Mechanical_Sample_Drawings.pdf
PDF 20 MB Posted
- Attached to
- HVAC Duct Cleaning Services
- Solicitation number
- ITB-2025-3078
- Issued by
- Florida
About this file
The document is a standard Adobe PDF portfolio opening page, recommending users open the file in Acrobat X or Adobe Reader X or later versions. The image depicts a red and white stylized PDF portfolio icon with the Adobe PDF logo, accompanied by text suggesting users download Adobe Reader for the optimal viewing experience. No additional contract or government procurement details are visible in this specific image.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
T
Office
Conf
008B
008A
Corr
Sto
007A
005B
005A
Recep
Corr
10"Ø
12x10
9"Ø
8"Ø
14"Ø 14"Ø
6"Ø
10x10
12"Ø
12"Ø
8"Ø8"Ø
1"CHWS&R
14x12
1-1/4"CHWS&R
24x5
1-1/2"CHWS&R
SCALE:
Mechanical Renovation Plan - Basement 1/8" = 1'-0"
10"ØM
MECH RM
EDH
EDH
2"CHWS&R
OA
INTAKE
2"CHWS&R
1. COORDINATE CLOSELY WITH EXISTING CONDTIONS. DO NOT OBSTRUCT
MAINTENANCE ACCESS.
1. CORE DRILL AND SLEEVE WALL. PROVIDE 2" CHWS&R DN EXTERIOR WALL TO
BASEMENT. SECURE PIPE TO WALL. PAINT TO MATCH.
2. PROVIDE TEE IN EXISTING CHWS&R PIPING. PROVIDE ISOLATION VALVES
NEAR CONNECTION POINT. ROUTE OVERHEAD (MIN 7' CLEAR) TO PUMP.
3. PROVIDE THERMOMETERS ON CHWS&R FOR BASEMENT.
Mechanical Renovation Plan - 2nd Floor 1/4" = 1'-0"
1. RELOCATE AHU-10 AS INDICATED. MOUNT ON WALL ABOVE STORAGE
CABINET. EXTEND REFRIGERANT PIPING THROUGH CEILING CAVITY TO NEW
LOCATION. PROVIDE CONDENSATE PUMP (LITTLE GIANT OR EQUAL). ROUTE
CONDENSATE DISCHARGE TUBE INTO CEILING CAVITY. TRANSITION TO
COPPER AND ROUTE TO OUTDOOR DISCHARGE LOCATION. TERMINATE 12"
ABOVE GRADE.
2. RELOCATE AND ROTATE CU-10 AND CONCRETE PAD AS INDICATED. EXTEND
REFRIGERANT PIPING, ELECTRICAL AND CONTROL WIRING AS REQUIRED.
3. PROVIDE OAU-B.1 UNIT PER DETAIL. PROVIDE 9'X14' CONCRETE PAD PER
DETAIL(SLOPE AWAY FROM BUILDING) WITH 4" HIGH HOUSEKEEPING PAD (6"
LARGER THAN UNIT ON ALL 4 SIDES, CROWN FOR DRAINAGE).
4. ROUTE DOUBLE-WALL DUCT UP AND INTO CEILING CAVITY. SECURE
EXTERIOR DUCT TO WALL AND PAINT TO MATCH.
5. ROUTE DUCT THROUGH CEILING CAVITY AS REQUIRED. WHERE STRUCTURAL
INTERFERENCES OCCUR, PROVIDE ACOUSTICAL TILE SOFFIT (WALL TO WALL)
TO ENCLOSE DUCT.
6. PROVIDE FCU PER DETAIL. COORDINATE LOCATIONS OF CHW SPECIALTIES
TO MAXIMIZE MAINTENANCE ACCESS. DO NOT IMPEDE FILTER ACCESS.
7. EXISTING SUPPORT FRAME MAY BE REUSED. MODIFY AS REQUIRED TO
ACCOMMODATE NEW FCU. CONNECT FCU TO EXISTING DUCTWORK AS
REQUIRED WITH SMOOTH TRANSITIONS.
8. PROVIDE INTERNALLY INSULATED SHEET METAL PLENUM/STAND TO
SUPPORT FCU. PROVIDE 3" DEEP PLENUM FOR WALL GRILLE AND
TRANSITION TO PLENUM/STAND. PROVIDE NEW RA GRILLE. ROUTE BYPASS
DUCT AROUND SA DUCT AND DROP TO TOP OF PLENUM BEHIND FCU.
9. PROVIDE INTERNALLY INSULATED SHEET METAL PLENUM/STAND TO
SUPPORT FCU. RECONNECT EXISTING RA DUCTWORK.
10. PROVIDE UNISTRUT FRAMEWORK AND MOUNT DISCONNECT IN FRONT OF RA
DUCTWORK.
11. ROUTE CHW PIPING THROUGH CEILING CAVITY AS REQUIRED BY FIELD
CONDITIONS.
12. CORE DRILL AND SLEEVE WALL. PROVIDE 2" CHWS&R UP EXTERIOR WALL TO
SECOND FLOOR MECHANICAL ROOM. SECURE PIPE TO WALL. PAINT TO
MATCH.
13. PROVIDE P-TRAP AND ROUTE 1" PVC CONDENSATE PIPE TO DRYWELL.
PROVIDE DRYWELL PER DETAIL.
1. REPLACE ALL ACOUSTICAL CEILING TILES IN BASEMENT WITH ARMSTRONG
FINE FISSURED (OR PREAPPROVED EQUAL) ACOUSTICAL TILES.
2. COORDINATE TEMPERATURE SENSOR LOCATIONS WITH FINAL DIFFUSER
LOCATIONS. TEMPERATURE SENSORS SHALL NOT BE MOUNTED IN THE
THROW PATTERN OF DIFFUSERS.
3. COORDINATE THE ROUTING OF ALL DUCTWORK AND PIPING WITH EXISTING
STRUCTURE, HVAC SYSTEMS NOT DEMOLISHED, PLUMBING SYSTEMS, AND
OTHER EXISTING WORK. OFFSET AND TRANSITION AS REQUIRED TO
OVERCOME INTERFERENCES. INDICATE INTERFERENCES AND MEANS TO
OVERCOME IN THE DUCTWORK SHOP DRAWINGS.
4. REMOVE CEILINGS, OR PORTIONS THEREOF, AS REQUIRED FOR WORK.
REPLACE CEILINGS REMOVED TO MATCH EXISTING.
5. REINSTALL EXISTING DUCT DETECTORS.
6. CONSTRUCTION SHALL BE PHASED TO CONVERT ONE UNIT (AREA) AT A TIME.
PROVIDE TEMPORARY PORTABLE AIR CONDITIONING FOR EACH AREA
DURING CONSTRUCTION.
7. CONTROLS CONTRACTOR SHALL PROVIDE 24V POWER TO VVT TERMINAL
UNITS.
M
MECH RM
LOWER LOBBY
LOWER LOBBY
OUTDOOR
CHILLER YARD
EXPANSION TANK
40X2426X24 22X18
3" CHWS&R UP
TO 2ND FLOOR
AIR SEPARATOR
CHEMICAL SHOT
FEEDER
4" CHWR
7' AFF
4" CHWS
4" CHWS&R
BELOW GRADE
3" CHWS&R
BELOW GRADE
4"
4"4"
3" CHWS
FLOW LIMIT VALVE
1.
1. REPLACE PUMP AND ISOLATION BASE. RECONNECT TO EXISTING PIPING.
MODIFY PIPING AS REQUIRED. PROVIDE NEW PRESSURE GAUGE AND
MANIFOLD ASSEMBLY. REUSE OTHER PIPING SPECIALITES. RECONNECT
EXISTING CONTROLS. MATCH EXISTING PIPING INSULATION AND PROVIDE
NEW NEW INSULATED BOX FOR IMPELLER.
2. REPLACE FLOW LIMIT VALVE CARTRIDGE WITH CARTRIDGE RATED FOR 220
GPM.
1. FLUSH NEW PIPING PER SPECS. CHEMICALLY TREAT CHILLED WATER SYSTEM
AND PROVIDE CHEMICAL REPORT TO OWNER.
Mechanical Renovation Plan - 1st Floor 1/4" = 1'-0"
Number
R e v is io n s
Sheet Title
O w ne r
Key Plan N.T.S.
AREAS OF WORK
M3.01
File details come from the government source that posted it. Updated .