08122025 Minnechaug High School BOM-Full System Upgrade and Mounts.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
MRHS Security Camera System Replacement P State and local contract opportunity
Solicitation number
BD-26-1965-09-09-118762
Issued by
Hampden County, Massachusetts

About this file

The document is a Bill of Materials (BOM) for the Hampden-Wilbraham Regional School District's security camera system replacement project at Minnechaug Regional High School, scheduled for August 12, 2025. The comprehensive upgrade involves procuring 89 cameras and associated equipment, including 2 NVR6-STD-FORM-D-48TB-S22-NA Network Video Recorders, multiple camera models ranging from 2.0C to 24C series with various specifications, 89 UNITY8-ENT licenses, and numerous accessories such as mounting hardware and power over ethernet adapters. The project is set for completion by December 31, 2025, with sealed bids due by 2:00 pm on August 18, 2025, to be publicly read at the District Office Conference Room.

The procurement requires vendors to be authorized under the Massachusetts Operational Services Division (OSD) Contract ITC71, demonstrating expertise in security system installation. The system will integrate with existing Avigilon infrastructure, featuring High Definition Stream Management, ONVIF compliance, and advanced analytics capabilities. While no specific budget is disclosed, the comprehensive nature of replacing 89 cameras and upgrading the video management system suggests a substantial investment. The district reserves the right to reject any or all bids and requires vendors to provide manufacturer certification and comply with local, regional, and national installation codes. The project aims to enhance school security through a modern surveillance system with capabilities like appearance search and unusual motion detection.

View the file

Other files for this state and local contract opportunity

Other files attached to MRHS Security Camera System Replacement P, newest first.
File Type Posted
Minnechaug Regional High School Full BOM Revised 08122025.pdf PDF
MRHS Map Floor 1.jpg JPG image
WageSchedule_20250721155655.pdf PDF
GoogleFolderLink.docx DOCX document
MRHS Map 2nd Floor_IDF.jpg JPG image
FY26MRHSCameraProjectBidDetailsWithDesign~1.pdf PDF
MRHS Map 2nd Floor-2.jpg JPG image
MRHS Map Floor 1_MDF_IDF.jpg JPG image
CCTV SWITCH CAMERA POWER ALLOCATION.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8-12-2025 - Minnechaug High Sch

Minnechaug Regional High School
Camera System Upgrade
BOM
August 12, 2025
Part typeModelQuantity
NVRNVR6-STD-FORM-D-48TB-S22-NA2
Camera12.0C-H6A-FE-360-DO1-IR14
Camera4.0C-H6A-D1-IR37
Camera6.0C-H6A-D1-IR6
Camera2.0C-H6A-D1-IR6
Camera15C-H5A-3MH11
Camera10.0C-H6ADH-DO1-IR3
Camera8.0C-H6A-FE-360-DO1-IR1
Camera2.0C-H6A-DO1-IR1
Camera20C-H5A-4MH1
Camera24C-H5A-3MH7
Camera4.0C-H6A-DO1-IR2
LicenseUNITY8-ENT89
AccessoriesH5A-FE-MT-NPTA11
AccessoriesH5AMH-AD-DOME16
AccessoriesH5AMH-DO-COVR119
AccessoriesH5AMH-AD-PEND113
AccessoriesWLMT-100113
AccessoriesPLMT-10015
AccessoriesCRNMT-10018
AccessoriesH4AMH-AD-IRIL18
AccessoriesPOE60U-1BTE8

File details come from the government source that posted it. Updated .