MCS_Reroofing.Phase_1.Drawings-12.3.21.pdf

PDF 4 MB Posted

Attached to
Reroofing City Schools Phase 1 - Mitchell-Neilson and Reeves-Rogers
Solicitation number
ITB-21-2022
Issued by
Rutherford County, Tennessee

About this file

The document is a comprehensive set of architectural drawings prepared by Johnson + Bailey Architects P.C. for the Murfreesboro City Schools' Reroofing Project Phase 1, which involves roof replacement and renovation at two elementary schools: Mitchell-Neilson Elementary School and Reeves Rogers Elementary School. The project includes detailed plans for demolition, new roofing installation, metal deck overlay, roof slope adjustments, and related infrastructure modifications. The drawings provide extensive technical specifications for removing existing roofing materials, installing new EPDM roofing, adding rigid roof insulation, replacing metal decking, modifying gutters and downspouts, and addressing various structural and architectural details across multiple roof sections and building areas.

The drawings indicate a comprehensive approach to roof rehabilitation, including provisions for maintaining existing structural elements, replacing deteriorated components, and implementing new roofing systems with improved drainage and insulation. Specific technical details include installing new pre-tapered roof insulation with slopes ranging from 1/16" to 1/4" per foot, replacing metal decking, modifying existing mechanical equipment supports, and addressing potential asbestos-containing materials. The project appears to be focused on extending the functional lifespan of these school buildings through systematic roofing upgrades, with careful attention to preserving existing infrastructure while implementing modern roofing technologies and improving overall building envelope performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Johnson + Bailey Architects P.C.

M u r f r e e s b o r o

C i t y

S c h o o l s

R e r o o f i n g a

F u

E l e m h o o l

P h a e

J

B

P o j e

N

P

SCHOOL INDEX - PHASE 2

Murfreesboro, TN 37130 1807 Greenland Drive Reeves Rogers Elementary School

Murfreesboro, TN 37129 711 West Clark Blvd.

Mitchell-Neilson Elementary School

Phase 1

Four Elementary Schools Reroofing at

Murfreesboro City Schools

Index of Drawings

GENERAL NOTES & METAL DECK INSTALLATION DETAILSS1.0

REEVES ROGERS ELEMENTARY SCHOOL ROOFING DETAILSA4.5

REEVES ROGERS ELEMENTARY SCHOOL ROOFING DETAILSA4.4

MITCHELL-NEILSON ELEMENTARY SCHOOL ROOFING DETAILSA4.3

MITCHELL-NEILSON ELEMENTARY SCHOOL ROOFING DETAILSA4.2

ROOFING DETAILSA4.1

REEVES ROGERS ELEMENTARY SCHOOL ROOF PLAN - PART BA3.4

REEVES ROGERS ELEMENTARY SCHOOL ROOF PLAN - PART AA3.3

MITCHELL-NEILSON ELEMENTARY SCHOOL ROOF PLAN - PARTS B & CA3.2

MITCHELL-NEILSON ELEMENTARY SCHOOL ROOF PLAN - PART AA3.1

REEVES ROGERS ELEMENTARY SCHOOL DEMOLITION ROOF PLAN - PART BA2.4

REEVES ROGERS ELEMENTARY SCHOOL DEMOLITION ROOF PLAN - PART AA2.3

MITCHELL-NEILSON ELEMENTARY SCHOOL DEMOLITION ROOF PLAN - PARTS B & CA2.2

MITCHELL-NEILSON ELEMENTARY SCHOOL DEMOLITION ROOF PLAN - PART AA2.1

AND REEVES ROGERS ELEMENTARY SCHOOL OVERALL ROOF SLOPE PLAN

REEVES REGERS ELEMENTARY SCHOOL OVERALL EXISTING ROOF STRUCTURE PLANA1.5

REEVES ROGERS ELEMENTARY SCHOOL OVERALL ROOF PLANA1.4

MITCHELL-NEILSON ELEMENTARY SCHOOL ROOF SLOPE PLANA1.3

MITCHELL-NEILSON ELEMENTARY SCHOOL OVERALL NEW METAL DECK PLANA1.2

MITCHELL-NEILSON ELEMENTARY SCHOOL OVERALL ROOF PLANA1.1

A1.1 08'

SCALE 1/16" = 1'-0"

32'16'16'

OVERALL ROOF PLAN

MITCHELL-NEILSON ELEMENTARY SCHOOL N

O

R T

H

PLAN

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

MATCHLINE

PART B

PART C

MATCHLINE

PART B

PART C

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

AREA OF CONSTRUCTION

A1.2

MITCHELL-NEILSON ELEMENTARY SCHOOL N

O R T

H

PLAN

08'

SCALE 1/16" = 1'-0"

32'16'16'

OVERALL NEW METAL DECK PLAN

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

MATCHLINE

PART B

PART C

MATCHLINE

PART B

PART C

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

GYPSUM DECK (TYP.)

METAL DECK OVER EXISTING

AREA TO RECEIVE NEW

A1.3

MITCHELL-NEILSON ELEMENTARY SCHOOL N

O R T

H

PLAN

08'

SCALE 1/16" = 1'-0"

32'16'16'

OVERALL ROOF SLOPE PLAN

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

MATCHLINE

PART B

PART C

MATCHLINE

PART B

PART C

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

EXISTING ROOF TO REMAIN

ROOF SLOPE PLAN LEGEND

NON-TAPERED

DECK - NEW INSULATION IS

ROOF SLOPES WITH EXISTING

PER FOOT

INSULATION TAPERED 1/4"

NEW PRE-TAPERED ROOF

PER FOOT

INSULATION SLOPED 1/8"

NEW PRE-TAPERED ROOF

PER FOOT

INSULATION SLOPED 1/16"

NEW PRE-TAPERED ROOF

A1.4

08'

SCALE 1/16" = 1'-0"

32'16'16'

OVERALL ROOF PLANN

O R T H

P L A N

REEVES ROGERS ELEMENTARY SCHOOL

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

AREA OF CONSTRUCTION

A1.5

N O R T H

P L A N

REEVES ROGERS ELEMENTARY SCHOOL

08'

SCALE 1/16" = 1'-0"

32'16'16'

OVERALL EXISTING ROOF STRUCTURE PLAN

REEVES ROGERS ELEMENTARY SCHOOL

N O R T H

P L A N

08'

SCALE 1/16" = 1'-0"

32'16'16'

OVERALL ROOF SLOPE PLAN

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

REMAIN (TYP.)

EXISTING ROOF TO

EPDM SEAMS.

5" WIDE COVER STRIP OVER

FOOT ROOF SLOPE. INSTALL

THIS AREA IS TO HAVE 1/16" PER

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

ON STEEL JOISTS (TYP.)

THICK CORRUGATED METAL DECK

RIGID ROOF INSULATION OVER 1 1/2"

ON STEEL JOISTS (TYP.)

THICK CORRUGATED METAL DECK

RIGID ROOF INSULATION OVER 1 1/2"

PLANKS (TYP.)

OVER PRECAST CONCRETE

RIGID ROOF INSULATION

DEEP METAL DECK (TYP.)

RIGID ROOF INSULATION OVER

CONCRETE PLANKS (TYP.)

CONCRETE ON PRECAST

LIGHTWEIGHT INSULATING

EXISTING ROOF TO REMAIN

EXISTING ROOF STRUCTURE PLAN LEGEND

DEEP METAL DECK

RIGID ROOF INSULATION OVER

PRECAST CONCRETE PLANKS

RIGID ROOF INSULATION OVER

DECK ON STEEL JOISTS

1 1/2" THICK CORRUGATED METAL

RIGID ROOF INSULATION OVER

ON PRECAST CONCRETE PLANKS

LIGHTWEIGHT INSULATING CONCRETE

EXISTING ROOF TO REMAIN

ROOF SLOPE PLAN LEGEND

NON-TAPERED

DECK - NEW INSULATION IS

ROOF SLOPES WITH EXISTING

PER FOOT

INSULATION TAPERED 1/4"

NEW PRE-TAPERED ROOF

PER FOOT

INSULATION SLOPED 1/8"

NEW PRE-TAPERED ROOF

PER FOOT

INSULATION SLOPED 1/16"

NEW PRE-TAPERED ROOF

A2.1

MITCHELL-NEILSON ELEMENTARY SCHOOL N

O

R T

H

PLAN

04'

SCALE 1/8" = 1'-0"

16'8'8'

DEMOLITION ROOF PLAN - PART A

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

A4.2

A4.2

A4.2

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

E.F. E.F.

E.F.

BOX

V.T.R.

V.T.R. V.T.R.

V.T.R.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

AND DOWNSPOUTS AS SHOWN

REMOVE EXISTING GUTTERS

AND DOWNSPOUTS AS SHOWN

REMOVE EXISTING GUTTERS

AND DOWNSPOUTS AS SHOWN

REMOVE EXISTING GUTTERS

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

A4.2

A4.2

CORRUGATED SIDEING.

ASBESTOS CONTAINING

REMOVE EXISTING

HIGH

HIGH

A3 .1

A3 .1

WITH SHEET MATAL

OPENING AT METAL DECK

CLAMP. CLOSE EXISTING

CAP & STAINLESS STEEL

WITH FERNCO FLEXIBLE

TO BELOW DECK & CAP

ABANDONED VENT PIPE

REMOVE EXISTING

WITH SHEET MATAL

OPENING AT METAL DECK

CLAMP. CLOSE EXISTING

CAP & STAINLESS STEEL

WITH FERNCO FLEXIBLE

TO BELOW DECK & CAP

ABANDONED VENT PIPE

REMOVE EXISTING

A4.1

A4.1

A4.1

EXISTING ROOF TO REMAIN

BE REMOVED.

FLASHING AND FASTNERS TO

GUTTERS, DOWNSPOUTS, CAP

MATERIAL, INSULATION, FLASHING,

AREA OF EXISTING ROOFING

DEMOLITION ROOF PLAN LEGEND

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

A2.2

MITCHELL-NEILSON ELEMENTARY SCHOOL N

O R T

H

PLAN

04'

SCALE 1/8" = 1'-0"

16'8'8'

DEMOLITION ROOF PLAN - PARTS B & C

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

MATCHLINE

PART B

PART C

MATCHLINE

PART B

PART C

A4.2

A4.2

AND DOWNSPOUTS AS SHOWN

REMOVE EXISTING GUTTERS

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

E.F.

V.T.R.

D.S.

V.T.R.

D.S.

D.S.

D.S.

V.T.R.

V.T.R.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

AND DOWNSPOUTS AS SHOWN

REMOVE EXISTING GUTTERS

AND DOWNSPOUTS AS SHOWN

REMOVE EXISTING GUTTERS

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

A4.2

A4.2

CORRUGATED SIDEING.

ASBESTOS CONTAINING

REMOVE EXISTING

CORRUGATED SIDEING.

ASBESTOS CONTAINING

REMOVE EXISTING

CORRUGATED SIDEING.

ASBESTOS CONTAINING

REMOVE EXISTING

HIGH

HIGH

LOW

A4.2

WALL

A4.2

A4.2

HIGH

A4.2

WALL

A4.2

LOW

A4.2

HIGH

A3.1

A4.2

LOW

A4.2

A4.1

A4.1

A4.1

A4.1

A4.1

SLEEPERS

REMOVE EXISTING 4X4

A4.1

A4.1

MATCHLINE

PART B

PART C

MATCHLINE

PART B

PART C

A4.2

A4.2

A4.3

AND DOWNSPOUTS AS SHOWN

REMOVE EXISTING GUTTERS

V.T.R.

V.T.R.

V.T.R.

BOX

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

D.S.

D.S.

D.S.

D.S.

D.S.D.S.

V.T.R.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S. D.S.

D.S.

AND DOWNSPOUTS AS SHOWN

REMOVE EXISTING GUTTERS

AND DOWNSPOUTS AS SHOWN

REMOVE EXISTING GUTTERS

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

EXPANSION JOINTS

OVER EXISTING

METAL CAP FLASHING

REMOVE EXISTING

FLUE

FLUE

CORRUGATED SIDEING.

ASBESTOS CONTAINING

REMOVE EXISTING

CORRUGATED SIDEING.

ASBESTOS CONTAINING

REMOVE EXISTING

A3.1

WALL5

A4.2

LOW4

A4.2

HIGH3

A4.3

LOW

A4.2

WALL

HIGH

A4.3

A4.2

A4.2

WITH SHEET MATAL

OPENING AT METAL DECK

CLAMP. CLOSE EXISTING

CAP & STAINLESS STEEL

WITH FERNCO FLEXIBLE

TO BELOW DECK & CAP

ABANDONED VENT PIPE

REMOVE EXISTING

WITH SHEET MATAL

OPENING AT METAL DECK

CLAMP. CLOSE EXISTING

CAP & STAINLESS STEEL

WITH FERNCO FLEXIBLE

TO BELOW DECK & CAP

ABANDONED VENT PIPE

REMOVE EXISTING

METAL.

BRICK WALL W/SHEET

STRUCTURAL DECK &

EXISTING OPENINGS AT

DRAIN & PIPING, CLOSE

REMOVE EXISTING ROOF R.D.

A4.1

A4.1

A4.1

WITH SHEET MATAL

OPENING AT METAL DECK

DECK. CLOSE EXISTING

ABANDONED FLUE TO BELOW

REMOVE EXISTING

WITH SHEET MATAL

OPENING AT METAL DECK

DECK. CLOSE EXISTING

ABANDONED FLUE TO BELOW

REMOVE EXISTING

A4.2

A4.1

A4.1

LOW

LOW

A4.2

EXISTING ROOF TO REMAIN

BE REMOVED.

FLASHING AND FASTNERS TO

GUTTERS, DOWNSPOUTS, CAP

MATERIAL, INSULATION, FLASHING,

AREA OF EXISTING ROOFING

DEMOLITION ROOF PLAN LEGEND

A2.3

N O R T H

P L A N

REEVES ROGERS ELEMENTARY SCHOOL

04'

SCALE 1/8" = 1'-0"

16'8'8'

DEMOLITION ROOF PLAN - PART A

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1V.T.R.

V.T.R.

V.T.R.

E.F.

R.D.

D.S.

D.S.

D.S.

D.S.

D.S.D.S.D.S.

CAP.

GAS LINE

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

CORRUGATED SIDING

ASBESTOS CONTAINING

REMOVE EXISTING

CORRUGATED SIDING

ASBESTOS CONTAINING

REMOVE EXISTING

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

SHEET METAL.

BRICK WALL W/ 12 GA.

STRUCTURAL DECK &

EXISTING OPENINGS AT

DRAIN & PIPING, CLOSE

REMOVE EXISTING ROOF

A4.1

EXISTING ROOF TO REMAIN

BE REMOVED.

FLASHING AND FASTNERS TO

GUTTERS, DOWNSPOUTS, CAP

MATERIAL, INSULATION, FLASHING,

AREA OF EXISTING ROOFING

DEMOLITION ROOF PLAN LEGEND

N O R T H

P L A N A2.4

REEVES ROGERS ELEMENTARY SCHOOL

04'

SCALE 1/8" = 1'-0"

16'8'8'

DEMOLITION ROOF PLAN - PART B

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

MECH.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

V.T.R.

V.T.R.

O.W.V.

E.F.

E.F.

V.T.R.

V.T.R.

V.T.R.

V.T.R. V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

FLUE

E.F.

FLUE

D.S.

D.S.

D.S.D.S.D.S.D.S.

D.S. D.S. D.S.

D.S.

D.S.

D.S.

D.S.D.S.D.S.

D.S.

D.S.

D.S.D.S.D.S.

D.S.D.S.

D.S.D.S.

E.F.

ELEC.

G

A

L

IN

E

GAS LINE

G

E

GAS LINE

GAS LINE

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

D.S.

MECH.

MECH.

MECH.

MECH.

MECH.

ONE-WAY VENTS - TYP.

REMOVE EXISTING

MECH.

MECH.MECH.

CORRUGATED SIDING

ASBESTOS CONTAINING

REMOVE EXISTING

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

HIGH

LOW

A4.5

A4.5

LOW

A4.5

HIGH

A4.5

A4.5

LOW

HIGH

A4.5

A4.4

A4.4

A4.5

A4.4

A4.4

A4.5

A4.5

A4.5

A4.5

SEE DETAIL 11/A4.3

SLEEPERS

REMOVE EXISTING 4X4

SLEEPERS

REMOVE EXISTING 4X4

A4.4

OPENING.

METAL PLATE OVER

INSTALL 12 GA.

DRAIN LINE.

HARDWARE. CAP

ROOF DRAIN AND

REMOVE EXISTING

OPENING.

METAL PLATE OVER

INSTALL 12 GA.

DRAIN LINE.

HARDWARE. CAP

ROOF DRAIN AND

REMOVE EXISTING

OPENING.

METAL PLATE OVER

INSTALL 12 GA.

DRAIN LINE.

HARDWARE. CAP

ROOF DRAIN AND

REMOVE EXISTING

OPENING.

METAL PLATE OVER

INSTALL 12 GA.

DRAIN LINE.

HARDWARE. CAP

ROOF DRAIN AND

REMOVE EXISTING

OPENING.

METAL PLATE OVER

INSTALL 12 GA.

DRAIN LINE.

HARDWARE. CAP

ROOF DRAIN AND

REMOVE EXISTING

SHEET METAL.

BRICK WALL W/ 12 GA.

STRUCTURAL DECK &

EXISTING OPENINGS AT

DRAIN & PIPING, CLOSE

REMOVE EXISTING ROOF

SHEET METAL.

BRICK WALL W/ 12 GA.

STRUCTURAL DECK &

EXISTING OPENINGS AT

DRAIN & PIPING, CLOSE

REMOVE EXISTING ROOF

A4.1

A4.1

A4.1

A4.1

D.S.

EXISTING ROOF TO REMAIN

BE REMOVED.

FLASHING AND FASTNERS TO

GUTTERS, DOWNSPOUTS, CAP

MATERIAL, INSULATION, FLASHING,

AREA OF EXISTING ROOFING

DEMOLITION ROOF PLAN LEGEND

33'-10"

43'-6"

"8

A3.1

MITCHELL-NEILSON ELEMENTARY SCHOOL N

O

R T

H

PLAN

1DETAIL - MITCHELL-NEILSON

A3.1 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

DEMOLITION NEW WORK

2DETAIL - MITCHELL-NEILSON

A3.1 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

DEMOLITION NEW WORK

04'

SCALE 1/8" = 1'-0"

16'8'8'

ROOF PLAN - PART A

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

A4.2

A4.2

A4.2

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

A4.2

HIGH

A3 .1

A3 .1

A4.1

A4.1

A4.1

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

- TYP.

AND SPLASHBLOCK

NEW METAL DOWNSPOUT

- TYP.

AND SPLASHBLOCK

NEW METAL DOWNSPOUT

- TYP.

AND SPLASHBLOCK

NEW METAL DOWNSPOUT

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

SEE 4/A4.1

NEW METAL GUTTER

SEE 6/A4.1

NEW METAL GUTTER

SEE 4/A4.1

NEW METAL GUTTER

SEE 4/A4.1

NEW METAL GUTTER

S.B.

D.S.

SEE 6/A4.1

NEW METAL GUTTER

ROOF DECK.

OVER EXISTING SLOPED

RIGID ROOF INSULATION

BOARD OVER NEW •" THICK

NEW •" THICK COVER

NEW EPDM ROOF OVER

TO GUTTERS AS SHOWN

ROOF INSULATION SLOPED

1/4" PER FOOT RIGID

BOARD OVER NEW PRE-TAPERED

NEW 1/2" THICK COVER

NEW EPDM ROOF OVER

‚" SLOPE ‚" SLOPE

O P

E

‚" SLOPE

O P

E

‚" SLOPE‚" SLOPE

PENETRATION

SHEET METAL ROOF

FLASH EXISTING

V.T.R. V.T.R.

V.T.R.

V.T.R.

E.F.

V.T.R.

BOX

E.F.

E.F.

‚" SLOPE

SUPPORT BRACKET.

3/A4.1. RECONNECT UNIT TO

4X4'S WERE REMOVED. SEE DETAIL

TWO NEW EQUIPMENT SUPPORTS WHERE

FROM SUPPORT BRACKET. INSTALL

DISCONNECT EXISTING HVAC UNIT

NEW 2-PIECE METAL ROOF EDGE

SEE DETAIL 6/A4.1

NEW METAL GUTTER

NEW MTL. DOWNSPOUT

NEW EPDM ROOF

NEW COVER BOARD

INSULATION

NEW RIGID ROOF

ACCESSORIES

FASCIA & ATTACHMENT

REMOVE EXISTING METAL

TO REMAIN

EXISTING WOOD BLOCKING

GUTTER & DOWNSPOUT

REMOVE EXISTING

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

DECK TO REMAIN

EXISTING PLY'WD.

STRUCTURE TO REMAIN

EXISTING WOOD

TO REMAIN

EXISTING EIFS

ROOF PLAN LEGEND EXISTING ROOF TO REMAIN

E.F.

O.A.I.

NEW METAL DOWNSPOUT

SEE DETAIL 1/A4.1

EXISTING PLUMBING VENT PIPE

SEE DETAIL 3/A4.1

EQUIPMENT ON EXISTING ROOF CURB-

EXISTING ROOF MOUNTED MECHANICAL

D.S.

NEW CONCRETE SPLASH BLOCK

S.B.

V.T.R.

INSULATION

ON NEW RIGID ROOF

AREA OF NEW EPDM ROOF

DRAINAGE DIRECTION

STORM WATER

O.W.V.

FP-10 VENT - SEE DETAIL 7/A4.1

RELIEF VENT- JOHNS MANVILLE

NEW ONE-WAY MOISTURE/PRESSURE

NEW 2-PIECE METAL ROOF EDGE

CUT TO FIT - TYP.

NEW CONT. 2X WOOD NAILERS,

AS SHOWN ON PLANS

TAPEREDINSULATION

NEW RIGID ROOF

NEW EPDM ROOF

NEW COVER BOARD

ACCESSORIES

FASCIA & ATTACHMENT

REMOVE EXISTING METAL

TO REMAIN

EXISTING WOOD BLOCKING

TO REMAIN

EXISTING GYPSUM DECK

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

TO REMAIN

EXISTING METAL DECK

18'-11"

37'-2"

18'-11"

15'-1"

18'-11"

33'-10"

15'-1"

18'-11"

37'-2"

15'-1"

18'-11"

37'-2"

18'-11"

A3.2

MITCHELL-NEILSON ELEMENTARY SCHOOL N

O R T

H

PLAN

04'

SCALE 1/8" = 1'-0"

16'8'8'

ROOF PLAN - PART 'B' & 'C'

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

MATCHLINE

PART B

PART C

MATCHLINE

PART B

PART C

A4.2

A4.2

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

A4.2

A4.2

HIGH

HIGH

LOW

A4.2

WALL

A4.2

A4.2

HIGH

A4.2

WALL

A4.2

LOW

A4.2

HIGH

A3.1

A4.2

LOW

A4.2

A4.1

A4.1

A4.1

A4.1

A4.1

A4.1

A4.1

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

- TYP.

AND SPLASHBLOCK

NEW METAL DOWNSPOUT

- TYP.

AND SPLASHBLOCK

NEW METAL DOWNSPOUT

- TYP.

AND SPLASHBLOCK

NEW METAL DOWNSPOUT

- TYP.

AND SPLASHBLOCK

NEW METAL DOWNSPOUT

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

SEE 4/A4.1

NEW METAL GUTTER

SEE 4/A4.1

NEW METAL GUTTER

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

TO GUTTERS AS SHOWN

ROOF INSULATION SLOPED

1/8" PER FOOT RIGID

BOARD OVER NEW PRE-TAPERED

NEW 1/2" THICK COVER

NEW EPDM ROOF OVER

TO GUTTERS AS SHOWN

ROOF INSULATION SLOPED

1/8" PER FOOT RIGID

BOARD OVER NEW PRE-TAPERED

NEW 1/2" THICK COVER

NEW EPDM ROOF OVER

TO GUTTERS AS SHOWN

ROOF INSULATION SLOPED

1/4" PER FOOT RIGID

BOARD OVER NEW PRE-TAPERED

NEW 1/2" THICK COVER

NEW EPDM ROOF OVER

TO GUTTERS AS SHOWN

ROOF INSULATION SLOPED

1/8" PER FOOT RIGID

BOARD OVER NEW PRE-TAPERED

NEW 1/2" THICK COVER

NEW EPDM ROOF OVER

SIDING

CORRUGATED

NEW METAL

SIDING

CORRUGATED

NEW METAL

‚" SLOPE

O P

E

‚" SLOPE ‚" SLOPE

„" SLOPE

„" SLOPE

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

‚" SLOPE‚" SLOPE

„" SLOPE

„" SLOPE

‚" SLOPE‚" SLOPE

‚" SLOPE‚" SLOPE

‚" SLOPE‚" SLOPE

„" SLOPE

„" SLOPE

PENETRATION

SHEET METAL ROOF

FLASH EXISTING

V.T.R.

V.T.R.

V.T.R.

E.F.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R. V.T.R.

V.T.R.

V.T.R.

‚" SLOPE

PADS

WALKWAY

NEW ROOF

SUPPORT BRACKET.

3/A4.1. RECONNECT UNIT TO

4X4'S WERE REMOVED. SEE DETAIL

TWO NEW EQUIPMENT SUPPORTS WHERE

FROM SUPPORT BRACKET. INSTALL

DISCONNECT EXISTING HVAC UNIT

MATCHLINE

PART B

PART C

MATCHLINE

PART B

PART C

A4.2

A4.2

A4.3

A3.1

WALL5

A4.2

LOW4

A4.2

HIGH3

A4.3

LOW

A4.2

WALL

HIGH

A4.3

A4.2

A4.2

A4.1

A4.1

A4.1

A4.2

A4.1

A4.1

LOW

LOW

A4.2

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

- TYP.

AND SPLASHBLOCK

NEW METAL DOWNSPOUT

- TYP.

AND SPLASHBLOCK

NEW METAL DOWNSPOUT

S.B.

D.S.

SEE 4/A4.1

NEW METAL GUTTER

SEE 4/A4.1

NEW METAL GUTTER

SEE 4/A4.1

NEW METAL GUTTER

SEE 4/A4.1

NEW METAL GUTTER

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

TO GUTTERS AS SHOWN

ROOF INSULATION SLOPED

1/8" PER FOOT RIGID

BOARD OVER NEW PRE-TAPERED

NEW 1/2" THICK COVER

NEW EPDM ROOF OVER

TO GUTTERS AS SHOWN

ROOF INSULATION SLOPED

1/8" PER FOOT RIGID

BOARD OVER NEW PRE-TAPERED

NEW 1/2" THICK COVER

NEW EPDM ROOF OVER

SIDING

CORRUGATED

NEW METAL

SIDING

CORRUGATED

NEW METAL

O P

E

„" SLOPE

„" SLOPE

„" SLOPE

„" SLOPE

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INTALL NEW METAL

S L

O P

E S

L O

P E

‚" SLOPE ‚" SLOPE

‚" SLOPE‚" SLOPE

‚" SLOPE‚" SLOPE

‚" SLOPE‚" SLOPE

PENETRATION

SHEET METAL ROOF

FLASH EXISTING

V.T.R.

BOX

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

OVER NEW METAL DECK

TO GUTTERS AS SHOWN

ROOF INSULATION SLOPED

1/4" PER FOOT RIGID

BOARD OVER NEW PRE-TAPERED

NEW 1/2" THICK COVER

NEW EPDM ROOF OVER

ROOF PLAN LEGEND EXISTING ROOF TO REMAIN

E.F.

O.A.I.

NEW METAL DOWNSPOUT

SEE DETAIL 1/A4.1

EXISTING PLUMBING VENT PIPE

SEE DETAIL 3/A4.1

EQUIPMENT ON EXISTING ROOF CURB-

EXISTING ROOF MOUNTED MECHANICAL

D.S.

NEW CONCRETE SPLASH BLOCK

S.B.

V.T.R.

INSULATION

ON NEW RIGID ROOF

AREA OF NEW EPDM ROOF

DRAINAGE DIRECTION

STORM WATER

O.W.V.

FP-10 VENT - SEE DETAIL 7/A4.1

RELIEF VENT- JOHNS MANVILLE

NEW ONE-WAY MOISTURE/PRESSURE

A3.3

N O R T H

P L A N

REEVES ROGERS ELEMENTARY SCHOOL

04'

SCALE 1/8" = 1'-0"

16'8'8'

ROOF PLAN - PART A

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1 V.T.R.

V.T.R.

V.T.R.

E.F.

CAP.

ELEC.

GAS LINE

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

A4.1

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

GUTTERS AS SHOWN.

INSULATION SLOPED TO

PER FOOT RIGID ROOF

NEW PRE-TAPERED 1/4"

COVER BOARD OVER

NEW 1/2" THICK

NEW EPDM ROOF OVER

AT 2'-0" ABOVE GRADE.

TO EXISTING PVC PIPE

CONNECT NEW DOWNSPOUT

GUTTERS AS SHOWN.

INSULATION SLOPED TO

PER FOOT RIGID ROOF

NEW PRE-TAPERED 1/4"

COVER BOARD OVER

NEW 1/2" THICK

NEW EPDM ROOF OVER

‚" SLOPE‚" SLOPE

‚" SLOPE

O P

E

O P

E

O P

E

O P

E

PADS

WALKWAY

NEW ROOF

SLOPE

1/16"

GAS LINE SUPPORTS - TYP.

INSTALL NEW PREMANUFACTURED

AS REQUIRED FOR REROOFING.

RAISE EXISTING GAS LINES

METAL SIDING

NEW HORIZONTAL

METAL SIDING

NEW HORIZONTAL

DETAIL 3/A4.1

DIVIDER - SEE

NEW ROOF AREA

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INSTALL NEW METAL

ROOF PLAN LEGEND EXISTING ROOF TO REMAIN

E.F.

O.A.I.

NEW METAL DOWNSPOUT

SEE DETAIL 1/A4.1

EXISTING PLUMBING VENT PIPE

SEE DETAIL 3/A4.1

EQUIPMENT ON EXISTING ROOF CURB-

EXISTING ROOF MOUNTED MECHANICAL

D.S.

NEW CONCRETE SPLASH BLOCK

S.B.

V.T.R.

INSULATION

ON NEW RIGID ROOF

AREA OF NEW EPDM ROOF

DRAINAGE DIRECTION

STORM WATER

O.W.V.

FP-10 VENT - SEE DETAIL 7/A4.1

N O R T H

P L A N A3.4

REEVES ROGERS ELEMENTARY SCHOOL

04'

SCALE 1/8" = 1'-0"

16'8'8'

ROOF PLAN - PART B

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

MECH.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

O.W.V.

V.T.R.

V.T.R.

O.W.V.

E.F.

E.F.

V.T.R.

V.T.R.

V.T.R.

V.T.R. V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

V.T.R.

FLUE

E.F.

FLUE

E.F.

ELEC.

G

E

GAS LINE

G

E

GAS LINE

GAS LINE

GAS LINE

MATCHLINE

PART A

PART B

MATCHLINE

PART A

PART B

MECH.

MECH.

MECH.

MECH.

MECH.

MECH.

MECH.MECH.

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

A4.4

HIGH

LOW

A4.5

A4.5

LOW

A4.5

HIGH

A4.5

A4.5

LOW

HIGH

A4.5

A4.4

A4.4

A4.5

A4.4

A4.4

A4.5

A4.5

A4.5

A4.5

A4.4

A4.1

A4.1

A4.1

A4.1

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

S.B.

D.S.

AT 2'-0" ABOVE GRADE.

TO EXISTING PVC PIPE

CONNECT NEW DOWNSPOUT

GUTTERS AS SHOWN.

INSULATION SLOPED TO

PER FOOT RIGID ROOF

NEW PRE-TAPERED 1/4"

COVER BOARD OVER

NEW 1/2" THICK

NEW EPDM ROOF OVER

GUTTERS AS SHOWN.

INSULATION SLOPED TO

PER FOOT RIGID ROOF

NEW PRE-TAPERED 1/4"

COVER BOARD OVER

NEW 1/2" THICK

NEW EPDM ROOF OVER

TO GUTTERS AS SHOWN.

EXISTING STRUCTURE SLOPES

ROOF INSULATION.

NEW 3" THICK RIGID

COVER BOARD OVER

NEW 1/2" THICK

NEW EPDM ROOF OVER

CURB

ON EXISTING ROOF

EXISTING HVAC UNIT

‚" SLOPE

‚" SLOPE

O P

E

O P

E

O P

E

O P

E

O P

E

O P

E

O P

E

E X I

S T I

N G

SEE DETAIL 11/A4.5

PENETRATION

SHEET METAL ROOF

FLASH EXISTING

EQUIPMENT SUPPORTS.

EXISTING HVAC UNIT ON NEW

SEE DETAIL 2/A4.1. REINSTALL

INSTALL TWO NEW EQUIPMENT SUPPORTS.

DISCONNECT EXISTING HVAC UNIT.

ON NEW EQUIPMENT SUPPORT.

REINSTALL EXISTING SWITCHES

SWITCHES. SEE DETAIL 2/A4.1.

EQUIPMENT SUPPORT TO SUPPORT

DISCONNECT SWITCHES. INSTALL NEW

DISCONNECT EXISTING ELECTRICAL

PADS

WALKWAY

NEW ROOF

PADS

WALKWAY

NEW ROOF

PADS

WALKWAY

NEW ROOF

PADS

WALKWAY

NEW ROOF

PADS

WALKWAY

NEW ROOF

R O

O

O P

W I

T H

R U

C T

U R

E R

O

O P

R U

C T

U R

E

R O

O P

R U

C T

U R

E R

O

O P

R U

C T

U R

E

SLOPE

1/8"

S L

O P

E

PADS

WALKWAY

NEW ROOF

PADS

WALKWAY

NEW ROOF

ROOF DECK

LIGHTWEIGHT CONCRETE

SHEET OVER EXISTING

NEW VENTILATING BASE

ROOF INSULATION OVER

BOARD OVER NEW RIGID

NEW 1/2" THICK COVER

NEW EPDM ROOF OVER

EXISTING ROOF SLOPE

INSULATION MAINTAINS

NEW NON-TAPERED ROOF

DECK SLOPED TO GUTTERS-

LIGHTWEIGHT CONCRETE ROOF

IS PROVIDED BY EXISTING

ROOF SLOPE AT THIS AREA

SLOPE

1/8"

S L

O P

E

S L

O P

E

S L

O P

E

E X I

S T I

N G

S L

O P

E

EXISTING

SLOPE

E X I

S T I

N G

S L

O P

E

E X I

S T I

N G

S L

O P

E

EXISTING

SLOPE

‚" SLOPE

O P

E

O P

E

3"3"3"

7" 7"

5†"

5†"

3"

5†"

7‚"

6‚"6‚" 6‚"

3"

3"

3"

3"

5„"

S.B.

D.S.

S.B.

D.S.

SLOPE

1/16"

SLOPE

1/16"

THIS AREA.

EPDM SPLICES AT

COVER STRIP OVER

INSTALL 5" WIDE

GUTTERS AS SHOWN.

INSULATION SLOPED TO

PER FOOT RIGID ROOF

NEW PRE-TAPERED 1/16"

COVER BOARD OVER

NEW 1/2" THICK

NEW EPDM ROOF OVER

GAS LINE SUPPORTS - TYP.

INSTALL NEW PREMANUFACTURED

AS REQUIRED FOR REROOFING.

RAISE EXISTING GAS LINES

GAS LINE SUPPORTS - TYP.

INSTALL NEW PREMANUFACTURED

AS REQUIRED FOR REROOFING.

RAISE EXISTING GAS LINES

GUTTERS AS SHOWN.

INSULATION SLOPED TO

PER FOOT RIGID ROOF

NEW PRE-TAPERED 1/8"

COVER BOARD OVER

NEW 1/2" THICK

NEW EPDM ROOF OVER

GUTTERS AS SHOWN.

INSULATION SLOPED TO

PER FOOT RIGID ROOF

NEW PRE-TAPERED 1/8"

COVER BOARD OVER

NEW 1/2" THICK

NEW EPDM ROOF OVER

METAL SIDING

NEW HORIZONTAL

CURB

ON EXISTING ROOF

EXISTING HVAC UNIT

EQUIPMENT SUPPORTS.

EXISTING HVAC UNIT ON NEW

SEE DETAIL 2/A4.1. REINSTALL

INSTALL TWO NEW EQUIPMENT SUPPORTS.

DISCONNECT EXISTING HVAC UNIT.

ON NEW EQUIPMENT SUPPORT.

REINSTALL EXISTING SWITCHES

SWITCHES. SEE DETAIL 2/A4.1.

EQUIPMENT SUPPORT TO SUPPORT

DISCONNECT SWITCHES. INSTALL NEW

DISCONNECT EXISTING ELECTRICAL

SUPPORTS

ON EXISTING EQUIPMENT

EXISTING HVAC UNIT

SUPPORTS

ON EXISTING EQUIPMENT

EXISTING HVAC UNIT

DETAIL 3/A4.1

DIVIDER - SEE

NEW ROOF AREA

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INSTALL NEW METAL

-SEE 5/A4.1

EXISTING EXP. JOINTS

CAP FLASHING OVER

INSTALL NEW METAL

D.S.

CANOPY BELOW

ROOF OF METAL

EXTEND D.S. TO

D.S.D.S.D.S.D.S.D.S.D.S. D.S.

C.O. C.O. C.O. C.O. C.O.

CONCRETE HEADWALL

DRAIN PIPE &

EXISTING 6" PVC

PIPES TO EXISTING

CONNECT NEW DRAIN

7 LOCATIONS

AFTER PIPE IS INSTALLED - TYP.

AND INSTALL NEW 4" THICK CONCRETE

FOR INSTALLATION OF NEW DRAIN PIPE

WIDE CONCRETE SIDEWALK AS REQUIRED

SAW CUT AND REMOVE EXISTING 6 FOOT

DIA. DRAIN PIPE

NEW SDR 26, 6" DIA.

DIA. DRAIN PIPE

NEW SDR 26, 6" DIA.

6" PIPE

HEADWALL SIZED FOR

NEW PRECAST CONCRETE

SIDEWALK

EXISTING CONCRETE

PER DETAIL 3/A4.4

MODIFY AIR DUCT SUPPORTS

REQUIRED FOR REROOFING.

EXISTING AIR DUCTS AS

REMOVE AND REINSTALL

PER DETAIL 3/A4.4

MODIFY AIR DUCT SUPPORTS

REQUIRED FOR REROOFING.

EXISTING AIR DUCTS AS

REMOVE AND REINSTALL

SIDEWALK - TYP. 7 LOCATIONS

PVC ADAPTOR AT 6" ABOVE

NEW 6" PVC DRAIN PIPE W/

CONNECT NEW DOWNSPOUT TO

ROOF PLAN LEGEND EXISTING ROOF TO REMAIN

E.F.

O.A.I.

NEW METAL DOWNSPOUT

SEE DETAIL 1/A4.1

EXISTING PLUMBING VENT PIPE

SEE DETAIL 3/A4.1

EQUIPMENT ON EXISTING ROOF CURB-

EXISTING ROOF MOUNTED MECHANICAL

D.S.

NEW CONCRETE SPLASH BLOCK

S.B.

V.T.R.

INSULATION

ON NEW RIGID ROOF

AREA OF NEW EPDM ROOF

DRAINAGE DIRECTION

STORM WATER

O.W.V.

FP-10 VENT - SEE DETAIL 7/A4.1

7"

5"

"2

M I

N

"2

4"

A4.1

4DETAIL

A4.1 03" 3" 6"1.5"

SCALE 3" = 1'-0"

2DETAIL

A4.1 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

1DETAIL

A4.1 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

5DETAIL

A4.1 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

6DETAIL

A4.1 03" 3" 6"1.5"

SCALE 3" = 1'-0"

7DETAIL ROOF VENT

A4.1NOT TO SCALE

3DETAIL

A4.1 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

METAL GUTTER

PRE-FINISHED

MASTIC

PIPE SEAL

NEW PRE-MOLDED

NEW SPLICING CEMENT

NEW LAP SEALANT

NEW WATER CUT-OFF

NEW S.S. CLAMPING RING

EXISTING ROOF DECK

ROOF DECK

SEE MECH.

MECH. UNIT-

EXISTING

NEW EDPM ROOFING

EXISTING

NEW RIGID ROOF INSUL.

NEW COVER BOARD

NEW EPDM ROOFING

BOARD

NEW COVER NEW PREMANUFACTURED

EQUIPMENT SUPPORT

NEW BOOT.

FOR INSTALLATION OF

EXTEND HEIGHT AS REQUIRED

EXISTING VENT PIPE -

TO ROOF.

FROM CAP FLASHING

4" MIN. DISTANCE

AS REQUIRED FOR

NEW WOOD BLOCKING

BLOCKING

EXISTING WOOD

EXISTING DECK

FLASHING

NEW METAL CAP

NEW EPDM ROOF

AS SHOWN ON PLANS

TAPEREDINSULATION

NEW RIGID ROOF

NEW COVER BOARD

(CONTINUOUS)

METAL GUTTER

PRE-FINISHED

INSULATING CONCRETE

EXISTING LIGHTWEIGHT

DECK

EXISTING METAL

BASE SHEET

NEW VENTILATED

SEALING MASTIC

SET VENT IN

IN HOLE

INSULATION

LOOSE

IN INSULATION

CUT VENT HOLE

ROOFING SYSTEM

NEW ADHERED EPDM

WAY ROOF VENT

FP-10 ONE

NEW JOHNS-MANVILLE

NEW LAP SEALANT

NEW EPDM MEMBRANE

NEW LAP SEALANT

NEW WOOD BLOCKING

AS REQUIRED FOR

4" MIN. DISTANCE

FROM CAP FLASHING

TO ROOF.

EXISTING DECK

NEW METAL CAP

FLASHING

NEW EPDM ROOF

NEW RIGID ROOF

INSULATION TAPERED

AS SHOWN ON PLANS

NEW COVER BOARD

M I

N

M I

N

"2

A4.2

DEMOLITION NEW WORKDEMOLITION NEW WORK

DEMOLITION NEW WORKDEMOLITION NEW WORK

NEW WORKDEMOLITION

1DETAIL - MITCHELL NEILSON

A4.2 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

2DETAIL - MITCHELL NEILSON

A4.2 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

5WALL DETAIL - MITCHELL NEILSON

A4.2 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

3HIGH DETAIL - MITCHELL NEILSON

A4.2 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

4LOW DETAIL - MITCHELL NEILSON

A4.2 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

CORRUGATED SIDING

ASBESTOS CONTAINING

REMOVE EXISTING

SIDING

METAL CORRUGATED

INSTALL NEW

NEW EPDM ROOF

AS SHOWN ON PLANS

TAPEREDINSULATION

NEW RIGID ROOF

TO REMAIN

EXISTING STEEL STRUCTURE

TO REMAIN

EXISTING WOOD BLOCKING

ACCESSORIES

FASCIA & ATTACHMENT

REMOVE EXISTING METAL

HARDWARE

DOWNSPOUTS & MOUNTING

REMOVE EXISTING GUTTER

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

TO REMAIN

EXISTING SOFFIT

NEW METAL ROOF EDGE

NEW METAL DOWNSPOUT

COVER

NEW METAL FASCIA

GUTTER WHERE OCCURS.

ALIGN W/ EXISTING

SEE 4/A4.2

NEW METAL GUTTER

NEW COVER BOARD

TO REMAIN

EXISTING GYPSUM DECK

TO REMAIN

EXISTING METAL DECK

TO REMAIN

EXISTING STEEL STRUCTURE

TO REMAIN

EXISTING SOFFIT BOARD

TO REMAIN

EXISTING WOOD BLOCKING

ACCESSORIES

FASCIA & ATTACHMENT

REMOVE EXISTING METAL

HARDWARE

DOWNSPOUTS & MOUNTING

REMOVE EXISTING GUTTER

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

NEW EPDM ROOF

AS SHOWN ON PLANS

TAPEREDINSULATION

NEW RIGID ROOF

NEW METAL ROOF EDGE

NEW METAL DOWNSPOUT

COVER

NEW METAL FASCIA

GUTTER WHERE OCCURS.

ALIGN W/ EXISTING

SEE DETAIL 4/A4.2

NEW METAL GUTTER

NEW COVER BOARD

TO REMAIN

EXISTING GYPSUM DECK

TO REMAIN

EXISTING METAL DECK

INSULATION TAPERED

NEW RIGID ROOF

AS SHOWN ON PLANS

NEW EPDM ROOF

ROOF INSULATION

REMOVE EXISTING

MATERIAL

REMOVE EXISTING ROOFING

DECK TO REMAINSTRUCTURE TO REMAIN

EXISTING STEEL

AS SHOWN

UNDER EXISTING SIDING

EXTEND NEW EPDM ROOFING

NEW COVER BOARD

EXISTING GYPSUM

TO REMAIN

STRUCTURE

EXISTING

EXISTING METAL DECK

TO REMAIN

BOARD TO REMAIN

EXISTING SOFFIT

ACCESSORIES

FASCIA & ATTACHMENT

REMOVE EXISTING METAL

TO REMAIN

EXISTING WOOD BLOCKING

TO REMAIN

EXISTING SOFFIT BOARD

TO REMAIN

EXISTING STEEL STRUCTURE

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

NEW 4"x4" MTL. DOWNSPOUT

FASCIA COVER

NEW METAL

NEW 2-PIECE METAL ROOF EDGE

AS SHOWN ON PLANS

TAPEREDINSULATION

NEW RIGID ROOF

NEW EPDM ROOF

GUTTER WHERE OCCURS.

ALIGN WITH EXISTING

SEE DETAIL 4/A4.2

NEW METAL GUTTER

NEW COVER BOARD

TO REMAIN

EXISTING GYPSUM DECK

HARDWARE

DOWNSPOUTS & MOUNTING

REMOVE EXISTING GUTTER

TO REMAIN

EXISTING METAL DECK

NEW CONC. SPLASHBLOCK

D

G E

G E

M

N

G

A4.3

DEMOLITION NEW WORKDEMOLITION NEW WORK

DEMOLITION NEW WORK

1DETAIL - MITCHELL NEILSON

A4.3 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

2DETAIL - MITCHELL NEILSON

A4.3 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

3HIGH DETAIL - MITCHELL NEILSON

A4.3 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

TO REMAIN

EXISTING STEEL STRUCTURE

TO REMAIN

EXISTING SOFFIT BOARD

TO REMAIN

EXISTING WOOD BLOCKING

ACCESSORIES

FASCIA & ATTACHMENT

REMOVE EXISTING METAL

HARDWARE

DOWNSPOUTS & MOUNTING

REMOVE EXISTING GUTTER

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

NEW EPDM ROOF

AS SHOWN ON PLANS

TAPEREDINSULATION

NEW RIGID ROOF

NEW METAL ROOF EDGE

NEW METAL DOWNSPOUT

COVER

NEW METAL FASCIA

CUT TO FIT - TYP.

NEW CONT. 2X WOOD NAILERS,

GUTTER WHERE OCCURS.

ALIGN W/ EXISTING

SEE DETAIL 4/A4.2

NEW METAL GUTTER

NEW COVER BOARD

TO REMAIN

EXISTING GYPSUM DECK

DRAWING S1

SEE DETAIL 1 ON

NEW METAL DECK-

BOARD TO REMAIN

EXISTING SOFFIT

ACCESSORIES

FASCIA & ATTACHMENT

REMOVE EXISTING METAL

TO REMAIN

EXISTING WOOD BLOCKING

TO REMAIN

EXISTING SOFFIT BOARD

TO REMAIN

EXISTING STEEL STRUCTURE

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

NEW 4"x4" MTL. DOWNSPOUT

FASCIA COVER

NEW METAL

NEW 2-PIECE METAL ROOF EDGE

AS SHOWN ON PLANS

TAPEREDINSULATION

NEW RIGID ROOF

NEW EPDM ROOF

CUT TO FIT - TYP.

NEW CONT. 2X WOOD NAILERS,

GUTTER WHERE OCCURS.

ALIGN WITH EXISTING

SEE DETAIL 4/A4.2

NEW METAL GUTTER

NEW COVER BOARD

TO REMAIN

EXISTING GYPSUM DECK

NEW CONC. SPLASHBLOCK

HARDWARE

DOWNSPOUTS & MOUNTING

REMOVE EXISTING GUTTER

DRAWING S1

SEE DETAIL 1 ON

NEW METAL DECK-

NEW EPDM ROOF

AS SHOWN ON PLANS

TAPEREDINSULATION

NEW RIGID ROOF

TO REMAIN

EXISTING STEEL STRUCTURE

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

NEW COVER BOARD

GYPSUM ROOF DECK

REMOVE EXISTING

TO REMAIN

EXISTING STEEL STRUCTURE

GYPSUM DECK THAT IS REMOVED

FOR THICKNESS OF EXISTING

INSULATION TO COMPENSATE

ADDITIONAL RIGID ROOF

DRAWING S1

SEE DETAIL 2 ON

NEW METAL DECK-

UNDER A UNIT COST ALLOWANCE

DECK IS DETERIORATED AND IS REPAIRED

AT LOCATIONS WHERE EXTSTING GYPSUM

NOTE: THIS CONDITION IS APPLICABLE

G E

G E

A4.4

NEW CONSTRUCTIONDEMOLITION

DEMOLITION NEW CONSTRUCTION

NEW CONSTRUCTIONDEMOLITION

5DETAIL - REEVES ROGERS

A4.4 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

NEW CONSTRUCTIONDEMOLITION

7DETAIL - REEVES ROGERS

A4.4 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

1HIGH DETAIL - REEVES ROGERS

A4.4 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

NEW CONSTRUCTIONDEMOLITION

4DETAIL - REEVES ROGERS

A4.4 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

2WALL DETAIL - REEVES ROGERS

A4.4 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

6OMITTED

A4.4 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

3DETAIL - REEVES ROGERS

A4.4 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTINGACCESSORIES

ROOF EDGE & ATTACHMENT

REMOVE EXISTING METAL

BLOCKING TO REMAIN

FASCIA AND WOOD

EXISTING METAL

ROOF EDGE

NEW 2 PIECE MTL.

COLOR

FACSIA MATCH EXISTING

PAINT EXISTING METAL

NEW COVER BOARD

WHERE OCCURS

SEE DETAIL 6/A3.1

NEW METAL GUTTER

WHERE OCCURS

NEW 4"x4" MTL. DOWNSPOUT

WHERE OCCURS

GUTTER & DOWNSPOUT

REMOVE EXISTING

NEW EPDM ROOF

DECK TO REMAIN

EXISTING METAL

AS SHOWN ON PLANS

INSULATION TAPERED

NEW RIGID ROOF

NEW 4"x4" MTL. DOWNSPOUT

TO REMAIN

EXISTING STL. STRUCT.

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

AS SHOWN ON PLANS

INSULATION TAPERED

NEW RIGID ROOF

NEW EPDM ROOF

ROOF EDGE

NEW 2 PIECE MTL.

SEE DETAIL 6/A3.1

NEW METAL GUTTER

COLOR

FACSIA MATCH EXISTING

PAINT EXISTING METAL

NEW COVER BOARD

ACCESSORIES

ROOF EDGE & ATTACHMENT

REMOVE EXISTING METAL

WHERE OCCURS

GUTTER & DOWNSPOUT

REMOVE EXISTING

BLOCKING TO REMAIN

FASCIA AND WOOD

EXISTING METAL

TO REMAIN

EXISTING CONC. STRUCT.

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTINGACCESSORIES

ROOF EDGE & ATTACHMENT

REMOVE EXISTING METAL

BLOCKING TO REMAIN

FASCIA AND WOOD

EXISTING METAL

ROOF EDGE

NEW 2 PIECE MTL.

COLOR

FACSIA MATCH EXISTING

PAINT EXISTING METAL

NEW COVER BOARD

WHERE OCCURS

SEE DETAIL 6/A3.1

NEW METAL GUTTER

WHERE OCCURS

NEW 4"x4" MTL. DOWNSPOUT

WHERE OCCURS

GUTTER & DOWNSPOUT

REMOVE EXISTING

NEW EPDM ROOF

AS SHOWN ON PLANS

INSULATION TAPERED

NEW RIGID ROOF

CONCRETE PLANKS

THAT TOP IS 3" ABOVE

REMOVE EXISTING WOOD SO

NEW 4"x4" MTL. DOWNSPOUT

TO REMAIN

EXISTING STL. STRUCT.

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

AS SHOWN ON PLANS

INSULATION TAPERED

NEW RIGID ROOF

NEW EPDM ROOF

ROOF EDGE

NEW 2 PIECE MTL.

SEE DETAIL 6/A3.1

NEW METAL GUTTER

COLOR

FACSIA MATCH EXISTING

PAINT EXISTING METAL

NEW COVER BOARD

ACCESSORIES

ROOF EDGE & ATTACHMENT

REMOVE EXISTING METAL

WHERE OCCURS

GUTTER & DOWNSPOUT

REMOVE EXISTING

BLOCKING TO REMAIN

FASCIA AND WOOD

EXISTING METAL

NEW COVER BOARD

INSULATION TAPERED

NEW RIGID ROOF

AS SHOWN ON PLANS

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

ACCESSORIES

ROOF EDGE & ATTACHMENT

REMOVE EXISTING METAL

WHERE OCCURS

GUTTER & DOWNSPOUT

REMOVE EXISTING

BLOCKING TO REMAIN

FASCIA AND WOOD

EXISTING METAL

DECK TO REMAIN

EXISTING METAL

CORRUGATED SIDING

ASBESTOS CONTAINING

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

MATERIAL

REMOVE EXISTING ROOFING

DECK TO REMAIN

EXISTING METAL

WHERE OCCURS

NEW 4"x4" MTL. DOWNSPOUT

WHERE OCCURS

SEE DETAIL 6/A3.1

NEW METAL GUTTER

NEW COVER BOARD

NEW EPDM ROOF

AS SHOWN ON PLANS

INSULATION TAPERED

NEW RIGID ROOF

COLOR

FACSIA MATCH EXISTING

PAINT EXISTING METAL

ROOF EDGE

NEW 2 PIECE MTL.

METAL SIDING

NEW HORIZ.

ROOF- SEE ROOF PLAN

NEW EPDM OR TPO

SPLASHBLOCK

NEW CONC.

NEW EPDM ROOFING

NEW 4" WIDE STRIP OF

WALKWAY PAD

CUT EXISTING STEEL AIR DUCT

SUPPORT TO 4" ABOVE NEW ROOF

NEW UNISTRUT ON NEW

WALKWAY PAD

NEW UNISTRUT

EXISTING STEEL

AIR DUCT SUPPORT

G E

G E

G E

"3

G E

N

G E

A4.5

NEW CONSTRUCTIONDEMOLITION

10HIGH DETAIL - REEVES ROGERS

A4.5 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

NEW CONSTRUCTIONDEMOLITION

8HIGH DETAIL - REEVES ROGERS

A4.5 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

NEW CONSTRUCTIONDEMOLITION

9LOW DETAIL - REEVES ROGERS

A4.5 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

NEW CONSTRUCTIONDEMOLITION

12DETAIL - REEVES ROGERS

A4.5 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

NEW CONSTRUCTIONDEMOLITION

13DETAIL - REEVES ROGERS

A4.5 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

A4.5 01' 1' 2'6"

DETAIL - REEVES ROGERS

SCALE 1" = 1'-0"

DEMOLITION NEW CONSTRUCTION

B.D.S.

R.L.L.

12-3-21

B.D.S.

THIS DRAWING SHALL NOT BE

REPRODUCED, PUBLISHED, OR USED

IN ANY WAY WITHOUT THE WRITTEN

PERMISSION OF THE ARCHITECT.

DRAWN BY

PROJECT N0.

DATE

CHECKED BY

REVISION DATE

NOTES:

Schools

Elementary at Four

Reroofing

City Schools

Murfreesboro

2105-P1

Phase 1

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTING

ACCESSORIES

ROOF EDGE & ATTACHMENT

REMOVE EXISTING METAL

BLOCKING TO REMAIN

FASCIA AND WOOD

EXISTING METAL

ROOF EDGE

NEW 2 PIECE MTL.

COLOR

FACSIA MATCH EXISTING

PAINT EXISTING METAL

NEW COVER BOARD

ROOF INSULATION

NEW 3" THICK RIGID

NEW EPDM ROOF

TO GUTTERS

STRUCTURE SLOPES

EXISTING STEEL

ROOFING MATERIAL

REMOVE EXISTING

ROOF INSULATION

REMOVE EXISTINGACCESSORIES

ROOF EDGE & ATTACHMENT

REMOVE EXISTING METAL

BLOCKING TO REMAIN

FASCIA AND WOOD

EXISTING METAL

ROOF EDGE

NEW 2 PIECE MTL.

COLOR

FACSIA MATCH EXISTING

PAINT EXISTING METAL

NEW COVER BOARD

WHERE OCCURS

SEE DETAIL 6/A3.1

NEW METAL GUTTER

NEW EPDM ROOF

AS SHOWN ON PLANS

INSULATION TAPERED

NEW RIGID ROOF

TO GUTTERS

STRUCTURE SLOPES

EXISTING STEEL

DOWNSPOUTS

GUTTERS &

REMOVE EXISTING

EXISTING DOWNSPOUTS

WINDOW SILL TO MATCH

PROVIDE BENDS AROUND

NEW 4"x4" MTL. DOWNSPOUT-

NEW COVER BOARD

ROOF INSULATION

REMOVE EXISTING

MATERIAL

REMOVE EXISTING ROOFING

DECK TO REMAIN

EXISTING CONC.

NEW EPDM ROOF

AS SHOWN ON PLANS

INSULATION TAPERED

NEW RIGID ROOF

AS SHOWN

UNDER EXISTING FLASHING

EXTEND NEW EPDM ROOFING

NEW 4"x4" MTL. DOWNSPOUT

ROOF EDGE

NEW 2 PIECE MTL.

SEE DETAIL 6/A3.1

NEW METAL GUTTER

COLOR

FACSIA MATCH EXISTING

PAINT EXISTING METAL

ACCESSORIES

ROOF EDGE & ATTACHMENT

REMOVE EXISTING METAL

BLOCKING TO REMAIN

FASCIA AND WOOD

EXISTING METAL

DOWNSPOUT

GUTTER &

REMOVE EXISTING

CONCRETE ROOF DECK

LIGHTWEIGHT INSULATING

TO EXPOSE EXISTING

ROOFING MATERIAL

REMOVE EXISTING

ROOF DECK TO REMAIN

INSULATING CONCRETE

EXISTING LIGHTWEIGHT

NEW EPDM ROOF

NEW COVER BOARD

BASE SHEET

NEW VENTILATING

PERIMETER BY 50 PERCENT

FASTENER SPACING AT CORNERS AND

DATA SHEET 1-29. INCREASE

WITH OVERSIZE PLATES PER F.M.

SECURED WITH ZONOLITE FASTNERS

NOTE: NEW VENTILATING BASE SHEET

TO REMAIN

EXISTING CONC. STRUCT.

WITH LIGHTWEIGHT

SLOPESINSULATION

NEW RIGID ROOF

X/AX.X

EDGE- SEE DETAIL

NEW VENTED ROOF

NEW 4"x4" MTL. DOWNSPOUT

ROOF EDGE

NEW 2 PIECE MTL.

SEE DETAIL 6/A3.1

NEW METAL GUTTER

COLOR

FACSIA MATCH EXISTING

PAINT EXISTING METAL

ACCESSORIES

ROOF EDGE & ATTACHMENT

REMOVE EXISTING METAL

BLOCKING TO REMAIN

FASCIA AND WOOD

EXISTING METAL

DOWNSPOUT

GUTTER &

REMOVE EXISTING

CONCRETE ROOF DECK

LIGHTWEIGHT INSULATING

TO EXPOSE EXISTING

ROOFING MATERIAL

REMOVE EXISTING

ROOF DECK TO REMAIN

INSULATING CONCRETE

EXISTING LIGHTWEIGHT

NEW EPDM ROOF

NEW COVER BOARD

BASE SHEET

NEW VENTILATING

PERIMETER BY 50 PERCENT

FASTENER SPACING AT CORNERS AND

DATA SHEET 1-29. INCREASE

WITH OVERSIZE PLATES PER F.M.

SECURED WITH ZONOLITE FASTNERS

NOTE: NEW VENTILATING BASE SHEET

TO REMAIN

EXISTING CONC. STRUCT.

WITH LIGHTWEIGHT

SLOPESINSULATION

NEW RIGID ROOF

X/AX.X

EDGE- SEE DETAIL

NEW VENTED ROOF

TO REMAIN

EXISTING ROOF CURB

WOOD EQUIPMENT SUPPORTS

REMOVE EXISTING

SUPPORTS

WOOD EQUIPMENT

REMOVE EXISTING

SUPPORTS

WOOD EQUIPMENT

REMOVAL OF EXISTING

MOUNTED EQUIPMENT FOR

REMOVE EXISTING ROOF

EQUIPMENT SUPPORT

PRE-MANUFACTURED

NEW 8'-0" LONG

EQUIPMENT SUPPORT

PRE-MANUFACTURED

NEW 8'-0" LONG

G E

G E

N

2105P1_zCover
2105P1_zA11MitchellNeilson
2105P1_zA12MitchellNeilson
2105P1_zA13MitchellNeilson
2105P1_zA14ReevesRogers
2105P1_zA15ReevesRogers
2105P1_zA21MitchellNeilson
2105P1_zA22MitchellNeilson
2105P1_zA23ReevesRogers
2105P1_zA24ReevesRogers
2105P1_zA31MitchellNeilson
2105P1_zA32MitchellNeilson
2105P1_zA33ReevesRogers
2105P1_zA34ReevesRogers
2105P1_zA41
2105P1_zA42
2105P1_zA43
2105P1_zA44
2105P1_zA45

File details come from the government source that posted it. Updated .