This document is a construction specification and project manual for the Meriden Public Library Exterior Envelope Weatherization Repairs, prepared by O'Riordan Migani Architects LLC for the City of Meriden, Connecticut. The project involves comprehensive exterior repairs focusing on weatherization, including concrete and masonry cleaning, joint sealant repairs, and elastomeric sheet waterproofing for the library located at 105 Miller Street. The specifications detail technical requirements for cleaning masonry surfaces using medium pressure spray, replacing deteriorated exterior weather sealants at various building penetrations, and addressing existing EPDM roofing system components. The project is dated 01-21-25 and is marked as an owner's 90% review copy, not for construction.

The specification documents outline precise technical requirements for contractors, including specific cleaning solutions, pressure ratings, surface preparation techniques, and installation standards. The existing roof is a Firestone EPDM system with a warranty from 05/16/2023, and the project mandates that any new work must be compatible with the current warranty. The roofing trade subcontractor must be certified as a Firestone designated system installer and will be required to inspect the entire roof at all levels. The project encompasses multiple roof levels, including Level 1, Level 1.25, Level 1.5, Level 2, and a mechanical penthouse, with specific attention to HVAC wells, louvers, and parapet conditions. Photographic documentation is extensively included to guide contractors in understanding the current building conditions and required repair areas.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared By: Drawing Index O'Riordan Migani Architects LLC Architecture, Planning & Urban Design 22 Bank Street, Seymour, CT 06483, P(203) 888-7667

Location Map

23264.101-21-25

Meriden Public Library Exterior Envelope Weatherization Repairs

Thomas J. Welsh, Library Board President

Kevin Scarpati, Mayor City of Meriden, 142, East Main Street, Meriden, CT 06450

Meriden Public Library, 105 Miller Street, Meriden, CT 06450 Meriden Public Library

23264.1

A001 SCOPE OF WORK & OUTLINE SPECIFICATIONS

A101 WORK SCOPE REFERENCE PLAN

A102 PHOTO REFERENCE ROOF PLAN

A103 PHOTO REFERENCE

A104 PHOTO REFERENCE

A105 PHOTO REFERENCE

OWNER 90% REVIEW COPY

NOT FOR ISSUE, NOT FOR ONSTRUCTION

01-21-25

Scope Description & Specifications

General Notes:

1. This project entails limited scope weatherization improvements to the Meriden Public Library located at 105 Miller Street, Meriden, Connecticut 06450. The purpose of the project is to address random water penetration through exterior building assemblies.

2. The Meriden Public Library is a 53,000 SF two story structure. The original 45,000 SF building was built in 1973 and an 8,000 SF addition was completed in 2023. The 2023 addition was designed by TSKP Studio Architects and built by Montagno Construction at a cost of approximately $13,200,000. The entire roof was replaced as part of the 2023 renovation, modernization and expansion project.

3. The project team is as follows:

a. Owner Representative

Richard Doucette Supervisor of Maintenance City Hall 142 East Main Street, Meriden, CT 06450 O 203.603.4155 C 203 537 1093 Email: rdoucette@meridenct.gov

b. Architect Joseph Migani, Senior Architect O'Riordan Migani Architects LLC 22 Bank Street, Seymour, CT 06483 O 203 888 7667 C 203 668 7985 Email: jcm@omarchitects.com

4. The Contractual Scope of Work includes, but is not limited to the following:

a. Staging and access to the building exterior including all elevations and roof as required to implement the work.

b. Inspection of all exterior joints and material assembly seams entire building.

c. Repair and/or replacement exterior joints and material assembly seams entire building.

d. Cleaning, tuck pointing if required, and then sealing all exterior concrete and masonry on the entire building.

e. Coordination with / notification of EPDM Roof System

(2023) warranty provider and roofing trade subcontractor installer that random leaking has occured and that an active field investigation and determination is underway to locate and address portential sources of water penetration into the building at various locations.

Repair of any found conditions by Firestone qualified roofer without voiding the existing roof system warranty.

5. Work shall be performed on a fully occupied public building and the General Contractor shall assume responsibility for staging the work in such a manner as to protect the public health, safety and welfare.

6. The General Contractor shall comply with all applicable codes, ordinances and regulations in performing the work.

7. The Contractor shall comply with all safe work place requirements and practices established by OSHAE .

8. The Contractor shall assume that there is no asbestos or lead paint hazardous materials contained within roof and exterior wall assemblies.

9. All materials removed from building shall disposed in compliance with applicable code, standards, ordinances or regulation.

10. The General Contractor shall maintain a digital photographic record of the project and deliver color prints and jpeg files of same on a USB stick to both the Architect and the Owner upon completion of project.

Specifications:

1.0.0 General Requirements

1.1.0 This project shall be implemented through a

purchase order issued by the office of the City of Meriden Finance Office, Rawle Dummett, Purchasing Officer, O 203 630 4115 email: rdummett@meridenct.gov.

2.0.0 Concrete & Masonry Cleaning

2.1.0 Summary - Includes cleaning of masonry and stone

surfaces.

2.2.0 Preinstallation Meeting - GC to prepare minimum

100 SF sample cleaning area for onsite review with Architect prior to implementing the work.

2.3.0 Definitions - Utilize Medum Pressure Spray (400 to

800 psi).

2.4.0 Quality Assurance – Prepare an approximately 25

SF mockup of cleaned area for each type of masonry and surface condition.

2.5.0 Cleaning Materials - Use potable water heated to a

temperature of 140 deg F with job mixed detergent solution prepared by mixing 2 cups (0.5 L) of tetrasodium pyrophosphate (TSPP), 1/2 cup (125 mL) of laundry detergent, and 20 quarts (20 L) of hot water for every 5 gal. (20 L) of solution required.

2.6.0 Protection - Comply with each manufacturer's

written instructions for protecting building and other surfaces against damage from exposure to its products. Prevent paint removers and chemical cleaning solutions from coming into contact with people, motor vehicles, landscaping, buildings, and other surfaces that could be harmed by such contact.

2.7.0 Cleaning General - Appearance Standard: Cleaned

surfaces are to have a uniform appearance as viewed from 20 feet (6 m)] away. Proceed with cleaning in an orderly manner; work from top to bottom and from one end of each elevation to the other. Ensure that dirty residues and rinse water do not wash over dry, cleaned surfaces. Use spray equipment that provides controlled application at volume and pressure indicated, measured at nozzle.

Adjust pressure and volume to ensure that cleaning methods do not damage surfaces, including joints.

2.8.0 Preliminary Cleaning - Before beginning general

cleaning, remove extraneous substances that are resistant to planned cleaning methods. Extraneous substances include paint, calking, asphalt, and tar.

2.9.0 Cleaning Masonry & Concrete - Detergent Cleaning:

Wet surface with hot water applied by low-pressure spray. Scrub surface with detergent solution using medium-soft brushes until soil is thoroughly dislodged and can be removed by rinsing. Use small brushes to remove soil from mortar joints and crevices. Dip brush in solution often to ensure that adequate fresh detergent is used and that surface remains wet. Rinse with hot water applied by medium-pressure spray to remove detergent solution and soil. Repeat cleaning procedure above where required to produce cleaning effect

3.0.0 Joint Sealants

3.1.0 Summary – Repair and/or replacement of deteriorated

exterior weather sealants at vents, grilles, louvers, parapets, facias, curbs, expansion joints and various r roof and wall penetrations.

3.2.0 Preinstallation Meeting – GC top identify and prepare

sample repair for minimum of 2 linear feet or occurrence at representative ‘deteriorated’ joint for onsite inspection prior to proceeding with the work.

3.3.0 General - Provide joint sealants, backings, and other

related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer, based on testing and field experience.

3.3.1 Color – Match existing subject to review and approval

by Architect.

3.4.0 Silicone - S, NS, 100/50, NT: Nonstaining, single-

component, nonsag, plus 100 percent and minus 50 percent movement capability, nontraffic-use, neutral-curing silicone joint sealant; ASTM C920, Type S, Grade NS, Class 100/50, Use NT.

3.5.0 Joint Sealant Backing - Sealant Backing Material, General: Nonstaining; compatible with joint substrates, sealants, primers, and other joint fillers; and approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.

3.5.1 Cylindrical Sealant Backings: ASTM C1330 as

approved in writing by joint-sealant manufacturer for joint application indicated], and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance

3.5.2 Bond-Breaker Tape: Polyethylene tape or other plastic

tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint.

Provide self-adhesive tape where applicable.

3.6.0 Miscellaneous Materials -

3.6.1 Primer: Material recommended by joint-sealant

manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests

3.6.2 Cleaners for Nonporous Surfaces: Chemical cleaners

acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants to joint substrates

3.6.3 Masking Tape: Nonstaining, nonabsorbent material

compatible with joint sealants and surfaces adjacent to joints.

3.7.0 Surface Cleaning of Joints: Clean out joints

immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements

3.7.1 Remove all foreign material from joint substrates that

could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.

3.7.2 Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air. Porous joint substrates including Concrete & Masonry. Clean nonporous joint substrate surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants.

3.8.0 Installation - Comply with joint-sealant manufacturer's written installation instructions for products and applications. Install sealant backings of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.

Immediately after sealant application and before skinning or curing begins, tool sealants to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint. Clean off excess sealant.

4.0.0 Elastomeric Sheet Waterproofing

4.1.0 Existing Installation - The existing roof is a Firestone

Platinum EPDM system installed in 2022 with a 30 year manufacturer's warranty as follows:

Project No: 4380575 Start Date: 05/16/2023 Building Identification: MERIDEN PUBLIC LIBRARY Store No.: NA Building Address: 105 Miller St, Meriden, CT 06450 Building Owner: CITY OF MERIDEN Installing Contractor: Premier Building Associates,LLC Warranty No: 700440164 ELEVATE (Warranty Provider) 26 Century Blvd., Suite 205, Nashville, TN 37214 800-428-4442 www.holcimelevate.com

4.2.0 Subcontractor Qualifications - The roofing contractor

shall be certified as a Firestone designated and trained system installer.

4.3.0 Installation - The roofing trade subcontractor is to

inspect the entire roof all levels and effect repairs, consistent with the warranty, where and if required.

4.4.0 Additional (New) Work - Where indicated, the

contractor shall install new EPDM membrance and flashings consistent with the manufacturer's standards and warranty and compatible with the installed warrantied roof system.

D ra w in g N um be r:

Jo b:

S ca le

D ra w n:

C he ck ed

D at e:

R ev is ed

N or th A rro w

S ta m p:

D ra w in g

Ti tle

P re pa re d

B y:

O 'R io rd an M ig an i A rc hi te ct s

LL

C

B an k

S tre et , S ey m ou r, C on ne ct ic ut

A rc hi te ct ur e, P la nn in g, U rb an D es ig n

P

3.

8.

F

3.

1.

1/ 8"

'-0

A001

-1

7-

W or k Sc op e

S pe ci fic at io ns

M ill er S tre et

, M er id en

, C T

4.

M J

JC

M

M er id en

P ub lic L ib ra ry

LEVEL 1 ROOF

LEVEL 1.5 ROOF

LEVEL 2 ROOF

MECHANICAL

PENTHOUSE

COOLING

TOWER WELL

TO LEVEL 1

LEVEL 1.25 ROOF

GENERAL NOTE:

DRAWING IS DIAGRAMATIC AND DOES NOT SHOW ALL

EQUIPMENT, DRAINS, SKYLIGHTS ETC. INSTALLED ON THE

EXISTING BUILDING. THE PURPOSE OF THIS PROJECT IS TO

INSPECT, IDENTIFY AND REPAIR EXISTING CONDITIONS

WHICH MAY BE CAUSING OR ALLOWING WATER TO LEAK

INTO THE BUILDING.

GENERAL SCOPE OF WORK

A. STAGE (ACCESS) & INSPECT & REPAIR ENTIRE ROOF FASCIA

/ FLASHING / DRIP EDGE ENTIRE ROOF PERIMETER ALL

LEVELS INCLUDING MECHANICAL PENTHOUSE.

B. ACCESS & INSPECT ENTIRE EPDM ROOF ALL LEVELS. CAULK,

PATCH, RESEAM WHERE, IF AND AS REQUIRED.

C. INSPECT FLAT MEMBRANE SURFACES FOR GRAVEL STONE

TRAPPED UNDER MEMBRANE. CUT OUT, REMOVE STONE,

PATCH & REPAIR MEMBRANE WHEREVER STONE IS

GREATER THAN 3/8" TO 1/2" IN SIZE.

D. INSPECT ALL ROOF DRAINS AND SCUPPERS TO CONFIRM IN

INTEGRITY OF SEAMS, WELDS AND PATCHES. REPAIR

WHERE AND IF AS REQUIRED

E. INSPECT, CLEAN AND SEAL ALL EXTERIOR CONCRETE AND

MASONRY (BRICK) ON THE BUILDING EXTERIOR.

DRAWING NOTES

1. INSTALL EPDM MEMBRANE OVER EXPOSED PARAPET CMU

EXTENDING UP FROM BREAKER BAR 8" ABOVE ROOF TO

UNDERSIDE OF METAL WALL CAP ENTIRE PERMITER OF

MECHANICAL PENTHOUJSE. COMPLY / MEET EXISTING

FIRESTONE EPDM 30 YEAR WARRANTY REQUIREMENTS.

D ra w in g N um be r:

Jo b:

S ca le

D ra w n:

C he ck ed

D at e:

R ev is ed

N or th A rro w

S ta m p:

D ra w in g

Ti tle

P re pa re d

B y:

O 'R io rd an M ig an i A rc hi te ct s

LL

C

B an k

S tre et , S ey m ou r, C on ne ct ic ut

A rc hi te ct ur e, P la nn in g, U rb an D es ig n

P

3.

8.

F

3.

1.

3/

'-0

A101

-1

7-

W or k Sc op e

R ef er en ce P la n

M ill er S tre et

, M er id en

, C T

4.

M J

JC

M

M er id en

P ub lic L ib

6 7 8

LEVEL 1 ROOF

LEVEL 1.5 ROOF

LEVEL 2 ROOF

LEVEL 3 ROOF

COOLING

TOWER WELL

TO LEVEL 1

LEVEL 1.25 ROOF

D ra w in g N um be r:

Jo b:

S ca le

D ra w n:

C he ck ed

D at e:

R ev is ed

N or th A rro w

S ta m p:

D ra w in g

Ti tle

P re pa re d

B y:

O 'R io rd an M ig an i A rc hi te ct s

LL

C

B an k

S tre et , S ey m ou r, C on ne ct ic ut

A rc hi te ct ur e, P la nn in g, U rb an D es ig n

P

3.

8.

F

3.

1.

3/

'-0

A102

-1

7-

Ph ot o R ef er en ce

R oo f P la n

M ill er

S tre et , M er id en , C

T

4.

M J

JC

M

M er id en

P ub lic L ib ra

3/64" = 1'-0"1 Photo Reference Roof Plan

1: Street View Looking North 2: Street View Looking South

3: Street View Looking East 4: Street View Looking West

5 - Penthouse WatermarksLooking Northwest 6 - Penthouse Looking West: Water Stains 7 - Penthouse Representative Water Stain 8 - Penthouse Representative Water Stain

D ra w in g N um be r:

Jo b:

S ca le

D ra w n:

C he ck ed

D at e:

R ev is ed

N or th A rro w

S ta m p:

D ra w in g

Ti tle

P re pa re d

B y:

O 'R io rd an M ig an i A rc hi te ct s

LL

C

B an k

S tre et , S ey m ou r, C on ne ct ic ut

A rc hi te ct ur e, P la nn in g, U rb an D es ig n

P

3.

8.

F

3.

1.

3/

'-0

A103

-1

7-

Ph ot o R ef er en ce s

M ill er

S tre et , M er id en , C

T

4.

M J

JC

M

M er id en

P ub lic L ib

9 - Penthouse Looking South 10 - Level 2 Roof Looking West 11 - Level 1 Roof From Level 2 Looking West 12 - Penthouse Level 2 Roof Looking East

13 - Penthouse Level 2 Roof Looking East 14 - Penthouse Level 2 Looking Northeast 15 - Penthouse Level 2 Looking Northeast 16 - Waterstains Penthouse Looking Southeast

17 - Typical Existing EPDM Flashing @ 3 Yrs 18 - Typical Existing EPDM Flashing @ 3 Yrs 19 - Typical Existing EPDM Flashing @ 3 Yrs 20 - Typical Existing EPDM Flashing @ 3 Yrs

D ra w in g N um be r:

Jo b:

S ca le

D ra w n:

C he ck ed

D at e:

R ev is ed

N or th A rro w

S ta m p:

D ra w in g

Ti tle

P re pa re d

B y:

O 'R io rd an M ig an i A rc hi te ct s

LL

C

B an k

S tre et , S ey m ou r, C on ne ct ic ut

A rc hi te ct ur e, P la nn in g, U rb an D es ig n

P

3.

8.

F

3.

1.

3/

'-0

A104

-1

7-

Ph ot o R ef er en ce s

M ill er

S tre et , M er id en , C

T

4.

M J

JC

M

M er id en

P ub lic L ib

21 - Level 2 Looking West 22 - View of HVAC Well from Level 2 Roof 23- Level 1 HVAC Well 24 - View of HVAC Well from Level 2 Roof

25 - Failed Flashing HVAC Louver 26 - Failed Flashing HVAC Louver 27 - Mechanical Penthouse Roof Looking Southeast

28 - Mechanical Penthouse Roof Looking Northeast

29 - Mechanical Penthouse Roof Looking North

30 - Mechanical Penthouse Parapet 31- Random Closeup of Gravel Stone Under EPDM Membrane

32- Random Closeup of Gravel Stone Under EPDM Membrane

D ra w in g N um be r:

Jo b:

S ca le

D ra w n:

C he ck ed

D at e:

R ev is ed

N or th A rro w

S ta m p:

D ra w in g

Ti tle

P re pa re d

B y:

O 'R io rd an M ig an i A rc hi te ct s

LL

C

B an k

S tre et , S ey m ou r, C on ne ct ic ut

A rc hi te ct ur e, P la nn in g, U rb an D es ig n

P

3.

8.

F

3.

1.

3/

'-0

A105

-1

7-

Ph ot o R ef er en ce s

M ill er

S tre et , M er id en , C

T

4.

M J

JC

M

M er id en

P ub lic L ib

Sheets
A000 - Cover Sheet
A001 - Work Scope & Specifications
A101 - Work Scope Reference Plan
A102 - Photo Reference Roof Plan
A103 - Photo References
A104 - Photo References
A105 - Photo References