Middle Mile Construction Unit Cost Sheet.xlsx
XLSX spreadsheet 41 KB Posted
- Attached to
- Telecommunication Infrastructure Project (FTTH)
- Solicitation number
- 082024-01
- Issued by
- Clay County, Tennessee
About this file
The document is a comprehensive Unit Cost Sheet for Middle Mile Construction from Newport Utilities (NU), located in Tennessee, detailing a Telecommunications Infrastructure Project for fiber optic network construction. The project seeks a telecommunications contractor to provide at least one crew for overhead and underground construction and maintenance, with an extensive unit price breakdown for various construction activities including aerial and underground fiber optic cable installation, conduit placement, trenching, boring, pavement cutting, and fiber splicing. The unit pricing covers detailed specifications for tasks such as placing ADSS cable, installing hand-holes, directional boring, trenching at various depths, and fiber strand placement, with pricing structured per foot, per location, or per specific construction activity.
The unit cost sheet includes comprehensive pricing structures with hourly rates for various labor positions (Foreman, Lineman, Senior Fiber Tech, etc.) at both straight time and overtime rates, and establishes markup limitations for subcontractors (10%), third-party equipment rental (20%), and contractor-supplied materials (20%). The document specifies that unit prices are firm and fixed for each project from the effective start date, with provisions for potential time and materials arrangements in exceptional circumstances such as permit delays or challenging access conditions. Contractor-owned equipment rates are also detailed, including base hourly rates for various machinery and vehicles that cover fuel, maintenance, insurance, and registration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract Certifications.pdf | ||
| Poles.cpg | — | |
| Q&A Document 1.pdf | ||
| Q&A Document 6.pdf | ||
| South_340.kmz | KMZ file | |
| Wiley_Town.kmz | KMZ file | |
| Poles.prj | — | |
| Poles.sbn | — | |
| Poles.sbx | — | |
| Q&A Document 3.pdf | ||
| Q&A Document 4.pdf | ||
| Q&A Document 5.pdf | ||
| Q&A Document 8.pdf | ||
| Revised RFP Telecommunications Project (FTTH).pdf | ||
| Middle Mile Design Area Estimated Mileage.xlsx | XLSX spreadsheet | |
| Middle Mile Revised Construction Unit Cost Sheet.xlsx | XLSX spreadsheet | |
| Poles.dbf | DBF file | |
| Poles.shp | — | |
| Poles.shx | — | |
| West_Parrottsville.kmz | KMZ file | |
| Byrd Anti-Lobbying Certification.pdf | ||
| Liberty_Hill.kmz | KMZ file | |
| Middle Mile Construction Contract.pdf | ||
| Poles.shp.xml | XML file | |
| Q&A Document 2.pdf | ||
| Q&A Document 7.pdf | ||
| RFP Telecommunications Project (FTTH).pdf | ||
| Revised Middle Mile Construction Contract.pdf |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION UNITS
Unit Pricing Units are firm and fixed for a each project from the EffectiveStart Date until completion. Any changes must be done in writing from authorized representive from Newport Utilities.
| Unit Description | Unit Measurement | Unit Definitions | Price Per Unit |
| Aerial Construction | |||
| Place ADSS Cable. 12 Count through 144 Count is the same diameter fiber. 288 Count is a different size. Please price accordingly. | Per Ft. | Install ADSS Fiber Optic Cable as per drawings provided. The labor to install Newport provided tangent assemblies, dead-end assemblies, and slack storage assemblies are included within this unit. Newport will provide all cable, tangent assemblies, dead-end assemblies, slack storage assemblies (snow-shoes), as required. Includes placement of coil type cable identification tags at each pole. Where Newport determines access to install ADSS cable exceeds the standard price listed, Newport and Contractor may use ADSS placement on a Time and Materials basis. Where Contractor must demobilize its employees as a result of delay solely caused by Newport's inability to secure appropriate and timely permits, Newport and Contractor shall work out Time and Materials rates for the duration of such delay. Where Contractor places its own guard strucres and covered-up additional equipment, any euipment used will be charged on a T&M basis only for that portion of time necessary to complete these items. Materials will be charged at cost to Contractor plus a 10% markup. | |
| Steel Pole Adder | Per Pole Adder to Place ADSS Cable | Due to the additional time and equipment to drill a steel pole over a wood pole, this adder is meant to offset this difference in cost between the two drilling methods. The Contractor will receive the “Place ADSS Cable” unit as well as the appropriate number of steel poles drilled. Regardless of the number of holes drilled in a steel pole, this adder is per steel pole | |
| ROW Access Adder | Per Foot Adder to Place ADSS Cable | This adder is in addition to the “Place ADSS Cable” unit & the “Clear Working Path” unit and is meant for sections of right-of-ways that are not accessible by bucket truck, including a track bucket truck. The footage is based on a pole-to-pole measurement, and not the footage of the indirect path that is taken by the contracting crew to access the poles | |
| Place 1/4" Strand | Per Ft. | Install 1/4” Class A EHS galvanized strand as per drawings provided. Includes installation of all applicable hardware (3-bolt suspension clamps, galvanized machine bolts, nuts, square washers, preformed strand grips, strand splice links etc.). This unit includes bonding to all existing ground assemblies. | |
| Cable Removal | Per Ft. | Remove and dispose of cable per drawings provided | |
| Place Head-Guy Strand | Per Location | Install 3/8” Class A EHS galvanized head-guy strand as per drawings provided. Includes installation of all applicable hardware (galvanized machine bolts, nuts, square washers, preformed strand grips, ground bonds, and head-guy attachments) | |
| Place 5/8” Rod/Anchor | Each | Installation of 5/8”x7’ rod and single screw anchor at locations specified on design drawings | |
| 1/4” DownGuy | Each | Installation of 3/8” down guy complete with 8' yellow plastic guy guard (if required), dead-end guy grip, thimble eye nut and thimble eye angle bolt for dead end of support strand and attachment of down guy. | |
| Reinstall U-Guard | Each Location | Remove and Re-install U-Guard from ground level to 18" below support strand or cable attachment. Minimum of 3" overlap per section of U-Guard, secure with 4" galvanized straps (3 per U-Guard section). Includes installing adequate material to plug and cover all innerduct associated with the transition from aerial to underground. | |
| Trim Trees (per span) | Per Span | This unit is intended to allow for the cost of tree trimming where trees need to be trimmed in one span. This unit includes the labor and equipment required to trim the trees and remove and dispose of the debris from the job site. Trimming shall be completed in a manner that minimizes the amount removed. | |
| Hang Aerial Splice/Slack loop | Each | Includes installation of aerial “snowshoes” with all associated hardware for storing of up to 150’ slack of fiber cable at an aerial splice point or 150’ slack as part as an slack loop. This unit also includes the labor required to secure the splice closure to the support strand or ADSS dead-end grip. This unit shall include a return trip if Splice closure is used. | |
| Place Ground Assembly | Each Location | Install ground assembly to bond down guy to MGM Power ground. | |
| Telcom Transfers | Each | Includes installation of necessary hardware and labor to transfer figure 8 pilot wire or any existing telecom cable attachment | |
| Underground Construction | |||
| Place Hand-Hole 30x48x36 | Each | Includes excavation to accept an Newport polymer concrete 30"x48"x36" hand hole to include 6” excavation on all sides and 12" of level crushed rock sub-base. All sides to be backfield with crushed limestone. This unit also includes coring 2 each 5” holes and 2 each 4”X 3’ schedule 40 conduit. Placement of 1 Newport locate post. Refer to Newport Handhole drawing. | |
| Pull in fiber cable in existing duct | Per Ft. | Includes pulling of cable in existing duct and figure eight of cable where necessary. This unit is to be paid for the lineal feet of duct pulled through, not the lineal feet of cable pulled. Rodding of existing duct (if required) shall be paid separately. Pulling of mule tape to facilitate the pulling of cable or inner duct shall be included. This unit shall include providing slack loops within the hand holes as specified. | |
| Remove fiber cable in existing duct | Per Ft. | Includes removing of cable in existing duct and dispose of cable where necessary. This unit is to be paid for the lineal feet of duct pulled through, not the lineal feet of cable removed. | |
| Blow fiber cable in existing duct | Per Ft. | Includes blowing of cable in existing innerduct and figure eight of cable where necessary using Sherman- Riley or equivalent. This unit is to be paid for the lineal feet of duct blown, not the lineal feet of cable pulled. This unit shall include the 150’ slack loops within the hand holes as specified. | |
| Place CFJ Cabinet | Each | Includes placement of cabinet, pad and gravel apron. This unit includes transporting from warehouse to site the cabinet and all provided mounting hardware. Contractor to provide all other materials per the drawing in theTC-100 Fiber Optic Fiber guide. | |
| Place B2500 Cabinet | Each | Includes placement of cabinet on station steel/ transmission structure. This unit includes transporting from warehouse to site the cabinet and all provided mounting hardware. Contractor to provide all other materials per the drawing in theTC-100 Fiber Optic Fiber guide. | |
| Proof duct and install locate wire | Per Ft. | Includes testing the integrity of the new duct and pulling in a tracer wire into new duct. Also includes terminating this tracer wire using industry standards so that the route can be located. | |
| Pull(1) 1-1/4'' & (2) 1" duct (per ft) | Per Ft. | Includes pulling of one 1-1/4 inch SDR-11 or SDR-13.5 Inner duct, in existing duct. | |
| Pull (2) each 1-1/4'' duct (per ft) | Per Ft. | Includes pulling of two SDR-11 or SDR-13.5 Inner duct, in existing duct. | |
| Pull (3) each 1-1/4'' duct (per ft) | Per Ft. | Includes pulling of three SDR-11 or SDR-13.5 Inner duct, in existing duct. | |
| Directional Bore (1) innerduct | Per Ft. | Includes machine boring (minimum 42” depth) under specified areas utilizing directional boring equipment, opening and back-filling of send and receive pits, compacting of backfill sufficient to meet compaction specifications of local governing authority and eliminate future settlement, placement of one – 1-1/4” HDPE conduit, leveling of pit areas to existing ground elevation, seeding, strawing, and site clean up. Should bore pits be required in asphalt, concrete, or landscaped areas, surface removal and repair of these areas will be paid per sq. ft. in addition to boring footage. This unit shall include all required pot- holing to verify existing utility placement. This unit shall include placement of cable marker as specified by the construction drawings or by the Project Engineer. | |
| Directional Bore (2) innerduct | Per Ft. | Includes machine boring (minimum 42” depth) under specified areas utilizing directional boring equipment, opening and back-filling of send and receive pits, compacting of backfill sufficient to meet compaction specifications of local governing authority and eliminate future settlement, placement of two – 1-1/4” HDPE conduit, leveling of pit areas to existing ground elevation, seeding, strawing, and site clean up. Should bore pits be required in asphalt, concrete, or landscaped areas, surface removal and repair of these areas will be paid per sq. ft. in addition to boring footage. This unit shall include all required pot- holing to verify existing utility placement. This unit shall include placement of cable marker as specified by the construction drawings or by the Project Engineer. | |
| Directional Bore (3) innerduct | Per Ft. | Includes machine boring (minimum 42” depth) under specified areas utilizing directional boring equipment, opening and back-filling of send and receive pits, compacting of backfill sufficient to meet compaction specifications of local governing authority and eliminate future settlement, placement of three 1-1/4” HDPE conduit, leveling of pit areas to existing ground elevation, seeding, strawing, and site clean up. Should bore pits be required in asphalt, concrete, or landscaped areas, surface removal and repair of these areas will be paid per sq. ft. in addition to boring footage. This unit shall include all required pot- holing to verify existing utility placement. This unit shall include placement of cable marker as specified by the construction drawings or by the Project Engineer. | |
| Directional Bore 4" Duct | Per Ft. | Includes machine boring (minimum 42” depth) under specified areas utilizing directional boring equipment, opening and back-filling of send and receive pits, compacting of backfill sufficient to meet compaction specifications of local governing authority and eliminate future settlement, placement of one – 4” Schedule 40 or equivalent conduit, leveling of pit areas to existing ground elevation, seeding, strawing, and site clean up. Should bore pits be required in asphalt, concrete, or landscaped areas, surface removal and repair of these areas will be paid per sq. ft. in addition to boring footage. This unit shall include all required pot-holing to verify existing utility placement. This unit shall include placement of cable marker as specified by the construction drawings or by the Project Engineer. | |
| Trench 42-48'' (1) innerduct | Per Ft. | Includes opening of trench by mechanical to 42" depth in boulevard type area (natural ground/grassed area), install one – 1-1/4” SDR-11 inner-duct, backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. | |
| Trench 42-48'' (2) innerduct | Per Ft. | Includes opening of trench by mechanical to 42" depth in boulevard type area (natural ground/grassed area), install two – 1-1/4” SDR-11 inner-duct, backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. | |
| Trench 42-48'' (3) innerduct | Per Ft. | Includes opening of trench by mechanical to 42" depth in boulevard type area (natural ground/grassed area), install three – 1-1/4” SDR-11 inner-ducts, backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. | |
| Trench 42-48'' 4" Duct | Per Ft. | Includes opening of trench by mechanical to 42" depth in boulevard type area (natural ground/grassed area), install one – 4” Schedule 40 inner-duct (or equivalent), backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. |
| Trench 60'' (1) innerduct | Per Ft. | Includes opening of trench by mechanical to 60" depth in boulevard type area (natural ground/grassed area), install one – 1-1/4” SDR-11 inner-duct, backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. |
| Trench 60'' (2) innerduct | Per Ft. | Includes opening of trench by mechanical to 60" depth in boulevard type area (natural ground/grassed area), install two – 1-1/4” SDR-11 inner-duct, backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. |
| Trench 60'' (3) innerduct | Per Ft. | Includes opening of trench by mechanical to 60" depth in boulevard type area (natural ground/grassed area), install three – 1-1/4” SDR-11 inner-ducts, backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement |
| Trench 60'' 4" Duct | Per Ft. | Includes opening of trench by mechanical to 60" depth in boulevard type area (natural ground/grassed area), install one – 4” Schedule 40 inner-duct (or equivalent), backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. |
| Plow 1-1/4" SDR-11 duct 48" (1) | Per Ft. | Includes opening of trench by mechanical Plow to 48" depth in boulevard type area (natural ground/grassed area), install one – 1-1/4” SDR-11 inner-duct, backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. |
| Plow 1-1/4" SDR-11 duct 48" (2) | Per Ft. | Includes opening of trench by mechanical Plow to 48" depth in boulevard type area (natural ground/grassed area), install two – 1-1/4” SDR-11 inner-duct, backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. |
| Plow 1-1/4" SDR-11 duct 48" (3) | Per Ft. | Includes opening of trench by mechanical Plow to 48" depth in boulevard type area (natural ground/grassed area), install three – 1-1/4” SDR-11 inner-ducts, backfill of trench, placement of buried cable warning signs. Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement seed and straw where necessary to rehabilitate the site to the original condition prior to construction. This unit shall include placement of all cable marker placement as specified by the construction drawings or by the Project Engineer. This unit shall include the installation of warning tape 12” above the duct placement. |
| Hand-dig 24-48'' (1) innerduct | Per Ft. | Includes opening of trench by hand to 24"-48” depth, install (1) 1-1/4” SDR-11 duct, backfill of trench, placement of buried cable warning signs (if applicable). Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement stone gravel where necessary to rehabilitate the site to the original condition prior to construction. |
| Hand-dig 24-48''' (2) innerduct | Per Ft. | Includes opening of trench by hand to 24"-48” depth, install (2) 1-1/4” SDR-11 ducts, backfill of trench, placement of buried cable warning signs (if applicable). Includes compacting of backfill material sufficient meet local governmental compaction specifications , eliminate future settlement, and level site area to existing ground elevation. Install replacement stone gravel where necessary to rehabilitate the site to the original condition prior to construction. |
| Hand-dig 24-48''' (3) innerduct | Per Ft. | Includes opening of trench by hand to 24"-48” depth, install (3) 1-1/4” SDR-11 ducts, backfill of trench, placement of buried cable warning signs (if applicable). Includes compacting of backfill material sufficient meet local governmental compaction specifications , eliminate future settlement, and level site area to existing ground elevation. Install replacement stone gravel where necessary to rehabilitate the site to the original condition prior to construction. |
| Hand-dig 24-48''' 4" Duct | Per Ft. | Includes opening of trench by hand to 24"-48” depth, install (1) 4” Schedule-40 duct, backfill of trench, placement of buried cable warning signs (if applicable). Includes compacting of backfill material sufficient meet local governmental compaction specifications, eliminate future settlement, and level site area to existing ground elevation. Install replacement stone gravel where necessary to rehabilitate the site to the original condition prior to construction. |
Core Bore Each Includes boring of hole with a boring machine appropriate for the material and depth to be bored. (up to 12” of concrete)
| Cut & Repair Asphalt Pavement | Per Square Ft. | Includes using a saw to cut the pavement. Includes removing and disposing of the old pavement. Includes repairing the pavement to existing conditions and to meet local permit requirements. |
| Cut & Repair Concrete Pavement | Per Square Ft. | Includes using a saw to cut the pavement. Includes removing and disposing of the old pavement. Includes repairing the pavement to existing conditions and to meet local permit requirements. |
| Cut Pavement | Per Saw Ft. | Includes using a saw to cut the pavement. Includes removing and disposing of the old pavement. This unit shall not be used with Cut/Repair Asphalt Pavement and/or Cut & Repair Concrete Pavement units above. |
| Rock Adder Trench | Per Cubic Ft. | Includes removal of rock necessary to complete Trenching units. |
| Rock Adder Bore | Per Cubic Ft. | Includes removal of rock necessary to complete boring units |
| Right-of-way clearing | Per Linear Ft. | Includes removal of trees up to 5” and brush adequate for men and equipment to perform its function |
| Rock Bore (fixed) | Per Foot | Ground that is not suitable to be drilled with a duckbill, railhead, tri-hawk head. |
Rock requires the use of a 30,000 pound or more machine with a hammer and/or mud motor This is not an adder to be used with the boring unit. Will only be paid while encountering rock. This unit will include placing an intended 4" conduit or smaller. Only approved by Engineer or above after test hole is dug or proof of rock.
| Light Rock Bore (fixed) | Per Foot | Ground that is not suitable to be drilled with a standard duck bill designed head. Example tooling would include railhead, tri-hawk type designs. This includes ground conditions of chunk rock, cobble and glacial till. This is not an adder to be used with the boring unit. Will only be paid while encountering rock. This unit will include placing an intended 4" conduit or smaller. Only approved by Engineer or above after test hole is dug or proof of rock. |
| Rock Saw (fixed) | Per Foot | Ground that is not suitable to be drilled or excavated. Unit requires the use of a rock saw that will go 42" in depth and provide a trench suitable for a 4" conduit. Will only be paid while encountering rock. Only approved by Engineer or above. |
FIBER SPLICING
Unit Price Splicing Schedule for Fiber Splicing & Testing
| Pre-Placement Reel Testing | ||||
| Item | Description | Unit | Unit Price | Counter |
| NP1 | 1-24 Fibers per Reel | Reel | ||
| NP2 | 25-48 Fibers per Reel | Fiber | ||
| NP3 | 49-96 Fibers per Reel | Fiber | ||
| NP4 | >96 Fibers per Reel | Fiber | ||
| Building Cabinet Preparation | ||||
| Item | Description | Unit | Unit Price | |
| NP10 | Inside Plant Fiber Cabinet | Each | ||
| Cable & Splice Case Preparation Loose tube and ADSS | ||||
| Item | Description | Unit | Unit Price | |
| NP20 | Standard Case Prep “NO SPLICING” | Location | ||
| NP21 | Single Fiber Fusion Splice 1-24 Fibers | Fiber | ||
| NP22 | Single Fiber Fusion Splice 25-48 Fibers | Fiber | ||
| NP23 | Single Fiber Fusion Splice 49-72 Fibers | Fiber | ||
| NP24 | Single Fiber Fusion Splice 73-96 Fibers | Fiber | ||
| NP25 | Single Fiber Fusion Splice 97-120 Fibers | Fiber | ||
| NP26 | Single Fiber Fusion Splice 121-216 Fibers | Fiber | ||
| NP27 | Single Fiber Fusion Splice 217-432 Fibers | Fiber | ||
| Cable & Splice Case Preparation OPGW | ||||
| Item | Description | Unit | Unit Price | |
| NP30 | Standard OPGW Case Prep “NO SPLICING” | Location | ||
| NP31 | Single Fiber Fusion Splice 1-24 Fibers | Fiber | ||
| NP32 | Single Fiber Fusion Splice 25-48 Fibers | Fiber | ||
| NP33 | Single Fiber Fusion Splice 49-72 Fibers | Fiber | ||
| NP34 | Single Fiber Fusion Splice 73-96 Fibers | Fiber | ||
| NP35 | Single Fiber Fusion Splice 97-120 Fibers | Fiber | ||
| NP36 | Single Fiber Fusion Splice 121-216 Fibers | Fiber | ||
| NP37 | Single Fiber Fusion Splice 217-432 Fibers | Fiber | ||
| Testing | ||||
| Item | Description | Unit | Unit Price | |
| NP40 | Dual Wavelength Bi-Directional OTDR | Fiber | ||
| Testing 1-24 Fibers | ||||
| NP41 | Dual Wavelength Bi-Directional OTDR | Fiber | ||
| Testing 25-48 Fibers | ||||
| NP42 | Dual Wavelength Bi-Directional OTDR | Fiber | ||
| Testing 49-96 Fibers | ||||
| NP43 | Dual Wavelength Bi-Directional OTDR | Fiber | ||
| Testing >96 Fibers | ||||
| NP44 | Dual Wavelength Bi-Directional Power Loss | Fiber | ||
| Testing 1-24 Fibers | ||||
| NP45 | Dual Wavelength Bi-Directional Power Loss | Fiber | ||
| Testing 25-48 Fibers | ||||
| NP46 | Dual Wavelength Bi-Directional Power Loss | Fiber | ||
| Testing 49-96 Fibers | ||||
| NP47 | Dual Wavelength Bi-Directional Power Loss | Fiber | ||
| Testing >96 Fibers | ||||
| Miscellaneous | ||||
| Item | Description | Unit | Unit Price | |
| NP50 | Per Diem – Rate per Night Employee | |||
| NP51 | Contractor supplied Materials – Cost plus % | |||
| NP52 | Emergency Call-out (Per call) |
HORULY RATES
Hourly Blanket Pricing
Hourly $
| Straight Time | Minimum Education, Experience, & Certifications |
| Foreman | |
| Lineman | |
| Senior Fiber Tech | |
| Splice Helper | |
| Equipment Operator | |
| Laborer | |
| Policeman | |
| Welder |
| Overtime |
| Foreman |
| Lineman |
| Senior Fiber Tech |
| Splice Helper |
| Equipment Operator |
| Laborer |
| Policeman |
| Welder |
| Please Note: The “T&M Hourly Rates” identified above are “fully burdened rates” and; includes; payroll burdens, taxes, fringe benefits, holidays, overhead, general and administrative (i.e. secretarial, administrative, and clerical support), profit, and any and all other elements of cost except travel and living expenses. The Owner will pay the Contractor the stated, “Straight-time Hourly Rate” for hours worked up to 40 hours / in a Work Week; and “Over-time Hourly Rate” for hours worked above 40 hours / in a specific Work Week. A Work Week as used herein this Attachment C means Monday through Saturday. | ||
| Markups | Limitations | Not to Exceed Amount |
| Notes | ||
| Subcontractor Mark-up | Subject to prior notification and Owner consent and other requirements set forth under Article 5 of the General Terms and Conditions | 10% of Contractor's actual invoice costs |
| Third Party Equipment Rental Mark-up | None | 20% of Contractor's actual invoice costs |
| Materials Mark-up | for Contractor supplied material, not including small tools and consumables | 20% of Contractors actual costs |
| Other Direct Costs | ||
| No other Direct Cost shall be allowable unless agreed to in advance by Owner. All allowable other Direct Costs, including flight travel, shall be reimbursed at Contractors’ actual cost, exclusive of any fees pursuant to Owner’s Travel & Expenses Guidelines. | ||
| CONTRACTOR OWNED EQUIPMENT | ||
| Equipment Description | Base Hourly Rate | |
| Tractor Lowboy | ||
| Power Bucket/Telsta Truck | ||
| Line Truck/Corner Mount | ||
| Trailer pole | ||
| Trailer equipment | ||
| Trailer cable | ||
| Backhoe | ||
| Trackhoe | ||
| Mini Trackhoe | ||
| Trencher rubber tire | ||
| Air Compressor | ||
| Cable Plow rubber tire | ||
| Cable Plow track | ||
| Dozer under 80hp | ||
| Dozer over 80hp | ||
| Water pump | ||
| Generator | ||
| Directional Boring | ||
| Arrow Board | ||
| Concrete saw | ||
| Track Bucket | ||
| Boring Truck | ||
| Fiber Fusion Splicer | ||
| OTDR & Power Meter | ||
| Chipper | ||
| Truck (1 ton) | ||
| Truck (dump) | ||
| Truck (3/4 ton) | ||
| Jumping Jack | ||
| Note: Equipment “Base Hourly Rates” above include fuel, maintenance, insurance, and registration only. |