MUOS Past Performance Questionnaire 20200514.docx

DOCX document 31 KB Posted

Attached to
Modification Upgrade of the Mobile User Objective System (MUOS) Capable Satellite Communications (SATCOM) System
Solicitation number
FA8552-20-R-0007
Issued by

View the file

Other files

File Type Posted
Contractor Questions_2 for MUOS FOPR FA8552-20-R-0007.pdf PDF
Attachment 1 MUOS SATCOM Order Description_20201103.pdf PDF
MACM CDRL Deficiency Report.pdf PDF
Attachment 1 MUOS SATCOM Order Description_20201008.pdf PDF
FA855220R0007_revised 13 Oct 2020.pdf PDF
MACM CDRL Tech Man Research.pdf PDF
Contractor Questions for MUOS FOPR FA8552-20-R-0007.pdf PDF
MACM CDRL Still Photo Coverage.pdf PDF
FOPR MUOS SATCOM_Revision 2_13 Oct 20 signed.pdf PDF
MACM CDRL E3VR Electromagnetic Enviro.pdf PDF
MACM CDRL Interface Contr Doc ICD.pdf PDF
MACM CDRL Test Plan.pdf PDF
MACM CDRL System-SubSystem SSDD.pdf PDF
MACM CDRL Interface Design Desc IDD.pdf PDF
MACM CDRL Software Documentation.pdf PDF
MACM CDRL Sys Defic Rpt SDR.pdf PDF
MACM CDRL Comp Prog ID Num CPIN.pdf PDF
MACM CDRL Still Photo Coverage.pdf PDF
MACM CDRL Tech Man Research.pdf PDF
MACM CDRL Engr Doc Prod Draw.pdf PDF
TMCR Installation of AN_ARC-210 (VI) RT-2036 Mobile User Objective System (MUOS) Radio on Select UH-1N Helicopters and UH-1N Block 1 Helicopters.pdf PDF
FOPR MUOS SATCOM updated_signed.pdf PDF
FOPR MUOS SATCOM signed.pdf PDF
Attachment 2 DD 1653 Transportation.pdf PDF
Attachment 3 FORM 158 Packaging.pdf PDF
Attachment 1 MUOS SATCOM Order Description_20200902.pdf PDF
Contractor Questions for MACM DRAFT FOPR FA8552-20-R-0007 - 20200902.pdf PDF
Attachment 6 GFP Module AttachmentTemplate.xlsx XLSX spreadsheet
Attachment 4 AFMC807 Quality Assurance.pdf PDF
Attachment 5 Exhibit A MACM MUOS CDRLs.pdf PDF
FA855220R0007.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(WHEN COMPLETED) SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104. FOR OFFICIAL USE ONLY

PAST/PRESENT PERFORMANCE QUESTIONNAIRE (PPQ)

Modification Upgrade of the Mobile User Objective System (MUOS) Capable Satellite Communications (SATCOM) System

RFP: FA8552-20-R-0007

SECTION 1: CONTRACT IDENTIFICATION (Government or Commercial, please specify)

A. Contractor: ________________________________________________________________________

B. Contractor Cage Code: _________________________________

C. Contract number: ______________________________________

D. Contract type: ______________________________

E. Role in the Program/Work Performed As:

_____ Prime _____ Subcontractor _____ Vendor/Supplier

F. Was this a competitive contract? Yes _____ No _____

G. Period of performance: _________________________________________________________

H. Period of Performance:

1. Original MAX Contract $ Value (assuming all options exercised): ___________________

2. Current Schedule (assuming all options exercised): ____________________

3. Reason for difference (if applicable): ___________________

I. Initial contract cost: $____________________________

J. Current/final contract cost: $_______________________________

K. Reasons for differences between initial contract cost and final contract costs: _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

L. Description of service provided:

SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION

A. Customer or Agency name: __________________________________________________________ B. Address: _________________________________________________________________________ C. Customer or Agency description (if applicable): __________________________________________

D. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other Commands:

SECTION 3: EVALUATOR IDENTIFICATION

A. Name/Role of Evaluator Relative to Contract (e.g. Buyer, Program Manager, etc.) __________________________________________________________________

B. Evaluator's title: ___________________________________________________________________

C. Evaluator's phone/fax number/email: ________________________________________________________

D. Length of time (number of years/months) evaluator worked on subject contract: ____________________

SECTION 4: EVALUATION

Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:

CODEPERFORMANCE RATING
BBLUE/EXCEPTIONAL - During the entire period, the contractor met and exceeded many of the requirements of the contract and consistently performed at a superior level. Performance was accomplished with very few minor problems, and the contractor took immediate and effective corrective actions for those problems that did occur.
PPURPLE/VERY GOOD - During the entire period, the contractor met and exceeded some of the requirements of the contract and consistently performed very well. Performance was accomplished with some minor problems, and the contractor took timely and effective corrective action for those problems that did occur.
GGREEN/SATISFACTORY - During the entire period, the contractor met the requirements of the contract and consistently performed at an acceptable level. Performance was accomplished with some problems, and the contractor took effective corrective action for those problems that did occur.
YYELLOW/MARGINAL – During the entire period, the contractor did not always meet some of the requirements of the contract and intervention was required to continue performance. There were instances where performance was at a less than acceptable level; performance was accomplished with some problems and some corrective actions appear only marginally effective or were not fully implemented.
RRED/UNSATISFACTORY – During the entire period, the contractor did not meet the requirements of the contract and performance was at an unacceptable level. There were a number of serious problems that required extensive oversight and involvement, and corrective actions were either ineffective or non-existent.
N/ANOT APPLICABLE - Unable to provide a rating. Contract did not include performance for this aspect, or information was not available. Do not know.

NOTE: In Section 4, should your response be other than “satisfactory (S),” please provide supporting documentation in “Additional Remarks” in Section 5 or on an additional sheet to this document (which is in word format). If supporting documentation is not provided for ratings that are other than “satisfactory,” the ratings will be considered to be unsubstantiated and will be interpreted as satisfactory.

NOTE to Past Performance Evaluation Team: The following are SAMPLE questions. Past Performance evaluation teams MUST construct a simple and concise PPQ, tailored to seek out key information tied to the significant aspects of the planned acquisition. Teams should develop as few questions as possible. Avoid questions that can be answered with a “yes” or “no” but instead, include probing and direct questions to draw out only the required information desired.

Technical Performance
E
VG
S
M
U
N/A

1. How did the contractor meet the technical requirements of the specification?

2. How was the quality of technical system operations & maintenance testing and certification efforts?

3. How was the quality/integrity of technical data/report preparation efforts?

4. How adequate/effective was the System Engineering Process?

5. How adequate/effective were the contractor’s environmental safety procedures?

Program Management
E
VG
S
M
U
N/A

1. How effective was overall contract management (including ability to effectively lead, manage, control and deliver on-time)?

2. How reasonable and cooperative was the contractor when dealing with program staff (including the ability to successfully resolve disagreements/disputes)?

3. How timely and effectively did the contractor resolve contract problems without extensive customer guidance?

4. How well did the contractor understand/comply with customer objectives and technical requirements?

5. How successfully did the contractor respond to emergency and/or surge situations (if applicable)?

6. How did the contractor manage quality/effectiveness of sub-contracted efforts?

7. How effective was the contractor’s material management (including Government Furnished Property or Material)?

Transition/phase-in
E
VG
S
M
U
N/A

1. How smoothly did the contractor transition resources and personnel?

2. How effective was the contractor in maintaining continuity of mission support while transitioning/phasing in resources and personnel to support other efforts?

Employee Retention/Attraction
E
VG
S
M
U
N/A

1. How effectively was the contractor able to hire/apply a qualified workforce to this effort?

2. How effectively was the contractor able to retain a qualified workforce on this effort?

Small and Small Disadvantaged Business Participation
E
VG
S
M
U
N/A

1. To what degree was the contractor able to meet or exceed small business and small disadvantaged business goals set forth in the approved subcontracting plan?

2. How effectively did the contractor manage small business participation to meet technical performance?

3. Government Contracts Only: Was this contract partially or completely terminated for default or convenience or are there any pending terminations?

Yes___Default___Convenience___Pending Termination___
No ___

If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules).

SECTION 5: NARRATIVE SUMMARY

Would you have any reservations about soliciting this contractor in the future or having them perform one of your critical and demanding programs?

Please provide any additional comments concerning this contractor’s performance, as desired.