23R4 013316.00 HANSCOM B1994 Updated DWG Submission_9MAY23.pdf

PDF 7 MB Posted

Attached to
Repair (Sustain) B1994, Child Development Center (CDC) Hanscom AFB
Solicitation number
MXRD170051-RFP
Issued by

About this file

This document is a comprehensive set of architectural and engineering design drawings for the HVAC replacement project at the Child Development Center (Building 1994) at Hanscom Air Force Base. The project involves replacing the existing HVAC systems, including multiple air conditioning units (AC-1, AC-2, AC-3), an air handling unit (AHU-1), exhaust fans (EF-1, EF-2), and associated ductwork and controls. The design specifications include detailed mechanical, electrical, and structural plans for installing new HVAC equipment with specific requirements such as concrete equipment pads, security fencing, duct routing, and integration with the existing building control systems. The drawings outline precise installation details, equipment specifications, and sequence of operations, with a focus on maintaining building functionality during the renovation and ensuring proper system performance, including occupancy mode controls, temperature management, and safety protocols.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REGIONAL MAP SITE MAP

PROJECT LOCATION

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

A R

TM

EN

T O

F

TH

E A

IR

F

O R

C E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

U.S. AIR FORCE

M A

R K

D

ES

C R

IP

TI

O N

HANSCOM AIR FORCE BASE

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

TR

U

SC

TI

O

N C

O

IN

C

BU

TT

O

N H

O

LE

D R

IV

E

PR

O

VI

D

EN

C

E, R

I 0

MARON CONSTRUCTION CO., INC.

180 BUTTONHOLE DRIVE

PROVIDENCE, RI 02909

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

UPDATED SUBMISSION

APRIL 20, 2023

G-000

C O

VE

R

S H

EE

T

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H A

N

SC

O M

A

IR

F O

R C

E B

A

SE

VC

S

AS

4/

/2

100% SUBMISSION

R

EP

LA

C

E H

VA

C

, C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R

PR

O

JE

C T

N U

M B

ER

: M

XR

D

6-

CHILD DEVELOPMENT CENTER, B1994

HANSCOM AIR FORCE BASE

REPLACE HVAC, CHILD DEVELOPMENT CENTER

PROJECT NUMBER: MXRD 16-0009

SHEET LIST

SHEET NUMBER SHEET NAME

G-000 COVER SHEET

G-001 GENERAL NOTES

D-101 DEMOLITION KEY PLAN

D-102 DEMOLITION PLANS

D-103 DEMOLITION PHOTOS

M-001 MECHANICAL ABBREVIATIONS, NOTES, AND SYMBOLS

M-101 NEW MECHANICAL PLANS

M-401 CONTROL SCHEMATICS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

E-101 ELECTRICAL PLANS

E-600 ELECTRICAL PANELBOARD SCHEDULE

D-104 NEW HVAC DEMO PLAN EAST

A-101 INFILL AT OPENING OF DUCTWORK ELEV. & DETAILS

M-102 NEW HVAC TAB PLAN WEST

M-103 M-104

NEW HVAC TAB PLAN CENTER

NEW HVAC TAB PLAN EAST

LE

AD

P R

O

FE

SS

IO

N

AL

S-101 STRUCTURAL DETAILS

M-402 NETWORK ARCHITECTURE SCHEMATIC

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

AR

TM

EN

T

O F

TH

E

AI

R

F O

R C

E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

ST

R U

C

TI

O N

C O

IN

C

BU

TT

O N

H O

LE

D

R

IV

E

PR

O

VI

D

EN

C E, R I 0

N

LE

AD

P R

O

FE

SI

O

N

AL

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

G-001

G

EN

ER

AL

N O

TE

S

CH

IL

D

DE

VE

LO

PM

EN

T

CE

NT

ER

, B

HA

NS

CO

M A

IR

F

O

RC

E

BA

SE

VC

S

AS

/2

1/

100% SUBMISSION

RE

PL

AC

E

HV

AC

, C

HI

LD

D

EV

EL

O

PM

EN

T

CE

NT

ER

PR

O

JE

CT

N

UM

BE

R:

M

XR

D

-0

GENERAL DEMOLITION NOTES:

IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ADHERE TO THE FOLLOWING:

1. ERECT AND MAINTAIN TEMPORARY STAGING, LIGHTS, BARRICADES, WARNING SIGNS, AND GUARDS NECESSARY TO PROTECT ADJACENT TENANTS FROM INJURY, AND/OR DAMAGE, ALL IN ACCORDANCE WITH APPLICABLE RULES AND REGULATIONS.

2. DO NOT CLOSE OR OBSTRUCT THE PATH OF EGRESS, CORRIDORS, OR OTHER OCCUPIED OR USED SPACES OR FACILITIES WITHOUT THE WRITTEN PERMISSION OF THE OWNER AND THE AUTHORITIES HAVING JURISDICTION. DO NOT INTERRUPT UTILITIES WITHOUT THE WRITTEN PERMISSION OF THE AUTHORITIES HAVING JURISDICTION. IF NECESSARY PROVIDE TEMPORARY UTILITIES. PRIOR TO OBSTRUCTION OF EGRESS PATHS OR IMPAIRMENT OF FIRE/LIFE SAFETY COMPONENTS.

3. CEASE OPERATION IF PUBLIC SAFETY OR REMAINING STRUCTURES ARE ENDANGERED. PERFORM TEMPORARY CORRECTIVE

MEASURES UNTIL OPERATIONS CAN BE CONTINUED PROPERLY.

4. THE CONTRACTOR WILL VISIT THE SITE AND VERIFY THE EXTENT AND LOCATION OF SELECTIVE DEMOLITION REQUIRED PRIOR TO STARTING THE WORK AT NO ADDITIONAL COST TO THE OWNER. CAREFULLY IDENTIFY THE LIMITS OF SELECTIVE DEMOLITION. MARK INTERFACE SURFACES AS REQUIRED TO ENABLE THE WORKMEN TO IDENTIFY THE ITEMS TO BE REMOVED

AND STORED, AS WELL AS THE ITEMS TO BE LEFT IN PLACE INTACT.

5. USE MEANS NECESSARY TO PREVENT DUST FROM BECOMING A NUISANCE TO THE PUBLIC, NEIGHBORING BUILDINGS, AND TO

ANY OTHER WORK BEING PERFORMED.

6. EXECUTE DEMOLITION WORK TO ENSURE THE SAFETY OF PERSONS AND ADJACENT PROPERTY AGAINST DAMAGE.

7. IN THE EVENT OF DEMOLITION OF ITEMS NOT SO SCHEDULED TO BE DEMOLISHED, PROMPTLY REPLACE SUCH ITEMS TO THE APPROVAL OF THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE OWNER. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR ANY DAMAGE DONE TO EXISTING FEATURES AS A RESULT OF THIS WORK. DAMAGED ITEMS SHALL

BE REPLACED IN KIND AND AT NO ADDITIONAL COST TO THE OWNER.

8. SHORE, BRACE AND SUPPORT EXISTING CONDITIONS AS REQUIRED PRIOR TO REMOVAL OF EXISTING CONSTRUCTION OR

INSTALLATION OF THE NEW WORK.

9. COORDINATE THE REMOVAL, RELOCATION, REPLACEMENT, RE-USE, SHUT-OFF, STUB-OFF, CAPPING-OFF OR UPGRADING OF ALL EXISTING PLUMBING, HVAC, SECURITY, FIRE ALARM, ELECTRICAL SYSTEMS, AND TELECOM SYSTEMS EQUIPMENT, AND APPURTENANCES - INCLUDING, BUT NOT LIMITED TO , UTILITY LINES, DUCTS, CONNECTIONS, PANELS, VENTS, FANS, ELECTRICAL BASEBOARD HEAT, PIPING , DEVICES, CONTROLS, SWITCHES, OUTLETS, AND CONDUIT DURING THE PHASED CONSTRUCTION AS REQUIRED, AS SCHEDULED OR AS SPECIFIED IN ACCORDANCE WITH ALL LOCAL, MUNICIPAL, STATE AND

FEDERAL CODES.

10. THE CONTRACTOR SHALL REMOVE AND LEGALLY DISPOSE OF ANY HAZARDOUS MATERIALS AND IN DOING SO SHALL COMPLY WITH ALL APPLICABLE OSHA REGULATIONS AND ALL OTHER FEDERAL, STATE AND LOCAL GUIDELINES REGARDING ASBESTOS-

CONTAINING MATERIAL REMOVAL AND DISPOSAL.

11. OWNER AND ARCHITECT/ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES FOR SAFETY PRECAUTIONS OR FOR THE CONTRACTORS FAILURE TO CARRY OUT THE WORK IN STRICT ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS. OWNER AND ARCHITECT/ENGINEER SHALL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTORS OR THEIR AGENTS OR EMPLOYEES OR

ANY OTHER PERSONS PERFORMING ANY OF THE WORK.

12. THE CONTRACTOR SHALL COORDINATE ALL ABOVE CEILING MEP AND STRUCTURAL ELEMENTS PRIOR TO DEMOLITION OF WALLS AND/OR CEILING. CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR FIRE SAFETY DURING PROJECT BEING IN

COMPLIANCE WITH IBC, IFC AND NFPA 241.

13. COORDINATE, TERMINATE, RELOCATE ALL ASSOCIATED WALL & CEILING ELECTRICAL (TELECOM/POWER OUTLETS, SWITCHING, THERMOSTAT, ETC.) DEVICES THAT ARE LOCATED ON OR IN WALLS & CEILINGS SCHEDULED FOR REMOVAL, GC

TO V.I.F PRIOR TO THE COMMENCEMENT OF WORK.

14. REMOVE ALL EXISTING FLOORING TO FACE OF EXISTING CONCRETE SLAB. ABATE SPECIAL WASTE MATERIALS (I.E. VINYL TILE) AND TURN OVER TO BASE ENVIRONMENTAL IN ACCORDANCE WITH SECTION 01560. DISPOSE OF ALL OTHER MATERIALS SET FOR DEMOLITION. WHERE EXISTING CERAMIC TILE IS LOCATED UNDER VINYL TILE AND NEW VINYL TILE IS TO BE INSTALLED, THE EXISTING CERAMIC TILE IS NOT REQUIRED TO BE REMOVED, ONLY VINYL TILE ABOVE IT.

15. FLOORS SHALL BE LEVEL AND PATCHED AS REQUIRED TO MEET THE MANUFACTURER'S REQUIREMENTS OF THE NEW

MATERIALS AS SPECIFIED.

16. REMOVE AND DISPOSE OF ALL WALLS SHOWN TO BE REMOVED, EXISTING EXTERIOR WOOD STUD WALLS, FURRING AREAS AND WALL TILE MATERIALS AND MATERIALS DAMAGED FROM THEIR REMOVAL. ABATE MASONRY PAINTED WALLS CONTAINING

LEAD BASED PAINT, REFER TO ASBESTOS CONTAINING MATERIAL NOTES.

17. PATCH ALL EXISTING WALLS ADJACENT TO ALL WALLS SCHEDULED FOR REMOVAL. PATCHWORK WILL BE CONSISTENT WITH THE WALL RATING. ANY STRUCTURAL STEEL DAMAGED OR MISSING SFRM SHALL BE REPLACED AFTER COMPLETION OF

APPROPRIATE SURFACE PREPARATION WORK AND ITS INSPECTION BY FPE.

18. REMOVE AND DISPOSE OF ALL DOORS INDICATED ON DEMOLITION PLAN. ALL OTHER DOORS SHALL HAVE HARDWARE

REMOVED AND DISPOSED OF. TAKE CARE NOT TO DAMAGE DOORS AS THEY WILL BE REUSED.

19. PROVIDE TERMITE TREATMENT IN COMPLIANCE WITH HANSCOM BFS, EPA REQUIREMENTS AND UFGS 31 31 16.13. TREATMENT SHALL CARRY A 5 YEAR WRITTEN WARRANTY COVERING RETREATMENT OF SITE AS REQUIRED TO ELIMINATE INFESTATION

AND REPAIR OF DAMAGE.

20. SUBMIT DEMOLITION SCHEDULE FOR APPROVAL INCLUDING SCHEDULE AND METHODS OF CAPPING AND CONTINUING UTILITY

SERVICE.

21. THE CONTRACTOR SHALL COMPLY WITH NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS AND 29 CFR 1910.34, COVERAGE AND DEFINITIONS, 29 CFR 1910-35, COMPLIANCE WITH NFPA 101-2009, LIFE SAFETY CODE, 2014,.29 CFR 1910-36, DESIGN AND CONSTRUCTION REQUIREMENTS FOR EXIT ROUTES, 29 CFR

1910-37, MAINTENANCE, SAFEGUARDS, AND OPERATIONAL FEATURES FOR EXIT ROUTES.

DUST CONTROL PROVISIONS:

1. THE GC SHALL PROVIDE A CONTAINMENT STRUCTURE AT ALL ENTRY AND EGRESS PATHS IN AND OUT OF THE LIMIT OF WORK AREA. REPLACE AS OFTEN AS NEEDED TO ENSURE AGAINST MIGRATION OF DUST AND CONSTRUCTION DEBRIS OUTSIDE OF THE WORK AREA. THE CONTRACTOR SHALL COMPLY WITH THE MARKING OF EGRESS IN

ACCORDANCE WITH THE CODE REQUIREMENT THROUGHOUT THE DEMOLITION.

2. THE GC SHALL PROVIDE STEP-OFF PADS (TACK MATS) AT ALL ENTRY AND EGRESS PATHS IN AND OUT OF THE LIMIT OF WORK AREA. THE GC SHALL REPLACE THE DUST BARRIER AS OFTEN AS NEEDED, TO ENSURE AGAINST

MIGRATION OF DUST AND CONSTRUCTION DEBRIS OUTSIDE OF THE WORK AREA.

3. THE GC SHALL PROVIDE DAILY REMOVAL OF ALL DEMOLITION DEBRIS. DO NOT STORE ANY DEMOLITION DEBRIS

ON THE FLOOR OVERNIGHT.

4. THE GC SHALL MAINTAIN A CLEAN AND SAFE WORK AREA THROUGHOUT THE PERIOD OF DEMOLITION. THE GC SHALL, AT THE END OF EACH WORK DAY, REMOVE ALL DEMOLITION DEBRIS AND HAZARDOUS AND POTENTIALLY

DANGEROUS MATERIALS USED IN THE WORK.

5. THE GC SHALL COLLECT CONSTRUCTION MATERIAL AND DEBRIS FREQUENTLY AND DISPOSE OF OR RECYCLE

DEBRIS AND REFUSE AWAY FROM THE CENTER IN A LAWFUL MANNER.

6. THE GC SHALL CLEAN THE EXTERIOR PUBLIC AREAS IMPACTED BY CONSTRUCTION DUST, DIRT AND DEBRIS ON A DAILY BASIS. THE GC SHALL BE RESPONSIBLE FOR ALL FEES, PERMITS, ETC., REQUIRED FOR WASTE DISPOSAL.

7. THE GC SHALL PROVIDE MEANS TO KEEP DUST AND HAZARDOUS MATERIALS FROM ENTERING ALL HVAC AIR SYSTEMS. ANY FILTRATION SHALL BE CHANGED AS RECOMMENDED BY THE FILTERING SYSTEM MANUFACTURER.

GENERAL NOTES:

1. THESE DRAWINGS REPRESENT THE EXISTING CONDITIONS AT THE PRESENT TIME, TO THE BEST OF OUR KNOWLEDGE, GIVEN THE LIMITS OF VISIBLE CONDITIONS, WITHOUT THE BENEFIT OF SUBSTANTIAL INVESTIGATIVE

DEMOLITION OR REMOVALS.

2. ALL DIMENSIONS SHALL BE VERIFIED BY THE GENERAL CONTRACTOR BEFORE INSTALLATION OF THE WORK INVOLVED. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE ATTENTION OF THE PROJECT MANAGER BEFORE

PROCEEDING.

3. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CLEARANCES OF BUILDING ELEMENT PRIOR TO FABRICATION OR INSTALLATION. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE

PROCEEDING.

4. WHERE WORK-IN-PLACE IS REJECTED OR OTHERWISE FOUND TO BE INCOMPLETE, INCONSISTENT WITH THE CONTRACT DOCUMENTS, OR OTHERWISE DEFICIENT, IT SHALL BE THE CONTRACTOR'S OPTION TO REMOVE THE REJECTED ELEMENT AND PROVIDE A COMPLETELY NEW ELEMENT, RATHER THAN ATTEMPT A REPAIR.

5. ALL DEFICIENT ELEMENTS THAT ARE REPAIRED SHALL MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS COMPLETELY, AND THE CONTRACTOR SHALL WARRANTEE THAT REPAIRED WORK TO THE

SATISFACTION OF THE OWNER.

6. CONSTRUCTION LIMIT LINES SHALL BE AS INDICATED ON THE DRAWINGS, HOWEVER, IN ORDER TO COMPLETE INDICATED WORK, THE CONTRACTOR MAY BE REQUIRED TO CARRY OUT WORK ADJACENT TO, BUT OUTSIDE INDICATED LIMITS. ALL BUILDING AND SITE ELEMENTS DAMAGED OR DISTURBED BY SUCH WORK SHALL BE

RESTORED BY THE CONTRACTOR TO ORIGINAL CONDITION AT HIS COST.

7. WORK UNDER THIS CONTRACT IS TO INCLUDE THE RELOCATION OR REPAIR OF EXISTING WATER SERVICE TO THE CONNECTION LOCATIONS SHOWN ON THE DRAWINGS. NO ADDITIONAL COSTS WILL BE CONSIDERED FOR EXTENDING UTILITIES TO MAKE A COMPLETE AND FUNCTIONING CODE COMPLIANT UTILITY SERVICE.

8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE HANSCOM AFB FACILITY STANDARDS (BFS) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) UNIFIED FACILITY CRITERIA (UFC) ENGINEERING TECHNICAL LETTERS (ETL) AND ALL APPLICABLE BUILDING AND HANDICAP ACCESSIBILITY CODES.

9. ALL EXIT AND ESCAPE FACILITIES SHALL BE CONTINUOUSLY MAINTAINED AT ALL TIMES DURING CONSTRUCTION.

IN THE EVENT ANY REQUIRED EXIT MUST BE TEMPORARILY CLOSED, COORDINATE WITH BUILDING OWNERS AND

PROVIDE OTHER MEASURES AND OR MEANS WHICH WILL PROVIDE EQUIVALENT SAFETY.

22' - 0"

8'

0"

13' - 7"

CONCRETE UTILITY PAD

CONCRETE UTILITY PAD

7'

8"

12' - 9"

1/ 2"

22' - 0 1/2"

5' - 5 3/4"

/2

19' - 1 1/2"

7' - 9"

"CONCRETE

UTILITY PAD

7' - 9"

15' - 7"

CONCRETE

UTILITY PAD

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

AR

TM

EN

T

O F

TH

E

AI

R

F O

R C

E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

ST

R U

C

TI

O N

C O

IN

C

BU

TT

O N

H O

LE

D

R

IV

E

PR

O

VI

D

EN

C E, R I 0

N

LE

AD

P R

O

FE

SI

O

N

AL

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

D-102

D

EM

O

LI

TI

O

N P

LA

N

S

CH

IL

D

DE

VE

LO

PM

EN

T

CE

NT

ER

, B

HA

NS

CO

M A

IR

F

O

RC

E

BA

SE

VC

S

AS

/2

1/

100% SUBMISSION

RE

PL

AC

E

HV

AC

, C

HI

LD

D

EV

EL

O

PM

EN

T

CE

NT

ER

PR

O

JE

CT

N

UM

BE

R:

M

XR

D

-0

1/4" = 1'-0"1 AC-1 ENCLOSURE

1/4" = 1'-0"2 AC-2 ENCLOSURE

1/4" = 1'-0"3 AC-3 ENCLOSURE

1/4" = 1'-0"4 AC-4 ENCLOSURE

DEMOLITION GENERAL NOTES:

1. THE CDC FACILITY AND ALL ADJACENT SPACES TO THE LIMIT OF WORK NEEDS TO REMAIN OPERATIONAL AT ALL TIMES DURING THE DEMOLITION AND CONSTRUCTION ACTIVITIES. ISOLATE THE SUPPLY AND RETURN AIR DUCTWORK TO ENSURE THAT NO AIR IS TRANSFERRED IN/OUT OF THE LIMIT OF WORK AREA. PROVIDE TEMPORARY VENTILATION IF REQUIRED.

2. THE SCOPE OF THE DEMOLITION INCLUDES THE REMOVAL OF WINDOW AC UNITS AS WELL AS DEMOLITION OF AC-1, AC-2, AC-3, AC-4, AND AHU-1. THE REMOVAL AND SALVAGE OF THE WINDOW UNITS IS SHOWN SCHEMATICALLY AND IS NOT INTENDED TO IDENTIFY THE

INDIVIDUAL WINDOW AC UNITS.

3. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. ALL DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT THE UNNECESSARY DESTRUCTION AND OR DAMAGE TO SYSTEMS THAT SHALL REMAIN IN OPERATION AT THE CONCLUSION OF THIS WORK. DETERMINE THE EXACT LOCATIONS OF ALL EXISTING EQUIPMENT, DEVICES AND WIRING BEFORE

COMMENCING WORK.

4. LOCATE AND PRESERVE ALL PORTIONS OF THE EXISTING HVAC SYSTEMS WHICH SHALL REMAIN.

5. NOT ALL CONTROL DEVICES AND WIRING ARE INDICATED ON THE MECHANICAL DEMOLITION DRAWINGS. REMOVAL SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR. COORDINATE WITH ENGINEER PRIOR TO START OF DEMOLITION.

6. THE MECHANICAL CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING HVAC DEVICES, EQUIPMENT AND WIRING PRIOR TO COMMENCING ANY WORK. THE MECHANICAL CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES THAT MIGHT OCCUR BECAUSE OF THE CONTRACTOR'S FAILURE TO ACCURATELY DISCOVER, LOCATE AND PROTECT ANY AND ALL

PORTIONS OF THE EXISTING HVAC SYSTEM.

7. WHERE THE EXISTING MECHANICAL EQUIPMENT AND DEVICES SHALL BE REMOVED, THE MECHANICAL CONTRACTOR SHALL REMOVE ALL ASSOCIATED DUCTWORK, PIPING AND CONTROLS THAT SHALL NOT REMAIN IN OPERATION BACK TO THEIR RESPECTIVE SOURCE

OR TO THE POINT ON A SHARED SYSTEM FROM WHERE THE EQUIPMENT OR DEVICE IS SERVED.

8. BEFORE COMMENCING WITH WORK ENSURE ALL ELECTRICAL POWER IS TURNED OFF TO THE EXISTING EQUIPMENT. COORDINATE WITH THE ELECTRICAL CONTRACTOR TO ENSURE WORKING POWER HAS BEEN EITHER TERMINATED OR TURNED OFF AT THE PANEL

AND LOCKED OUT AND TAGGED.

9. THE MECHANICAL CONTRACTOR SHALL COMPLETELY REMOVE ALL ITEMS INDICATED AND SHALL BE RESPONSIBLE FOR DISPOSAL PER LOCAL, STATE AND FEDERAL REGULATIONS AND PAY FOR ALL ASSOCIATED COSTS OF DISPOSAL.

10. IF REQUIRED, RELOCATE AS NECESSARY ALL EXISTING DUCTWORK, PIPING AND CONTROLS FOUND PASSING THROUGH THE AREA OF CONSTRUCTION, AND WHICH ARE PRESENTLY IN USE IN OTHER PORTIONS OF THE BUILDING UNAFFECTED BY THIS PROJECT PHASE, TO MAINTAIN THE CONTINUITY OF SERVICE.

11. ALL DUCTWORK, GRILLES AND DEVICES WITHIN THE AREA OF CONSTRUCTION WHICH ARE NOT INDICATED TO BE REUSED OR TURNED

OVER TO THE OWNER SHALL BE DISPOSED OF BY THE CONTRACTOR.

12. THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING NECESSARY TO REPAIR ANY DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES UNDER HIS/HER CONTRACT. THIS WORK INCLUDES AREAS OUTSIDE ANY LIMITS OF CONSTRUCTION LINES

INDICATED ON THE DRAWINGS.

13. RUBBISH AND DEBRIS SHALL BE REMOVED FROM THE WORK AREAS DAILY, UNLESS OTHERWISE DIRECTED, TO AVOID ACCUMULATION AT THE DEMOLITION SITE. MATERIALS THAT CANNOT BE REMOVED DAILY SHALL BE STORED IN AREAS SPECIFIED.

14. THE EXISTING UNITS’ REFRIGERANT IS R-22. THIS REFRIGERANT SHALL BE CAPTURED AND LEGALLY DISPOSED IN ACCORDANCE WITH

THE FEDERAL AND STATE REGULATIONS.

DEMOLITION KEYED NOTES:

DEMOLISH AND REMOVE AC UNIT INCLUDING ALL APPURTENANCES, SUPPORTS, ELECTRICAL AND MECHANICAL CONNECTIONS, ETC.

DEMOLISH AND REMOVE THE SUPPLY AND RETURN AIR CONNECTION TO THE BUILDING. DEMOLISH THE OUTSIDE AIR DUCT CONNECTION. DEMOLITION SHALL INCLUDE ALL INSULATION, DAMPERS, FRAMES, FLANGES, FLEX CONNECTIONS, ETC. ENSURE THE

AREA IS CLEAR FOR THE INSTALLATION OF THE NEW AC UNIT.

DEMOLISH AND REMOVE THE EXISTING CONCRETE PAD. DEMOLITION SHALL INCLUDE ALL FOOTINGS, BASE, UNDERLAYMENTS, ETC.

CLEAR ALL DEBRIS AND PREPARE AREA TO RECEIVE NEW CONCRETE PAD.

DEMOLISH AND REMOVE THE ORNAMENTAL BRICK ENCLOSURE AND DOOR. DEMOLITION SHALL INCLUDE FOUNDATIONS, FOOTINGS, AND REINFORCEMENTS. EXERCISE CAUTION NOT TO DAMAGE EXISTING EXTERIOR BUILDING BRICK WALL. PREPARE AREA TO RECEIVE

NEW FENCING.

DEMOLISH AND REMOVE AC-4 FENCING AND PAD. PATCH PAVEMENT WHERE REQUIRED.

DEMOLISH AND REMOVE ALL WINDOW AC UNITS, FRAMES, SUPPORTS, AND ALL OTHER APPURTENANCES. THE DEMOLITION OF THE WINDOW UNITS IS SHOWN SCHEMATICALLY AND IS NOT INTENDED TO IDENTIFY THE INDIVIDUAL WINDOW AC UNITS.

PHASING PLAN:

1. AC UNITS SHALL BE DEMOLISHED AND REMOVED ONE AT A TIME. THE INTENT IS TO USE THE EXISTING WINDOW AC UNITS AS TEMPORARY COOLING FOR THE SPACES BEING AFFECTED. THE CONSTRUCTION PHASING PLAN SHALL SHOW THE SEQUENCE OF

DEMOLITION.

2. PRIOR TO DEMOLITION OF THE AC UNITS, PROVIDE 72 HOURS WRITTEN NOTIFICATION TO THE OWNER FOR ALL SHUTDOWN ACTIVITIES.

3. ONCE AN AC UNIT HAS BEEN REPLACED WITH THE NEW UNIT, PERFORM STARTUP AND TESTING OF THE NEW UNIT TO PROVIDE COOLING TO THE BUILDING. THIS STARTUP AND TESTING IS NOT A SUBSTITUTION FOR THE SYSTEM COMMISSIONING.

4. ONCE ALL NEW AC UNITS HAVE BEEN INSTALLED, PERFORM THE REQUIRED SYSTEM WIDE COMMISSIONING FOR THE BUILDING HVAC.

5. CONTRACTOR SHALL PROVIDE A CONSTRUCTION SCHEDULE AND CONSTRUCTION PHASING PLAN FOR GOVERNMENT APPROVAL PER THE BASIC MACC CONTRACT PRIOR TO COMMENCING WORK. SERVICE TO MORE THAN ONE ZONE SHALL NOT BE REMOVED FROM ACTIVE SERVICE SIMULTANEOUSLY DURING PHASED CONSTRUCTION. HVAC SERVICES SHALL NOT BE INTERRUPTED WITHOUT PRIOR APPROVAL OF GOVERNMENT AND TEMPORARY SERVICES SHALL BE PROVIDED FOR OUTAGES DURING WORKING HOURS AND LONGER

THAN 8 HOURS.

2 5

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

AR

TM

EN

T

O F

TH

E

AI

R

F O

R C

E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

ST

R U

C

TI

O N

C O

IN

C

BU

TT

O N

H O

LE

D

R

IV

E

PR

O

VI

D

EN

C E, R I 0

N

LE

AD

P R

O

FE

SI

O

N

AL

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

D-103

D

EM

O

LI

TI

O

N P

H O

TO

S

CH

IL

D

DE

VE

LO

PM

EN

T

CE

NT

ER

, B

HA

NS

CO

M A

IR

F

O

RC

E

BA

SE

VC

S

AS

/2

100% SUBMISSION

RE

PL

AC

E

HV

AC

, C

HI

LD

D

EV

EL

O

PM

EN

T

CE

NT

ER

PR

O

JE

CT

N

UM

BE

R:

M

XR

D

-0

N.T.S.1 DEMOLITION PHOTOS

DEMOLITION GENERAL NOTES:

1. THE CDC FACILITY AND ALL ADJACENT SPACES TO THE LIMIT OF WORK NEEDS TO REMAIN

OPERATIONAL AT ALL TIMES DURING THE DEMOLITION AND CONSTRUCTION ACTIVITIES.

ISOLATE THE SUPPLY AND RETURN AIR DUCTWORK TO ENSURE THAT NO AIR IS

TRANSFERRED IN/OUT OF THE LIMIT OF WORK AREA. PROVIDE TEMPORARY VENTILATION

IF REQUIRED.

2. THE SCOPE OF THE DEMOLITION INCLUDES THE REMOVAL OF WINDOW AC UNITS AS WELL

AS DEMOLITION OF AC-1, AC-2, AC-3, AC-4, AND AHU-1. THE DEMOLITION OF THE WINDOW

UNITS IS SHOWN SCHEMATICALLY AND IS NOT INTENDED TO IDENTIFY THE INDIVIDUAL

WINDOW AC UNITS.

3. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE

AND EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE

WORK. THE CEILING SPACE IN THE LIMIT OF WORK IS HIGHLY CONGESTED. ALL

DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO

PREVENT THE UNNECESSARY DESTRUCTION AND OR DAMAGE TO SYSTEMS THAT SHALL

REMAIN IN OPERATION AT THE CONCLUSION OF THIS WORK. DETERMINE THE EXACT

LOCATIONS OF ALL EXISTING EQUIPMENT, DEVICES AND WIRING BEFORE COMMENCING

WORK.

4. LOCATE AND PRESERVE ALL PORTIONS OF THE EXISTING HVAC SYSTEMS WHICH SHALL

REMAIN.

5. NOT ALL CONTROL DEVICES AND WIRING ARE INDICATED ON THE MECHANICAL

DEMOLITION DRAWINGS. REMOVAL SHALL BE THE RESPONSIBILITY OF THE MECHANICAL

CONTRACTOR. COORDINATE WITH ENGINEER PRIOR TO START OF DEMOLITION.

6. THE MECHANICAL CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL

EXISTING HVAC DEVICES, EQUIPMENT AND WIRING PRIOR TO COMMENCING ANY WORK.

THE MECHANICAL CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL

DAMAGES THAT MIGHT OCCUR BECAUSE OF THE CONTRACTOR'S FAILURE TO

ACCURATELY DISCOVER, LOCATE AND PROTECT ANY AND ALL PORTIONS OF THE EXISTING

HVAC SYSTEM.

7. WHERE THE EXISTING MECHANICAL EQUIPMENT AND DEVICES SHALL BE REMOVED, THE

MECHANICAL CONTRACTOR SHALL REMOVE ALL ASSOCIATED DUCTWORK, PIPING AND

CONTROLS THAT SHALL NOT REMAIN IN OPERATION BACK TO THEIR RESPECTIVE SOURCE

OR TO THE POINT ON A SHARED SYSTEM FROM WHERE THE EQUIPMENT OR DEVICE IS

SERVED.

8. BEFORE COMMENCING WITH WORK ENSURE ALL ELECTRICAL POWER IS TURNED OFF TO

THE EXISTING EQUIPMENT. COORDINATE WITH THE ELECTRICAL CONTRACTOR TO ENSURE

WORKING POWER HAS BEEN EITHER TERMINATED OR TURNED OFF AT THE PANEL AND

LOCKED OUT AND TAGGED.

9. THE MECHANICAL CONTRACTOR SHALL COMPLETELY REMOVE ALL ITEMS INDICATED AND

SHALL BE RESPONSIBLE FOR DISPOSAL PER LOCAL, STATE AND FEDERAL REGULATIONS

AND PAY FOR ALL ASSOCIATED COSTS OF DISPOSAL.

10. IF REQUIRED, RELOCATE AS NECESSARY ALL EXISTING DUCTWORK, PIPING AND

CONTROLS FOUND PASSING THROUGH THE AREA OF CONSTRUCTION, AND WHICH ARE

PRESENTLY IN USE IN OTHER PORTIONS OF THE BUILDING UNAFFECTED BY THIS PROJECT

PHASE, TO MAINTAIN THE CONTINUITY OF SERVICE.

11. ALL DUCTWORK, GRILLES AND DEVICES WITHIN THE AREA OF CONSTRUCTION WHICH ARE

NOT INDICATED TO BE REUSED OR TURNED OVER TO THE OWNER SHALL BE DISPOSED OF

BY THE CONTRACTOR.

12. THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING NECESSARY

TO REPAIR ANY DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES UNDER HIS/HER

CONTRACT. THIS WORK INCLUDES AREAS OUTSIDE ANY LIMITS OF CONSTRUCTION LINES

INDICATED ON THE DRAWINGS.

13. RUBBISH AND DEBRIS SHALL BE REMOVED FROM THE WORK AREAS DAILY, UNLESS

OTHERWISE DIRECTED, TO AVOID ACCUMULATION AT THE DEMOLITION SITE. MATERIALS

THAT CANNOT BE REMOVED DAILY SHALL BE STORED IN AREAS SPECIFIED.

DEMOLITION KEYED NOTES:

DEMOLISH AND REMOVE AHU-1 UNIT. DEMOLITION SHALL INCLUDE ALL GAUGES,

INSTRUMENTATION, CONTROLS, SUPPORTS, ELECTRICAL AND MECHANICAL

CONNECTIONS, AND ALL APPURTENANCES.

RETAIN THE SUPPLY AND RETURN DUCTWORK AS INDICATED. PRESERVE THE

CONNECTIONS SUCH THAT THESE CAN BE REUSED TO CONNECT TO THE NEW UNIT.

DISCONNECT ALL HOT WATER SUPPLY AND RETURN PIPING TO THE UNIT. RETAIN THE

PIPING FOR CONNECTION TO THE NEW UNIT.

DISCONNECT AND DEMOLISH THE OUTDOOR CONDENSING UNIT, HOUSEKEEPING PAD,

AND ALL REFRIGERANT PIPING TO THE EXISTING AHU-1. DEMOLITION SHALL INCLUDE

ALL REFRIGERANT PIPING, SUPPORTS, HANGERS, ALL APPURTENANCES INCLUDING

THE CONDENSING UNIT.

DEMOLISH AND REMOVE THE OUTSIDE AIR INTAKE AS SHOWN. EXTEND THE LOUVER

BLOCKAGE TO INCLUDE THE OPENING.

EXTERIOR LOUVER SHALL REMAIN AND BE PROTECTED DURING DEMOLITION OR

CONSTRUCTION ACTIVITIES. ANY DAMAGE SHALL BE REPAIRED BY THE CONTRACTOR

AT NO COST TO THE GOVERNMENT.

ALSSS

G

F

E

D

C

B

A f-' I I l I

FP-1 I ':>

lilh 11111 =''d'·

IILE-- :.,

FP-.J-IC

( I I f-1 I 1 · - ·, 1;1 ==,c,;

c::_ I b ::)

i I

I --� I i I (I 1 f • . - 4 1

CD NEW HVAC DEMO PLAN EAST

1/8"=1'

[1 -- ,/ 4 1 I 11

,A.: . [,SS1 , -

ll-l1(!

ILC:T-,Q

1 ?

I f--------------

.�; ¼-' '

•TT FOR ' !

! I I I .

ET--

. �n,.___1::·,

• - rr. FOR "I • :' I

I I

=-l

1/-1 lvl-1

I I I

I

C· '/:

rRE T:C:DLE::OS

1 t .' I

I !

11 I ) ;.. \ 0 Ii ' � c; rm I[: OF [l 'Vlrv-

--------tH-+=� 2, C l1'VI"--+---""'--.,;::---+-, '.' / ,; :J 'S"""l!,..,,,..=---'-tt,c--.-�---:N=C""l - 55

I lJ

N -· N .J _/L__L- -----NlXI N1 1 • I N r; '-I --r -I Ii�·� =r1 .. E 2 -.1,, W--

N -x,:L�F''1 I 15

IC 1 C

I 01) 11 lh N

' I \I 'F[ I '

-i-----,1 :_�, I. U ri--' .

. ! 4

(I,-' f')-1 41

:c 7Tl .. -2C1 i]A -371 1111 L= '' IILET=i3'

,:-1\1 1.,1

._l

, /:'.,.ii I - I t � .!'

IS.3 :"_1

l '0•• I

� � I : l\ I 11 f I

� 10 I

KEYED NOTES:

I

0 I I -- -"

,-I

:B f�

I.I - I 9. ·1 CF .I

1111 - :,•J':, :-1 I 11'11 - =i-''

IIF i•JIT3 I I ,..

f

---1 =1

- 71 n

' ' ·. 11 C 1__::1 -; _,, 111.�. = 4 1.1 ,1

11111 __ , 'JC 1 FI.

11.ILC:--i3'

1. DEMOLISH AND REMOVE EXISTING 28X20 AND

28X10 MAIN DUCT LINES AS INDICATED.

1P-IJ- -

I.I = 'T3 I.Ill -231 :1H

11\I - "

1·,, ;:u11

F II ID

I I I

.l __ _,,,..,_, C:,IJFFL

PC:HPl=-cl- ,:c

-r• --:c ·I

EXISTING TO DEMO

SEE D-1 01

Hfl-- Fr-.!- 5 Iii --2':, lvlll .=Id

II _ET= ::1"

,: ii ,1 I

[,I. -T Sl1IJl<E 1;f f .• _.1;,, �111, 1T I F:F'

RETAIN ALL FPTU'S BRANCH DUCTS AND

FITTINGS TO BE RECONNECTED TO NEW DUCT.

RETAIN AND PROTECT ALL HWS/HWR PIPING.

2. PREPARE THE AREA TO RECEIVE NEW DUCT

WORK. REFER TO M-104 FOR NEW WORK

DETAILS.

3. DEMOLISH AND REMOVE EXISTING DUCT CAP

PREVIOUSLY INSTALLED. DEMOLITION SHOULD

BE COMPLETE TO MAKE ROOM FOR NEW DUCT.

KEY

--EXISTING

---DEMOLISH

KEV Pl AN

,,.....N

�J

HANSCOM AIR

FORCE BASE

z ci z .. 0 z w - I- !.: � !.: � ClOI- Ct:'. w � u 1- :::) (\J :J zCll- 0 0 W�cn t'..)

z tJ woo Nz en< w tJ tt:

LL tt:

<(w I-

LL

0 I-z w ::!i

Ii:

�w

0, 0, � "'w -Cl)�tt: <( MW Cl r-. I- � zwo WUC/l Utt:�!z t2 w w tt: Cl) ::. - ::, C. <I 0::; u ....IO c7jwuC/l> Cl) <(Wz:,,C <( CI ..J I u a:: wI-z w en en CJ en... I- 0 ID W o

Zo

• (I) w ' ffi<C::E�I-ID II.. Qzwoa::w<J...J>< (.) a:: w ::EI- 0 > a:: z LL.

w w a:: Q w::E-CID II.. <C :::! ::Eo::E:i:::=i ...JO<JzW(.) "I- >(/)CJ (.)Wz <C WC<(> -, Q :i::: :i::: 0...J w a::

:i::: (.) II..

II..wa::

t.i ='WmO>o

t) a:: O') zo� Ow-� ....I ct'.'. uO ::, I Wtt:zU 1-0 z C/l 1-w z r- g 0::, > umo z Ott:

o�a.

tt: <( :a:

I-z <C...J :i: w 0

�:i:::

s: w z

SHEET ID

D-104

100% SUBMISSION

GROUND

0' - 0"

8" CONCRETE PAD

20 GA MIN. METAL STRAPS, GALVANIZED

OR EQUAL. WRAP CONTINUOUS AROUND

POSTS W/MINIMUM 24" OVERLAP. PROVIDE

#10 SCREWS AT 6" O.C. AT OVERLAP

UNISTRUT P1001 SUPPORT POST EACH

SIDE OF DUCT. STRONG AXIS

ORIENTED PARALLEL TO GOOSENECK.

GALVANIZED OR EQUAL.

NOTE:

BIRD SCREEN

AC UNIT

SUPPLY AND RETURN

DUCTWORK NOT SHOWN

FOR CLARITY.

6X6 METAL

PLATE AT BASE

OF UNISTRUT.

ALL (4) SIDES

COMPACTED SUBBASE (TYP.)

NEW 8" THICK CONCRETE PAD

(4) - ½"Ø HILTI KWIK ANCHOR

BOLT TZ2. PROVIDE 6" MINIMUM

EMBEDMENT INTO SLAB. (TYP.)

PHP SYSTEMS/DESIGNS 6"x6"

POST BASE ON CONCRETE

(TYP)

INTAKE DUCT

UNISTRUCT DUCT

SUPPORT FRAME

4" MIN. (TYP.)

6" M

IN

T/ CONC. PAD

EL. VERIFY IN FIELD

T/ DUCT SUPPORT

EL. VERIFY IN FIELD

PHP-D SUPPORT STAND (4 POSTS)

1/2" Ø HILTI KWIK ANCHOR

BOLT TZ2 MIN. 6" EMBEDMENT,

(4) REQ'D. PER 6x6 PLATE.

8" CONC. SLAB W/

W.W.F. 6x6 - W2.1xW2.1

FL

EX

C O

N N

EC

TI

O N

(F C

AC UNIT

RETURN SIDE ELEVATION

FACTORY CURB

NEW SUPPLY/RETURN

EXIST. BLDG.

3/16" SIMPSON TITAN TURBO MASONRY

SCREWS @ 6" O.C. MIN. 2" EMBED IN BRICK

3" x 3" x 16 GAUGE GALVANIZED

UTILITY ANGLE FULL WIDTH OF DUCT

#10 TEK SCREWS @ 6" O.C. INTO DUCT

THREE #6 CORROSION RESISTANT BUGLE

HEAD SCREWS INTO EACH STUD @ 6" O.C.

STRUCTURAL NOTES:

2.

A.

B.

C.

D.

E.

F.

G.

H.

GENERAL NOTES:

CONSTRUCTION SHALL FOLLOW I.B.C. 2018.

THE CONTRACTOR SHALL FIELD VERIFY ALL DUCT DIMENSIONS BEFORE PREPARING

SHOP DRAWINGS, ORDERING OR FABRICATING ANY MATERIALS. ALL EXPANSION JOINTS AND

CONSTRUCTION SHALL ALIGN WITH AND MATCH EXISTING CONSTRUCTION. CONFIRM WITH

ARCHITECTURAL PLANS. REPORT ANY DISCREPANCIES TO ENGINEER PRIOR TO

PROCEEDING WITH WORK.

THE CONTRACTOR SHALL PROTECT EXISTING FACILITIES, STRUCTURES AND UTILITY LINES

FROM ALL DAMAGE.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATE BRACING OF DUCTS

AND NON-STRUCTURAL ITEMS DURING CONSTRUCTION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A CLEAN AND WORKMANLIKE

APPEARANCE. ALL DEBRIS SHALL BE REMOVED FROM THE SITE CONFORMING TO THE

GOVERNING LAW.

THE CONTRACTOR SHALL COMPLY WILL ALL GOVERNING CODES AND LAWS AFFECTING THE

WORK. THIS SHALL BE INCLUSIVE OF ANY LOCAL, STATE, OR FEDERAL LAWS AND CODES.

PRIOR TO EXCAVATING OR DEMOLISHING, NOTIFY THE ONE CALL SYSTEM IN THE REGION TO

ASSURE THAT UNDERGROUND FACILITIES ARE IDENTIFIED. LAW REQUIRES NO LESS THAN

THREE NOR MORE THAN TEN WORKING DAYS NOTICE BEFORE YOU DIG.

ALL REFERENCED STANDARDS REFER TO LATEST EDITION.

3.

A.

B.

C.

CONCRETE:

CONCRETE SHALL EXHIBIT A 28-DAY COMPRESSIVE STRENGTH OF 4,000 P.S.I.

REINFORCING SHALL CONFIRM TO A.S.T.M. A615, GRADE 60, UNLESS NOTED OTHERWISE.

CONCRETE SHALL MEET THE REQUIREMENTS OF A.C.I. 318.

C.

1.

2.

WIND LOADS:

BASIC WIND SPEED (3 SECOND GUST)

OVERALL EXPOSURE CATEGORY

E.

1.

2.

3.

4.

5.

6.

7.

SEISMIC:

SPECTRAL RESPONSE SHORT PERIODS

SPECTRAL RESPONSE 1 s PERIOD

SEISMIC IMPORTANCE FACTOR

OCCUPANCY CATEGORY

SEISMIC CATEGORY

SITE CLASS

SEISMIC RESPONSE COEFFICIENT

Ss = 29.8 % S1 = 6.91 % 1.5

IV

C C Cs = .0776

= 109 MPH

= C

B.

1.

2.

3.

4.

SNOW LOADS:

GROUND SNOW LOAD

DUCT SNOW LOAD

SNOW EXPOSURE FACTOR

SNOW LOAD IMPORTANCE FACTOR

Pg = 50 PSF Pf = 35 PSF Ce = 1.0 ls = 1.0

A. BUILDING CODE: 2018 IBC / UFC 3-301-01

1. DESIGN CRITERIA:

4.

A.

STEEL CONSTRUCTION

STEEL MEMBERS FOR DUCT SUPPORT SHALL BE UNISTRUT OR EQUAL, SIZE AS SHOWN ON THE

DRAWINGS.SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS AND CODE OF STANDARD PRACTICE, F. RISK CATEGORY: II

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

A R

TM

EN

T O

F

TH

E A

IR

F

O R

C E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

F

E

D

C

B

A

D A

TE

M

A R

K D

ES

C

R

IP

TI

O

N

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

ST

R U

C

TI

O N

C O

IN

C

BU

TT

O N

H O

LE

D

R

IV

E

PR

O

VI

D

EN

C E, R I 0

N

LE

A

D P

R O

FE

SI

O N

A L

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

S-100

ST

R

U C

TU

R

AL

D

ET

AI

LS

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H A

N

SC

O M

A

IR

F O

R C

E B

A

SE

/2

0/

R

EP

LA

C

E H

VA

C

, C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R

PR

O

JE

C T

N U

M B

ER

: M

XR

D

6-

SCALE = N.T.S.1 INTAKE SIDE ELEVATION

SCALE = N.T.S.2 INTAKE SUPPORT DETAIL

SCALE = N.T.S.3 RETURN SIDE ELEVATION

SCALE = N.T.S.4 SECTION THRU EXTERIOR WALL

Tom New Stamp

EQUIPMENT DESIGNATIONS

ABBREVIATIONS MECHANICAL GRAPHIC SYMBOLS

MIN MINIMUM

RELIEF HOOD

UNIT HEATER

SUPPLY FANSF

FAN TERMINAL UNITFT

UH

WATER COLUMN

STAINLESS STEEL

STATIC PRESSURE

REVOLUTIONS PER MINUTE

PRESSURE DROP

PLUMBING CONTRACTOR

OUTSIDE AIR TEMPERATURE

NORMALLY OPEN

NOT IN CONTRACT

NORMALLY CLOSED

COOLING COIL

EXHAUST FAN

WB WET BULB

EF

F

CC

WC

WG

FILTER

WATER GAUGE

RPM

TYP

V

SS

SP

SENS.

SA

OA

PD

PC

OAT

RA

PH

NC

MTD

NTS

NO

NIC

TYPICAL

SENSIBLE HEAT

SUPPLY AIR

VOLTS

RETURN AIR

OUTSIDE AIR

NOT TO SCALE

MOUNTED

PHASE

RH

BUILDING AUTOMATION SYSTEM

CUBIC FEET PER MINUTE

AIR PRESSURE DROP

ABOVE FINISHED FLOOR

LEAVING AIR TEMPERATURE

HERTZ, CYCLES PER SECOND

GENERAL CONTRACTOR

FEET PER MINUTE

ELECTRICAL CONTRACTOR

ENTERING AIR TEMPERATURE

DIRECT EXPANSION

MECHANICAL CONTRACTOR

MIXED AIR TEMPERATURE

MFR

MC

MBH

MAT

LAT

Hz

HP

IN

FD

GC

FPM

F

EC

EAT

EA

DX

DEG

INCHES

HORSEPOWER

MANUFACTURER

1000 BTUH

DEGREES

FLOOR DRAIN

FAHRENHEIT

EXHAUST AIR

APD

BAS

CFM

BTUH

BTU

DB

AFF

BTU / HOUR

DRY BULB

DP DIFFERENTIAL PRESSURE SENSOR

HIGH DENSITY POLYETHYLENE PIPINGHDPE

FEETFT

FIRE DAMPERFD

AIR HANDLING UNITAHU

VARIABLE AIR VOLUME BOX

CABINET UNIT HEATER

AIR CONDITIONING UNIT

CONDENSING UNIT

VAV

CUH

AC

CU

BRITISH THERMAL UNITS

AIR CURTAIN UNITARC

HEATING COILHC

NOTE: NOT ALL SYMBOLS ARE USED IN THIS PROJECT.

1. ALL THERMOSTATS ARE TO BE MOUNTED 5’-6” ABOVE FINISH FLOOR.

2. THE HVAC CONTRACTOR SHALL SEAL THE PIPING PENETRATIONS THROUGH

WALLS WITH APPROVED FIRE STOP MATERIAL.

3. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE

MANUFACTURER'S APPROVED PUBLISHED LITERATURE.

4. ALL WORK UNDER THE SECTION SHALL BE COORDINATED WITH ALL OTHER

TRADES BEFORE INSTALLATION IS MADE.

5. REFER TO ARCHITECTURAL DRAWINGS FOR LOUVER INFORMATION..

6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF 'ALL'

SUBCONTRACTORS AND THEIR EQUIPMENT, PIPING, CONDUITS, VALVING, ETC. IF

LOCATIONS CAN NOT BE INSTALLED DUE TO FIELD CONDITION. RELOCATION OR

ADJUSTMENT OF SUCH ITEMS MUST BE INCLUDED IN BASE BID OF CONTRACTORS

AND WILL NOT BE CONSIDERED AS AN EXTRA.

GENERAL CONSTRUCTION NOTES

1. THE BUILDING WILL REMAIN OCCUPIED DURING DEMOLITION ACTIVITIES. DUST

CONTROL PROVISIONS ARE REQUIRED TO ENSURE AGAINST MIGRATION OF ALL

DUST AND DEMOLITION DEBRIS TO OCCUPIED SPACES.

2. THE CONTRACTOR SHALL COMPLY WITH THE MARKING OF EGRESS IN

ACCORDANCE WITH THE CODE REQUIREMENT THROUGHOUT THE DEMOLITION.

3. THE CONTRACTOR SHALL PROVIDE STEP-OFF PADS (TACK MATS) AT ALL ENTRY

AND EGRESS PATHS IN AND OUT OF THE LIMIT OF WORK AREA. THE CONTRACTOR

SHALL REPLACE THE STEP-OFF PADS AS OFTEN AS NEEDED, TO ENSURE AGAINST

MIGRATION OF DUST AND CONSTRUCTION DEBRIS OUTSIDE OF THE WORK AREA.

1. THE BUILDING WILL REMAIN OCCUPIED DURING DEMOLITION ACTIVITIES. NOISE

CONTROL PROVISIONS ARE REQUIRED TO ENSURE AGAINST DISTURBANCE OR

DISRUPTION OF WORK ACTIVITIES OF THE BUILDING OCCUPANTS.

2. ANY PROPOSED INTERRUPTION TO TENANT OPERATIONS DURING DEMOLITION

MUST HAVE PRIOR APPROVAL FROM THE OWNER WITH A MINIMUM OF 72 HOURS

ADVANCE NOTICE.

3. THE DEMOLITION SUBCONTRACTOR SHALL ADOPT QUIETER TYPES OF

DEMOLITION AS IS PRACTICAL BY USING POWER TOOLS EQUIPPED WITH

SILENCERS.

4. THE CONTRACTOR SHALL PROVIDE PROVISIONS TO ENSURE AGAINST SOUND AND

VIBRATION NOISE TO THE BUILDING OCCUPANTS.

DUST CONTROL PROVISIONS

NOISE CONTROL PROVISIONS

1. DRAWINGS, PLANS AND DIAGRAMS INDICATE GENERAL LOCATION AND

ARRANGEMENT OF EQUIPMENT AND PIPING. PROVIDE ALL

APPURTENANCES/ACCESSORIES NECESSARY FOR THE PROPER INSTALLATION,

COORDINATION AND OPERATION OF SYSTEMS. ALL SYSTEMS AND EQUIPMENT

SHALL BE INSTALLED IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL

CODES.

2. INSTALL EQUIPMENT ACCORDING TO APPROVED SUBMITTAL DATA. INSTALL

EQUIPMENT LEVEL, PLUMB AND PARALLEL TO BUILDING AND WITH

MANUFACTURER'S RECOMMENDED MINIMUM CLEARANCES FOR MAINTENANCE,

REPAIR AND REPLACEMENT.

3. REFER TO DETAILS AND SPECIFICATIONS FOR ALL NECESSARY

APPURTENANCES AND METHODS AND COMPLY WITH THE REQUIREMENTS.

4. VERIFY EXACT SIZE AND LOCATION OF EXISTING UTILITIES BEFORE START OF

DEMOLITION.

5. RELOCATE, REMOVE, AND ADJUST ALL MECHANICAL AND ELECTRICAL ITEMS TO

COORDINATE WITH NEW WORK PLANS.

6. ALL MECHANICAL ITEMS SHOWN ARE EXISTING AND SHOWN IN SCHEMATIC

FORM ONLY.

7. REMOVE EXISTING PIPING, DUCTWORK AND CONTROL WIRING BACK TO LAST

ACTIVE SERVICE. UPON DEMOLITION OF MECHANICAL UNIT AND ASSOCIATED

CONTROL WIRING, THE BAS CONTRACTOR SHALL UPDATE THE SOFTWARE

SYSTEM GRAPHICS TO INDICATE UNIT IS NO LONGER IN SERVICE.

8. REMOVED FIXTURES AND EQUIPMENT SHALL REMAIN THE PROPERTY OF THE

OWNER. ALL EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL

BE REMOVED FROM THE PREMISES BY THE CONTRACTOR.

9. IN AREAS WHERE EXISTING CONSTRUCTION IS REMOVED AND NO ADDITIONAL

CONSTRUCTION IS INDICATED. PATCH EXISTING CONSTRUCTION TO MATCH

EXISTING CONDITION. FIRE SEAL ALL EXISTING OPENINGS IN ALL WALLS AND

FLOORS WHERE EXISTING PENETRATIONS ARE TO REMAIN.

10. CONNECTIONS TO, AND SHUTDOWNS OF, EXISTING SYSTEMS SHALL BE

COORDINATED WITH OWNER TO ALLOW MINIMUM INTERFERENCE WITH

OWNER'S OPERATION AND MINIMUM DOWNTIME OF EXISTING SERVICES.

CONTRACTOR SHALL SUBMIT TO OWNER FOR REVIEW AND APPROVAL OF THE

PROPOSED PHASING PLAN FOR CONNECTING NEW SERVICES TO EXISTING

SERVICES.

11. CONTRACTOR SHALL COMPLY WITH GENERAL CONDITIONS AND PROTECTION

PROVISIONS SPECIFIED FOR JOINT OWNER/CONTRACTOR OCCUPANCY WORK

AREAS.

12. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS BEFORE BEGINNING WORK.

CONTRACTOR SHALL PROTECT EXISTING UTILITIES, EQUIPMENT AND MATERIALS

FROM DAMAGE DURING CONSTRUCTION. ANY EXISTING UTILITIES, EQUIPMENT,

MATERIALS AND SERVICES DAMAGED SHALL BE REPAIRED AT NO EXPENSE TO

THE OWNER. CONTRACTOR SHALL TEMPORARILY MOVE OR TAKE OUT

EQUIPMENT SERVICES AS NECESSARY TO COMPLETE WORK. SUCH SERVICES

SHALL BE REPAIRED IN ACCORDANCE WITH THE SPECIFICATION.

NOTE: APPLICABLE TO ALL DRAWINGS

GENERAL NOTES

T/H

EQUIPMENT DESIGNATION

SECTION REFERENCES

KEYED NOTE SYMBOL

INDICATES POINT OF CONNECTION

BETWEEN NEW AND EXISTING

THERMOSTAT

FIN TUBE RADIATOR

MOTORIZED CONTROL VALVE

RTU

M

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

AR

TM

EN

T

O F

TH

E

AI

R

F O

R C

E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

ST

R U

C

TI

O N

C O

IN

C

BU

TT

O N

H O

LE

D

R

IV

E

PR

O

VI

D

EN

C E, R I 0

N

LE

AD

P R

O

FE

SI

O

N

AL

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

M-001

M

EC

H

AN

IC

AL

A

BB

R

EV

IA

TI

O N

S, N

O

TE

S, A

N D

SY

M

BO

LS

CH

IL

D

DE

VE

LO

PM

EN

T

CE

NT

ER

, B

HA

NS

CO

M A

IR

F

O

RC

E

BA

SE

VC

S

AS

/2

1/

100% SUBMISSION

RE

PL

AC

E

HV

AC

, C

HI

LD

D

EV

EL

O

PM

EN

T

CE

NT

ER

PR

O

JE

CT

N

UM

BE

R:

M

XR

D

-0

OUTSIDE

AIR INTAKE

SEE DETAIL

1/M-500

24" x 44"

RETURN

AIR

24" x 44"

SUPPLY

AIR

NEW

SECURITY

FENCE. SEE

SHEET M-502.

4'-0"

4' -0

4'-0"

21'-8"

NEW

CONCRETE

UTILITY PAD,

SLOPE

CONCRETE

UTILITY PAD

FOR POSITIVE

DRAINAGE

AWAY FROM

THE BUILDING

NEW

CONCRETE

UTILITY PAD,

SLOPE

CONCRETE

UTILITY PAD

FOR POSITIVE

DRAINAGE

AWAY FROM

THE BUILDING

OUTSIDE

AIR INTAKE

SEE DETAIL

1/M-500

24" x 44"

RETURN

AIR

24" x 44"

SUPPLY

AIR

NEW

SECURITY

FENCE. SEE

SHEET M-502.

4'-0"

4' -0

4'-0"

3'-1"

20'-10"

1"

OUTSIDE AIR INTAKE

SEE DETAIL 1/M-500

20" x 32"

RETURN

AIR

26" x 34"

SUPPLY

AIR

NEW SECURITY FENCE.

SEE SHEET M-502.

4' -0

4'-0"

4' -0

17' - 9"

'-8

17' - 9"

NEW CONCRETE

UTILITY PAD,

SLOPE

CONCRETE

UTILITY PAD

FOR POSITIVE

DRAINAGE

AWAY FROM

THE BUILDING

CU-1

AHU-1

24" x 16"

OUTSIDE

AIR INTAKE

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

A R

TM

EN

T O

F

TH

E A

IR

F

O R

C E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

M

A R

K D

ES

C

R

IP

TI

O

N

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

ST

R U

C

TI

O N

C O

IN

C

BU

TT

O N

H O

LE

D

R

IV

E

PR

O

VI

D

EN

C E, R I 0

N

LE

A

D P

R O

FE

SI

O N

A L

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

M-101

N

EW

M

EC

H

AN

IC

AL

P

LA

N S

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H A

N

SC

O M

A

IR

F O

R C

E B

A

SE

VC

S

AS

4/

/2

100% SUBMISSION

R

EP

LA

C

E H

VA

C

, C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R

PR

O

JE

C T

N U

M B

ER

: M

XR

D

6-

1/4" = 1'-0"1 AC-1_NEW MECHANICAL

1/4" = 1'-0"2 AC-2_NEW MECHANCIAL

1/4" = 1'-0"3 AC-3_NEW MECHANICAL

1/4" = 1'-0"4 MECHANICAL AND ELECTRICAL ROOM

1.

2.

3.

4.

5.

6.

7.

GENERAL NOTES:

ALL INFORMATION AND WORK SHOWN AS EXISTING WAS TAKEN FROM FIELD VISITS BY

THE ENGINEER AND FROM OWNER PROVIDED PAST CONSTRUCTION DOCUMENTS.

EQUIPMENT AND DUCTWORK HAVE BEEN SHOWN IN AN APPROXIMATE WAY.

CONSEQUENTLY, THE INFO IS APPROXIMATE AT BEST.

ALL WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT

THE UNNECESSARY DESTRUCTION AND OR DAMAGE TO SYSTEMS THAT SHALL REMAIN

IN OPERATION DURING THE PERFORMANCE OF THIS WORK.

DETERMINE THE EXACT LOCATIONS OF ALL EXISTING EQUIPMENT, DEVICES AND WIRING

BEFORE COMMENCING WORK. NOTIFY ENGINEER WITH ANY QUESTIONS.

THE CDC FACILITY AND ALL ADJACENT SPACES TO THE LIMIT OF WORK NEEDS TO

REMAIN OPERATIONAL AT ALL TIMES DURING THE DEMOLITION AND CONSTRUCTION

ACTIVITIES. ISOLATE THE SUPPLY AND RETURN AIR BRANCH DUCTWORK TO ENSURE

THAT NO AIR IS TRANSFERRED OUT OF THE LIMIT OF WORK AREA. PROVIDE

TEMPORARY VENTILATION IF REQUIRED.

CONTRACTOR SHALL PROVIDE A CONSTRUCTION SCHEDULE AND CONSTRUCTION

PHASING PLAN FOR GOVERNMENT APPROVAL PER THE BASIC MACC CONTRACT PRIOR

TO COMMENCING WORK. SERVICE TO MORE THAN ONE ZONE SHALL NOT BE REMOVED

FROM ACTIVE SERVICE SIMULTANEOUSLY DURING PHASED CONSTRUCTION. HVAC

SERVICES SHALL NOT BE INTERRUPTED WITHOUT PRIOR APPROVAL OF GOVERNMENT

AND TEMPORARY SERVICES SHALL BE PROVIDED FOR OUTAGES DURING WORKING

HOURS AND LONGER THAN 8 HOURS.

INSTALL UNITS IN A MANNER TO MEET THE MANUFACTURER'S RECOMMENDED

CLEARANCES AS REQUIRED.

INSTALL AN EMERGENCY HVAC SHUTOFF/POWER (EPO) PUSH BUTTON AT THE MAIN

FACILITY ENTRANCE. COORDINATE LOCATION OF EPO WITH THE GOVERNMENT.

KEYED NOTES:

AC-1

TRANSITION TO EXISTING 48X24 RETURN DUCT.

TRANSITION TO EXISTING 28X24 SUPPLY DUCT.

AC-2

TRANSITION TO EXISTING 42X24 RETURN DUCT.

TRANSITION TO EXISTING 24X24 SUPPLY DUCT.

AC-3

TRANSITION TO EXISTING 48X24 RETURN DUCT.

TRANSITION TO EXISTING 28X24 SUPPLY DUCT.

AHU-1

TRANSITION TO EXISTING 48X12 RETURN DUCT IN MECHANICAL ROOM.

TRANSITION TO EXISTING 36X14 SUPPLY DUCT IN MECHANICAL ROOM.

PROVIDE NEW INSULATED OUTSIDE AIR DUCT WITH MOTORIZED DAMPER. DAMPER

SHALL BE CLASS 1 A LOW LEAKAGE DAMPER.

INSTALL THE NEW CONDENSING UNIT ON NEW 6" CONCRETE PAD. PAD SHALL BE SIZED

TO EXTEND 6" BEYOND THE FOOTPRINT OF THE UNIT ON ALL SIDES. OBSERVE ALL

MANUFACTURER RECOMMENDED CLEARANCES.

8. CONTACT FIRE PREVENTION FOR ANY ISSUANCE OF HOT WORK PERMITS EXT. 5-5600

RECONNECT THE EXISTING HOT WATER HEADER TO NEW AHU-1 HEATING COIL.

STERILIZE AND DISINFECT ALL PIPING. FLUSH PIPING BEFORE PLACING INTO SERVICE.

SEE SPECIFICATION 23 05 15. SEE DETAIL 5/M-501

schmidtv Pencil schmidtv Pencil

BACKDRAFT

DAMPER

FAILURE

ALARM

CT

M

EX

HA

US

T

AI

R

MOTORIZED

DAMPER

A H

EXHAUST FANS EF-1 AND EF-2 SHALL BE INTERLOCKED

WITH AHU-1. WHENEVER EXHAUST FANS ARE ENERGIZED,

AHU-1 SHALL RUN.

C

H C

C

FS TSTS

HC

CT

VFD

SUPPLY AIRRETURN AIR

O U

TS

ID

E

AI

R F

R O

M G

O O

SE

N

EC

K

AB

O

VE

R

O O

F

LE

VE

L

DPS

FILTER

SPT

LOCATED 2/3 DOWN

SUPPLY DUCT

EXISTING

JCI

CONTROLLER

EXISTING PLANT NETWORK

FACTORY CONTROLS PROVIDED WITH AHU

BACNET

DIRTY ALARM

(.75" WC)

SPEED START/

STOP

SPEED ALARM

STATUS/FAILURE

ALARM

LIQ

VAP

HWS

HWR

SUPPLY FAN

M

H

TS

SD

FIRE ALARM SYSTEM DUCT

DETECTOR

M

OAS

TO EXHAUST FAN

INTERLOCK AND

ROOM PRESSURE

SENSOR

COOLING COIL

REFRIGERANT LINES

TO/FROM

CONDENSING UNIT

(LIQUID/VAPOR)

H

LEGEND:

HOA

CT CURRENT SENSOR/TRANSMITTER

DPS DIFFERENTIAL PRESSURE SWITCH

FLOW SENSOR/SWITCHFS

HUMIDITY SENSOR

HAND-OFF-AUTO

HWR

HWS

LIQ

M

SD

SPT

TS

VAP

VFD

HOT WATER RETURN

HOT WATER SUPPLU

REFRIGERANT LINE (LIQUID)

MOTOR/MOTOR OPERATED

SMOKE DETECTOR

STATIC PRESSURE SENSOR/TRANSMITTER

TEMPERATURE SENSOR/TRANSMITTER

REFRIGERANT LINE (VAPOR)

VARIABLE FREQUENCY DRIVE

OAS OUTDOOR AIR FLOW MONITORING STATION

H

A

H

AFS AIR FLOWER SENSOR

ROOF

AFS

TO FACP

AFSTS

T T

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

A R

TM

EN

T O

F

TH

E A

IR

F

O R

C E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

M

A R

K D

ES

C

R

IP

TI

O

N

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

ST

R U

C

TI

O N

C O

IN

C

BU

TT

O N

H O

LE

D

R

IV

E

PR

O

VI

D

EN

C E, R I 0

N

LE

A

D P

R O

FE

SI

O N

A L

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

M-401

C O

N

TR

O L

SC

H

EM

AT

IC

S

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H A

N

SC

O M

A

IR

F O

R C

E B

A

SE

VC

S

AS

/1

8/

100% SUBMISSION

R

EP

LA

C

E H

VA

C

, C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R

PR

O

JE

C T

N U

M B

ER

: M

XR

D

6-

N.T.S.1 EXHAUST FAN CONTROL SCHEMATIC

N.T.S.2 AHU-1 CONTROL SCHEMATIC

1.

2.

3.

NOTE:

TAB CONTRACTOR AND ATC CONTRACTOR TO WORK

TOGETHER TO CALIBRATE OA FLOW MONITORING STATIONS

FOR ALL UNITS.

REPLACE ALL THERMOSTATS CONTAINING MERCURY. ALL

NEW THRERMOSTATS SHALL BE FURNISHED BY JCI

MARKING AND TAGGING SHALL BE IN COMPLIANCE WITH AFI

91-203, CHAPTER 20.

MS-TP

UH-1 EF-1

EF-2

NEW

EF POINTS

(TYP)

EXISTING

UH POINTS

(TYP)

EXISTING

FPTU/VAV POINTS

(TYP)

AHU-1

EXISTING

BOILER CONTROL

PANEL B-2

AC-3

EXISTING

HOT WATER

SYSTEM POINTS

EXISTING

BOILER CONTROL

PANEL B-1

AC-2AC-1

HWP-1

HWP-2

FPTU-1

FPTU-2

FPTU-3

FPTU-4

FPTU-5

FPTU-6

FPTU-7

FPTU-8

FPTU-9

FPTU-10

FPTU-11

FPTU-12

FPTU-13

FPTU-14

FPTU-15

FPTU-16

FPTU-17

FPTU-18

FPTU-19

FPTU-20

FPTU-21

FPTU-22

FPTU-23

VAV-1

JCI

CONTROLSEOL RESISTOR EOL RESISTOR

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

A R

TM

EN

T O

F

TH

E A

IR

F

O R

C E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

M

A R

K D

ES

C

R

IP

TI

O

N

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

ST

R U

C

TI

O N

C O

IN

C

BU

TT

O N

H O

LE

D

R

IV

E

PR

O

VI

D

EN

C E, R I 0

N

LE

A

D P

R O

FE

SI

O N

A L

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

M-402

N

ET

W O

R K

AR

C

H

IT

EC

TU

R E

SC

H

EM

AT

IC

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H A

N

SC

O M

A

IR

F O

R C

E B

A

SE

VC

S

AS

4/

/2

100% SUBMISSION

R

EP

LA

C

E H

VA

C

, C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R

PR

O

JE

C T

N U

M B

ER

: M

XR

D

6-

09N.T.S.1 NETWORK ARCHITECTURE SCHEMATIC

EXHAUST FAN SCHEDULE

TAG MAKE MODEL TYPE MOTOR

HP CFM RPM SP

(IN WG)

VOLTAGE NOTES

EF-1 GREENHECK CUBE ROOF UPBLAST 3 3859 1625 2.75 460/3 1 THRU 4

EF-2 GREENHECK SQ-95 IN-LINE 1/4 535 1725 0.6 120V/1 1 THRU 3

NOTES:

1. PROVIDE UNIT WITH ALL ACCESSORIES, OPTIONS, AND APPURTENANCES FOR A COMPLETE FUNCTIONAL SYSTEM.

2. PROVIDE WITH DISCONNECT SWITCH.

3. EF-1 AND EF-2 SHALL BE INTERLOCKED TOGETHER AND TO AHU-1.

4. PROVIDE WITH MANUFACTURER RECOMMENDED ROOF CURB.

INPUT/OUTPUT SUMMARY TABLE

B1994 CONTROL PROGRAM FUNCTIONS

INPUT

OUTPUT

ANALOG DIGITAL

CONTROL POINTS LIST (EF-1 AND EF-2)

G R

AP

H

IC

D

IS

PL

AY

ST

AT

U S

AL

AR

M

EN

AB

LE

/D

IS

AB

LE

ST

AT

U S

O N

/O

FF

ST

AT

U S

O

PE

N /C

LO

SE

AL

AR

M R

EP

O

R

TS

TR

EN

D R

EP

O

R

TS

AI

R

F

LO

W R

AT

E

ST

AT

U S

O

PE

N /C

LO

SE

R U

N T

IM

E

AL

AR

M

AN

AL

O G

O U

TP

U

T

D

IG

IT

AL

O U

TP

U

T

FAN STATUS • • • • • • • • • •

EPO • • • • • •

AC UNIT SCHEDULE

TAG MAKE MODEL TOTAL AIR

FLOW (CFM)

OUTSIDE AIR

FLOW (CFM)

ESP

(IN WC) HP

COOLING ELECTRICAL

WEIGHT

(LBS) NOTES

TOTAL LOAD

(MBH)

SENSIBLE

LOAD (MBH)

EAT (⁰F)

(DB/WB)

LAT (⁰F)

(DB/WB) VOLTAGE MCA MFS

AC-1 TRANE TTH240G4 6,600 1,000 1.50 5.0 261.3 196 87.6/71.6 60.1/59.8 460/3 46 60 2514 1 THRU 11

AC-2 TRANE TTH300G4 8,200 2,600 1.40 7.5 307.1 231.6 87.6/71.6 61.4/60.5 460/3 56 70 2631 1 THRU 11

AC-3 TRANE TTH300G4 8,400 2,500 1.40 7.5 308.3 233.6 87.6/71.6 61.6/60.7 460/3 56 70 2631 1 THRU 11

NOTES:

1. OUTDOOR UNIT, WITH R-13 CABINET, INTEGRAL FRAME, GROUND MOUNTED, INTEGRAL SPRING ISOLATORS. PROVIDE UNIT WITH ALL ACCESSORIES, OPTIONS, AND APPURTENANCES FOR A COMPLETE FUNCTIONAL SYSTEM.

2. PROVIDE WITH FACTORY CONTROLS WITH JCI BACNET CONNECTIVITY INCLUDING ALL REQUIRED SENSORS, ACTUATORS, ETC.

3. PROVIDE WITH HORIZONTAL DISCHARGE AND HORIZONTAL RETURN.

4. PROVIDE WITH FACTORY MOUNTED AND WIRED DISCONNECT SWITCH WITH SINGLE POINT CONNECTION.

5. PROVIDE WITH CONDENSER HAIL GUARD.

6. PROVIDE WITH MERV 13 FILTERS.

7. PROVIDE WITH TRANE FACTORY KIT TO ALLOW CONVERSION OF UNIT TO VARIABLE AIR VOLUME SYSTEM. PROVIDE VFD ON SUPPLY FAN.

8. ANCHOR FACTORY CURB TO CONCRETE DECK.

9. PROVIDE WITH OA/RA MODULATING DAMPERS FOR ECONOMIZER CONTROL. OA DAMPER SHALL BE LOW LEAKAGE CLASS 1A.

10. PROVIDE UNIT WITH OUTSIDE AIR FLOW MONITORING UNIT.

11. PROVIDE FLEX CONNECTION AT DUCT CONNECTIONS TO UNIT.

INPUT/OUTPUT SUMMARY TABLE

B1994 CONTROL PROGRAM FUNCTIONS

INPUT

OUTPUT

ANALOG DIGITAL

CONTROL POINTS LIST EACH AC UNIT

(AC-1, AC-2, & AC-3)

G R

AP

H

IC

D

IS

PL

AY

ST

AT

U S

AL

AR

M

EN

AB

LE

/D

IS

AB

LE

ST

AT

U S

O N

/O

FF

ST

AT

U S

O

PE

N /C

LO

SE

TE

M

PE

R

AT

U

R E

PR

ES

SU

R

E

H U

M

ID

IT

Y

AL

AR

M R

EP

O

R

TS

TR

EN

D R

EP

O

R

TS

AI

R

F

LO

W R

AT

E

TE

M

PE

R

AT

U

R E

PR

ES

SU

R

E

H U

M

ID

IT

Y

ST

AT

U S

O

PE

N /C

LO

SE

R U

N T

IM

E

FI

LT

ER

D

IF

FE

R

EN

TI

AL

AL

AR

M

AN

AL

O G

O U

TP

U

T

D

IG

IT

AL

O U

TP

U

T

AC STATUS • • • • • • • • •

SUPPLY AIR TEMPERATURE • • • • • • • •

SUPPLY AIR HUMIDITY • • • • • • • •

RETURN AIR TEMPERATURE • • • • • • •

DUCT STATIC PRESSURE SENSOR • • • • • •

SUPPLY AIR FLOW • • • • • •

RETURN AIR FLOW • • • • • •

MIXED AIR TEMPERATURE • • • • • • •

OUTSIDE AIR DAMPER STATUS • • • • • • •

OUTSIDE AIR TEMPERATURE • • • •

OUTSIDE AIR HUMIDITY • • • •

OUTSIDE AIR FLOW RATE • • • • • • •

SPACE AIR TEMPERATURE (HI/LO ALARMS) • • • • • • • •

SPACE AIR HUMIDITY (HI/LO ALARMS) • • • • • • •

ECONOMIZER • • • • • • • • • • • •

FILTER STATUS • • • • • • •

FIRE ALARM SYSTEM ACTIVIATION • • • • • •

VFD SPEED • • • • • •

SMOKE DETECTION • • • • • •

EPO • • • • • •

HANSCOM AIR

FORCE BASE

SHEET ID

D

EP

A R

TM

EN

T O

F

TH

E A

IR

F

O R

C E

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

M

A R

K D

ES

C

R

IP

TI

O

N

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H

AN

SC

O

M A

IR

F

O R

C E

BA

SE

M

AS

SA

C

H U

SE

TT

S

M

AR

O N

C O

N

ST

R U

C

TI

O N

C O

IN

C

BU

TT

O N

H O

LE

D

R

IV

E

PR

O

VI

D

EN

C E, R I 0

LE

A

D P

R O

FE

SI

O N

A L

BB

IX

, L

LC

SO

U

TH

S

TR

EE

T

BO

ST

O

N , M

A

/0

3/

R

EV

IS

IO

N

M-601

M

EC

H

AN

IC

AL

S C

H

ED

U

LE

S

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R , B

H A

N

SC

O M

A

IR

F O

R C

E B

A

SE

VC

S/

TJ

G

AS

4/

/2

R

EP

LA

C

E H

VA

C

, C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R

PR

O

JE

C T

N U

M B

ER

: M

XR

D

6-

SEQUENCE OF OPERATION - AC-1, AC-2, & AC-3

A. EACH AC UNIT SHALL OPERATE TO SERVE THE SPACES WITHIN

BUILDING 1994.

B. THE HVAC SYSTEM SHALL BE PROVIDED WITH BACNET

COMPATIBLE FACTORY CONTROLS AND PROGRAMMED TO

OPERATE THE HVAC SYSTEM IN THE APPROPRIATE MODE OF

OPERATION.

C. THE EXISTING FACILITY DDC CONTROL SYSTEM, ENERGY

MANAGEMENT CONTROL SYSTEM (EMCS), AND BASE WIDE

BUILDING CONTROLS, UTILITY MONITORING AND CONTROL

SYSTEM (UMCS), AT HANSCOM AFB ARE JCI METASYS USING

BACNET MS-TP PROTOCOL. THE MASTER CONTROL PANEL IS

LOCATED IN BUILDING 1810. ALL NEW CONTROLS SHALL BE

FURNISHED BY JCI. THE CONTRACTOR SHALL PROVIDE CONTROL

SYSTEMS USING BACNET MS-TP PROTOCOL AND SHALL

INTEGRATE THE NEW SYSTEM CONTROLS WITH THE EXITING JCI

METASYS SYSTEM. DESIGN AND PROVIDE GRAPHICS,

PROGRAMMING, SYSTEM INSTRUMENTATION DIAGRAM,

SEQUENCE OF OPERATIONS, SCHEMATICS, POINT LIST, LABEL,

AND DESCRIPTIONS, ONE-LINE DIAGRAM OF THE BUILDING

CONTROLS IDENTIFYING EXISTING AND NEW COMPONENTS AND

DEVICES.

D. THE HVAC SYSTEM SHALL BE CONTROLLED BY THE DDC SYSTEM.

THE DDC CONTROLLER'S MAIN FUNCTION IS TO OPERATE THE

HVAC SYSTEM IN THE APPROPRIATE MODE OF OPERATION. THE

HVAC DDC CONTROL SYSTEM SHALL BE CAPABLE OF AUTOMATIC

SYSTEM STARTUP BASED ON OPTIMAL START, NIGHT SETUP,

TIME SCHEDULE, RESTART FOLLOWING A FIRE ALARM, OR

RESTART FOLLOWING A POWER FAILURE.

E. THE BUILDING IS SERVED BY EXISTING TERMINAL UNITS (FPTU)

WITH HOT WATER COILS. THE FPTU'S PROVIDE BUILDING

HEATING AND ARE INTEGRATED WITH THE EXISTING DDC

SYSTEM. ON A CALL FOR SPACE HEATING THE HOT WATER

VALVES ON THE TERMINAL UNITS OPEN TO PROVIDE SPACE

HEATING. THE FUNCTION OF THE NEW AC UNITS WILL BE

INTEGRATED WITH THAT OF THE EXISTING TERMINAL UNITS.

F. THE EXISTING BUILDING HAS EXISTING DUCT PRESSURE

SENSORS (P-2) LOCATED AT COLUMN LINE 5-B (AC-1), COLUMN

LINE 14-E (AC-2), AND ROOM 160 (AC-3). THESE DUCT PRESSURE

SENSORS SHALL BE REPLACED WITH NEW SENSORS AND SHALL

BE INTEGRATED INTO THE DESIGN OF THE DDC SYSTEM.

G. THE EXISTING BUILDING HAS THREE BUILDING PRESSURIZATION

SENSORS SHALL REMAIN AND BE INTEGRATED INTO THE DDC

SYSTEM. THESE BUILDING PRESSURE SENSORS SHALL HAVE NO

OPERATIONAL FUNCTION.

OCCUPANCY MODE:

A. THE OCCUPANCY MODE SHALL BE COMMUNICATED OR

HARDWIRED TO THE CONTROLLER VIA A BINARY INPUT. VALID

OCCUPANCY MODES FOR THE UNIT SHALL BE:

OCCUPIED MODE - COOLING:

A. OCCUPIED ROOM COOLING SET POINT FOR SUMMER MONTHS

SHALL BE 74°F (ADJ).

B. IN OCCUPIED MODE, EACH AC UNIT SHALL OPERATE

CONTINUOUSLY TO SATISFY THE TEMPERATURE AND HUMIDITY

SETPOINTS. VFD'S WILL MODULATE SUPPLY FAN AIRFLOW BASED

ON DUCT STATIC PRESSURE TO MEET TEMPERATURE

REQUIREMENTS IN DESIGNATED ZONES.

C. UPON START-UP, THE CONTROL SYSTEM WILL OPEN THE

OUTSIDE AIR DAMPER TO ALLOW THE REQUIRED OUTSIDE AIR

FLOW INTO THE SPACE. THE RELIEF AIR DAMPER SHALL

MODULATE IN SYNC WITH THE OUTSIDE AIR DAMPER TO

MAINTAIN MINIMUM DUCT STATIC PRESSURE (0.6” WG ADJ).

D. WHEN THE SPACE TEMPERATURE IS ABOVE 74°F (ADJ), THE VFD'S

WILL MODULATE SUPPLY FAN AIRFLOW BASED ON DUCT STATIC

PRESSURE TO MEET TEMPERATURE REQUIREMENTS IN

DESIGNATED ZONES. THE RELIEF AIR DAMPER SHALL MODULATE

IN SYNC WITH THE OUTSIDE AIR DAMPER TO MAINTAIN MINIMUM

DUCT STATIC PRESSURE (0.6” WG ADJ).

E. IN COOLING MODE, THE SYSTEM SHALL OPERATE TO MAINTAIN

THE HUMIDITY LEVEL AT OR BELOW 50%. IF A ZONE'S SPACE

TEMPERATURE IS SATISFIED BUT HUMIDITY IS ABOVE 50%, THE

RESPECTIVE ZONE'S INTERIOR TERMINAL UNITS, SUCH AS FPTU'S

HOT WATER REHEAT COIL SHALL OPERATE TO PROVIDE

DEHUMIDIFICATION FUNCTION. THE RESPECTIVE FPTU'S REHEAT

COIL SHALL REMAIN IN OPERATION UNTIL THE SPACE HUMIDITY IS

AT 50% OR BELOW.

F. DURING DEHUMIDIFICATION MODE, EACH AC UNIT SHALL

CONTINUOUSLY OPERATE TO REMOVE HUMIDITY FROM THE

SUPPLY AIR.

G. THE ECONOMIZER SHALL BE ENABLED WHENEVER OUTSIDE AIR

TEMPERATURE IS LESS THAN 55 F DB (ADJ), THE OUTSIDE AIR

HUMIDITY IS LESS THAN 22 BTU/LB (ADJ), THE OUTSIDE AIR

TEMPERATURE IS LESS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .