Encl_1_FacilitiesCorpus_ w hangar 58 drawing
367 KB Posted
- Solicitation number
- N00019-10-R-0069
About this file
Attachment 18 - Enclosure 1 CC Facilities w/Hangar 58 drawing (01_20_11)
Text of this file
Corpus
| Enclosure 1 NAS Corpus Christi Facilities | ||
| Solicitation N00019-10-R-0069 | ||
| Hangar 51 | ||
| Room # | Shop | SQ FT |
| 123 | Office | 148.8 |
| 119 | Component Repair | 4,153.9 |
| 119A | Component Repair | 763.7 |
| 121 | Component Repair | 424.3 |
| 123 | Conditional Maintenance Office | 247.5 |
| 229 | Break Room | 460.0 |
| 231 | Avionics | 781.4 |
| 135 | SM Component Repair | 2,426.9 |
| Hangar Deck (620 & 500) | 12,680.1 | |
| Paint Booth | 345.0 | |
| Composite Paint Booth | 168.0 | |
| Tool Room | 357.0 | |
| Total: | 22,956.6 | |
| Hangar 55 | ||
| First Floor – Eastside | ||
| Room # | Shop | SQ FT |
| 107 | Corrosion Control | 485 |
| Hangar Deck Eastside | Corrosion Control | 10,000 |
| (including paint booth) | ||
| Total: | 10,485 | |
| Hangar 56 | ||
| First Floor – Eastside | ||
| Room # | Shop | SQ FT |
| 106 | Conditional Maintenance | 571 |
| 107 | Break Room | 600 |
| 107A | T-34C Maintenance Mgr | 110 |
| 107B | Conditional Maintenance Mgr | 102 |
| 108 | T-34C Maintenance | 497 |
| 109 | T-34C Avionics | 250 |
| 1112 | T-34C Maintenance Control | 476 |
| Hangar Deck | Aircraft Maintenance | 16,580 |
| (East/Westside) | ||
| White Building | Paraloft (SA) | 1,610 |
| Paraloft (Maint) | 1,465 | |
| T-34C Tool Room | 540 | |
| Storage | 1,530 | |
| Bldg 56A | Flammable Storage Locker | 113 |
| Eastside | Aircraft Wash Rack | 12,000 |
| Bldg 366 | Hazardous Waste Storage | 1,200 |
| Total: | 37,644 | |
| Hangar 57 | ||
| First Floor – Eastside | ||
| Room # | Shop | SQ FT |
| 101 | T-44A Tool Room | 498 |
| 103 | GSE Back Shop | 785 |
| 104 | Property Mgr Office | 291 |
| 105 | Break Room | 711 |
| 106 | T-44A Maintenance | 470 |
| 110A | Storage | 102 |
| 110B | Union Office | 157 |
| First Floor – Westside | ||
| Room # | Shop | SQ FT |
| 123 | Training | 477 |
| 122 | Avionics | 418 |
| 120 | Quality Assurance | 294 |
| 119C | QA Mgr Office | 148 |
| 119D | A/C Maintenance Mgr | 241 |
| 119A | Maintenance Admin | 501 |
| 119E | Maintenance Admin | 112 |
| 118 | T-44A Maintenance Control | 483 |
| 115 | Safety/Environmental | 256 |
| 115A | Data Analysis | 191 |
| Hangar Deck | Aircraft Maintenance | 40,000 |
| Bldg 57A | Flammable Storage Locker | 113 |
| Eastside | Aircraft Wash Rack | 9,600 |
| Bldg 365 | Hazardous Material Storage | 750 |
| Bldg 280 | Plans Captain Shack | 550 |
| Bldg A57A | Explosive locker | 50 |
| Total: | 57,198 | |
| Bldg 1843 | ||
| Room # | Shop | SQ FT |
| 101 | Administrative Office | 153 |
| 102 | Administrative Office | 208 |
| 103 | Administrative Office | 255 |
| 104 | Administrative Office | 176 |
| 105 | Administrative Office | 255 |
| 106 | Administrative Office | 208 |
| 107 | Administrative Office | 170 |
| 108 | Administrative Office | 192 |
| 109 | Administrative Office | 221 |
| 110 | Administrative Office | 176 |
| Total: | 2,014 | |
| Bldg 1218 | ||
| Room # | Shop | SQ FT |
| South Bay | Supply/Shipping/Receiving | 13,860 |
| Total: | 13,860 | |
| Miscellaneous Facilities | ||
| Room # | Shop | SQ FT |
| Eastside Hangar 56 | Oxygen Storage Area | 720 |
| Total: | 720 | |
| PROJECTED T-6 FACILITIES | ||
| Planned for FY12 Activation – Subject to change | ||
| Total Approximately: 20,000 SqFt | ||
| Bldg 82 | ||
| Room # | Shop | SQ FT |
| Central Seat Service Area | 1,649 | |
| Canopy Maintenance Shop | ||
| Ejection Seat Component | ||
| Maintenance Shop | ||
| Non-Explosive Spare Parts | ||
| Storage | ||
| Bldg #’s TBD | ||
| Room # | Shop | SQ FT |
| Ready Service Lockers (3) | Built up Seat Storage | TBD |
| Built up Canopy Storage | TBD | |
| Explosive Spares Storage | TBD | |
| Hangar XX – Shared Space T-34/T-44/T-6 | ||
| Room # | Shop | SQ FT |
| T-6B Backshops | Wheel & Tire Buildup | TBD |
| Raft Shop | TBD | |
| Parachute Packing Shop | TBD | |
| NDI | TBD | |
| Battery Locker | ||
| Hangar 56 – Shared Space T-34/T-44/T-6 | ||
| Room # | Shop | SQ FT |
| Blue Door Structure Center | ALSS Storage and Maintenance | 4,424 |
| of Hangar | of Pilot Gear | |
| Hangar 55 – Shared Space T-34/T-44/T-6 | ||
| Room # | Shop | SQ FT |
| Corrosion Control | TBD | |
| Hangar XX – T-6 Maintenance Hangar & O-Level Shops | ||
| Room # | Shop | SQ FT |
| T6B Quality Control | TBD | |
| Maintenance Control and Other | ||
| Maintenance Admin Spaces | ||
| Bldg XX | ||
| Room # | Shop | SQ FT |
| Line Maintenance Shelter | TBD | |
| Aircraft Wash Rack – Shared T-34/T-44/T-6 |
&RN00019-10-R-0069
PWS Enclosure 1 NASCC Facilities Page &P of &N
CC Hangar 58 Notional Drawing
Enclosure 1 CC Hangar 58 Notional Drawing
&RN00019-10-R-0069
PWS Enclosure 1, NAS Corpus Christi Hangar 59
This drawing is notional and is subject to change.
MBD001A5271.pdf
Other files
Show 40 more
Latest 50 of 298 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .