MRHS Map 2nd Floor-2.jpg
JPG image 1 MB Posted
- Attached to
- MRHS Security Camera System Replacement P State and local contract opportunity
- Solicitation number
- BD-26-1965-09-09-118762
- Issued by
- Hampden County, Massachusetts
About this file
The file MRHS Map 2nd Floor-2.jpg appears to be an architectural floor plan image related to the Minnechaug Regional High School (MRHS) security camera system replacement project for the Hampden-Wilbraham Regional School District in Massachusetts. The project involves replacing or adding 89 cameras throughout the school's second floor, upgrading the existing Avigilon (Motorola) video management system, and implementing a comprehensive security surveillance infrastructure. Sealed bids are due by 2:00 pm on August 18, 2025, with a project completion date set for December 31, 2025. The bid will be publicly read at the District Office Conference Room, and vendors must be authorized under the Massachusetts Operational Services Division (OSD) Contract ITC71.
The procurement requires detailed pricing for equipment, labor, and low voltage cabling, with specific technical requirements including High Definition Stream Management, ONVIF-compliant Avigilon cameras, and advanced analytics capabilities. The system will integrate with existing infrastructure, requiring Network Video Recorders (NVRs) with 35 days and 7 hours of video storage, and cameras featuring appearance search and unusual motion detection. While no explicit budget is disclosed, the comprehensive nature of the project suggests a substantial investment. The District reserves the right to reject any or all bids, and vendors must provide manufacturer certification and comply with local, regional, and national installation codes. No specific set-aside designations or disadvantaged enterprise restrictions are mentioned in the procurement documents.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| MRHS Map Floor 1.jpg | JPG image | |
| WageSchedule_20250721155655.pdf | ||
| GoogleFolderLink.docx | DOCX document | |
| MRHS Map 2nd Floor_IDF.jpg | JPG image | |
| FY26MRHSCameraProjectBidDetailsWithDesign~1.pdf | ||
| MRHS Map Floor 1_MDF_IDF.jpg | JPG image | |
| CCTV SWITCH CAMERA POWER ALLOCATION.xlsx | XLSX spreadsheet | |
| 08122025 Minnechaug High School BOM-Full System Upgrade and Mounts.xlsx | XLSX spreadsheet | |
| Minnechaug Regional High School Full BOM Revised 08122025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .