Builder's Sites Advertisement for Bids BP3 - MCS Addit & Renov.pdf
PDF 126 KB Posted
- Attached to
- Building Construction & Renovation State and local contract opportunity
- Solicitation number
- RFP MAT 260000002260 2
- Issued by
- Van Buren County, Michigan
About this file
This is a builder's advertisement for bids issued by Mattawan Consolidated School for Bid Package 3 of the MCS Middle School Additions & Renovations project, with AVB Construction, LLC serving as the Construction Manager. The project involves construction of an addition and renovations to the existing Mattawan Middle School, encompassing multiple trade packages including selective demolition, concrete, masonry, structural steel, metal panels, roofing, doors, glazing, painting, drywall, flooring, kitchen equipment, fire protection, plumbing, mechanical, electrical, technology, sitework, asphalt paving, fencing, and landscaping. A non-mandatory pre-bid walk is scheduled for Monday, June 22, 2026, at 1:00 p.m. at the school site. Sealed bids are due by 1:00 PM on Friday, July 10, 2026, at Mattawan Consolidated School, Central Office, 56720 Murray St., Mattawan, MI 49071, with public bid opening immediately following. Construction is scheduled to commence on August 31, 2026, and continue through March 31, 2028.
Bid security in the amount of not less than 5% of the bid amount is required with all submissions. Each bidder must submit sworn and notarized affidavits disclosing any familial relationships between the bidder and school board members or superintendent, certifying that the contractor is not barred from public contracting due to bid rigging or bid rotating convictions, and certifying that the business is not an "Iran-Linked Business" as defined under Michigan Act 517. All inquiries regarding the bid should be directed to AVB Construction at alafler@avbinc.com.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| BP3 Phasing Plan 6.10.2026.pdf | ||
| AVB Health Safety Program v30 08.29.2023.pdf | ||
| BP3 Bidding Schedule 6.10.2026.pdf | ||
| MCS BP3 MS Add & Ren - Addendum 1 - For Release.pdf | ||
| Bid location.pdf | ||
| 1. AVB 00 0000 MCS Bidders Instructions & Req BP3 MCS MS Addit & Renov.pdf | ||
| Prevailing Wage Rates - MCS Middle School Additions & Renovations.pdf | ||
| 2. AVB 01 0000 Subcontractor Gen Req - BP3 MCS MS Addit & Renov.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: MCS Middle School Additions & Renovations
Owner: Mattawan Consolidated School Design Professional: TowerPinkster Architect’s Project Number: 23-106.035
Bid Package 3 – MCS Middle School Additions & Renovations
Construction Manager: AVB Construction, LLC AVB Project Number: AVB 26-507
To potential bidders: The Owner is soliciting bids to construct an addition and renovations to the existing Mattawan Middle School. AVB Construction, LLC is the Construction Manager for the project and is seeking bids for the following:
02.400 Selective Demolition; 03.100 Concrete; 04.200 Masonry; 05.100 Structural Steel & Misc Metals; 06.800 General Trades;
07.460 Metal Panels; 07.530 Membrane Roofing; 08.340 OH Doors; 08.400 Aluminum, Glass Glazing; 09.910 Paint; 09.250 Studs, Insulation, Drywall, Ceilings; 09.600 General Flooring; 11.400 Kitchen Equipment; 21.100 Fire Protection; 22.100 Plumbing; 23.100
Mechanical; 26.100 Electrical; 27.100 Technology; 31.100 Sitework; 32.120 Asphalt & Paving; 32.310 Fences & Gates; 32.900
Landscaping
Pre-Bid Walk:
• A non-mandatory pre-bid walk is scheduled for Monday, June 22, 2026, at 1:00 p.m. at Mattawan Middle School.
Construction commencement:
• August 31, 2026 – March 31, 2028
Bids are due at 1:00 PM Friday, July 10, 2026 - Public Bid Opening immediately following.
Bid requirements include:
1. Submit clearly labeled sealed bids by Friday, July 10, 2026, by the 1:00 PM deadline, to Mattawan Consolidated School, Central Office, 56720 Murray St., Mattawan, MI 49071. (Bids received after the due date and time listed above shall not be considered or accepted.)
2. Bids submitted shall be accompanied by bid security in the amount of not less than 5% of the amount of the bid.
3. Each bid submitted shall be accompanied by the following sworn and notarized affidavits located in the Bidder’s Instructions:
a. Disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the board or the superintendent of the school district.
b. Certifying that contractor is not barred from public contracting due to bid rigging or bid rotating convictions; and
c. Certifying that it is not an “Iran-Linked Business” as defined in Act 517, Public Acts of Michigan, 2001, MCL 129.311, et seq.
Please direct any questions or inquiries pertaining to this bid to AVB at alafler@avbinc.com.
mailto:alafler@avbinc.com
• A non-mandatory pre-bid walk is scheduled for Monday, June 22, 2026, at 1:00 p.m. at Mattawan Middle School.
File details come from the government source that posted it. Updated .