This document is LBNL's response to a bidder question regarding missing BOMs (Bills of Materials) and documentation for five Bipolar Power Converter assemblies under RFP MG-02122026, dated February 18, 2025.
LBNL clarifies that all required BOMs and data files are provided in .zip files organized by assembly and sub-component type. For each of the five assemblies (Items 1-5), documentation is structured in three tiers: top-level assembly files, mechanical fabrication/assembly files (including chassis, metalwork, and harnesses), and electrical fabrication/assembly files (including printed circuit boards and electrical components). Each assembly includes a Document Control List (DCL) with corresponding LBNL reference numbers. LBNL also corrects the assembly part numbers in the vendor-provided table, with corrected numbers highlighted in red in Table 1. The mechanical and electrical files are dated 05-20-2025 and 05-21-2025 respectively, with file dates for Item 2's electrical files listed as 05-12-2025. All five assemblies have corresponding LBNL internal reference numbers (AL-1821-XXXX) to facilitate tracking and retrieval of the complete technical documentation packages.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LBNL Response to Question 01 Re: LBNL RFP MG-02122026 – 02/18/2025
1. Looked at all files, and there are no BOMs (part list) and documents/data files for the following assemblies listed below.
Per their ECO’s, all list more than 1 sub-assembly.
ITEM # Assy Part
Number Number Rev Description Assy Description ???
1 BPC-2CH-S-
18V-24A
LT-EL-SR-PS-CRR-
6201-10
E Bipolar Power Converter
BPC-2CH-S-18V-24A
Bipolar Power Converter
2 BPC-4CH-S-
18V-10A
LT-EL-SR-PS-CRR-
6201-10
Bipolar Power Converter
BPC-4CH-S-18V-10A
3 BPC-2CH-S-
16V-35A
LT-EL-SR-PS-CRR-
6203-10
B Bipolar Power Converter
BPC-2CH-S-16V-35A
4 BPC-1CH-F-
16V-70A
LT-EL-SR-PS-CRR-
6201-10
B Bipolar Power Converter
BPC-1CH-F-16V-70A
5 BPC-1CH-S-
16V-200A
LT-EL-SR-PS-CRR-
6103-10
B Bipolar Power Converter
BPC-1CH-S-16V-200A
LBNL Response:
a) Please note that the .zip files listed in Table 1 below include the BOMs and data files required for Mechanical and Electrical Fab/Assem.
b) LBNL Files for ITEMS 1.3, 2.3, 3.3, 4.3, 5.3 contain the BOMs and data files for electrical components, including printed circuit boards, Fab/Assembly
c) LBNL Files for ITEMS 1.2, 2.2, 3.2, 4.2, 5.2 contain the BOMS and data files for mechanical components, including chassis, metal work, harnesses, etc.
d) The Assy P/N highlighted in RED is the corrected number; the vendor-provided table had these in error
TABLE 1
ITEM Assembly Assy P/N REV/File Date
Description LBNL #
1 BPC-2CH-S-
18V-24A
LT-EL-SR-PS-CRR-
6201-10
E Top Level Assembly
1.1 DCL-LT-EL-SR-PS-
CRR-6201-10_REV-E
E Document Control List (DCL)
AL-1821-0504
1.2 Mechanical Files xxx
For BPC.zip
05-20-2025 All Mechanical Fab/Assem files
AL-1821-0507
1.3 Electrical Files xxx for
BPC.zip
05-21-2025 All Electrical Fab/Assem files
AL-1821-0505
2 BPC-4CH-S-
18V-10A
LT-EL-SR-PS-CRR-
6401-10
G Top Level Assembly
2.1 DCL-LT-EL-SR-PS-
CRR-6401-10_REV-G
G Document Control List(DCL)
AL-1821-0508
2.2 Mechanical Files xxx
For BPC.zip
05-14-2025 All Mechanical Fab/Assem files
AL-1821-0513
2.3 Electrical Files xxx for
BPC.zip
05-12-2025 All Electrical
AL-1821-0510
3 BPC-2CH-S-
16V-35A
LT-EL-SR-PS-CRR-
6203-10
B Top Level Assembly
3.1 DCL-LT-EL-SR-PS-
CRR-6203-10_REV-B
B Document Control List(DCL)
AL-1821-0501
3.2 Mechanical Files xxx
For BPC.zip
05-20-2025 All Mechanical Fab/Assem files
AL-1821-0503
3.3 Electrical Files xxx for
BPC.zip
05-21-2025 All Electrical
AL-1821-0502
4 BPC-1CH-F-
16V-70A
LT-EL-SR-PS-CRR-
6102-10
B Top Level Assembly
4.1 DCL-LT-EL-SR-PS-
CRR-6102-10_REV-B
B Document Control List(DCL)
AL-1821-0492
4.2 Mechanical Files xxx
For BPC.zip
05-20-2025 All Mechanical Fab/Assem files
AL-1821-0495
4.3 Electrical Files xxx for
BPC.zip
05-21-2025 All Electrical
AL-1821-0494
5 BPC-1CH-S-
16V-200A
LT-EL-SR-PS-CRR-
6103-10
B Top Level Assembly
5.1 DCL-LT-EL-SR-PS-
CRR-6103-10_REV-B
B Document Control List(DCL)
AL-1821-0498
5.2 Mechanical Files xxx
For BPC.zip
05-20-2025 All Mechanical Fab/Assem files
AL-1821-0500
5.3 Electrical Files xxx for
BPC.zip
05-21-2025 All Electrical
AL-1821-0959