This is a Division specification document for the Connecticut state government related to the Whiting Forensic Hospital Transformer Replacement project. The scope of work encompasses the installation of a new 750 KVA pad mount transformer and all necessary connections to existing building electrical services. The project is located at Whiting Forensic Hospital in Connecticut and represents a critical infrastructure upgrade to the facility's electrical systems. The document provides detailed technical specifications and requirements for qualified contractors bidding on this replacement project, with specifications organized by construction divisions to ensure comprehensive coverage of all work components.
The specification document establishes the technical standards and performance requirements that bidding contractors must meet to be considered for award. It includes detailed construction specifications, material requirements, installation procedures, and quality assurance standards necessary for the successful completion of the transformer replacement and associated electrical connections. Contractors submitting bids must demonstrate their ability to comply with all specified technical requirements and Connecticut state regulations governing electrical work and hospital facility modifications.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
�*..� %�/'0����
�" -&" .�12�� 1 �*,� ,,�$*&% ,0�����
3���&*'�,%" %� �&"�*'+%�'0�����
4 56�
�&'$2��&7&"" %%&0��� �0����0�����8�����*,,*�' "�
..*$%*�'�� "7*$ ,� 7 '� � �&"%!�".0����� 4 5��
�"�# $%��&'�&���&% ������2� 0�6 64�
00 01 02
NOTICE FORM
CT DAS 5000 (Rev. 07.01.2026) STANDARD FORM FOR ALL PROJECTS
IMPORTANT NOTICE - FOR YOUR INFORMATION:
THIS PROJECT MANUAL CONTAINS UPDATED REQUIREMENTS:
07/01/2026 UPDATES
UPDATED: SBE / MBE Subcontractor Participation Goals:
In accordance with Connecticut General Statutes Section (C.G.S. §) 4a-60g (C), as amended by Public Act 25-168, on and after July 1, 2026, (i) state agencies shall establish annual spending allocation goals for goods and services by industry category pursuant to subsection (k) of this section, and (ii) awarding agencies shall establish contract-specific spending allocation goals for public works contracts that reflect and are consistent with the percentage of available businesses in the relevant industry and geographic market area that are identified as small contractors and minority business enterprises in the database established pursuant to subparagraph (A) of this subdivision.
Awarding agencies setting spending allocation goals and contractors awarded public works contracts shall make good faith efforts, as defined in section 4a-60, and consistent with state and federal law, to achieve the spending allocation goals established pursuant to this subparagraph.
UPDATED: Commission on Human Rights and Opportunities (CHRO) Updates:
On public works contracts valued at one million dollars or more or for projects for which a construction manager has entered into a public works contract providing for a guaranteed maximum price valued at one hundred fifty thousand dollars or more, C.G.S. § 46a-68e requires that the awarding agency “shall withhold two percent of the total contract price per month from any payment made to such contractor until such time as the contractor has submitted all compliance reports required by the Commission.”
The term “awarding agency” is defined by C.G.S. § 4a-60g as “a state agency or political subdivision of the state, including a municipality or quasi-public agency.”
UPDATED: 00 52 73 Subcontract Agreement Form:
The signature page has been removed from Section 00 52 73 Subcontract Agreement Form.
UPDATED: Elevator Agreement:
All references to the Elevator Agreement have been removed from Section 00 30 00 General Statements for Available Information and Section 50 00 00 Project-Specific Available Information.
UPDATED: “FM Global”:
All references to “FM Global” have been updated to “FM” in Section 00 30 00 General Statements for Available Information and Section 50 00 00 Project-Specific Available Information.
Updated Documents:
• 00 01 10 Table Of Contents
• 00 11 16 Invitation to Bid
• 00 21 13 Instructions to Bidders
• 00 30 00 General Statements for Available Information
• 00 41 00 Bid Proposal Form
• 00 41 10 Bid Package Submittal Requirements
• 00 52 73 Subcontract Agreement Form
• 50 00 00 Project-Specific Available Information
• DELETED: 50 50 00 Elevator
10/01/2025 UPDATES
NEW: Signed Statements from Named Subcontractors Effective October 1, 2025: Effective October 1, 2025, in accordance with Public Act 25-168, the Bidder must obtain and provide a signed statement from each Named Subcontractor listed in Table 2.7 of the Project’s Bid Proposal Form, stating that the Named Subcontractor has communicated directly with the Bidder about the work to be performed on such contract. The Bidder may use Section 00 45 20 Named Subcontractor Signature Page to obtain such signed statements.
UPDATED: Commission on Human Rights and Opportunities (CHRO) Updates: Effective October 1, 2025, in accordance with Public Act 25-168, the Commission on Human Rights and Opportunities (CHRO) Contract Compliance Unit has introduced changes to the requirements for State-Funded Projects. Good Faith Efforts Plans replace Set-Aside Plans and Affirmative Action Plans. Plans will only need to be submitted when the state funding is $150,000 or more.
The Good Faith Efforts Short Form Plan will replace the Set-Aside Plan and the Good Faith Efforts Long Form Plan will replace the Affirmative Action Plan. Monthly Reports will no longer be required for all projects, including those started prior to the effective date. Within 45 days of substantial completion, contractors must submit: subcontractor payment documentation, lien waivers, and any outstanding subcontract notifications. General contractors must pay subcontractors within 15 days of the due date, unless there is a bona fide dispute. Failure to file plans, meet deadlines, or make good faith efforts will be subject to enforcement that may lead to withholding of contract payments, disqualification from future bidding, and/or civil penalties and legal action by CHRO. Please see the CHRO website for a summary of changes and templates for the new plan formats.
UPDATED: 00 73 44 Connecticut Department Of Labor (CT DOL) Prevailing Wage Rates / Contractor’s Wage Certification / Payroll Certification: Updates to Subsection 8 “Footnotes and Important Information”.
Updated / New Documents:
• 00 01 10 Table of Contents
• 00 11 16 Invitation to Bid
• 00 21 13 Instructions to Bidders
• 00 25 13 Pre-Bid meeting
• 00 40 15 DAS Contractor Prequalification Certificate Requirements
• 00 40 16 DAS Update Statement Requirements
• 00 41 00 Bid Proposal Form
• 00 41 10 Bid Package Submittal Requirements
• 00 45 14 General Contractor Bidder’s Qualification Statement
• 00 45 15 Objective Criteria Established for Evaluating Qualifications of Bidders
• 00 45 17 Named Subcontractor Bidder’s Qualification Statement
• NEW: 00 45 20 Named Subcontractor Signature Page
• 00 52 03 DAS-CS Contract
• 00 72 13 General Conditions of the Contract for Construction For Design-Bid-Build
• 00 73 27 SBE-MBE Subcontractor Participation Schedule
• 00 73 44 Connecticut Department Of Labor (CT DOL) Prevailing Wage Rates / Contractor’s Wage
Certification / Payroll Certification
08/25/2025 UPDATES
NEW: NOTICE TO BIDDER – PROJECT LABOR AGREEMENT:
A Project Labor Agreement (PLA) may be required as part of this Contract. See page 1 of Section 00 11 16 Invitation to Bid or Section 00 41 00 Bid Proposal Form for applicability.
If applicable, Connecticut DAS, pursuant to Connecticut General Statutes Section 31-56b, has determined that it is in the public’s interest to require a PLA for this public works project. A PLA is a pre-hire agreement covering the terms and conditions for all persons who will perform work on the project. In addition to other terms and conditions, the PLA shall contain provisions required by the aforementioned statute.
A copy of the PLA signed by the Greater Hartford-New Britain Building and Construction Trades Council is included in Specification Section 00 73 48 of the Contract Documents. The “Acceptance of Agreement” form is also included in Section 00 73 48.
The Bidder will be required to sign the PLA and “Acceptance of Agreement” prior to the Award of this Contract, acknowledging that the Bidder has received a fully executed copy of the PLA, and accepts and agrees to be bound by the PLA for this Project. The Bidder will be required to ensure that Contractors sign the “Acceptance of Agreement” form attached to the PLA for the purpose of performing work on the Project. The Bidder shall monitor and enforce compliance with the PLA by the Unions and by all Contractors who, through their execution of the “Acceptance of Agreement”, together with their subcontractors, accept and agree to be bound by the PLA for this Project. The term “Contractors” shall include all Contractors, Subcontractors and sub- subcontractors of whatever tier engaged in on-site construction work within the scope of this Agreement.
In accordance with Connecticut General Statutes Section 31-56b(d), if the Bidder does not agree to abide by the conditions of the PLA, the Bidder shall not be regarded as a responsible and qualified bidder. If any Contractor performing work for the Project does not agree to abide by the conditions of the PLA, the Bidder shall not regard such Contractor as a responsible and qualified contractor.
UPDATED: Section 00 52 03 DAS-CS Contract was updated by the Connecticut Office of the Attorney General (OAG) and the Office of Policy and Management (OPM) to more accurately reflect the statutory language of the Campaign Contribution Restriction and State Ethics Laws (Connecticut General Statutes Sections 9-612 and 1-101qq).
Section 00 73 13 General Conditions Of The Contract For Construction For Design-Bid-Build was updated by the OAG and OPM to clarify the indemnification provisions in Article 35.6 Indemnification and Hold Harmless Provisions.
Updated / New Documents:
• 00 11 16 Invitation to Bid
• 00 21 13 Instructions to Bidders
• 00 25 13 Pre-Bid meeting
• 00 41 00 Bid Proposal Form
• 00 41 10 Bid Package Submittal Requirements
• 00 52 03 DAS-CS Contract
• 00 72 13 General Conditions Of The Contract For Construction For Design-Bid-Build
• NEW: 00 73 48 Project Labor Agreement
07/01/2025 UPDATES
UPDATED: In accordance with Connecticut General Statutes Section (C.G.S. §) 31-53, as amended by Public Act 25-168 and effective July 1, 2025, the Bidder agrees to include the C.G.S. § 31-53 prevailing wage provision in each contract, including contracts for off-site custom fabrication.
For purposes of this section, "off-site custom fabrication" means the fabrication of systems that are fabricated at a site located within the state other than the location of a public works project, but are fabricated specifically for such public works project, including plumbing systems, heating systems, cooling systems, pipefitting systems, ventilation systems or exhaust duct systems.
"Off-site custom fabrication" does not include components or materials that are stock shelf items or readily available.
UPDATED: Changes were made related to contractors' obligations to make good faith efforts to employ minority contractors to conform to Public Act 25-168.
Updated Documents:
• 00 11 16 Invitation to Bid
• 00 21 13 Instructions to Bidders
• 00 41 00 Bid Proposal Form
• 00 41 10 Bid Package Submittal Requirements
• 00 62 39 SBE/MBE Certificate Requirements
• 00 72 13.1 Supplementary Conditions Of The Contract For Construction For Design-Bid-Build
• 00 73 27 SBE/MBE Subcontractor Schedule
• 00 73 38 CHRO Contract Compliance Regulations
• 00 73 40 CHRO Bidder Contract Compliance Monitoring Report Requirements
• 00 73 44 CT DOL Prevailing Wage Rates / Contractor’s Wage Certification / Payroll Certification
End of Section 00 01 02 Notice Form
SECTION 00 01 07
SEALS PAGE
CT DAS 5000 (Rev. 10.01.2023) PROJECT NO. MHA-1457
Project Title: Whiting Forensic Hospital - Transformer Replacement
Project Location: Middletown, Connecticut 06457
Project Number: MHA-1457
Architect/Engineer: Bemis Associates LLC- 185 Main Street, Farmington, CT 06032
SEALS, SIGNATURES, AND DATES OF DESIGN PROFESSIONALS OF RECORD
Architect Professional Certification:
I hereby certify that these documents were prepared or approved by me and that I am a duly registered Architect.
Civil Engineer Professional Certification:
I hereby certify that these documents were prepared or approved by me and that I am a duly registered Professional Engineer.
NOT USED MICHAEL PLICKYS, PE
(Print Consultant Name) (Print Consultant Name) 17241
License No. License No.
(Seal and Signature) (Seal and Signature) 1/31/2026
Expiration Date Expiration Date
Structural Engineer Professional Certification:
I hereby certify that these documents were prepared or approved by me and that I am a duly registered Professional Engineer.
Electrical Engineer Professional Certification:
I hereby certify that these documents were prepared or approved by me and that I am a duly registered Professional Engineer.
NOT USED LUCIAN DRAGULSKI, PE
(Print Consultant Name) (Print Consultant Name)
PEN 0018360
License No. License No.
(Seal and Signature) (Seal and Signature) 1/31/2026
Expiration Date Expiration Date
Mechanical Engineer Professional Certification:
I hereby certify that these documents were prepared or approved by me and that I am a duly registered Professional Engineer.
Fire-Protection Engineer Professional Certification:
I hereby certify that these documents were prepared or approved by me and that I am a duly registered Professional Engineer.
NOT USED NOT USED
(Print Consultant Name) (Print Consultant Name)
License No. License No.
(Seal and Signature) (Seal and Signature)
Expiration Date Expiration Date
End of Section 00 01 07 Seals Page ation:
these pared and that istered d d d d d d
Electrical E Professional I hereby cer docdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocdocumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeumeuments appappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappappapproved ed ed ed by am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am am a da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da da d ProProProProProProProProProProProProProProProProProProProProProProProProProfessiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosiosionalnalnalnalnalnalnalnalnalnalnalnalnalnalnalnal
LUCIAN DR
NamNamNamNamNamNamNamName)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e)e) (Print Consu
PEN
Licens
1/3
SECTION 00 01 10
TABLE OF CONTENTS
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
VOLUME 1 of 2
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
Section No. Title Page
Count Not
Used
00 01 01 Title Page 1 00 01 02 Notice Form 4 00 01 07 Seals Page 1 00 01 10 Table of Contents 9 00 01 15 List of Drawing Sheets 1 00 11 16 Invitation to Bid 4 00 21 13 Instructions To Bidders 18 00 25 13 Pre-Bid Meeting Agenda 6 00 30 00 General Statements for Available 5
00 30 10 General Statement for Existing Conditions Information 00 30 20 General Statement for Environmental Assessment Information 00 30 30 General Statement for Hazardous Building Materials Inspection and Inventory
00 30 40 General Statement for PCB Remediation Health Safety and Emergency Response
00 30 50 General Statement for Subsurface Geotechnical Report 00 30 60 General Statement for FM Checklist for Roofing Systems 00 30 70 General Statement for “Statement of Special Inspections” 00 30 80 General Statement for Other Information
00 40 14 Certificate (of Authority) 2 00 40 15 DAS Contractor Prequalification Certificate Requirements 0 00 40 16 DAS Update Statement Requirements 1 00 41 00 Bid Proposal Form 24 00 41 10 Bid Package Submittal Requirements 4 00 43 16 Standard Bid Bond 1 00 45 14 General Contractor Bidder's Qualification Statement 6 00 45 15 Objective Criteria Established for Evaluating Qualifications of Bidders 4 00 45 17 Named Subcontractor Bidder’s Qualification Statement 5 00 45 20 Named Subcontractor Signature Page Template 1 00 52 03 Contract 10 00 52 73 Subcontract Agreement Form 2 00 62 16 Certificate of Insurance (SAMPLE) 1
00 62 16.1 Asbestos Attachment to Acord Form 1 00 72 13 General Conditions of the Contract for Construction For Design-Bid-Build 34
00 72 13.1 Supplementary Conditions of the Contract for Construction for Design-Bid-Build 4 00 72 13A DMHAS Clarification of Section 00 72 13 1 00 73 27 SBE/MBE Subcontractor Participation Schedule – SAMPLE 2 00 73 44 Prevailing Wage Rates/Contractor’s Wage Certification/Payroll Certification 34 00 73 48 Project Labor Agreement 43 00 73 63 CT DMHAS Security Requirements 18
00 73 73 Build America, Buy America Act Requirements for Projects with Federal Financial Assistance 6
00 92 10 Additional Forms To be Submitted After Bond Commission Funding Approval 7
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
VOLUME 1 of 2 (continued)
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS (continued)
Section No. Title Page
Count Not
Used
00 92 30 Procedures Regarding Taxation for Nonresident General/Prime Contractor and Subcontractors 2
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
VOLUME 1 of 2 (continued)
DIVISION 01 GENERAL REQUIREMENTS
Section No. Title Page Count
Not Used
01 11 00 Summary of Work 6 01 20 00 Contract Considerations 4 01 23 13 Supplemental Bids 0 01 25 00 Substitution Procedures 4 01 26 00 Contract Modification Procedures 3 01 29 76 Progress Payment Procedures 5 01 31 00 Project Management and Coordination 4 01 31 19 Project Meetings 3 01 32 16 Construction Progress Schedules 3
01 32 16.13 CPM Schedules 0 01 32 33 Photographic Documentation 2 01 33 00 Submittal Procedures 7 01 35 16 Alteration Project Procedures 0 01 35 26 Government Safety Requirements 12 01 42 20 Reference Standards & Definitions 3 01 45 00 Quality Control 3
01 45 23.13 Testing for Indoor Air Quality, Baseline Indoor Air Quality, and Materials 0 01 50 00 Temporary Facilities & Controls 8 01 57 30 Indoor Environmental Control 0 01 57 40 Construction Indoor Air Quality Management Plan 0 01 60 00 Product Requirements 3 01 71 23 Field Engineering 2 01 73 29 Cutting and Patching 4 01 74 19 Construction Waste Management & Disposal 0 01 75 00 Starting & Adjusting 0 01 77 00 Closeout Procedures 5 01 78 23 Operation & Maintenance Data 4 01 78 30 Warranties & Bonds 3 01 81 13 Sustainable Design Requirements 0 01 91 00 Commissioning 0
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
VOLUME 1 of 2 (continued)
TECHNICAL SPECIFICATIONS
DIVISION 02 EXISTING CONDITIONS Not Used
Section No. Title Page Count 02 32 19 Test Pits 3
DIVISION 03 CONCRETE Not Used
Section No. Title Page Count
DIVISION 04 MASONRY Not Used
Section No. Title Page Count
DIVISION 05 METALS Not Used
Section No. Title Page Count
DIVISION 06 WOOD, PLASTICS AND COMPOSITES Not Used
Section No. Title Page Count
DIVISION 07 THERMAL AND MOISTURE PROTECTION Not Used
Section No. Title Page Count
DIVISION 08 OPENINGS Not Used
Section No. Title Page Count
DIVISION 09 FINISHES Not Used
Section No. Title Page Count
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
VOLUME 1 of 2 (continued)
DIVISION 10 SPECIALTIES Not Used
Section No. Title Page Count
DIVISION 11 EQUIPMENT Not Used
Section No. Title Page Count
DIVISION 12 FURNISHINGS Not Used
Section No. Title Page Count
DIVISION 13 SPECIAL CONSTRUCTION Not Used
Section No. Title Page Count
DIVISION 14 CONVEYING SYSTEMS Not Used
Section No. Title Page Count
DIVISION 15 RESERVED
DIVISION 16 RESERVED
DIVISION 17 RESERVED
DIVISION 18 RESERVED
DIVISION 19 RESERVED
DIVISION 20 RESERVED
DIVISION 21 FIRE SUPPRESSION Not Used
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
VOLUME 1 of 2 (continued)
DIVISION 22 PLUMBING Not Used
Section No. Title Page Count
DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING Not Used
Section No. Title Page Count
DIVISION 24 RESERVED
DIVISION 25 INTEGRATED AUTOMATION Not Used
Section No. Title Page Count
DIVISION 26 ELECTRICAL Not Used
Section No. Title Page Count
26 05 00 BASIC ELECTRICAL MATERIALS AND METHODS 15
26 05 13 MEDIUM VOLTAGE CABLE 8
26 12 19 MEDIUM VOLTAGE PAD MOUNT TRANSFORMER 8
DIVISION 27 COMMUNICATIONS Not Used
Section No. Title Page Count
DIVISION 28 ELECTRONIC SAFETY AND SECURITY Not Used
Section No. Title Page Count
DIVISION 29 RESERVED
DIVISION 30 RESERVED
VOLUME 1 of 2 (continued)
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
DIVISION 31 EARTHWORK Not Used
Section No. Title Page Count
31 11 00 SITE UTILITY PREPARATION AND DEMOLITION 4
31 23 00 EXCAVATION AND FILL 8
31 23 33 TRENCHING AND BACKFILLING 8
DIVISION 32 EXTERIOR IMPROVEMENTS Not Used
Section No. Title Page Count
32 12 16 BITUMINOUS ASPHALT CONCRETE PAVING 4
DIVISION 33 UTILITIES Not Used
Section No. Title Page Count
DIVISION 34 TRANSPORTATION Not Used
Section No. Title Page Count
DIVISION 35 WATERWAYS AND MARINE Not Used
Section No. Title Page Count
DIVISION 36 RESERVED
DIVISION 37 RESERVED
DIVISION 38 RESERVED
DIVISION 39 RESERVED
DIVISION 40 PROCESS INTEGRATION Not Used
Section No. Title Page Count
DIVISION 41 MATERIAL PROCESSING Not Used
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
VOLUME 1 of 2 (continued)
DIVISION 42 PROCESS HEATING, COOLING, AND DRYING Not Used
Section No. Title Page Count
DIVISION 43 PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT Not Used
Section No. Title Page Count
DIVISION 44 POLLUTION CONTROL EQUIPMENT Not Used
Section No. Title Page Count
DIVISION 45 INDUSTRY SPECIFIC MANUFACTURING EQUIPMENT Not Used
Section No. Title Page Count
DIVISION 46 RESERVED
DIVISION 47 RESERVED
DIVISION 48 RESERVED
DIVISION 49 RESERVED
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
VOLUME 1 of 2 (continued)
DIVISION 50 PROJECT-SPECIFIC AVAILABLE INFORMATION Page Count Not Used
50 10 00 Existing Conditions Information 50 20 00 Environmental Assessment Information 161 50 30 00 Hazardous Building Materials Inspection and Inventory 58 50 40 00 PCB Remediation Health, Safety, and Emergency Response 9 50 50 00 Subsurface Geotechnical Report 50 60 00 FM Checklist For Roofing Systems 50 70 00 Statement of Special Inspections 50 80 00 CVH Contractor Orientation Forms 17
50 80 00.1 50 80 00.2 50 80 00.3
End of Section 00 01 10 Table of Contents
SECTION 00 01 15
LIST OF DRAWING SHEETS
CT DAS 5000 (Rev. 10.01.2023) PROJECT NO. MHA-1457
List of Drawing Sheets
Sheet No. Title
COVER SHEET
C-1 SITE DEMO PLAN
C-2 SITE LAYOUT AND MATERIALS PLAN
ED-1 ELECTRICAL DEMOLITION PLAN
E-1 POWER PLAN
E-2 SITE PLAN AND DETAILS
E-3 POWER RISER DIAGRAM
End of Section 00 01 15 List of Drawing Sheets
SECTION 00 11 16
INVITATION TO BID
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
Advertisement No.: MHA-1457 Advertisement Date: 08/13/2026
INVITATION TO BID
Awarding Authority:
Department of Mental Health and Addiction Services 1000 Silver Street
Middletown, CT. 06457
This Invitation to Bid is open to ALL bidders.
All Bidders must make Good Faith Efforts to meet the SBE and MBE Subcontractor Participation Goals listed below.
Required DAS Prequalification Classification for Bidders:
Bidders must by Prequalified by DAS for General Building Construction (Group B) if their bid is greater than one million dollars ($1,000,000.00).
Find Invitations to Bid: Go to the Bid Board on CTsource: https://portal.ct.gov/das/ctsource/bidboard
Date and Time of Bid Opening: 09 17 2026 Time: 10:00 AM (Month) (Day) (Year) (ET)
Questions and Requests: All Project Questions, Bid Questions, and Pre-Bid Equals & Substitution Requests must be submitted fourteen (14) Calendar Days prior to the date of the Bid Opening.
Email all Project Questions and Pre-Bid Equals and Substitution Requests to:
Architect/Engineer: Kim Symmonds, Bemis Associates, LLC Email: kims@bemisassociates.com
Construction Administrator: Loretta Eisler, Chief of Engineering Services
1, DMHAS
Email: loretta.eisler@ct.gov
Project Manager: Loretta Eisler, Chief of Engineering Services
1, DMHAS
Email: loretta.eisler@ct.gov
Email all Bid Questions to:
Bidding Unit: Mikako Tirone, DMHAS-FSB Email: MikakoFabiano.Tirone@ct.gov
This Invitation to Bid is for the following Project:
Project Title: Whiting Forensic Hospital Transformer Replacement
Project Location: CVH Whiting Forensic Hospital - 70 O'Brien Drive Middletown, CT 06457 Project Number: MHA-1457
Project Description: See Specifications Section 01 11 00 Summary of Work, Section 1.3
Cost Estimate Range: $ 000.00 To $ 545,000.00 Prevailing Wages:
(see page 3 for more details) This is a Prevailing Wages Project
Dept. of Correction Applicability:
(see page 4 for more details) NOT APPLICABLE (this is NOT a Department of Correction project).
Project Labor Agreement:
(see page 3 for more details) This Project is NOT subject to a Project Labor Agreement.
Federal Financial Assistance:
(see page 3 for more details) This Project DOES NOT include Federal Financial Assistance.
Federal BABA Applicability:
(see page 3 for more details) "Build America, Buy America Act" (BABA) requirements DO NOT apply to this Project.
Threshold Limits (C.G.S. §29-276b): This Project DOES NOT exceed Threshold Limits.
SBE & MBE Subcontractor
Participation Goals:
SBE Subcontractors &/or Suppliers: 5.36% MBE Subcontractors &/or Suppliers: 2.62% https://portal.ct.gov/das/ctsource/bidboard file://MHA-CVH01/Groups/Fiscal%20Services%20Bureau/ac%20Telework%20Invoice%20Distribution/Mikako/DAS%20BIDS/DIV.00%20UPDATED%20VERSION%20-%2007-01-2026/kims@bemisassociates.com file://MHA-CVH01/Groups/Fiscal%20Services%20Bureau/ac%20Telework%20Invoice%20Distribution/Mikako/DAS%20BIDS/DIV.00%20UPDATED%20VERSION%20-%2007-01-2026/loretta.eisler@ct.gov file://MHA-CVH01/Groups/Fiscal%20Services%20Bureau/ac%20Telework%20Invoice%20Distribution/Mikako/DAS%20BIDS/DIV.00%20UPDATED%20VERSION%20-%2007-01-2026/MikakoFabiano.Tirone@ct.gov
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
Invitation to Bid (continued)
Special Requirements:
Driver’s license submittal by 8/20/2026 is required for background check prior to attending the walkthrough or will not be permitted to attend the mandatory walkthgrough. Please email a copy of license to MikakoFabiano.Tirone@ct.gov and cc loretta.eisler@ct.gov.
Plans and Specs: Plans and Specs are available for electronic download from CTsource.
Bid Results: Bid Results will be posted on CTsource within approximately two days after the bid opens.
Contract Time Allowed: Calendar Days: 406 Liquidated Damages: $ 1972.00 Per Calendar Day Beyond Substantial Completion.
$ 1676.00 Per Calendar Day Beyond 90 days After Substantial Completion.
Pre-Bid Meeting Date: 08/27/2026 Pre-Bid Meeting Time: 10:00 ☒ AM ☐ PM
Pre-Bid Meeting Attendance: Bidders are required to attend a MANDATORY Pre-Bid Meeting.
Pre-Bid Meeting Location: Whiting Forensic Hospital Ambulatory Care Conference Room#207 Shew Hall, 2nd Fl 28 Harvey Drive
Middletown, CT 06457 Pre-Bid Meeting Contact: DAS/CS Project Manager: Loretta Eisler, Chief of Engineering Services 1, DMHAS
Phone No.: (860) 881-4667 Pre-Bid Meeting Registration: At the Pre-Bid Meeting, all prospective bidders shall sign his or her name on the official roster and list the name and address of the company he or she represents. For MANDATORY Pre-Bid Meetings, this shall be done no later than the designated start time of the Pre-Bid Meeting. No attendee will be allowed to register after the advertised start time. Bids submitted by contractors who have not properly registered and attended the MANDATORY Pre-Bid Meeting shall be rejected as non-responsive. See Section 00 25 13 Pre-Bid Meeting Agenda for details.
Bid Proposal Submission and Other Bid Submittal
Requirements:
See Sections 00 21 13 Instructions to Bidders, 00 41 00 Bid Proposal Form, and 00 41 10 Bid Package Submittal Requirements for Bid Proposal submission requirements, including requirements for Certifications, Representations, Addenda, Pre-Bid Equals and Substitution Requests, and other bidding documents.
All Contractors are cautioned that any modifications or alterations made to either the Project Manual or any of the forms and documents contained herein may be just cause to reject the bid!
Bid Uploading, Editing, and Opening:
Bids can be uploaded and edited electronically on CTsource BEFORE the Bid Opening Date and Time and thereafter shall be locked down and publicly opened on CTsource.
Please allow sufficient time to upload your Bid as responses not fully uploaded by the Bid Opening Date and Time will not be considered. Upon submission, you will receive a confirmation message that will display that the response was submitted.
Guide to the Code of Ethics For Current or Potential State
Contractors (for contracts greater than
$500,000):
In accordance with the Connecticut General Statutes Sections (C.G.S. §§) 1-101mm and 1-101qq, as amended, anyone seeking a large state construction contract with a value of more than $500,000 shall electronically download the Guide to the Code of Ethics For Current or Potential State Contractors from the of Office of State Ethics (OSE) website (https://portal.ct.gov/ethics). On the website, scroll down to “Resources”, click on the “Publications” link, then scroll down and click on the form.
State Elections Enforcement Commission (SEEC) Notice of Campaign Contribution and Solicitation Limitations
(for contracts greater than $50,000):
In accordance with C.G.S. §§ 9-612 and 4a-100, as amended, anyone seeking a state contract with a value of more than $50,000, or a combination or series of such agreements or contracts having a value of $100,000 or more, shall electronically download the Notice To Executive Branch State Contractors And Prospective State Contractors (incorporated in contracting and bidding documents) Notice Only from the SEEC Website (https://portal.ct.gov/seec). On the website, scroll down to “Resources”, click on “Forms and Templates”, then click on “Contractor Reporting Forms”, and next click on the “Notice” link.
file://MHA-CVH01/Groups/Fiscal%20Services%20Bureau/ac%20Telework%20Invoice%20Distribution/Mikako/DAS%20BIDS/DIV.00%20UPDATED%20VERSION%20-%2007-01-2026/MikakoFabiano.Tirone@ct.gov file://MHA-CVH01/Groups/Fiscal%20Services%20Bureau/ac%20Telework%20Invoice%20Distribution/Mikako/DAS%20BIDS/DIV.00%20UPDATED%20VERSION%20-%2007-01-2026/loretta.eisler@ct.gov https://portal.ct.gov/ethics https://portal.ct.gov/seec
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
Invitation to Bid (continued)
PREVAILING WAGE RATES:
See page 1 of this Section 00 11 16 Invitation to Bid for applicability.
• If prevailing wages are required on this project, they shall be in accordance with the schedule provided in Section 00 73 44
Prevailing Wage Rates, pursuant to C.G.S.§ 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. § 31-55a concerning annual adjustments to prevailing wages.
• Wage Rates will be posted each July 1st on the Department of Labor website www.ctdol.state.ct.us. Such prevailing wage adjustment shall not be considered a matter for any contract amendment.
• For Prevailing Wage Projects on and after July 1, 2025, in accordance with C.G.S. § 31-53 as amended by Public Act 25-168, the Bidder agrees to include the C.G.S. § 31-53 prevailing wage provision in each contract, including contracts for off-site custom fabrication. For purposes of this section, "off-site custom fabrication" means the fabrication of systems that are fabricated at a site located within the state other than the location of a public works project, but are fabricated specifically for such public works project, including plumbing systems, heating systems, cooling systems, pipefitting systems, ventilation systems or exhaust duct systems. "Off-site custom fabrication" does not include components or materials that are stock shelf items or readily available.
EXECUTIVE ORDERS:
• To access Executive Orders, go to https://portal.ct.gov/ > Governor Ned Lamont > Executive Orders.
PROJECTS WITH FEDERAL FINANCIAL ASSISTANCE:
See page 1 of this Section 00 11 16 Invitation to Bid for applicability.
• The Federal Government’s “Build America, Buy America Act (BABA)”, enacted as part of the Infrastructure Investment and
Jobs Act on November 15, 2021, established a domestic content procurement preference for all Federal Financial Assistance obligated for infrastructure projects, effective October 23, 2023. In accordance with BABA, all non-federal entities who receive Federal Financial Assistance obligated on or after the effective date of October 23, 2023, for an infrastructure project, are subject to the provisions of BABA.
• The “Buy America Preference” provisions of BABA dictate that, absent a waiver, none of the funds made available for a Federal Award for an infrastructure project may be obligated unless all of the iron, steel, manufactured products, and construction materials incorporated into the project are produced in the United States.
• See additional details in Section 00 21 13 Instructions to Bidders; Section 00 41 00 Bid Proposal Form; Section 00 72 13.1 Supplementary Conditions of the Contract for Construction for Design-Bid-Build (subsection 36.4 Build America, Buy America Act); and Section 00 73 73 Build America, Buy America Act Requirements for Projects with Federal Financial Assistance in the project’s specifications.
PROJECTS WITH A PROJECT LABOR AGREEMENT (PLA):
See page 1 of this Section 00 11 16 Invitation to Bid for applicability.
• Connecticut DAS, pursuant to Connecticut General Statutes Section 31-56b, has determined that it is in the public’s interest to require a PLA for this public works project. A PLA is a pre-hire agreement covering the terms and conditions for all persons who will perform work on the project. In addition to other terms and conditions, the PLA shall contain provisions required by the aforementioned statute.
• A copy of the PLA signed by the Greater Hartford-New Britain Building and Construction Trades Council is included in Specification Section 00 73 48 Project Labor Agreement of the Contract Documents. The “Acceptance of Agreement” form is also included in Section 00 73 48.
• The Bidder will be required to sign the PLA and “Acceptance of Agreement” prior to the Award of this Contract, acknowledging that the Bidder has received a fully executed copy of the PLA, and accepts and agrees to be bound by the PLA for this Project.
The Bidder will be required to ensure that Contractors sign the “Acceptance of Agreement” form attached to the PLA for the purpose of performing work on the Project. The Bidder shall monitor and enforce compliance with the PLA by the Unions and by all Contractors who, through their execution of the “Acceptance of Agreement”, together with their subcontractors, accept and agree to be bound by the PLA for this Project. The term “Contractors” shall include all Contractors, Subcontractors and sub- subcontractors of whatever tier engaged in on-site construction work within the scope of this Agreement.
• In accordance with Connecticut General Statutes Section 31-56b(d), if the Bidder does not agree to abide by the conditions of the PLA, the Bidder shall not be regarded as a responsible and qualified bidder. If any Contractor performing work for the Project does not agree to abide by the conditions of the PLA, the Bidder shall not regard such Contractor as a responsible and qualified contractor.
• See Section 00 21 13 Instructions to Bidders (subsection 1.21 Projects With a Project Labor Agreement) for Bidder requirements and Section 00 73 48 Project Labor Agreement for a copy of this project’s PLA (if applicable).
http://www.ctdol.state.ct.us/
CT DAS 5000 (Rev. 07.01.2026) PROJECT NO. MHA-1457
Invitation to Bid (continued)
DEPARTMENT OF CORRECTION (DOC) FACILITIES: “SECURITY BACKGROUND QUESTIONNAIRE”:
See page 1 of this Section 00 11 16 Invitation to Bid for applicability.
**If this is not a DOC Project, then the “Security Background Questionnaire” is not required.**
• All Bidders attending a Pre-Bid Meeting at a DOC Facility must complete and submit a “Security Background
Questionnaire” and obtain approval prior to the Pre-Bid Meeting, otherwise admission to the Pre-Bid Meeting will be denied.
• Download the “Security Background Questionnaire” from the DOC website (https://portal.ct.gov/DOC). To find the questionnaire, scroll down the webpage and click on “Forms” then “Security Background Questionnaire”. Complete and submit the DOC “Security Background Questionnaire” as directed.
• It is recommended that the approved form be brought as evidence of approval to attend the Pre-Bid Meeting.
• Read Section 00 73 63 Connecticut Department of Correction (DOC) Security Requirements in the project’s specifications.
PROCESS FOR CONSTRUCTION STORMWATER GENERAL PERMIT:
See Section 01 50 00 Temporary Facilities and Controls.
• For all state agency construction projects disturbing one or more total acres of land area on a site regardless of project phasing, the Awarding Authority’s Architect/Engineer shall be responsible for filing a Department of Energy and Environmental Protection (DEEP) General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities (DEEP-WPED-GP-015) registration and Stormwater Pollution Control Plan (SWPCP) prior to bidding.
• Once the Contractor is under contract with the Awarding Authority, and prior to the commencement of any construction activities, the Contractor (and all other contractors and subcontractors listed on the SWPCP) shall assume responsibility for storm water pollution control and conform to the general permit obligations and requirements by signing the SWPCP “Contractor Certification Statement” and License Transfer Form as directed by the Architect/Engineer.
• At completion of the project, the Contractor shall file a Notice of Termination (DEP-PED-NOT-015) with the DEEP in order to terminate the Construction Stormwater General Permit. A project shall only be considered complete after all post-construction measures are installed, cleaned, and functioning and the site has been stabilized for at least three (3) months following the cessation of construction activities.
IMPORTANT NOTE:
The Awarding Authority reserves the right to do any of the following without liability, including but not limited to: (a) waive technical defects in the bid proposal as he or she deems best for the interest of the State; (b) negotiate with a contractor in accordance with Connecticut General Statutes Section 4b-91; (c) reject any or all bids; (d) cancel the award or execution of any contract prior to the issuance of the “Notice To Proceed”; and (e) advertise for new bids.
https://portal.ct.gov/DOC
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
CT DAS 5000 (Rev. 07.01.2026) STANDARD FORM FOR ALL PROJECTS
Instructions to Bidders (recent updates are in yellow highlight)
1.0 General Information
1.1 Online Bidding:
The Awarding Authority requires all firms to upload their Bid Package Documents online through the CTsource e-Procurement system prior to the date and time of the Bid Opening. See Page 1 of the Invitation to Bid for the date and time of the Bid Opening. The submission of paper Bid Package Documents is no longer acceptable by the Awarding Authority.
The Bid Proposal must be signed prior to the date and time of the Bid Opening.
See the DAS State Contracting Portal webpage for details: https://portal.ct.gov/das/procurement-programs-and-services/ctsource For questions, email the Awarding Authority as directed in the Invitation to Bid.
1.2 Bid Opening:
All Bids shall be publicly opened in CTsource by the Awarding Authority as stated in Section 00 11 16 Invitation to Bid.
1.3 Withdrawal of Bid:
1.3.1 Prior to the Bid Opening:
Any Bid on CTsource can be retracted, deleted, or edited prior to the date and time of the Bid Opening.
1.3.2 After the Bid Opening:
The following three requirements must be met and attested to as true statements by the Bidder for a Bid to be withdrawn after the Bid Opening: (1) the mistake on the Bid Proposal Form must relate to a material aspect of the contract; (2) the mistake must be so great that enforcement of the Bid would be unconscionable; and (3) no substantial prejudice should result to the party who has not made the mistake. If these three requirements cannot be met, then, in accordance with Connecticut General Statutes Section (C.G.S. §) 4b-92, failure to execute a contract awarded as specified and bid shall result in the forfeiture of such Bid Bond or Certified Check.
1.4 Disqualification from Bidding:
Any contractor who violates any provision of C.G.S. § 4b-95, as amended, shall be disqualified from bidding on other contracts for a period not to exceed twenty-four (24) months, commencing from the date on which the violation is discovered, for each violation.
1.5 Waive Minor Irregularities:
1.5.1 The Awarding Authority shall be authorized to waive minor irregularities which it considers in the best interest of the
State, provided the reasons for any such waiver are stated in writing by the Awarding Authority and made a part of the contract file.
1.5.2 No such bid shall be rejected because of the failure to submit prices for, or information relating to, any item or items for which no specific space is provided in the bid form furnished by the Awarding Authority, but this sentence shall not be applicable to any failure to furnish prices or information required by C.G.S. § 4b-95, as amended, to be furnished in the bid form provided by the Awarding Authority.
1.6 Minimum Percentage of Work:
The Awarding Authority may require in the Bid Proposal Form that the contractor agree to perform a stated, minimum percentage of work with its own forces, in accordance with C.G.S. § 4b-95(b).
1.7 Small Business Enterprise (SBE) and/or Minority Business Enterprise (MBE) Subcontract Requirements:
The Awarding Authority may require the contractor to make good faith efforts to award a portion of the contract to Small Business Enterprise (SBE) and/or Minority Business Enterprise (MBE) subcontractors, in accordance with C.G.S. § 4a-60g.
See Sections 00 11 16 Invitation to Bid and 00 41 00 Bid Proposal Form for details.
1.8 Union Labor:
Attention is called to the fact that there may or could be construction work carried on at the site by union labor. This fact must be kept in mind by all Bidders.
https://portal.ct.gov/das/procurement-programs-and-services/ctsource
CT DAS 5000 (Rev. 07.01.2026) STANDARD FORM FOR ALL PROJECTS
1.0 General Information (continued)
1.9 Connecticut Sales And Use Taxes:
1.9.1 All Bidders shall familiarize themselves with the current statutes and regulations of the Connecticut Department of
Revenue Services (DRS), including the Regulations of Connecticut State Agencies (R.C.S.A.) §12-426-18 and all relevant state statutes. The tax on materials or supplies exempted by such statutes and regulations shall not be included as part of a bid. To find and download a copy of the Sales and Use Tax Exemption for Purchases by Qualifying Governmental Agencies (CERT-134), go to the DRS website (https://portal.ct.gov/drs) and click on the following links: Forms > Forms by Tax Type > Exemption Certificates > CERT-134.
1.9.2 The State of Connecticut construction contract has the following tax exemptions: (1) Purchasing of materials which will be physically incorporated and become a permanent part of the project; and (2) Services that are resold by the contractor. For example, if a Contractor hires a plumber, carpenter or electrician, a resale certificate may be issued to the subcontractor because these services are considered to be integral and inseparable component parts of the building contract.
1.9.3 The following items are not exempt from taxes when used to fulfill a State of Connecticut construction contract: Tools, supplies and equipment used in fulfilling the construction contract.
1.10 Rejection of Bids:
The Awarding Authority shall reject every such Bid Proposal, including but not limited to, the following reasons:
1.10.1 A Bid Proposal Form that does not contain the signature of the bidder or its authorized representative will be rejected (unless the bid is signed by the duly authorized representative in the presence of the Awarding Authority within two
(2) business days after the Bid Opening, without alteration or revision to the submitted Bid Proposal Form).
1.10.2 A Bid Proposal Form that is not accompanied in CTsource by Section 00 43 16 Standard Bid Bond, completed for either the Bid Bond option or Certified Check option, will be rejected.
• If using the Bid Bond option, the Standard Bid Bond must be completed and uploaded to CTsource using
Section 00 43 16 Standard Bid Bond prior to the date and time of the Bid Opening;
• If using the Certified Check option, the check must be delivered to the Awarding Authority prior to the date and time of the Bid Opening).
1.10.3 A Bid Proposal Form that is not accompanied in CTsource by Section 00 45 14 General Contractor Bidder’s
Qualification Statement, completed correctly, will be rejected.
1.10.4 A Bid Proposal Form that is not accompanied in CTsource by a DAS Contractor Prequalification Certificate for the Bidder if their bid is greater than $1,000,000, will be rejected, unless the Certificate is submitted to the Awarding Authority within two (2) business days after the Bid Opening.
1.10.5 A Bid Proposal Form that is not accompanied in CTsource by a DAS Update Statement for the Bidder if their bid is greater than $1,000,000, will be rejected, unless the Update Statement is submitted to the Awarding Authority within two (2) business days after the Bid Opening.
1.10.6 A Bid Proposal Form that fails to correctly list ALL of the Named Subcontractors within a particular Class of Work on the Bid Proposal Form for subcontracts in excess of $100,000 will be rejected.
1.10.7 A Bid Proposal Form that fails to correctly state a Named Subcontractor’s price on the Bid Proposal Form will be rejected.
1.10.8 A Bid Proposal Form that fails to list Named Subcontractors who are DAS Prequalified at the time of the bid will be rejected, if the value of their subcontract is in excess of $1,000,000.
1.10.9 A Bid Proposal Form that is not submitted on the forms furnished for the specific project will be rejected. NOTE: In no event will bids or changes in bids be made by telephone, telegraph, facsimile or other communication technology except through CTsource. All pages of the Bid Proposal Form must be uploaded to CTsource prior to the date and time of the Bid Opening.
1.10.10 A Bid Proposal Form that has omitted items, omitted pages, added items not called for, altered the form, contains conditional bids, contains alternative bids, or contains obscure bids will be rejected.
1.10.11 A paper Bid Package sent to the Awarding Authority will be rejected and returned to the bidder unopened.
1.10.12 When a Pre-Bid Meeting is MANDATORY, any Bidder who does not properly register and attend the MANDATORY Pre-Bid Meeting shall be rejected as non-responsive. See Section 00 11 16 Invitation to Bid for applicability.
1.10.13 Any Bidder that does not make all required pre-award submittals within the designated time period may be rejected by the Awarding Authority as non-responsive.
https://portal.ct.gov/drs
1.0 General Information (continued)
1.11 Pre-Bid Meeting:
1.11.1 See Section 00 11 16 Invitation to Bid and Section 00 25 13 Pre-Bid Meeting Agenda for details.
.1 Department of Correction (DOC) Facilities: All Bidders attending a Pre-Bid Meeting at a DOC Facility shall read Section 00 73 63 Connecticut Department of Correction (DOC) Security Requirements, complete and submit the DOC “Security Background Questionnaire” as directed, and obtain approval, prior to the Pre-Bid Meeting, otherwise admission to the Pre-Bid Meeting will be denied.
To find and download a copy of the Security Background Questionnaire, go to the DOC website (https://portal.ct.gov/DOC), scroll down to “Forms” then “Security Background Questionnaire”. It is recommended that the approved form be brought as evidence of approval to attend the Pre-Bid Meeting.
1.11.2 When a Pre-Bid Meeting is “strongly encouraged”, all attendees shall sign his or her name to the official roster and list the name and address of the company he or she represents.
1.11.3 When a Pre-Bid Meeting is MANDATORY, all attendees will be required to register. Proper registration means that the attendee has signed his or her name to the official roster and listed the name and address of the company he or she represents on the official roster no later than the designated start time of the MANDATORY Pre-Bid Meeting. Bidders are advised to register early as no attendee will be allowed to register after the advertised start time of the MANDATORY Pre-Bid Meeting.
All bids submitted by all contractors who have not properly registered and attended the MANDATORY Pre-Bid Meeting shall be rejected as non-responsive.
1.12 Pre-Bid Equals and/or Substitutions Requests Procedures:
1.12.1 All submissions requesting “Equals and/or Substitutions” shall be made by the Bidder in accordance with Section 01 25
00 Substitution Procedures of the Division 01 General Requirements and Article 15, Materials: Standards of Section 00 72 13 General Conditions. Every submission shall contain all the information necessary for the Awarding Authority to evaluate the submission and the request.
Failure to submit sufficient information to make a proper evaluation, including submittal of data for the first manufacturer listed as well as the data for the “Equals and/or Substitutions” proposed, shall result in a rejection of the submission and request.
Upon receipt of the submission and request, the Awarding Authority shall notify the Bidder that the request has been received and as soon as possible shall render a decision on such submission and request.
.1 Projects with Federal Financial Assistance: All requests for “Equals and/or Substitutions” must include a “BABA…
This is the start of the file's text. The full file is on GovTribe.