MHA-1457 Whiting Forensic Transformer - CD Drawing Set 7.10.26.pdf

PDF 8 MB Posted

Attached to
Whiting Forensic Hospital Transformer Replacement
Solicitation number
MHA-1457
Issued by
Middlesex County, Connecticut

About this file

This is a construction drawing set for the Whiting Forensic Hospital Transformer Replacement project, prepared for the State of Connecticut Department of Mental Health and Addiction Services located in Middletown, Connecticut. The project involves the installation of a new 750 KVA pad mount transformer and associated electrical connections to the existing building's electric services at Connecticut Valley Hospital's Whiting Forensic facility. The drawings, dated July 10, 2026, include a Site Demo Plan and Site Layout and Materials Plan at a scale of 1"=10', detailing the removal of existing pavement, utility locations, temporary construction fencing installation, protection of existing infrastructure, and the restoration of disturbed areas. The project requires the contractor to acquire professional underground utility locating services utilizing ground penetrating radar and electromagnetic locators with a minimum of five years' experience, verify all utility locations through Call Before You Dig 811, and complete all work in accordance with Connecticut Department of Transportation standards and project specifications.

The construction documents specify multiple requirements for contractor execution including hand excavation within proximity to existing utility lines, repair of any incidental utility damage at no cost to the owner, positive drainage provision away from concrete pads, disposal of all removed items in accordance with federal and state regulations, restoration of disturbed areas outside the work limits to original conditions at no additional cost, and placement of a minimum six inches of topsoil and seeding in all disturbed areas. The contractor must also provide bollard installation around the transformer enclosure, pavement restoration using a specified section detail with 2" of Class 2 bituminous concrete atop 2" of Class 1 bituminous concrete, temporary silt sacks and coir logs for erosion control, and completion of field surveys limited to the temporary construction fencing area with below-grade utilities and installed utilities marked on as-built drawings. All work must be completed in accordance with the project manual and CT DOT Form 819, with no unauthorized construction accepted for payment without prior written approval from the engineer.

View the file

Other files

File Type Posted
MHA-1457_Aug_14_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_MHA-1457_v1_Aug_13_26.pdf PDF
MHA-1457_Aug_18_26_solicitation_doc.pdf PDF
MHA-1457_Aug_21_26_solicitation_doc.pdf PDF
MHA-1457_Aug_26_26_solicitation_doc.pdf PDF
MHA-1457_Sep_3_26_solicitation_doc.pdf PDF
MHA-1457_Sep_8_26_solicitation_doc.pdf PDF
MHA-1457_Sep_15_26_solicitation_doc.pdf PDF
MHA-1457_Oct_8_26_solicitation_doc.pdf PDF
MHA-1457_Oct_16_26_solicitation_doc.pdf PDF
MHA 1457 6020 Bid Phase Meeting Attendance Log 8.27.26.pdf PDF
VendorChangeDetailsReport_BID 2027-07_v3_Sep_11_26.pdf PDF
MHA-1457_Aug_20_26_solicitation_doc.pdf PDF
MHA-1457_Aug_25_26_solicitation_doc.pdf PDF
MHA-1457_Sep_10_26_solicitation_doc.pdf PDF
MHA-1457_Oct_2_26_solicitation_doc.pdf PDF
MHA-1457_Sep_1_26_solicitation_doc.pdf PDF
MHA-1457_Sep_9_26_solicitation_doc.pdf PDF
MHA-1457_Sep_11_26_solicitation_doc.pdf PDF
MHA-1457_Oct_7_26_solicitation_doc.pdf PDF
MHA-1457_Oct_13_26_solicitation_doc.pdf PDF
MHA-1457_Oct_15_26_solicitation_doc.pdf PDF
6030A Bid Addendum-4 MHA-1457.pdf PDF
DIV.00 DIV.01 MHA-1457 Whiting Forensic Transformer.pdf PDF
6030A Bid Addendum-1 MHA-1457.pdf PDF
MHA-1457_Sep_17_26_solicitation_doc.pdf PDF
MHA-1457_Sep_24_26_solicitation_doc.pdf PDF
6030A Bid Addendum-3 MHA-1457.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7/10/2026

E

E

E

E

E

E

E

T

T

T

T

T

T

T

SAWCUT EXIST. BITUMINOUS

CONCRETE.

APPROX. LOCATION

OF ON SITE CATCH

BASIN. PROVIDE SILT

SACK PROTECTION.

INSTALL COIR LOG. (TYP.)

INSTALL TEMPORARY

6'-0" CONSTRUCTION

FENCING

PROTECT EXISTING

GENERATOR ENCLOSURE

TO REMAIN.

PROTECT EXISTING UTILITY

VAULTS AND CONNECTING

LINES TO REMAIN. TYP.

UNDERGROUND

UTILITY LINES TO

REMAIN. SEE

ELECTRICAL

DRAWINGS FOR

MORE INFO.

FENCE GATE. FIELD

LOCATION AND QUANTITY TO

BE DETERMINED BY

CONTRACTOR.

WHITING FORENSIC BUILDING

S

S

S

S

S

S

S

S

S

S

W

W

W

W

W

EXISTING SANITARY SEWER

(SIZE, MATERIAL,& FLOW LINES

UNKNOWN)

EXISTING 8" WATERMAIN

T

T E

E

E

T

T

T

T

T

T

T

T

T

T

E

E

E

E

E

E

E

E

E

INSTALL TEMPORARY

6'-0" CONSTRUCTION

FENCING

EXISTING 6" STORM PIPE

EXISTING 12" STORM PIPE

CONDENSING

UNIT

GENERATOR FEEDER

&AND CONTROLS

SITE DEMO PLAN

GENERAL CONSTRUCTION NOTES:

1. THE CONTRACTOR SHALL ACQUIRE THE PROFESSIONAL SERVICES OF A PRIVATE UNDERGROUND UTILITY LOCATER (PUUL). AT A MINIMUM THE PUUL SHALL UTILIZE GROUND PENETRATING RADAR (GPR) AND ELECTRO MAGNETIC (EM) LOCATER TO COMPLETE THEIR WORK. THE PUUL SHALL DEMONSTRATE THEY HAVE A MINIMUM OF FIVE (5) YEARS' EXPERIENCE WITH GPR AND EM ACTIVITIES. EACH UTILITY SHALL BE

IDENTIFIED WITH THE APPROPRIATE SPRAY PAINT COLOR.

2. VERIFY ALL UTILITY LOCATIONS - CALL BEFORE YOU DIG (CBYD) 811. IN THE EVENT CBYD IS UNABLE TO LOCATE THE EXISTING UTILITIES IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE AN UNDERGROUND UTILITY MARKING COMPANY TO LOCATE THEM AT NO

ADDITIONAL COST TO THE OWNER.

3. UTILITY INFORMATION SHOWN IS TAKEN FROM UTILITY MAPS AND LIMITED FIELD INFORMATION. CONTRACTOR IS RESPONSIBLE FOR FINAL VERIFICATION OF UTILITY LOCATIONS AFFECTING THE PROPOSED WORK AND ANY ASSOCIATED FIELD MODIFICATIONS. ANY MODIFICATION TO THE WORK OUTLINED IN THESE PLANS OR THE PROJECT SPECIFICATIONS SHALL BE TO THE SATISFACTION OF THE ENGINEER.

5. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE AS PER DRAWINGS PROVIDED FROM BEMIS ASSOCIATES ON DECEMBER 18, 2024.

ANY DISCREPANCY BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. ALL PROPOSED CONSTRUCTION IS TO BE COMPLETED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. NO CHANGES TO THE PROPOSED CONSTRUCTION SHALL BE PERMITTED WITHOUT WRITTEN APPROVAL FROM THE OWNER AND/OR ENGINEER

6. ALL ITEMS TO BE REMOVED SHALL BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH ALL FEDERAL, & STATE REGULATION, AS

WELL AS THE SPECIFICATIONS.

7. INDICATES THE EXTENTS OF BITUMINOUS CONCRETE REMOVAL AND REPLACEMENT BY CONTRACTOR.

8. PROVIDE POSITIVE DRAINAGE AWAY FROM THE CONCRETE PADS.

9. EXCAVATION REQUIRED WITHIN PROXIMITY OF EXISTING UTILITY LINES SHALL BE DONE BY HAND. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING UTILITY LINES INCURRED DURING CONSTRUCTION OPERATIONS AT NO COST TO THE OWNER.

10. ALL DISTURBED AREAS WITHIN THE CONTRACT LIMIT LINES OTHER THAN PAVED/CRUSH STONED AREAS SHALL RECEIVE A MINIMUM OF 6" OF

TOPSOIL AND BE SEEDED UNLESS OTHERWISE NOTED.

11. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT NO COST TO THE OWNER.

12. ALL CONSTRUCTION SHALL BE COMPLETED IN ACCORDANCE WITH THESE DRAWINGS, THE PROJECT MANUAL AND CT DOT FORM 819. NO CHANGES IN THE PROPOSED CONSTRUCTION SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. NO

UNAUTHORIZED CONSTRUCTION WILL BE ACCEPTED FOR PAYMENT.

13. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

14. FIELD SURVEY AT THE COMPLETION OF WORK SHALL BE LIMITED TO AREA OF THE SHOWN TEMPORARY CONSTRUCTION FENCING. BELOW GRADE UTILITIES FOUND IN TEST PITS AND INSTALLED UTILITIES SHALL BE MARKED ON THE AS-BUILTS.

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title descriptiondatemark

R E V I S I O N S

TRANSFORMER REPLACEMENT

WHITING FORENSIC HOSPITAL

MHA-1457

STATE OF CONNECTICUT

DEPARTMENT OF MENTAL HEALTH AND ADDICTION SERVICES

MIDDLETOWN, CT.

professional seal

JMB

AS NOTED

HSM

7/10/2026

CONNECTICUT VALLEY HOSPITAL

DIRECTION OF RUN-OFF

FLOW (TYP.)

SOIL/AGGREGATE STOCKPILE OF

EXISTING SITE MATERIAL TO BE

REUSED AND/OR IMPORTED MATERIAL

TO BE INSTALLED IN THE WORK

DOUBLE ROW SILT FENCING

OR HAYBALE BACKED SILT

FENCE

SF

SF SF

SF

SF

SF

SF

SF

SF

SF

SFSF

SF

SF

SF

SF

SF

SF

STOCKPILE DETAIL

SF

SF SF

SF

SF

SF

SF

SF

SF

SFSFSF

SF

SF

SF

SF

SF

N.T.S.

NOTES:

1. ALL EXISTING EXCAVATED MATERIAL THAT IS NOT TO BE REUSED IN THE WORK IS TO BE IMMEDIATELY

REMOVED FROM THE SITE AND PROPERLY DISPOSED OF.

2. SOIL/AGGREGATE STOCKPILE SITES TO BE WHERE SHOWN ON THE DRAWINGS OR LOCATED IN THE FIELD

WITH THE APPROVAL OF THE ENGINEER.

3. RESTORE STOCKPILE SITES TO PRE-EXISTING PROJECT CONDITION AND RESEED AS REQUIRED.

4. STOCKPILE HEIGHTS MUST NOT EXCEED 35'. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER.

5. STOCKPILES OF EARTH MATERIALS TO BE IN PLACE GREATER THAN 30 DAYS SHALL BE COVERED, SEEDED

WITH TEMPORARY SEED MIX OR MULCHED.

6. COORDINATE COORDINATE QUANTITY AND LOCATION(S) WITH CONSTRUCTION MANAGER'S SITE

LOGISTICS PLANS.

4'

2"x2"x3/4"

BLOCK

RUBBER

RESTRAINT

1/4" NYLON

EXPANSION

ROPE

REMOVAL FROM INLET

1" REBAR FOR BAG

2'

SILTSACK 3'

TYPICAL SILT SACK DETAIL

N.T.S.

OVERFLOW HOLES (TYP.)

NOTE: HIGH FLOW = 200 GAL./MIN./SF

STAPLE TO ONLY

PENETRATE NETTING,

NOT INNER MATERIAL

COIR LOGS

TYPICAL CURLEX COIR LOG DETAIL

N.T.S.

NOTE: USE OF STAPLES IN PAVEMENT

IS OPTIONAL. IF USED, ALL DAMAGED

PAVEMENT TO BE RESTORED TO

EXISTING CONDITIONS AT NO

ADDITIONAL COST TO THE OWNER.

SITE DEMO PLAN

SCALE: 1"=10'

INSTALL BOLLARDS AROUND

ENCLOSURE. SEE 1/C-2 FOR DETAIL

INSTALL TRANSFORMER AND PAD

SEE ELECTRICAL DRAWINGS FOR

MORE INFORMATION

UNDERGROUND ELECTRICAL CONDUIT

SEE ELECTRICAL DRAWINGS FOR

DETAILS

AREA OF PAVEMENT RESTORATION

SEE DETAIL 3/C-2

E

E

E

E

E

E

E

T

T

T

T

T

T

T

WHITING FORENSIC BUILDING

S

S

S

S

S

S

S

S

S

S

W

W

W

W

W

T

T E

E

E

T

T

T

T

T

T

T

T

T

T

E

E

E

E

E

E

E

E

E

SITE LAYOUT AND MATERIALS PLAN

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title descriptiondatemark

R E V I S I O N S

TRANSFORMER REPLACEMENT

WHITING FORENSIC HOSPITAL

MHA-1457

STATE OF CONNECTICUT

DEPARTMENT OF MENTAL HEALTH AND ADDICTION SERVICES

MIDDLETOWN, CT.

professional seal

JMB

AS NOTED

HSM

7/10/2026

CONNECTICUT VALLEY HOSPITAL

N.T.S.

8" DIA. SCHEDULE 40 GALV. STEEL

PIPE FILLED WITH CONCRETE.

PAINT EXTERIOR GLOSS ENAMEL

BLACK. COVER WITH YELLOW PVC

SLEEVE

PAVEMENT

BASE COURSE

CONCRETE F'c = 4500 psi

ROUND-OFF TOP

1'-0" 1'-0"

TOP OF EXISTING

PAVEMENT

1'-0" 1'-0"

SAWCUT AND REMOVE EXISTING

BITUMINOUS CONCRETE APPLY

TACK COAT PER THE CUT AND

MATCH PAVEMENT DETAIL

2" CLASS 2 BITUMINOUS

CONCRETE (DEPTH AS

SPECIFIED, OR MATCH EXIST.

WHICHEVER IS GREATER

2" (MIN.) CLASS 1 BITUMINOUS

CONCRETE (TOTAL DEPTH

OF BIT. = 4" OR MATCH

EXISTING WHICHEVER IS GREATER)

COMPACTED PROCESSED

AGGREGATE BASE (CTDOT FORM 818

M.05.01) DEPTH VARIES MATCH EXIST.

AS REQUIRED

COMPACTED GRANULAR FILL DEPTH

VARIES MATCH EXIST. AS REQUIRED

COMPACTED SUBGRADE

NOMINAL TRENCH WIDTH REFER

TO APPROPRIATE UTILITY DETAIL

PROCESSED AGGREGATE BASE, GRANULAR FILL,

AND SUBGRADE COMPACTED TO 95% OF MAX. DRY

DENSITY AS DETERMINED BY ASTM D 1557

METHOD

TYPICAL UTILITY TRENCH REPAIR DETAIL

N.T.S.

SEAL EDGES WITH CT DOT LIQUID

EMULSION HOT ASPHALT TACK COAT.

WOVEN GEOTEXTILE

SITE LAYOUT AND MATERIAL PLAN

SCALE: 1"=10'

NOTE: PAVEMENT SECTION TO MATCH DETAIL

SHOWN ABOVE OR EXISTING PAVEMENT.

WHICHEVER IS GREATER.

File details come from the government source that posted it. Updated .