estimate of the associated differential cost to design, test, and build the export version(s).
1.7.2Engineering DataThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.7.3Management DataThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.7.4Support DataThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.7.5Data DepositoryThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.8Peculiar Support EquipmentThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.9Common Support EquipmentThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.10Operations/Site ActivationThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.11Industrial FacilitiesThis WBS element is not applicable to the 3DELRR Pre-EMD contract
1.12Initial Spares & Repair PartsThis WBS element is not applicable to the 3DELRR Pre-EMD contract