MRHS Map 2nd Floor_IDF.jpg

JPG image 782 KB Posted

Attached to
MRHS Security Camera System Replacement P State and local contract opportunity
Solicitation number
BD-26-1965-09-09-118762
Issued by
Hampden County, Massachusetts

About this file

The file "MRHS Map 2nd Floor_IDF.jpg" appears to be an architectural floor plan image related to the Hampden-Wilbraham Regional School District's security camera system replacement project at Minnechaug Regional High School. The project involves replacing or adding 89 cameras and upgrading the existing Avigilon (Motorola) video management system, with sealed bids due by 2:00 pm on August 18, 2025, and a project completion date set for December 31, 2025. Bidders must be authorized vendors under the Massachusetts Operational Services Division (OSD) Contract ITC71 and demonstrate extensive experience in security system installation and evaluation.

The procurement requires detailed pricing for equipment, labor, and low voltage cabling, with specific technical requirements including Avigilon cameras featuring High Definition Stream Management, ONVIF compliance, and advanced analytics capabilities. The system will integrate with existing Avigilon infrastructure, requiring Network Video Recorders (NVRs) with 35 days and 7 hours of video storage and cameras with features like appearance search and unusual motion detection. While no explicit budget range is disclosed, the comprehensive nature of the project suggests a substantial investment. The district reserves the right to reject any or all bids, and vendors must provide manufacturer certification and comply with local, regional, and national installation codes. No specific set-aside designations or disadvantaged enterprise restrictions are mentioned in the procurement documents.

View the file

Other files for this state and local contract opportunity

Other files attached to MRHS Security Camera System Replacement P, newest first.
File Type Posted
MRHS Map Floor 1.jpg JPG image
WageSchedule_20250721155655.pdf PDF
GoogleFolderLink.docx DOCX document
08122025 Minnechaug High School BOM-Full System Upgrade and Mounts.xlsx XLSX spreadsheet
Minnechaug Regional High School Full BOM Revised 08122025.pdf PDF
FY26MRHSCameraProjectBidDetailsWithDesign~1.pdf PDF
MRHS Map 2nd Floor-2.jpg JPG image
MRHS Map Floor 1_MDF_IDF.jpg JPG image
CCTV SWITCH CAMERA POWER ALLOCATION.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .