MCS BP3 MS Add & Ren - Addendum 1 - For Release.pdf

PDF 16 MB Posted

Attached to
Building Construction & Renovation State and local contract opportunity
Solicitation number
RFP MAT 260000002260 2
Issued by
Van Buren County, Michigan

About this file

This document is Addendum 1, dated June 24, 2026, to the MCS MS Additions & Renovations BP3 project for Mattawan, Michigan (Project AVB-26-507). The addendum provides clarifications and updates to the original bid documents for this building construction and renovation project. Key items addressed include pre-bid Requests for Information (RFIs) covering staff specifications and elevations, glazing and film clarifications, girt depth clarification behind metal panels, door hardware scope, existing interior brick/CMU scope, mason scope regarding water/vapor barriers, and pipe bollard scope clarification. All unanswered RFIs will be distributed with Addendum 2, tentatively released on July 2, 2026. Bidders were reminded that RFI submissions were due June 25, 2026. The addendum includes a logistics plan and reissued work scopes with changes marked in red, along with specifications sections and numerous reissued and new drawing sheets covering architectural, structural, mechanical, electrical, and civil components.

The addendum addresses several technical scope clarifications, including details on spread footings for new openings in existing bearing walls, proper installation of new WF 31 footings to match existing conditions or be doweled into existing footings, pipe bollard specifications requiring supply and installation per Section 33.1111, and clarification that all pipe bollards and bollard covers are to be supplied by Section 15.4111 and installed by Section 15.4111. The document specifies that bidders must read and adhere to all data provided and will be held responsible for ensuring a complete turnkey work scope is included in their bids. No pricing information, budget amounts, or incumbent contractor details are provided in this addendum.

View the file

Other files for this state and local contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCS MS Additions & Renovations

BP3

Mattawan, MI

AVB-26-507

AD 01 00

ADDENDUM #1

This Article is noted as Addendum No. 1, dated 6/24/2026, to the MCS MS Additions & Renovations, BP3. Update bid documents as necessary with the enclosed information to ensure that a complete turnkey work scope is included at bid time.

Each Bidder/Contractor/Sub-Contractor will be held responsible for reading and adhering to any and all data as found within the following pages.

AD 01 01 Pre-Bid RFIs

1.1. See the following attachments for the below noted Pre-Bid RFIs:

1. Pre-Bid RFIs #: PreBid-1: Staff-277 Spec & Elevations; PreBid-2: Glazing, Film Clarifications; PreBid 3:

Girt Depth Clarification Behind Metal Panels; PreBid-7: Door Hardware Scope Clarification; PreBid-12:

Existing Interior Brick/CMU Scope Clarification; PreBid-16: Mason Scope Clarification - Water/Vapor

Barrier; PreBid-18: Pipe Bollard Scope Clarification

2. NOTE: All unanswered RFIs will be answered and distributed with Addendum 2, tentatively released on

7/2/2026.

3. REMINDER: All RFIs are due tomorrow, 6/25/26

AD 01 02 AVB Write-Up/Work Scope Changes

1.1. Logistics Plan is Included in Addendum

1.2. Work Scopes are being re-issued. Changes will be in RED.

AD 01 03 Tower Pinkster Write-up/Document(s) Issued

1.1. Tower Pinkster, Addendum 1 Narrative.

1.2. Specifications Sections Reissued/Added: 04 2000, 07 4213.13, 07 4293

1.3. New / Reissued Sheets (under Separate Cover): C 200, S 401, AD 201, A 101F, A 102F, A 201, A 201F, A 301, A

321, A 324, A 401, A 501, A503, IG 002, I 101B, P 001, P 001F, P 101, P 101F, P 301, P 501, M 101, M 101B, M

102, M 501, M 502, E101F, E103, E160, E501, T101F

End of Addendum #1 Write Up.

See the Following Pages for Attachments.

,-(./01(.234/.2,-1/5 $6.728.9%.'(

:6.0 =>0'(/%7(4>0?@@@

A1B./?

,510C1 D,;< =>0'(/%7(4>0?

AA=E

+FGHHG

H+HF

,510C1 A1B./

,0C/.I'?

J.''4712@@@ K1I-41'?

A>/42DL>@@@

,0C/.I'?

J.''471 K1I-41'?

A>/42DL>@@@

+FG

HFG

H+HF

$%&'(4(%(4>0 8.9%.'(

=-1M2$(%--2D,;<

=>0'(/%7(4>0?2AA=E?

N104.-2<%/0'2D,;<

=>0'(/%7(4>0?2AA=E

O>

,510C1 A1B./2D,;< =>0'(/%7(4>0?

AA=E

PQ

,510C12A1B./2$.0(2R>02J%02HH?2H+HF21(2+STUU2152VNL

W((6'TGGIII@C/>6&>X@7>5G'7-GYG4C06ZU[\1&\7&M(+FZ5>%GS+*)S+H)S*+)'M'(.5@6C]̂/-[.M_M̀&X[7aSZ.aa-]>UZ-5FZX6&]b'(_ZX.'cI0/bC-_+ K-.1'.2'..2(W.21((17W.C27>56-.(.C2'%&'(4(%(4>02/.9%.'(2]>/5@ d2W1̀.21-'>21((17W.C212-40[2(>2>%/2'%&54((1-2&>>[-.(2I4(W2'>5.25>/.240]>/51(4>02>02>%/2Y/.21-1/52610.-'210C2C.̀47.'@2D4(e'2(>>2-1/f.2(>21((17W2(>2(W.2.514-E

$%&'(4(%(4>028.9%.'(23>/5@6C]

K/.<4C)H+ + VX4'(40f2R1'>0/M ;.0../2$%66>/(21(2O.I :6.040f'

:6.0 =>0'(/%7(4>0?@@@

A1B./?

,510C1 D,;< =>0'(/%7(4>0?

AA=E

+FGHgG

H+HF

,510C1 A1B./

,0C/.I'?

J.''4712@@@ K1I-41'?

A>/42DL>@@@

,0C/.I'?

J.''471 K1I-41'?

A>/42DL>@@@

+aG +*G

H+HF

<4CC40f N104.-2<%/0'2D,;<

=>0'(/%7(4>0?2AA=E

O>

,510C1 A1B./2D,;< =>0'(/%7(4>0?

AA=E

PQ

,510C12A1B./2$.0(2h.C2J%02Hg?2H+HF21(2+ST*c2152VNL K-.1'.2'..21((17W.C283d2C/1I40f@2LW.2C/1I40f'240C471(.2(W.2.X4'(40f2̀.0../2I4--2&.2-.](2%0'%66>/(.C210C2-.](24026-17.2&M2(W.2NVR:27>0(/17(>/2>07.2(W.2>6.040f'2402(W.2.X4'(40f2I1--'21/.27>56-.(.C@2d(2I>%-C2&.25>/.2.i74.0(2(>2C.5> (W.2̀.0../2(>2(W.2]%--2W.4fW(2>]2(W.2>6.040f'210C240Y--.C2IGgj2=Rk@2,GV2K-.1'.21C̀4'.@

K>/(1-2A40(.-283d@6C]

K/.<4C)*S + <.1/40f2h1--2&.(I..0 =1].(./412A>%0f.210C =1].(./412$.1(40f

:6.0 =>0'(/%7(4>0?@@@

<%/0'?

N104.-2D,;< =>0'(/%7(4>0?

AA=E

+FGHgG

H+HF

,510C1 A1B./

,0C/.I'?

J.''4712@@@ K1I-41'?

A>/42DL>@@@

,0C/.I'?

J.''471 K1I-41'?

A>/42DL>@@@

+aG +*G

H+HF

<4CC40f

=-1M2$(%--2D,;<

=>0'(/%7(4>0?2AA=E?

N104.-2<%/0'2D,;<

=>0'(/%7(4>0?2AA=E

O>

N104.-2<%/0' D,;< =>0'(/%7(4>0?

AA=E

PQ

N104.-2<%/0'2$.0(2h.C2J%02Hg?2H+HF21(2+ST**2152VNL N/1I40f2$*+*<2'W>I'2DgE23F@+2'6/.1C2]>>(40f'2>02102.X4'(40f2&.1/40f2I1--@2N.(14-2UG$U+*2'W>I'2(W4'2]>>(40f2I4(W2127>-%502&%(20>27>-%50'2'W>I02>02]/1540f26-10@2h.e/.21''%540f2(W.'.2'6/.1C2]>>(40f'21/.240(.0C.C2(>2'%66>/(2(W.

l15&'2>]2(W.20.I2>6.040f'2402(W4'2.X4'(40f2I1--@2d(24'2-4[.-M2(W4'2I1--21-/.1CM2W1'212'6/.1C2]>>(40f2'407.24(24'2.X4'(40f@2 m $W>%-C2(W.'.20.I23F@+2]>>(40f'2&.26>%/.C21(2'15.2.-.̀1(4>021'2.X4'(40f2>/2%0C./0.1(W2>/2>02(>62>]̂2$W>%-C2(W.M2&.2C>I.--.C2402>/2>(W./I4'.2n(4.Cn240(>2.X4'(40f2]>>(40f'̂

3/1540f2K-102$U+*<2'W>I'2-40(.-'2AHH2>̀./2(W.'.2(I>20.I2>6.040f'@2LW.'.2-40(.-'2/.9%4/.C2&.1/40f26-1(.'2<KU,@ m d'2(W.240(.0(2>]2(W.'.2<.1/40f2K-1(.'2(>2&.2'.(2402.X4'(40f2&->7[2I1--̂2d]2'>?26-.1'.27>0Y/52(W.'.27.--'2I>%-C20..C2(>2&.2f/>%(.C2'>-4C2C>I02(>2]>>(40f̂ m K-.1'.27>0Y/520>2̀./(471-2/.40]>/7.5.0(24'2/.9%4/.C2(>2(4.2.X4'(40f2I1--240(>20.I2]>>(40f

,2I1--2]/1540f2.-.̀1(4>02I>%-C2&.2W.-6]%-2(>210'I./2(W.'.29%.'(4>0'@

K/.<4C)*c + K46.2<>--1/C2$7>6.

=-1/4Y71(4>0

=->'.C =>0'(/%7(4>0?@@@

<%/0'?

N104.-2D,;< =>0'(/%7(4>0?

AA=E

+FGHgG

H+HF

,510C1 A1B./

A1B./?

,510C1 D,@@@

+aG +*G

H+HF

+FGHgG

HF

<4CC40f

=-1M2$(%--2D,;<

=>0'(/%7(4>0?2AA=E?

N104.-2<%/0'2D,;<

=>0'(/%7(4>0?2AA=E

O>

N104.-2<%/0' D,;< =>0'(/%7(4>0?

AA=E

PQ

N104.-2<%/0'2$.0(2h.C2J%02Hg?2H+HF21(2+cT\a2152VNL h>/[2'7>6.'2'(1(.2646.2&>--1/C'2&M2+\@*++@2o>I.̀./?2&>--1/C'21/.2'6.74Y.C2402$.7(4>02UH2UU++2IW47W24'2(>2&.2&M2+F@c++@2K-.1'.27-1/4]M@

�Q

N104.-2<%/0'2D,;<2=>0'(/%7(4>0?2AA=E28.'6>0C.C2h.C2J%02Hg?2H+HF21(2+cT\c2152VNL ,--2646.2&>--1/C'210C2&>--1/C27>̀./'21/.2(>2&.2'%66-4.C2&M2+\@*++210C240'(1--.C2&M2+U@*++@ +F@c++2&4CC./'2'W1--2.X7-%C.2&>--1/C'@

,;<2=>0'(/%7(4>0?2AA=

K/40(.C2>02h.C2J%02Hg?2H+HF21(2*+THS2152VNL

J>&2pT2,;<)HF)\+aR=$2)2<KU2R4CC-.2$7W>>-2,CC4(4>0'2b28.0>̀1(4>0' \FaH+2R%//1M2$(

R1((1I10?2R47W4f102gS+a* qrstuvuwxuy

*Unanswered RFIs will be answered in Addendum 2 - ETA 7/2/26* Reminder: RFIs due tomorrow, 6/25/26!

��� ��������
�����
��������� ���������
����� ������ ���������!

,&-'./0123405$62&78 %#&9:0;$6<#-=

@A%

B.-=6#<96&.-CDDD

E2F$#C @32-'2 G@A% B.-=6#<96&.-C

EEBH

+I8JK8

J+JI

@32-'2 E2F$#

@-'#$/=C

1$==&920DDD

"2/7&2=C

E.#&0GL.DDD

@-'#$/=C 1$==&92

DDD

"2/7&2=C

E.#&0GL.DDD

+I8 K+8

J+JI

%&''&-M 52-&$70%<#-=0G@A%

B.-=6#<96&.-C0EEBH

N.

@32-'2 E2F$#0G@A% B.-=6#<96&.-C

EEBH

OP

@32-'20E2F$#0Q$-60L<$01<-0JKC0J+JI0260+RSJT0?30U5L

LV$0$W&=6&-M0$W6$#&.#0/&-'./=02??$2#06.0V2X$04#&9:0#$6<#-=02606V$032=.-#Y0.?$-&-M=D0LV$09.-6#2960'#2/&-M=0'.0-.602??$2#06.0&-97<'$020/&-'./0Z2340'$62&70[.#06V$0-$/04#&9:0X$-$$#0.X$#0B\]0/27709.-=6#<96&.-C0-.#0'.06V$Y0&-'&926$ /V$6V$#04#&9:0#$6<#-=02#$0#$̂<&#$'0260-$/0/&-'./0.?$-&-M=D "7$2=$0972#&[Y0/V$6V$#04#&9:0#$6<#-=02#$0#$̂<&#$'02602770-$/032=.-#Y0X$-$$#0/&-'./0.?$-&-M=D0_[0=.C0?7$2=$0?#.X&'$06V$0#$̂<&#$'0Z2340'$62&702-'02-Y02==.9&26$'0'&3$-=&.-=0.#0'$62&7&-M0#$̂<&#$3$-6=D

"#$%&'()I + \2=.-0Q9.?$ B72#&̀926&.-0(0,26$#8 A2?.#0%2##&$#

B7.=$' @A%

B.-=6#<96&.-CDDD

E2F$#C @32-'2 G@A% B.-=6#<96&.-C

EEBH

+I8JK8

J+JI

@32-'2 E2F$#

E2F$#C @32-'2

G@DDD

+I8 K+8

J+JI

+I8JK8

JI

%&''&-M 52-&$70%<#-=0G@A%

B.-=6#<96&.-C0EEBH

N.

@32-'2 E2F$#0G@A% B.-=6#<96&.-C

EEBH

OP

@32-'20E2F$#0Q$-60L<$01<-0JKC0J+JI0260+)Sa+0?30U5L \2=.-0Q9.?$0&6$30J0&-06#2'$0=?$9&̀9=07&=6=0/26$#8X2?.#042##&$#02-'0'23?0?#..̀-M02=06V$032=.-b=0#$=?.-=&47YD0N.-$0&=0=V./-0.-06V$0'#2/&-M=D0"7$2=$09.-̀#306V&=0&=0-.60-$$'$'0[.#06V&=0?#.Z$96

�P @32-'20E2F$#0G@A%0B.-=6#<96&.-C0EEBH0;$=?.-'$'0L<$01<-0JKC0J+JI0260+)Sa+0?30U5L ,26$#8X2?.#042##&$#0-.602??7&9247$06.032=.-#Y0=9.?$0.[0/.#:D0c./$X$#C0+RDJ++0&=0#$=?.-=&47$0[.#0/26$#0#$?$77$-602-'0F$W&47$0F2=V&-M=D0Q9.?$=0/&7704$0#$(&==<$'0/&6V0@''$-'<3D

"#$%&'()a + 526205#.?8@99$== B.-6#.705$3.0(0]-&60% 5#2/&-M0B72#&̀926&.-

@A%

B.-=6#<96&.-CDDD

E2F$#C @32-'2 G@A% B.-=6#<96&.-C

EEBH

+I8JK8

J+JI

@32-'2 E2F$#

@-'#$/=C

1$==&920DDD

"2/7&2=C

E.#&0GL.DDD

@-'#$/=C 1$==&92

DDD

"2/7&2=C

E.#&0GL.DDD

+I8 K+8

J+JI

%&''&-M 52-&$70%<#-=0G@A%

B.-=6#<96&.-C0EEBH

N.

@32-'2 E2F$#0G@A% B.-=6#<96&.-C

EEBH

OP

@32-'20E2F$#0Q$-60L<$01<-0JKC0J+JI0260+)SRT0?30U5L

LV$0$7$96#&9270'$3.0?#&-6=0'.-d60=V./02-Y0'2620'#.?=0&-0<-&60%0.#02-Y0.[06V$0299$==09.-6#.70'$3.0&-02-Y02#$2D0_=06V&=032#:$'02-Y/V$#$0$7=$e

"#$%&'()R + f..'0Q$#X&9$ Û <&?3$-60g<2-6&6Y 5&=9#$?2-9&$=0h0_6$3= K)+@C0R+i@C0R)+@C0DDD

@A%

B.-=6#<96&.-CDDD

E2F$#C @32-'2 G@A% B.-=6#<96&.-C

EEBH

+I8JK8

J+JI

@32-'2 E2F$#

@-'#$/=C

1$==&920DDD

"2/7&2=C

E.#&0GL.DDD

@-'#$/=C 1$==&92

DDD

"2/7&2=C

E.#&0GL.DDD

+I8 K+8

J+JI

%&''&-M 52-&$70%<#-=0G@A%

B.-=6#<96&.-C0EEBH

N.

@32-'2 E2F$#0G@A% B.-=6#<96&.-C

EEBH

OP

@32-'20E2F$#0Q$-60L<$01<-0JKC0J+JI0260))SKT0230U5L

"7$2=$0?#.X&'$0972#&̀926&.-0.-06V$0[.77./&-M0f..'0Q$#X&9$0Û <&?3$-60̂<2-6&6Y0'&=9#$?2-9&$=S

)D _6$30K)+@0h0j$667$0Q62-' k f..'0Q$#X&9$0Û <&?3$-60Q?$9&̀926&.-0&-'&926$=0g6YD0)D k Û <&?3$-60Q9V$'<7$0&-'&926$=0g6YD0JD k f..'0Q$#X&9$0Û <&?3$-60"72-0&-'&926$=0g6YD0JD k "7$2=$09.-̀#306V$0#$̂<&#$'0̂<2-6&6YD

JD Q-$$l$0m<2#'= k LV$0f..'0Q$#X&9$0Û <&?3$-60Q?$9&̀926&.-=02??$2#06.0&-'&926$0206.6270.[0)J0=-$$l$0M<2#'=C0/V&7$06V$0?72-=02??$2#06.0=V./0206.6270.[0)+D

_6$30R+i@0h0Q-$$l$0m<2#'S k Q?$9&̀926&.-0&-'&926$=0g6YD0JD k Û <&?3$-60Q9V$'<7$0&-'&926$=0g6YD0)D k "72-0&-'&926$=0g6YD0)D

_6$30R)+@0h0Q-$$l$0m<2#'S k Q?$9&̀926&.-0&-'&926$=0g6YD0JD k Û <&?3$-60Q9V$'<7$0&-'&926$=0g6YD0)D k "72-0&-'&926$=0g6YD0)D

LV$04&''$#04$7&$X$=06V2606/.0=-$$l$0M<2#'=09<##$-67Y0&'$-6&̀$'02=0_6$30R+)032Y0&-=6$2'04$0&-6$-'$'06.0=$#X$0_6$3=0R+i02-'0R)+D0"7$2=$09.-̀#306V$09.##$960̂<2-6&6&$=02-'0&6$302==&M-3$-6=0[.#02770=-$$l$0M<2#'=D KD _6$30R)R@0h0@&#0B<#62&-0;$[#&M$#26.# k f..'0Q$#X&9$0Û <&?3$-60Q?$9&̀926&.-0&-'&926$=0g6YD0)D k Û <&?3$-60Q9V$'<7$0&-'&926$=0g6YD0JD

@A%0B.-=6#<96&.-C0EEB

"#&-6$'0.-0,$'01<-0JRC0J+JI0260)+SJi0230U5L

1.40nS0@A%(JI(a+*\BQ0(0%"K0\&''7$0Q9V..70@''&6&.-=0o0;$-.X26&.-= aI*J+0\<##2Y0Q6

\2662/2-C0\&9V&M2-0Ri+*) pqrstutvwtx

��� ��������
�����
��������� ���������
����� ������ ���������!

" #$$%&'()*+,(&-./+01(23&4562&+2%+,63(7&839:&;:

" 45(67(&,$2<)1&3=(&)(./+)(%&./623+39:

45(67(&,56)+>9&3=(&6?$*(&%+7,)(062,+(7&62%&+%(23+>9&@=+,=&%$,/1(23&7=655&A$*()2&>$)&?+%%+2A&0/)0$7(7:

4)(B+%CDE F

-G3()+$)&H67$2)9 I56)+<,63+$27

J0(2

KLB

I$273)/,3+$2M:::

N6O()M K162%6

PKLB

I$273)/,3+$2M

NNIQ

FRS;ES

;F;R

K162%6 N6O()

K2%)(@7M T(77+,6&:::

46@5+67M

N$)+&PU$:::

K2%)(@7M T(77+,6 46@5+67M

N$)+&PU$:::

FRS

EFS

;F;R

B+%%+2A

V62+(5&B/)27&PKLB

I$273)/,3+$2M&NNIQ

W$

K162%6

N6O()&PKLB

I$273)/,3+$2M

NNIQ

XY

K162%6&N6O()&'(23&U/(&T/2&;EM&;F;R&63&DDZF[&61&-VU

K)(&@(&163,=+2A&3=(&(G+73+2A&(G3()+$)\&45(67(&7((&6336,=(%&0+,3/)(7Z

]7&3=(&?)+,̂&+27(3&?(5$@&3=(&7$5%+()&,$/)7+2A&)(./+)(%\&]37&2$3&7=$@2&$2&3=(&2(@&%)6@+2A7C&05(67(&6%*+7(

]7&3=(&(G+73+2A&7$5%+()&0633()2&)(./+)(%&>$)&3=(&6%%+3+$2\&45(67(&6%*+7(

U=(&?67(&$>&3=(&(G+73+2A&?)+,̂&(G3()+$)&=67&6&7$5%+()&,$/)7(&63&F_CF̀C&3=(&2(@&%)6@+2A7&%$&2$3&7=$@&3=+7:&a+55&3=+7&?(&)(./+)(%&>$)&3=(&2(@&6%%+3+$2\&45(67(&6%*+7( H6336@62&-G3()+$)&J*()=62A:0%> H6336@62&-G3()+$)&'$5%+()&4633()2:0%> H6336@62&-G3()+$):0%>

4)(B+%CD; F

-G+73+2A&]23()+$)&B)+,̂S IHb&',$0( I56)+<,63+$2

I5$7(%

KLB

I$273)/,3+$2M:::

N6O()M K162%6

PKLB

I$273)/,3+$2M

NNIQ

FRS;ES

;F;R

K162%6 N6O()

N6O()M K162%6

PK:::

FRS

EFS

;F;R

FRS;ES

;R

B+%%+2A

V62+(5&B/)27&PKLB

I$273)/,3+$2M&NNIQ

W$

K162%6

N6O()&PKLB

I$273)/,3+$2M

NNIQ

XY

K162%6&N6O()&'(23&U/(&T/2&;EM&;F;R&63&DDZFE&61&-VU

U=(&(G+73+2A&+23()+$)&=67&7(*()65&6)(67&@=()(&?)+,̂&+7&?(+2A&)(1$*(%&>$)&2(@&167$2)9&+2<557:&H67$2)9&7,$0(&%$(7&2$3&+2%+,63(&765*6A+2AS,5(62+2A&(G+73+2A&?)+,̂:&a+55&2(@&?)+,̂S,1/&?(&/7(%&+2&3=(7(&5$,63+$27&$)&7=$/5%&@(&>6,3$)&+2 765*6A(%&163()+657\&45(67(&6%*+7(

�Y

K162%6&N6O()&PKLB&I$273)/,3+$2M&NNIQ&c(70$2%(%&U/(&T/2&;EM&;F;R&63&DDZFE&61&-VU F;:dFF&7=655&765*6A(&655&+23()+$)&?)+,̂&)(1$*(%&>$)&2(@&$0(2+2A7&62%&73$)(&$2&0655(37 Fd:;FF&7=655&,5(62&765*6A(%&?)+,̂&67&2((%(%&>$)&/7(&+2&+23()+$)&+2<55&$)&3$$3=C+2&6005+,63+$27:&V+70$7(&$>&)(16+2+2A&765*6A(&?)+,̂&+2&KLB&0)$*+%(%&%/1073()7&/0$2&,$105(3+$2:

a$)̂&',$0(7&@+55&?(&/0%63(%&+2&/0,$1+2A&K%%(2%/1

4)(B+%CDD F

H67$2)9&C&V(5(A63(% V(7+A2&I56)+<,63+$2

J0(2

KLB

I$273)/,3+$2M:::

N6O()M K162%6

PKLB

I$273)/,3+$2M

NNIQ

FRS;ES

;F;R

K162%6 N6O()

K2%)(@7M T(77+,6&:::

46@5+67M

N$)+&PU$:::

K2%)(@7M T(77+,6 46@5+67M

N$)+&PU$:::

FRS

EFS

;F;R

B+%%+2A

V62+(5&B/)27&PKLB

I$273)/,3+$2M&NNIQ

W$

K162%6

N6O()&PKLB

I$273)/,3+$2M

NNIQ

XY

K162%6&N6O()&'(23&U/(&T/2&;EM&;F;R&63&DFZde&61&-VU a+55&%(5(A63(%&%(7+A2&?(&06)3&$>&3=+7&?+%&06,̂6A(\&45(67(&6%*+7(:

4)(B+%CDF F IHb&U90(&I56)+<,63+$2 J0(2

KLB

I$273)/,3+$2M:::

N6O()M K162%6

PKLB

I$273)/,3+$2M

NNIQ

FRS;ES

;F;R

K162%6 N6O()

K2%)(@7M T(77+,6&:::

46@5+67M

N$)+&PU$:::

K2%)(@7M T(77+,6 46@5+67M

N$)+&PU$:::

FRS

EFS

;F;R

B+%%+2A

V62+(5&B/)27&PKLB

I$273)/,3+$2M&NNIQ

W$

K162%6

N6O()&PKLB

I$273)/,3+$2M

NNIQ

XY

K162%6&N6O()&'(23&U/(&T/2&;EM&;F;R&63&DFZdf&61&-VU U=(&+23()+$)&(G+73+2A&,6>(3()+6M&,$))+%$)&;F;&62%&̂+3,=(2&6)(67&6)(&7+2A5(&7,$)(%&IHbC&7=$/5%&3=+7&?(&,6))+(%&+2&655&2(@&@6557&$)&7362%6)%&IHb\&45(67(&6%*+7(

4)(B+%Ce F V*+7+$2&DDdFFF&C I$11(),+65 #$$%7()*+,(

J0(2

KLB

I$273)/,3+$2M:::

N6O()M K162%6

PKLB

FRS;ES

;F;R

K162%6 N6O()

K2%)(@7M T(77+,6&:::

46@5+67M

K2%)(@7M T(77+,6

FRS

EFS

;F;R

B+%%+2A

V62+(5&B/)27&PKLB

I$273)/,3+$2M&NNIQ

W$ K162%6

N6O()&PKLB

I$273)/,3+$2M

KLB&I$273)/,3+$2M&NNI

4)+23(%&$2&a(%&T/2&;dM&;F;R&63&DFZ;e&61&-VU

T$?&gZ&KLBC;RChFfHI'&C&B4E&H+%%5(&',=$$5&K%%+3+$27&i&c(2$*63+$27 hRf;F&H/))69&'3

H6336@62M&H+,=+A62&deFfD jklmnonpqnr

��� ��������
�����
��������� ���������
����� ������ ���������!

"#$%&'()*+,('-./0 10/2%34/*%-)

1-)5*2$4*%-)6

7-2%+9:-;;;

</=0%/56 7-2%+9:-;;;

@'/)A/+7/B(2+C()*+:$(+D$)+EF6+EGEH+/*+IGJIK+/'+"L:

<0(/5(+/A.%5(+=M-+%5+2('-.%)N+/)A+A%5&-5%)N+-O+*M(+(P%5*%)N+(#$%&'()*+A$2%)N+A('-0%*%-);

<2(Q%ARS G

:(4M)-0-NT+</2*

U$'V(2+10/2%34/*%-)5

W&()

@XQ

1-)5*2$4*%-)6;;;

7/B(26 @'/)A/

9@XQ

1-)5*2$4*%-)6

GHYEFY

EGEH

@'/)A/ 7/B(2

@)A2(=56 D(55%4/+;;;

</=0%/56 7-2%+9:-;;;

@)A2(=56 D(55%4/ </=0%/56 7-2%+9:-;;;

GHY

FGY

EGEH

Q%AA%)N

L/)%(0+Q$2)5+9@XQ

1-)5*2$4*%-)6+7718

U-

@'/)A/

7/B(2+9@XQ

1-)5*2$4*%-)6

@'/)A/+7/B(2+C()*+:$(+D$)+EF6+EGEH+/*+IGJIE+/'+"L:

ZM/*+&/2*[+%5+*-+V(+$5(A+O-2+*M(+@X+()4-A(26+L(4-A(26+*M(+*-$4M+</)(06+/)A+*M(+@YX+&2-4(55-2+/5+*M(5(+/2(+)-*+0%5*(A+%)+*M(+@XI+(#$%&'()*+54M(A$0(\ :M(+</N%)N+(#$%&'()*+/)A+CT)4M2-)%](A+40-4̂+54M(A$0(+5M-=+*M(+5/'(+%)O-2'/*%-);+ZM/*+/2(+*M(+&/2*+[_5+O-2+*M(5(+'/*(2%/05\

<2(Q%AR̀ G

L--2+a/2A=/2(+C4-&( 10/2%34/*%-)

10-5(A

@XQ

1-)5*2$4*%-)6;;;

7/B(26 @'/)A/

9@XQ

1-)5*2$4*%-)6

GHYEFY

EGEH

@'/)A/ 7/B(2

7/B(26 @'/)A/ 9@;;;

GHY

FGY

EGEH

GHYEFY

EH

Q%AA%)N

L/)%(0+Q$2)5+9@XQ

1-)5*2$4*%-)6+7718

U-

@'/)A/

7/B(2+9@XQ

1-)5*2$4*%-)6

@'/)A/+7/B(2+C()*+:$(+D$)+EF6+EGEH+/*+IGJGb+/'+"L:

ZM-+%5+&2-.%A%)N+L--2+a/2A=/2(\

@'/)A/+7/B(2+9@XQ+1-)5*2$4*%-)6+7718+,(5&-)A(A+:$(+D$)+EF6+EGEH+/*+IGJGb+/'+"L:

L--2+M/2A=/2(+%5+&2-.%A(A+VT+GH;SGG+-2+GS;KGG;

<2(Q%ARH G

@44(55+1-)*2-0+CT5*('

1--2A%)/*%-) 10/2%34/*%-)5

W&()

@XQ

1-)5*2$4*%-)6;;;

7/B(26 @'/)A/

9@XQ

1-)5*2$4*%-)6

GHYEFY

EGEH

@'/)A/ 7/B(2

@)A2(=56 D(55%4/+;;;

</=0%/56 7-2%+9:-;;;

@)A2(=56 D(55%4/ </=0%/56 7-2%+9:-;;;

GHY

FGY

EGEH

Q%AA%)N

L/)%(0+Q$2)5+9@XQ

1-)5*2$4*%-)6+7718

U-

@'/)A/

7/B(2+9@XQ

1-)5*2$4*%-)6

@'/)A/+7/B(2+C()*+:$(+D$)+EF6+EGEH+/*+IGJGG+/'+"L:

I;+L,C+EbG@6+È I@6+/)A+È I1+/2(+0%5*(A+-)+*M(+A--2+M/2A=/2(+54M(A$0(+/5+M/.%)N+2(/A(2+V$*+A-(5)_*+5M-=+/+2(/A(2+-)+*M(+A2/=%)N;++:M(5(+/2(+0%5*(A+/5+0-4̂A-=)+A--25;+cT+/55$'&*%-)+%5+*M/*+*M(T+A-+)-*+)((A+/+2(/A(2;+@'+d 4-22(4*\ E;+L,C+EHS6+È F6+È Q̀6+FIe6+/)A+FEE+/2(+0%5*(A+-)+*M(+A--2+M/2A=/2(+54M(A$0(+/5+M/.%)N+2(/A(2+V$*+A-(5)_*+5M-=+/+2(/A(2+-)+*M(+A2/=%)N;+:M(T+/2(+)-*+0-4̂+A--2+A--25;+CM-$0A+*M(T+M/.(+2(/A(25\ F;+L,C+FEF+/)A+FEK+/2(+5%)N0(+5*/00+2(5*2--'5+/)A+/2(+0%5*(A+M/5+)-*+M/.%)N+/+2(/A(2+-)+*M(+M/2A=/2(+54M(A$0(+V$*+A-+M/.(+(0(4*2%3(A+M/)A0(5;+CM-$0A+*M(5(+A--25+M/.(+2(/A(25+/)A+%O+)-*+/2(+*M(T+/4*$/00T+&/2*+-O+*M(+/44(55+5T5*('\ K;+L,+EHe+%5+-)+*M(+M/2A=/2(+54M(A$0(+=%*M+/+2(/A(2+/)A+/5+/+0-4̂A-=)+A--2;+d+4-$0A+)-*+3)A+%*+-)+*M(+A2/=%)N;+Z/5+*M%5+A--2+(0%'%)/*(A;

b;+d+O-$)A+)-+2(O(2()4(+/5+*-+&/)(0+0-4/*%-)5;+d5+/00+M(/A()A+(#$%&'()*+N-%)N+%)+*M(+cLf\ H;+d+5((+*M(+cLf+%)+2--'+EHS6+V$*+)-+%)A%4/*%-)5+O-2+dLf5;+1/)+T-$+&0(/5(+&-%)*+*M('+-$*\+C(2.(2+IKH\ ;̀+W&*%4/0+3V(2+%)5*/00/*%-)+%5+)-*+2(#$%2(A+O-2+*M%5+&2-g(4*\

<2(Q%ARb G 1-%0%)N+L--2+È E L(*/%05+h+10/2%34/*%-)5

W&()

@XQ

1-)5*2$4*%-)6;;;

7/B(26 @'/)A/

9@XQ

1-)5*2$4*%-)6

GHYEEY

EGEH

@'/)A/ 7/B(2

@)A2(=56 D(55%4/+;;;

</=0%/56 7-2%+9:-;;;

@)A2(=56 D(55%4/ </=0%/56 7-2%+9:-;;;

GHY

EeY

EGEH

Q%AA%)N

L/)%(0+Q$2)5+9@XQ

1-)5*2$4*%-)6+7718

U-

@'/)A/

7/B(2+9@XQ

1-)5*2$4*%-)6

@'/)A/+7/B(2+C()*+c-)+D$)+EE6+EGEH+/*+IGJbG+/'+"L:

<0(/5(+&2-.%A(+g/'V6+5%006+/)A+M(/A+A(*/%05+O-2+4-$)*(2+4-%0%)N+A--2+È E;+C&(4%34/*%-)5+5*/*(+%)*(N2/0+O2/'(+/)A+5%00+V$*+/05-+5*/*(+*-+'-$)*+V(*=(()+g/'V5;

<0(/5(+/05-+40/2%OT+A(5%N)+%)*()*+O-2+5%00+/*+A--2+È E;+CM-$0A+fC"+&2-.%A(A+A%5M+*/V0(+bGK@+(P*()A(A+*M2-$NM+A--2+-&()%)N+/5+5%00+-2+/+5(&/2/*(+5*/%)0(55+5%00+V(+&2-.%A(A\

@XQ+1-)5*2$4*%-)6+771

<2%)*(A+-)+Z(A+D$)+EK6+EGEH+/*+IGJEe+/'+"L:

D-V+[J+@XQREHRbG̀ c1C+R+Q<F+c%AA0(+C4M--0+@AA%*%-)5+h+,()-./*%-)5 bH̀ EG+c$22/T+C* c/**/=/)6+c%4M%N/)+KeG̀ I ijklmnmopmq

��� ��������
�����
��������� ���������
����� ������ ���������!

+$,-$./0/102'' 345-647/-#$#0/1 3$89#45$0+11:5;

<=$7

>=$5 2?%

@15./#-7/&15ABBB

C4D$#A 2845'4 E2?% @15./#-7/&15A

CC@F

*GHIGH

J*JG

2845'4 C4D$#

25'#$K.A

L$..&740BBB

"4KM&4.A

C1#&0EN1BBB

25'#$K.A L$..&74

BBB

"4KM&4.A

C1#&0EN1BBB

*GH

JOH

J*JG

%&''&5;

@M4P0</-MM0E2?%

@15./#-7/&15A0CC@FA

Q45&$M0%-#5.0E2?%

@15./#-7/&15A0CC@F

R1

2845'4 C4D$#0E2?% @15./#-7/&15A

CC@F

ST

2845'40C4D$#0<$5/0N-$0L-50IGA0J*JG04/0*JU**0=80VQN

WX0Y&$K$'0/Z$0=#1[$7/045'0K45/$'0/10#$47Z01-/0/10.$$0&60X071-M'0;$/0?$#.&710+11:5;0<P./$8.04''$'0/10/Z$0C1K0<M1=$0#11:5;0.=$7.04.040845-647/-#$#B0X0Z4Y$04071-=M$0160715/#47/1#.0KZ104#$0&5/$#$./$'0&50/Z&.0=#1[$7/B X04804//47Z&5;0409#17Z-#$0.Z1K&5;0/Z$0#11:5;0.P./$8.0/Z4/0?$#.&7101\$#.B0 ]1-074504M.10M$4#5081#$0491-/01-#0#11:5;0.P./$8.09P0Y&.&/&5;?$#.&71B7180W

?$#.&7102MM0<P./$8.0%#17Z-#$B='6

_&#/0Q$=/Z0@M4#&:74/&15 9$Z&5'03$/4M0"45$M.

@M1.$' 2?%

@15./#-7/&15ABBB

C4D$#A 2845'4 E2?% @15./#-7/&15A

CC@F

*GHIGH

J*JG

2845'4 C4D$#

C4D$#A 2845'4

E2BBB

*GH

Ĵ H

J*JG

*GHIGH

JG

%&''&5;

@M4P0</-MM0E2?%

@15./#-7/&15A0CC@FA

Q45&$M0%-#5.0E2?%

@15./#-7/&15A0CC@F

R1

2845'4 C4D$#0E2?% @15./#-7/&15A

CC@F

ST

2845'40C4D$#0<$5/0N-$0L-50IGA0J*JG04/0*̀ Û 0̂480VQN

@450K$07M4#&6P0/Z$0'$=/Z0160/Z$0718=1.&/$0;&#/.09$Z&5'0/Z$08$/4M0=45$M.a0<=$7.0.4P0)W0-5M$..01/Z$#K&.$051/$'B0Q#4K&5;.0'15b/051/$0/Z$0'$=/ZA09-/0&/04==$4#.0/109$0;#$4/$#0/Z45)W

�T

2845'40C4D$#0E2?%0@15./#-7/&15A0CC@F0+$.=15'$'0N-$0L-50IGA0J*JG04/0*̀ ÛO0480VQN

NZ&.0&.0450&..-$045'0K&MM09$04''#$..$'0&50406-/-#$02''$5'-8B0

"#$%&'(J * _M4c&5;0(0d&M8 @M4#&:74/&15.

@M1.$' 2?%

@15./#-7/&15ABBB

C4D$#A 2845'4 E2?% @15./#-7/&15A

CC@F

*GHIGH

J*JG

2845'4 C4D$#

C4D$#A 2845'4

E2BBB

*GH

Ĵ H

J*JG

*GHIGH

JG

%&''&5; R1

2845'4 C4D$#0E2?% @15./#-7/&15A

CC@F

ST

2845'40C4D$#0<$5/0N-$0L-50IGA0J*JG04/0*̀ ÛI0480VQN

NZ$0&5/$#&1#07156$#$57$0#1180K&5'1K0$M$Y4/&15.074MM061#040Y&5PM0:M8A09-/0510.=$7&:74/&150K4.0=#1Y&'$'B02HV0"M$4.$04'Y&.$B

�T

2845'40C4D$#0E2?%0@15./#-7/&15A0CC@F0+$.=15'$'0N-$0L-50IGA0J*JG04/0*̀ ÛJ0480VQN

X5/$#&1#.0.4P.0/Z$P0=M47$'0/Z$0Y&5PM0:M8061#0/Z$07156$#$57$0#1180&50/Z$0;M4c&5;0.=$7B

"#$%&'(I * </4\(Jee0<=$70f

VM$Y4/&15.

@M1.$' 2?%

@15./#-7/&15ABBB

C4D$#A 2845'4 E2?% @15./#-7/&15A

CC@F

*GHIGH

J*JG

2845'4 C4D$#

C4D$#A 2845'4

E2BBB

*GH

Ĵ H

J*JG

*GHIGH

JG

%&''&5; R1

2845'4 C4D$#0E2?% @15./#-7/&15A

CC@F

ST

2845'40C4D$#0<$5/0N-$0L-50IGA0J*JG04/0*̀ UJ̀ 0480VQN

X0.4K0P1-#051/$0491-/04''&5;0/Z$0=M4./&70M17g$#0.=$70.&57$0&/b.0.Z1K50150d<V0=M45.A09-/0/Z$P0'&'5b/0=#1Y&'$040.=$7B0X04804M.10.$$&5;0/Z$0.$4/&5;071-5/$#045'07Z4&#.0K&/Z&50</4\0(0JeeB0X0'15b/0.$$045P0$M$Y4/&15.061#0/Z4/0150<4#4b.0&5/$#&1# =M45.045'0510.=$7.0150d<V0'#4K&5;.B02HV02'Y&.$

�T 2845'40C4D$#0E2?%0@15./#-7/&15A0CC@F0+$.=15'$'0N-$0L-50IGA0J*JG04/0*̀ UJh0480VQN i$0'15b/0Z4Y$0/Z$045.K$#0P$/0/10$M$Y4/&15061#0</4\0JeeB0NZ&.0K&MM09$0150406-/-#$02''$5'-8B

2?%0@15./#-7/&15A0CC@

"#&5/$'0150i$'0L-50J)A0J*JG04/0I*UJh0480VQN

L190jU02?%(JG(O*e3@<0(0%"̂03&''M$0<7Z11M02''&/&15.0f0+$51Y4/&15.

OGeJ*03-##4P0</

34//4K45A03&7Z&;450)h*eI klmnopoqrop

MCS 2024 BOND - MIDDLE SCHOOL OFFICE & CAFETERIA

Bid Package 3

Mattawan, MI

AVB-26-507

FORM 00 7200

(a.k.a. ATTACHMENT B - SCOPE OF WORK ALL TRADES)

00 7200 General Work Scope

Specification Sections Included:

AVB 00 0000 Bidders Instructions and Requirements

AVB 01 0000 Subcontractor General Requirements

AVB 00 AVB Health & Safety Policy

Division 00 Procurement & Contracting Requirements

Division 01 General Requirements

Submittal of a proposal and acceptance of a contract assumes this subcontractor has included all scope of work relative to this bid category and has accepted all terms and conditions identified in the bid documentation.

Bidder acknowledges review of all bid documentation and instruction, including AVB Standard Subcontract as provided for reference in Bidders Instructions and Requirements. Unmodified subcontract will be signed within 7 days of issuance, or prior to starting work, whichever is sooner. Proceeding with work constitutes acceptance of work scope and subcontract terms.

If bidder has separate contract review team, bidder will note such on proposal and subcontractor's review of AVB

Subcontract will be completed prior to scheduling of post bids and proposed changes will be discussed at Post Bid

Interview

Subcontractor shall provide adequate manpower and equipment at all times, as required to meet the project schedule. Subcontractor shall provide labor as required to preserve workplace harmony and prevent any jobsite disruption.

Include a two year warranty from the substantial completion date for the entire project, not from the substantial completion of this portion of work. Where special warranties are specified, those longer warranty periods shall commence from substantial completion date for the entire project.

Bidder will get formal acceptance on any warranty shorter than any specification requirement or shorter than subcontractor warranty of two years through RFI process, recorded and distributed, or will bid as specified with voluntary alternate for savings of reduced warranty term.

Furnish all necessary taxes, bonds and insurance. A Certificate of Insurance from the Subcontractor's Insurance

Carrier must be in AVB Construction's possession prior to start of work. AVB Construction and the Project Owner and any other parties listed in the contract shall be named as additional insured. A sample with specific verbiage and owner entities for additional insured will be provided.

Subcontractor shall furnish all means, methods, labor, material, equipment, layout, field measurements, permits, licenses, etc. which may be required to complete their scope of work.

Subcontractor will identify any sub-tiered subs on proposal, in SOV and in workplan. 3rd tier subs will be managed on site by a direct employee of the awarded subcontractor. The on site management will be developed and approved at the discretion of the AVB superintendent, and may be adjusted by the AVB superintendent when deemed necessary to manage labor, safety, schedule, quality and site cleanliness.

Any materials with longer than 4 week lead times should be called out with their respective lead time in the bid and work plan.

All materials shall meet the requirements of the specifications, and shall be installed per manufacturer recommendations and specifications.

Subcontractor is responsible for review and knowledge of all drawings as related to this project. Any discrepancies in the drawings that will affect this subcontractor's scope of work shall be brought to CM's attention immediately.

1.0 Work Scope Notes:

Subcontractor will review all specifications within their work scope and submit product data, shop drawings, samples and other required submittals in packages by spec section for approval electronically; PDF documents are preferred. Unless otherwise noted, contractor will receive notification of submittals required through PROCORE and submit through PROCORE to those specs. Contractor should notify AVB if there are discrepancies in the submittal log received.

Subcontractor shall have full time supervision on the jobsite at all times that is knowledgeable and competent in the detailed requirements of the work of this subsystem. This person shall not be removed from this project until the work is complete and shall not be removed or replaced without the approval of the AVB Project Manager.

Subcontractors are responsible for assigning a designated English speaking foreman. It is the responsibility of the subcontractor to translate the site specific safety orientation, updates, and any other communications from AVB.

Lack of understanding of the English language is NOT a valid reason for violating ANY safety rules or required AVB procedures.

15 Subcontractor to participate in pre-installation meetings noted on bid schedule.

Subcontractor will participate in on-site Progress Meetings starting 2 weeks prior to their trades work and continuing 2 weeks beyond completion of their trades work. Additional meetings may be required to coordinate trades and will be attended by trades at the AVB team discretion. AVB superintendent may grant requests to attend virtually or miss a meeting, if received at least 2 days prior to meeting.

Subcontractor must coordinate its work with the work of other subcontractors at the site to eliminate conflicts. No additional costs as a result of a lack of coordination will be allowed.

Subcontractor is to include all unloading and protection of materials delivered to site including all necessary machinery for material handling. This includes all staging and movement to final placing. This subcontractor to coordinate the location of stored materials with CM and provide relocation if necessary.

Subcontractor shall inspect the area of work to insure that surfaces are ready for installation. Subcontractor to bring to the attention of the AVB Construction Superintendent or Project Manager any problems with the surfaces.

Proceeding with the work constitutes acceptance of a surface.

Clean up and removal of debris from construction area to appropriate project dumpster shall be performed by this subcontractor as it applies to their scope of work on a DAILY basis. Additional clean up may be required to maintain clear egress and a safe worksite, at the discretion of the AVB Construction Superintendent. Failure to clean up shall be cause for this work to be performed by others at the expense of this subcontractor.

Clean existing streets and parking areas of all dirt and debris as generated by your work force on a daily and as-needed basis, or as directed by the CM.

If, after prior written request, this subcontractor has not cleaned loose debris, materials, and general garbage to satisfaction of AVB Superintendent, AVB will perform the necessary cleaning at a rate of 10% higher than the subcontractors highest labor rate of the offending subcontractor. For example, if the foreman is listed at $80/hr, AVBs hourly rate for cleanup will be $88/hr.

Provide multiple mobilizations, at no additional cost, as required to maintain construction progress and as directed by AVB.

All work is to comply with all federal, state, and local codes and ordinances, including OSHA, MIOSHA and the AVB

Safety Program. AVB Safety Program is included in bidding documents. AVB Supervisory Personnel may issue deviation tickets and impose monetary fines and/or withhold from the subcontractors next progress payment for non-compliance with safety and health requirements.

2 Notify Miss Dig and/or all appropriate utility companies before start of work and locate all existing utilities.

All scaffolding and temporary handrails are to comply with OSHA guidelines. Provide and install all necessary bracing, signage, and protection as directed by OSHA and/or AVB guidelines. Daily inspections/tagging are required for the entire duration of the erected scaffold.

4 Subcontractor to provide and comply with written silica dust control plan for all activities creating potential hazard.

Subcontractor will implement a project specific safety program and shall participate in site safety program including, but not limited to: site safety orientations, daily foreman review with superintendent and site specific trainings and meetings.

It is the responsibility of each trade to provide, maintain and train workers within that trade on Safety Data Sheets related to any materials used by this trade on site.

Jobsite safety per OSHA and AVB Safety plans is required. AVB can issue safety deviation tickets and fine the company of any employee not adhering to required safety measures.

Subcontractor shall have at least one first aid certified crew member on site at all times. Subcontractor will provide first aid certification cards at the on site safety orientation as requested.

2.0 Safety:

Subcontractor will submit subcontractor safety manual, field workers first aid certificates, other respective trainings, equipment certifications, and safety data sheets as PROCORE Submittals (01 3500-01 Safety Manual, 01 3500-02

Certifications, 01 3500-03 SDS)

Please note that although the schedule defines the planned order of construction, Bidders should not assume any assurance is given or implied as to the calendar dates associated with completion of the work of a particular contract.

All Contractors and Subcontractor recognize and shall accept modifications to the schedule which are reasonable, in the opinion of the Construction Manager, for the general interest of the project as a result of allowable time extensions in any contract, and such modifications are inherent to the construction process and shall not qualify as a basis for extra compensation from the Construction Manager or Owner.

The Contractor, in submitting a proposal for the work of a particular work category, agrees to commit the necessary resources to complete the work activities of that work category, within a time span not greater than the duration given on the Bid Document Construction Schedule.

Bidder to provide detailed work plan, including amount of dedicated, on-site manpower for any tasks identified in

Bid Schedule. Provide similar information with expected duration breakdown of any Subtasks not specifically identified in Bid Schedule but is required to complete scope of work. Additional information may be requested upon review by AVB Project Manager. This detailed work plan to be provided with SOV prior to Post Bid Interview to allow further discussion at Post Bid Interview

Any overrun of the duration for this Contractor given in the Bid Document Construction Schedule that will require overtime, unplanned measures, or other consequences of delay that must be instituted by subsequent Contractors to avoid extension of the scheduled end date and associated liquidated damages will be the financial burden of this

Contractor.

AVB Construction reserves the right to retain additional labor forces to complete this scope of work if it is deemed the construction schedule is not being met. This additional manpower will be the financial responsibility of this

Contractor.

1 Costs associated with document printing and CAD files (or equivalent) are the Subcontractors responsibility.

2 Take note of Time, Material and Performance provisions as noted in the General Requirements.

3 Include in proposal: labor rates and mark-ups for add's/extras/change orders.

Provide Schedule of Values to AVB Project Manager with proposal, prior to scheduling post bid interview. Schedule of values should show labor and material costs for each item.

All subcontractors will provide a two year warranty for their scope of work. Warranty shall be effective from substantial completion of the completed project; not from substantial compeltion of subcontractor's scope of work.

AVB may hold progress payments at the 50% mark or beyond of billing completion until specification-required

Operation and Maintenance information and other close-out information is submitted and approved up to as-built and final warranty documentation.

Operations and maintenance manuals, extra/maintenance materials and special warranties as required by the specifications are to be submitted in a timely manner. If at closeout time, special warranties do not meet the terms of the specification, the subcontractor will supply, on their own letterhead, a warranty that their company will cover the specification terms. Release of retention is contingent upon work completion, receipt of closeout documents, sworn statements and waivers.

Project will have progress and final punch performed by project team members, bidders are to plan to address these within 3 days to keep the project moving.

Formal cost requests for any field added work during punch time is to be submitted within 7 days of completion of the added work.

All subcontractors must provide a color electronic copy of their as-builts as part of closeout. Subcontractors who do not provide electronic copy can be backcharged for the documentation fees incurred.

00 7200 General Work Scope

3.0 Schedule:

4.0 Accounting:

5.0 Closeout:

Mattawan, MI

AVB-26-507

FORM 00 24 00.1.4.02.400

(a.k.a. ATTACHMENT B - SCOPE OF WORK ALL TRADES)

Work Scope 02.400 Selective Demolition

Specification Sections Included:

02 4116 Structure Demolition; 02 4119 Selective Demolition

Reference Specification Sections:

Bid Due Date: July 10, 2026 at 1PM EST

This will be a Public Bid Opening. All bids must be sealed and received by MCS prior to bid due date and time noted above. Public Bid Opening will follow immediately.

Bidders must comply with current Prevailing Wage Requirements. Refer to specifications for current wages and requirements as well as AVB Subcontract addendum included in Bid Documents

Bidders must include a Bid Bond and PLM bond as part of base bid. Provide the DEDUCT cost for the PLM Bond as noted on AVB Bid Proposal Form. Necessity of PLM bond will be at the discretion of AVB and/or MCS based on review of Bidder's proposal and qualifications.

Bidders must review and include AVB General Workscope 00 7200 in addtion to the Trade Specific Work Scope

Requirements below.

Subcontractor shall provide current MiCHATS Background Checks for all field personnel assigned to project prior to personnel arriving on site.

Mattawan Consolidated School campus is a tobacco and smoke free campus. Use of tobacco, cigarettes, vape, etc. will not be tolerated in the building, on site, or in vehicles and will be cause for removal from the project.

All material and equipment deliveries shall be coordinated with AVB and may be restricted to specific times to accomodate school traffic.

1 Include demolition and removal of building materials per Architectural Demolition drawings.

2 Items to be salvaged per drawings and specifications shall be turned over to AVB

3 Slab-on-grade removal by others

4 Demolition related to Mechanical, Electrical, Plumbing to be by others. Coordinate with AVB and MEP contractors

5 Flooring demolition shall include removal of flooring mastics and mortars to bare concrete for a level condition

Include all shoring material and labor necessary to maintain existing building structure at all times until permanent structural members are installed.

7 Include all temporary enclosure measures for openings created through demolition.

8 Protect adjacent surfaces not called to be removed or demolished

9 Include all dumpsters required for demolished building material while on site

10 Verify that all utilities have been marked and capped before starting demolition.

11 Inform AVB immediately upon finding unmarked utilities, asbestos, or hazardous materials.

12 All equipment used on site shall be electric or be equipped with an air scrubber for fuel-fired equipment

7.0 Mandatory Alternates:

1 ENTRY PLAZA

2 EMERGENCY GENERATOR

3 NEW CEILINGS AND LIGHTING IN PLACE OF EXISTING

0.0 Special Bidding Requirements:

6.0 Trade Specific:

8.0 Voluntary Alternates:

Work Scope 02.400 Selective Demolition

Mattawan, MI

AVB-26-507

FORM 00 24 00.1.4.03.100

(a.k.a. ATTACHMENT B - SCOPE OF WORK ALL TRADES)

Work Scope 03.100 Concrete

Specification Sections Included:

03 3000 Cast-In-Place Concrete; 32 1313 Concrete Paving; 32 1313.13 Exposed Aggregate Concrete

Paving; 32 1373 Concrete Paving and Joint Sealants; 07 2100 Thermal Insulation; 07 9200 Joint Sealants;

10 7516 Ground-Set Flagpoles

Reference Specification Sections:

Bid Due Date: July 10, 2026 at 1PM EST

This will be a Public Bid Opening. All bids must be sealed and received by MCS prior to bid due date and time noted above. Public Bid Opening will follow immediately.

Bidders must comply with current Prevailing Wage Requirements. Refer to specifications for current wages and requirements as well as AVB Subcontract addendum included in Bid Documents

Bidders must include a Bid Bond and PLM bond as part of base bid. Provide the DEDUCT cost for the PLM Bond as noted on AVB Bid Proposal Form. Necessity of PLM bond will be at the discretion of AVB and/or MCS based on review of Bidder's proposal and qualifications.

Bidders must review and include AVB General Workscope 00 7200 in addtion to the Trade Specific Work Scope

Requirements below.

Subcontractor shall provide current MiCHATS Background Checks for all field personnel assigned to project prior to personnel arriving on site.

Mattawan Consolidated School campus is a tobacco and smoke free campus. Use of tobacco, cigarettes, vape, etc. will not be tolerated in the building, on site, or in vehicles and will be cause for removal from the project.

All material and equipment deliveries shall be coordinated with AVB and may be restricted to specific times to accomodate school traffic.

Include all footings, foundations, piers, stoops, and frost walls. Include foundation wall insulation. Include all waterstop in wall construction joints.

Include box outs and openings for other trades' penetrations. Coordinate with contractors which may require sleeving through foundation walls for installations of their work, for sleeve materials & locations. Undermining of foundation walls will not be permitted.

Include thickened or depressed slabs if indicated including excavation as required. Includes shallow footings for interior masonry walls. Refer to architectural floor plans for locations and structural drawings for details.

Include all wire mesh, fiber mesh, masonry dowels, reinforcing steel, rods, expansion material, support steel, and chairs required per plans and specifications. Coordinate masonry dowel location and spacings with drawings and masonry contractor.

Install anchor bolts and embeds as provided by others. Maintain specified embedment & projections for attachment as indicated in project documents. Templates for anchor bolts shall be provided by Structural Steel contractor.

6 Include grouting of all steel columns

Include all slab-on-grade. Including any pumping if necessary. Include all under-slab insulation and vapor barrier as

& where specified in project documents.

Include sawcut and removal of slab-on-grade per slab demolition plans and infill of slab-on grade per slab infill plans. Exclude slab removal and infill in Receiving/Cold Storage 232; by 26.100.

Coordinate with Kitchen Equipment for extents of Cooler/Freezer slab-on-grade requiring under slab insulation.

Include in-slab insulation and 2x10 blocking within slab.

Include all site concrete including, but not limited to sidewalks, curb & gutter, integral curbs, maintenance strips, handicap ramps and warning pads, etc.

11 Include sandblasted logo on sidewalk per details. Include any templating and cleanup.

12 Include flag pole and flag pole base

Include fine grade and compaction of base material for all areas as scheduled to receive concrete. Compactable base materials will be furnished and installed by others.

Subcontractor shall include all caulk of expansion and control concrete joints. Include any expansion material or backer rod as necessary

Include concrete sealant finish. Refer to interior finish drawings. Provide complete densifier, hardener, sealer system per drawings. Include any floor preparations required for application inlcuding cleaning, grinding, etc.

16 Install and fill pipe bollards provided by 05.100

Include all hoisting, pumping, buggy or wheel barrow transporting of concrete that may be necessary to complete your work.

CM shall provide concrete testing by taking concrete test cylinders at the site with on-site cure for one day.

Subcontractor shall be responsible for all testing costs, whenever necessary, to verify “in place” concrete strengths if a cylinder compression break fails to meet required strength standards.

Subcontractor shall be responsible for all costs associated with the removal and replacement of any concrete failing to meet required strengths, as directed by the CM and/or Structural Engineer.

Repair all defects such as cracks, honeycombing, etc. in concrete. Repair will be completed to the satisfaction of the

AVB superintendent.

Sawcut control joints as soon as possible, if beyond twenty-four (24) hours after placement of concrete, dry cutting will not be allowed. Saw cuts performed after 24 hours from placement of concrete shall be performed as "wet-cutting", and contractor shall clean all resulting slurry from all surfaces. Contractor shall provide saw cut layout to

CM for approval PRIOR to any saw cutting activities.

Clean all entries and roadways daily to remove mud or materials as a result of this contractors work and vehicle travel associated with this work.

23 Include protection of adjacent prior installed work.

Subontractor shall place caps over all protruding steel reinforcements as well as anchor bolts installed by this contractor.

If required, subcontractor to provide blankets for cold weather protection. Temp heat will be provided by AVB if needed

26 All equipment used on site shall be electric or be equipped with an air scrubber for fuel-fired equipment

All pours shall be coordinated with AVB and scheduled so concrete trucks and other equipment does not impeded school drop-off or pick-up.

7.0 Mandatory Alternates:

1 ENTRY PLAZA

2 EMERGENCY GENERATOR

3 NEW CEILINGS AND LIGHTING IN PLACE OF EXISTING

8.0 Voluntary Alternates:

Work Scope 03.100 Concrete

Mattawan, MI

AVB-26-507

FORM 00 24 00.1.4.04.200

(a.k.a. ATTACHMENT B - SCOPE OF WORK ALL TRADES)

Work Scope 04.200 Masonry

Specification Sections Included:

04 2000 Masonry; 07 1900 Water Repellents; 07 9200 Joint Sealants

Reference Specification Sections:

Bid Due Date: July 10, 2026 at 1PM EST

This will be a Public Bid Opening. All bids must be sealed and received by MCS prior to bid due date and time noted above. Public Bid Opening will follow immediately.

Bidders must comply with current Prevailing Wage Requirements. Refer to specifications for current wages and requirements as well as AVB Subcontract addendum included in Bid Documents

Bidders must include a Bid Bond and PLM bond as part of base bid. Provide the DEDUCT cost for the PLM Bond as noted on AVB Bid Proposal Form. Necessity of PLM bond will be at the discretion of AVB and/or MCS based on review of Bidder's proposal and qualifications.

Bidders must review and include AVB General Workscope 00 7200 in addtion to the Trade Specific Work Scope

Requirements below.

Subcontractor shall provide current MiCHATS Background Checks for all field personnel assigned to project prior to personnel arriving on site.

Mattawan Consolidated School campus is a tobacco and smoke free campus. Use of tobacco, cigarettes, vape, etc. will not be tolerated in the building, on site, or in vehicles and will be cause for removal from the project.

All material and equipment deliveries shall be coordinated with AVB and may be restricted to specific times to accomodate school traffic.

Include complete masonry work scope package per specifications and drawings including all CMU, Brick, DCMU, cast stone construction.

Include specified reinforcing, ties, anchors, core pouring, grouting, bond beams, weeps, vents, water/vapor barrier, dampproofing, and flashing and necessary accessories as indicated.

3 Include dowels drilled and expoxied into existing construction. Refer to structural elevations

4 Include "zee brick straps" for DCMU units at entry canopy construction

A1

Include cleaning of salavaged brick (removal of mortar/grout, etc) for use in interior infill and tooth-in applications.

Dispose of remaining salvaged brick in AVB provided dumpsters upon completion. 02.400 shall salvage bricks and palletize for use by 04.200 contractor.

5 Include "toothing-in" block and brick masonry as and where requried per drawings and specifications.

Include bullnose block at all exposed corners. Include grinding existing block in newly created openings to create bullnose or "toothing-in" new bullnose block

7 Include flowable fill between foundation walls at double firewall constrution (13/S301)

8 Include block, DCMU,and cast stone at Front Signage. Refer to architectural drawings.

Include coordination with concrete contractor prior to foundations to coordinate locations and spacings of vertical wall dowels to ensure proper placement including at corners, end walls, door jambs, etc per drawing requirments

Include setting all loose lintels and bearing plates supplied by 05.100 Steel scope. Contractor shall coordinate delivery sequence with CM & Misc Steel Contractor such as to avoid delays in installation.

Include bracing of unsupported walls complying with all MIOSHA regulations. Subcontractor shall provide proper training for other trades required to work in restricted access zones.

Include grouting of hollow metal door and window frames. Frames supplied, set and braced by General Trades contractor

Coordinate and guarantee opening dimensions for all mechanical & architectural louvers, windows, and door openings. AVB to provide rough openings prior to start of masonry walls

14 Include cleaning/washing of all masonry work. Protect surrounding material and surfaces

Include water repellents as applied to materials installed under this scope of work per specification and manufacturer requirements

Include all joint sealants, backer rod, etc. as required at all control joints. Joint Sealants are to be professional manner/by professional

17 Include spackling of divits and other surface imperfections in preparation for paint.

18 Include heated "cut house" for winter construction

Include on bid proposal a weekly rate for winter conditions to include temporary heat, enclosures, maintenance of such

All cutting of masonry materials shall performed as "wet cut" or in such manner as to effectively control dust.

Subcontractor is responsible to protect adjacent surfaces from saw slurry which may be generated during wet cutting.

Provide and maintain all OSHA and AVB-Safety Manual required Controlled Access Zones and appropriate barricades and signage. Provide training to other subcontractors on-site for their access.

Subcontractor shall place caps over all protruding steel reinforcements as well as anchor bolts installed by this contractor.

23 Subcontractor shall cooperate and make corrections as needed as a result of third-party testing and inspections

24 All equipment used on site shall be electric or be equipped with an air scrubber for fuel-fired equipment

Adequate area for on site batch plant will be provided. Refer to site logistics plan. However, access between staging area/batch plant and construction area may be limited at certain times due to school drop-off, pick-up or other school activities. Coordinate with AVB.

7.0 Mandatory Alternates:

1 ENTRY PLAZA

2 EMERGENCY GENERATOR

3 NEW CEILINGS AND LIGHTING IN PLACE OF EXISTING

8.0 Voluntary Alternates:

Work Scope 04.200 Masonry

Mattawan, MI

AVB-26-507

FORM 00 24 00.1.4.05.120

(a.k.a. ATTACHMENT B - SCOPE OF WORK ALL TRADES)

Work Scope 05.100 Structural Steel & Misc Metals

Specification Sections Included:

05 2100 Steel Joist Framing; 05 3100 Steel Decking; 05 5000 Metal Fabrications

Reference Specification Sections:

Bid Due Date: July 10, 2026 at 1PM EST

This will be a Public Bid Opening. All bids must be sealed and received by MCS prior to bid due date and time noted above. Public Bid Opening will follow immediately.

Bidders must comply with current Prevailing Wage Requirements. Refer to specifications for current wages and requirements as well as AVB Subcontract addendum included in Bid Documents

Bidders must include a Bid Bond and PLM bond as part of base bid. Provide the DEDUCT cost for the PLM Bond as noted on AVB Bid Proposal Form. Necessity of PLM bond will be at the discretion of AVB and/or MCS based on review of Bidder's proposal and qualifications.

Bidders must review and include AVB General Workscope 00 7200 in addtion to the Trade Specific Work Scope

Requirements below.

Subcontractor shall provide current MiCHATS Background Checks for all field personnel assigned to project prior to personnel arriving on site.

Mattawan Consolidated School campus is a tobacco and smoke free campus. Use of tobacco, cigarettes, vape, etc. will not be tolerated in the building, on site, or in vehicles and will be cause for removal from the project.

All material and equipment deliveries shall be coordinated with AVB and may be restricted to specific times to accomodate school traffic.

Include furnish and erection of structural steel system per drawing and specifications. Inlcude all anchor bolts, columns, beams, joists, decking, fasteners, certified welding, labor, crane services, equipment, for a complete system

2 Include bearing plates and loose lintels for installation by 04.200 subcontractor.

3 Include roof opening framing per detail

4 Include roof access ladders per roof plan and details

5 Include all bollards and bollard covers for installation by 03.100 subcontractor

6 Include galvanizing metals as required and indicated in drawings. Non galvanized metals to be shop-primed.

7 All exposed steel to be welded and ground for finish appearance at direction of AVB superintendent.

8 All field welds are to be performed by a certified welder

9 Include repair or correction of all deficiencies as required by the steel inspection service at no additional cost

Take all precautions to properly store on site steel as directed by the CM. This subcontractor to coordinate the location of stored materials with CM and provide relocation if necessary prior to steel erection. Furnish all precautions to keep steel clean. It will be the responsibility of this contractor to clean steel prior to paint

11 Field verify all existing dimensions and elevations as it relates to this subcontractors scope of work.

12 All equipment used on site shall be electric or be equipped with an air scrubber for fuel-fired equipment

7.0 Mandatory Alternates:

1 ENTRY PLAZA

2 EMERGENCY GENERATOR

3 NEW CEILINGS AND LIGHTING IN PLACE OF EXISTING

8.0 Voluntary Alternates:

Work Scope 05.100 Structural Steel & Misc Metals

Mattawan, MI

AVB-26-507

FORM 00 24 00.1.4.06.800

(a.k.a. ATTACHMENT B - SCOPE OF WORK ALL TRADES)

Work Scope 06.800 General Trades

Specification Sections Included:

06 1000 Rough Carpentry; 06 1600 Sheathing; 06 4023 Interior Architectural Woodwork; 06 4114 Plastic

Laminate Faced Architectural Cabinets; 08 1113 Hollow Metal Doors and Frames; 08 1243 Fire

Resistance-R…

This is the start of the file's text. The full file is on GovTribe.