2) Sample SubK Bipolar Converters.pdf

PDF 316 KB Posted

Attached to
Storage Ring (SR) Bipolar Power Converter (BPC)
Solicitation number
MG-02122026
Issued by

About this file

This is a fixed-price subcontract from The Regents of the University of California (Lawrence Berkeley National Laboratory) for the production and delivery of completed assemblies for five custom models of Bipolar Power Converters for the Advanced Light Source Upgrade (ALS-U) Power Supply System. The subcontract is issued under Department of Energy Prime Contract No. DE-AC02-05CH11231 and classified under NAICS code 334418 (Printed Circuit Assembly Manufacturing).

The subcontract requires delivery of first article units for five converter models (BPC-2CH-S-18V-24A, BPC-4CH-S-18V-10A, BPC-2CH-S-16V-35A, BPC-1CH-F-16V-70A, and BPC-1CH-S-16V-200A) by June 16, 2026, followed by production quantities totaling 358 units across all five models with final delivery by November 10, 2026. The subcontractor must perform all work at the same facility where first articles are produced and is subject to University inspection rights at all manufacturing phases. All electrical equipment must be NRTL-certified per OSHA standards. Payment is structured as a fixed price with invoicing required within 30 days of item acceptance, subject to a 15-day payment term. The allocated funding amount is currently limited to TBD with anticipated increases as funding becomes available, though the University is not obligated to fund beyond the current allocation. The subcontractor must submit monthly project schedule updates and comply with extensive environmental and sustainability requirements including e-waste recycling certification, packaging standards, and prohibition of foam materials. The University Procurement Representative is Martha Gamarano Grausz at (510) 486-6618, and the Technical Representative is TBD.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontract No. TBD Page 1

SUBCONTRACT

NO. TBD

The Regents of the University of California Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720

Subcontractor:

TBD

Attention: TBD Address: TBD City, State Phone: TBD E-Mail: TBD

University Procurement Representative:

Name: Martha Gamarano Grausz Title: Sr. Subcontracts Administrator Phone: (510) 486-6618 E-Mail: MGGrausz@lbl.gov

Introduction This is a fixed price Subcontract (hereinafter "Subcontract") for production work required to provide completed assemblies for five (5) custom models of the Bipolar Power Converters for the Advanced Light Source Upgrade (ALS-U) Power Supply System, as further described herein. The North American Industry Classification System (NAICS) for this acquisition is 334418 Printed Circuit Assembly (Electronic Assembly) Manufacturing.

This Subcontract is between The Regents of the University of California, (hereinafter "University") and the party identified above as the "Subcontractor".

This Subcontract is issued under Prime Contract No. DE-AC02-05CH11231 between the University and the United States Government (hereinafter "U.S. Government"), represented by the Department of Energy (hereinafter "DOE") for the management and operation of the Lawrence Berkeley National Laboratory (hereinafter "LBNL") and the performance of certain research and development work.

Agreement The parties agree to perform their respective obligations in accordance with the terms, conditions, and provisions of the attached SCHEDULE OF ARTICLES and the documents referenced or incorporated therein, which together with this Signature Page shall collectively constitute the entire Agreement and shall supersede all prior negotiations, representations, or agreements, whether verbal or written.

TBD

THE REGENTS OF THE

UNIVERSITY OF CALIFORNIA

By:

By:

Name:

Name:

Title:

Title:

Date:

Date:

Subcontract No. TBD Page 2

SCHEDULE OF ARTICLES

ARTICLE 1 – ORDERED ITEMS

Description The Subcontractor shall furnish and deliver the following ordered item(s), in accordance with this Subcontract:

First Article Items Item

Item ID/Description Quantity UOM Price Extended Amount

Delivery Schedule:

BPC-2CH-S-18V-24A 1 EA $TBD $TBD By

06/16/2026

2 BPC-4CH-S-18V-10A 1 EA $TBD $TBD By 06/16/2026

3 BPC-2CH-S-16V-35A 1 EA $TBD $TBD By 06/16/2026

4 BPC-1CH-F-16V-70A 1 EA $TBD $TBD By 06/16/2026

5 BPC-1CH-S-16V-

200A 1 EA $TBD $TBD By

06/16/2026 Production Items

Item # Description Quantity UOM Price Extended

Amount Delivery Schedule:

1 BPC-2CH-S-18V-24A 27 EA $TBD $TBD By 11/10/2026

2 BPC-4CH-S-18V-10A 153 EA $TBD $TBD By 11/10/2026

3 BPC-2CH-S-16V-35A 48 EA $TBD $TBD By 11/10/2026

4 BPC-1CH-F-16V-70A 103 EA $TBD $TBD By 11/10/2026

5 BPC-1CH-S-16V-

200A 27 EA $TBD $TBD By

11/10/2026

Total Subcontract Amount: $TBD

The above delivery schedule identifies the date(s) by which the specified item(s) shall be delivered to the shipping address indicated in the article below entitled Shipping Requirements.

Acceptance Acceptance of the items described above is based upon successful completion of the acceptance criteria per the Statement of Work (SOW) AL-1823-1141 SR BPC Procurement SOW, Rev. D, dated 11/17/2025, incorporated into this Subcontract.

Electrical Device Certification Requirement All electrical equipment, components, conductors and other items delivered to the University, or to any subcontractor facility or remote work location, of the type requiring testing by a Nationally Recognized Testing Laboratory (NRTL) recognized by the Occupational Safety and Health Administration (OSHA)

Subcontract No. TBD Page 3 shall be NRTL listed, labeled, and certified in accordance with Part 1910, Occupational Safety and Health Standards, of Title 29 of the Code of Federal Regulations (29 CFR 1910). The Subcontractor shall notify the Technical Representative, TBD, in writing, of any item to be delivered that does not meet this requirement. The University reserves the right to refuse delivery of or return any such items. Information on required NRTL testing is available at https://www.osha.gov/nationally-recognized-testing-laboratory-program.

Notice to Proceed The following documents shall be submitted to the University. Acceptable documents, as determined by the University, must be submitted, and a Notice to Proceed must be issued before any work may commence, unless otherwise noted below.

• Hold Point (HP) – The Subcontractor must not proceed beyond a hold point (HP) per the incorporated Statement of Work (SOW) AL-1823-1141 SR BPC Procurement SOW, Rev. D, dated 11/17/2025, Section 4.4 – Hold Points and what is required, without a formal written Notice to Proceed (NTP).

ARTICLE 2 – PRICE AND PAYMENT

Fixed Price The Subcontractor shall furnish and deliver the ordered item(s) for the total fixed price of $TBD.

Sales or Use Tax Items purchased by the University hereunder are treated as for resale, per the University's California State Resale Permit No. SR-CH 21-835970 for LBNL, and shall not be subject to any California or other State sales or use tax if shipped to California. Any items furnished hereunder for rentals or leases are subject to California State sales or use tax, and such tax is included in the fixed prices/rates stated herein.

The University of California State Resale Permit No. SR-CH 21-835970 for LBNL is available at:

http://procurement.lbl.gov/supplier-forms/.

Invoices

• The Subcontractor shall email invoice(s) directly to the LBNL Accounts Payable Office at APInvoice@lbl.gov, within thirty days of the acceptance of the item(s). The "subject" line of the email shall state the Subcontractor's name and the Subcontract number. If final invoices are not submitted within 180 days of acceptance, then any amounts paid by the University to that point will represent satisfaction in full by LBNL under this Subcontract and an Accord and Satisfaction.

This means that LBNL will not be obligated to make any further payments under this Subcontract.

To avoid delays in processing and payment, Subcontractors should include only one attachment per email. Multiple invoices should be combined and attached as a single portable document format (PDF) or Microsoft Word or rich text format (RTF) file (up to 30 individual invoices per attachment) or emailed separately (one attachment per email). Do not include icons/pictures in the email (logos, etc.), and ensure only one subcontract number is listed on the invoice.

• Invoice(s) shall state: the Subcontract number; the Subcontractor (including business heading or logo); bill to address (same address as above); invoice date; unique invoice number; remittance address; sufficiently identify the items/services being invoiced; and identify any separately payable freight charges (with receipts if available) and taxes. Invoice(s) in a spreadsheet format are not http://procurement.lbl.gov/supplier-forms/ mailto:APInvoice@lbl.gov

Subcontract No. TBD Page 4 acceptable, but a spreadsheet can be used to support an invoice. The Subcontractor shall maintain records which support all invoiced amounts, and provide them to the University Procurement Representative upon request.

Payment Terms All invoices except the final invoice shall be payable within 15 days of receipt if the invoice submission is complaint with the subcontract requirements for invoicing; provided, however, that payments made thereafter shall not be subject to any penalty, interest, or late charges. Only those items/services identified in this Subcontract or a Subcontract Modification will be considered for payment. Payment amounts may be adjusted for any applicable credits, offsets, or withholds. Full payment shall not be due until any final acceptance requirements of this Subcontract have been satisfied. For inquiries about the status of an invoice, call (510) 486-6954 or aphelp@lbl.gov.

Allocated Funding Limit

• The funding presently allocated for payment to the Subcontractor under this Subcontract is limited to $TBD. The allocated funding amount covers the completion of TBD.

• It is anticipated that the University will increase this allocated funding amount up to the total fixed price of this Subcontract as funding becomes available, excluding unexercised options;

however, the University shall not be obligated to do so beyond the currently funded amount. The allocated funding amount may be unilaterally changed by the University Procurement Representative by issuance of a written modification to this Subcontract.

• The allocated funding amount specified above shall be the limit of the University's liability for all costs under this Subcontract, any other provision to the contrary notwithstanding. The Subcontractor is not authorized to proceed beyond the point where the amount payable by the University (the price of services the allotted funds cover) equals the amount of the funds allocated. The Subcontractor is not obligated to continue performance under this Subcontract or otherwise incur cost or expenses in excess of the allocated funding amount. The Subcontractor shall notify the University in writing at least five working days prior to stopping work to avoid exceeding the allocated funding amount.

• If the University provides funding in accordance with the milestone/payment/deliverable funding schedule, the subcontractor is required to perform and deliver the entire scope of work covered by the fixed price regardless of the rate at which the subcontractor progresses, incurs costs, or expects to experience profit or loss, and the University will pay the subcontractor the entire fixed price for the action, subject to other terms and conditions of the subcontract.

ARTICLE 3 – SUBCONTRACT ADMINISTRATION

Notices, Requests, and Modifications The Subcontractor shall submit all notices and requests for approval by email to the University Procurement Representative indicated on the signature page.

Only the University Procurement Representative is authorized to modify the terms, conditions, and requirements of this Subcontract, including any changes to the description of the work, and to issue any notices and approvals required by this Subcontract. Certain changes to this subcontract may be made only by the University Procurement Representative without subcontractor agreement or negotiation prior to the change. Such changes may include: changes of an administrative nature, directed changes pursuant to the clause incorporated herein entitled: “CHANGES,” unilateral modifications authorized by clauses other than the Changes clause, and termination notices. Apart from the University Procurement Representative’s

Subcontract No. TBD Page 5 authority to issue unilateral changes, the parties may mutually agree to make changes in the work ordered, or modify any other term or condition of the subcontract, resulting in an amendment to the subcontract, but only by a written modification signed by the authorized representatives of both parties.

Technical Representative TBD is the Technical Representative for this Subcontract. This individual is designated to monitor performance of the work and to interpret and clarify the technical requirements, but is not authorized to make changes to the work or to modify any of the terms and conditions of this Subcontract, including those related to the completion schedule or pricing.

TBD

techrep@lbl.gov

(510) XXX-XXXX

Technical Direction and Changes Performance of the work under this Subcontract shall be subject to the technical direction of the University Technical Representative. The Subcontractor shall promptly proceed with the performance of technical direction of the nature prescribed by this article issued by the University Technical Representative.

The term "technical direction" is defined to include directions to the Subcontractor within the Scope of Work of the Subcontract which: (1) clarify the desired work emphasis between work areas or tasks; (2) direct the pursuit of certain lines of inquiry; (3) assist in the interpretation of drawings, specifications, or technical portions of the work description; or (4) fill in details necessary to perform and complete the Scope of Work. All technical directions must be issued in writing by the University Technical Representative.

The University Technical Representative is not authorized to issue any technical direction which would:

(1) constitute an assignment of work outside the general scope of the work covered by this Subcontract;

(2) change the description of the work to be performed or any applicable drawings, designs, and specifications; (3) change the time or place of performance; the method of shipment or packaging, or the place of inspection, delivery or acceptance; (4) increase the estimated cost for performance of the work, the fixed fee, or the time required for performance of the work; (5) change any expressed term or condition of the Subcontract; or (6) unreasonably interfere with the Subcontractor’s ability to perform and complete the work.

Any such technical direction must first be authorized by a written modification to this Subcontract issued by the University Procurement Representative, as provided in the clause of these General Provisions entitled Changes.

If any instruction or direction by the University Technical Representative falls within one of the types described in the paragraph above, the Subcontractor shall not proceed to act on such technical direction and shall promptly notify the University Procurement Representative. Upon receipt of a notification from the Subcontractor, the University Procurement Representative shall promptly advise the Subcontractor either that, in accordance with the Changes clause: (1) the technical direction is within the general scope of the Subcontract and does not constitute a change and to proceed to act on such technical direction; or

(2) the technical direction is not within the general scope of the Subcontract or would constitute a change, and to not act on such technical direction unless and until the University issues a written modification to the subcontract.

Subcontract No. TBD Page 6

Closeout The Subcontractor shall, as a condition of full payment, assist the University after the completion of the work in accomplishing the administrative closeout of this Subcontract, including, as necessary or required, the furnishing of documentation and reports, the disposition of property, the disclosure of any inventions, the execution of any required documents (including an Assignment and Release form if this form is an incorporated document), the performance of any audits, and the settlement of any interim or disallowed costs.

ARTICLE 4 – FURNISHED AND ACQUIRED PROPERTY

The University will not furnish any U.S. Government Property for use under this Subcontract and no Subcontractor Acquired Property is anticipated. The Subcontractor is not authorized to acquire, fabricate, or provide any tangible personal property items for use under this Subcontract without the University Procurement Representative's advanced written approval via Subcontract modification. The Subcontractor is required to notify the University prior to purchasing any Subcontractor Acquired Property and assumes the risk of not being reimbursed for property if approvals are not provided by the University in advance via Subcontract modification.

ARTICLE 5 – SHIPPING REQUIREMENTS

Shipping Terms The shipping terms are FOB Destination, Freight Prepaid and Add. All shipments shall be shipped via a licensed common carrier selected by the Subcontractor, at the University's expense.

Shipping Value Items shall be shipped at the maximum declared value for the lowest applicable transportation rate or classification, and the bill of lading shall note it as such.

Shipping Cost The Subcontractor is required to declare the full value of the item(s) when shipped.

Airway bills shall be marked with the appropriate “Government Package” entry. Shipping costs in excess of those per the shipping instructions specified in the Subcontract shall be deducted from the Subcontractor’s invoice.

Shipping Address All shipments shall be shipped to the following address:

Brookhaven National Laboratory Attn: Jerome Malley 98 Rochester Street Building 744 Rm 149 Upton, NY 11973

Shipping Point

Subcontract No. TBD Page 7

The shipping point is: TBD

ARTICLE 6 – REPORTS

Type of Reports The Subcontractor shall prepare and submit the following reports to the University:

• Reports as identified within the Statement of Work Reports as identified within the Statement of Work (SOW) AL-1823-1141 SR BPC Procurement SOW, Rev. D, dated 11/17/2025, Section 4.1 - Reporting/Communication requirements, shall be prepared and submitted in accordance with the instructions provided therein. In addition to what is listed in the SOW, monthly full project plan Gantt schedule updates, including procurement, fabrication, assembly, inspection/testing activities & deliveries, will be required.

Submittal.

Reports shall be separately submitted to the following recipients at the following email addresses:

Recipient Email Tech Rep TechRep@lbl.gov Name Name@lbl.gov Name Name@lbl.gov Martha G. Grausz mggrausz@lbl.gov

ARTICLE 7 – APPROVAL OF TECHNICAL DATA

If this Subcontract requires the Subcontractor to furnish any drawings, specifications, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance or test data, or other technical data for approval by the University prior to Subcontractor performance, the approval of the data by the University shall not relieve the Subcontractor from responsibility for any errors or omissions in such data or from responsibility for complying with the requirements of this Subcontract, except as specified below.

Any work done prior to such approval shall be at the Subcontractor's risk.

Unless otherwise specified, the University requires a period of 10 working days from the date of receipt to review and approve the data. If the University does not approve the data within the allotted time period, the parties will establish a new time period for review and approval of the data, and, if necessary, the delivery schedule or completion date will be equitably adjusted.

If the data includes any variations from the Subcontract requirements, the Subcontractor shall describe such variations in writing at the time of submission of the data. If the University approves any such variation(s), a change order to the Subcontract shall be issued by the University and, if appropriate, a bilateral modification to the Subcontract shall be negotiated.

ARTICLE 8 – PRELIMINARY INSPECTION

The University reserves the right to observe and witness all phases of the manufacturing of the items, including design, fabrication, assembly, testing, and inspection, conducted at the Subcontractor's facility or at any of its sub-tier subcontractors' facilities.

Subcontract No. TBD Page 8

Preliminary in-process and source inspections may be performed at the Subcontractor's facility or at any of its sub-tier subcontractors' facilities. The inspection shall allow the University to verify that the Subcontractor has met the requirements of this Subcontract. Prior to University inspection, the Subcontractor shall perform a complete inspection and document the results. The Subcontractor shall present this documentation to the University at the time of the preliminary inspection. Such preliminary inspection does not waive the right of the University to inspect and accept or reject at the destination. The University reserves the right to subcontract with a qualified third party to conduct on its behalf any or all of the University inspections.

ARTICLE 9 – ENVIRONMENTALLY PREFERABLE PRODUCTS AND SERVICES

The Laboratory is subject to several interacting initiatives and federal and DOE requirements related to sustainability, including waste reduction, Recycled Content Products (EPA Designated Products), Biobased (BioPreferred®), energy efficient products (EnergyStar®), environmentally preferable and energy efficient electronics (Federal Energy Management Program (FEMP) Designated Products), and Non-Ozone Depleting Alternative Products (SNAP). The Laboratory also implements State of California requirements on packaging and electronic waste recycling.

The subcontractor must deliver products and services in compliance with this article which implements the requirements of DOE’s Sustainable Acquisition Program, as well as other federal- and state-mandated sustainability requirements.

In the performance of this Subcontract, the Subcontractor must specify, furnish, and use environmentally preferable products and services (i.e., products and services with a lesser or reduced effect on human health and the environment), to the maximum possible extent consistent with the Subcontract requirements herein, the General Provisions, and the intended end use of the products or services.

The subcontractor must maximize, to the extent feasible, the procurement of materials and operations with lower embodied emissions and alternatives to ozone-depleting substances and high global warming potential hydrofluorocarbons.

The subcontractor must minimize, to the extent feasible, the supply of products and services determined by the EPA to be contaminants of emerging concern (CEC), including pharmaceuticals and personal care products and CECs found therein.

The subcontractor must minimize the supply of products with toxic and hazardous characteristics, and minimize the generation of toxic and hazardous waste, to the maximum extent practicable.

E-Waste Recycling Requirements. All recyclers of electronic equipment must be e-Steward certified by the Basel Action Network (BAN).

For any equipment removed by the subcontractor and scheduled to be refurbished or recycled, the subcontractor must attest that those actions will be handled by a refurbisher or recycler that is third-party certified to one of the known electronics recycling certification programs that is used in the United States, the Responsible Recycling Standard (R2) or the E-Stewards Standard.

Subcontract No. TBD Page 9

State of California sustainable procurement information can be found at: https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html

Questions regarding these sustainable acquisition requirements may be directed to the Laboratory Sustainable Procurement Representative (Business-Assurance-Sustainable@lbl.gov).

Packaging The subcontractor must minimize the supply of single use items including single-use plastic foodware (e.g., plates, cups, utensils, beverage bottles and bags).

The subcontractor must make good faith efforts to utilize smart-size packing; to customize box sizes in order to reduce packaging waste, and to minimize the number of shipments per order. Recycling practices and methods should be used to minimize the adverse effects on the environment. The subcontractor must use every reasonable effort to use cardboard and paper-based packaging materials for shipments to the Laboratory.

Packaging Requirements All packaging must be compliant with the California Toxics in Packaging Prevention Act (California AB 455). and must meet all additional standards and requirements set forth in the UC Sustainable Practices Policy. In addition, the Laboratory requires that all packaging meet at least one of the criteria listed below:

• Uses bulk packaging;

• Uses reusable packaging (e.g. totes reused by delivery service for next delivery);

• Uses innovative packaging that reduces the weight of packaging, reduces packaging waste, or utilizes packaging that is a component of the product;

• Maximizes recycled content and/or meets or exceeds the minimum post-consumer content level for packaging in the U.S. Environmental Protection Agency Comprehensive Procurement Guidelines;

• Uses locally recyclable or certified compostable material.

Foam packaging is prohibited as follows:

• Foam Ban – Food Service Packaging - The Laboratory does not allow packaging foam or expanded polystyrene (EPS) for takeaway containers or other food service items, in any University-owned or -operated food service facility.

• Foam Ban – Product Packaging - The Laboratory prohibits all subcontracted and non-subcontracted suppliers from selling or distributing packaging foam (other than that utilized for laboratory supply or medical packaging) to the Laboratory. Packaging foam is defined as any open or closed cell, solidified, polymeric foam used for cushioning or packaging, including but not limited to: low-density polyethylene foam, polypropylene foam, polystyrene foam (i.e. EPS), polyurethane foam, polyethylene foam, polyvinyl chloride (PVC) foam, and microcellular foam.

Not included in this ban are easily biodegradable, plant-based foams such as those derived from corn or mushrooms.

ARTICLE 10 – FIRST ARTICLE APPROVAL

The Subcontractor shall deliver to the University for testing the first article units BPC-2CH-S-18V-24A, BPC-4CH-S-18V-10A, BPC-2CH-S-16V-35A, BPC-1CH-F-16V-70A, and BPC-1CH-S-16V-200A as stated in Article 1 of this Subcontract.

https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html mailto:Business-Assurance-Sustainable@lbl.gov

Subcontract No. TBD Page 10

The shipping documentation shall contain this Subcontract number and the item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this Subcontract.

Within 2 weeks after receiving the first article, the University shall notify the Subcontractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Subcontractor from complying with all requirements of the specifications and all other terms and conditions of this Subcontract. A notice of conditional approval shall state any further action required of the Subcontractor. A notice of disapproval shall cite reasons for the disapproval.

If the first article is disapproved, the Subcontractor, upon the University's request, shall submit an additional first article for testing. After each request, the Subcontractor shall make any necessary changes, modifications, or repairs to the first article or select another unit for first article testing. All costs related to these tests are to be borne by the Subcontractor, including any and all costs for additional tests following a disapproval. The Subcontractor shall furnish any additional first article under the terms and conditions and within the time specified by the University. The University shall act on the first article within the time specified in paragraph C, above. The University reserves the right to require an equitable adjustment of the Subcontract price for any extension of the delivery schedule or for any additional costs to the University related to these tests.

If the Subcontractor fails to deliver any first article on time, or the University disapproves any first article, the Subcontractor shall be deemed to have failed to make delivery within the meaning of the termination for default provisions of this Subcontract.

If the University does not act within the time specified in the previous two paragraphs, the University shall, upon timely written request from the Subcontractor, equitably adjust the delivery or performance dates and/or the Subcontract price and any other subcontractual term affected by the delay.

Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the Subcontract quantity is at the sole risk of the Subcontractor. Before first article approval, the costs thereof shall not be allocable to this Subcontract for (1) progress payments, or

(2) termination settlements if the Subcontract is terminated for the convenience of the University.

The Subcontractor shall produce both the first article and the production quantity at the same facility.

The Subcontractor shall remove and dispose of any first article from the University test facility at the Subcontractor’s expense if the first article is not included in the subcontract purchased quantity or is rejected by the University.

ARTICLE 11 – REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED

COMPUTER SOFTWARE

The Federal Acquisition Regulation clause FAR 52.214-14, RIGHTS IN DATA-GENERAL, is incorporated by reference as part of this Subcontract. Under the clause, the Subcontractor may withhold from delivery data that qualify as limited rights data or restricted computer software, and deliver form, fit, and function data instead. By acceptance or performance of this Subcontract, the Subcontractor certifies that none of the data proposed for fulfilling the data delivery requirements qualifies as limited rights data or restricted computer software. If the Subcontractor believes data to be provided for fulfilling the data delivery requirements under this Subcontract qualify as limited rights data or restricted computer software, Subcontract No. TBD Page 11 the Subcontractor must notify the University procurement representative and the University technical representative identified in the Subcontract, within 10 days of award and identify such data.

ARTICLE 12 – INCORPORATED DOCUMENTS

The following documents are hereby incorporated as a part of this Subcontract. The order of precedence for each document must be as specified in the Entire Agreement and Order of Precedence clause in the General Provisions. Any other documents not incorporated herein by specific reference are excluded from this Subcontract. The documents marked with an asterisk are available at http://procurement.lbl.gov/supplier-forms/.

• AL-1823-1141 SR BPC Procurement SOW, Rev. D, dated 11/17/2025

• AL-1823-0958 Bipolar Power Converter (BPC-1CH-F-16V-70A) SR, Rev. A, dated 06/20/2025

• AL-1823-0959 Bipolar Power Converter (BPC-1CH-S-16V-200A) SR, Rev. A, dated

06/20/2025

• AL-1823-0961 Bipolar Power Converter (BPC-2CH-S-16V-35A) SR, Rev. A, dated 06/20/2025

• AL-1823-0962 Bipolar Power Converter (BPC-2CH-S-18V-24A) SR, Rev. A, dated 06/20/2025

• AL-1823-0963 Bipolar Power Converter (BPC-4CH-S-18V-10A) SR, Rev. A, dated 06/20/2025

ARTICLE 13 – GENERAL PROVISIONS

The following General Provisions are incorporated by reference into this Subcontract and are available at:

http://procurement.lbl.gov/welcome-to-procurement-property/become-a-supplier/general-provisions/.

General Provisions for Commercial Supplies & Services, dated 01/31/25

The clauses listed in the referenced General Provisions shall be applicable to this Subcontract, based on the value of the Subcontract, the status of the Subcontractor, or the nature and location of the Services, as indicated in the General Provisions.

The cost accounting standards requirements do not apply to this Subcontract. Accordingly, the related clauses of the General Provisions (FAR 52.230-2, -3, -5, and -6) shall not apply.

(END OF SCHEDULE OF ARTICLES)

http://procurement.lbl.gov/supplier-forms/ http://procurement.lbl.gov/welcome-to-procurement-property/become-a-supplier/general-provisions/

Article 4 – FURNISHED AND ACQUIRED PROPERTY
Article 6 – REPORTS

File details come from the government source that posted it. Updated .