Builder's Sites Advertisement for Bids BP3 - MCS Addit & Renov.pdf

PDF 126 KB Posted

Attached to
Building Construction & Renovation State and local contract opportunity
Solicitation number
RFP MAT 260000002260 2
Issued by
Van Buren County, Michigan

About this file

This is a builder's advertisement for bids issued by Mattawan Consolidated School for Bid Package 3 of the MCS Middle School Additions & Renovations project, with AVB Construction, LLC serving as the Construction Manager. The project involves construction of an addition and renovations to the existing Mattawan Middle School, encompassing multiple trade packages including selective demolition, concrete, masonry, structural steel, metal panels, roofing, doors, glazing, painting, drywall, flooring, kitchen equipment, fire protection, plumbing, mechanical, electrical, technology, sitework, asphalt paving, fencing, and landscaping. A non-mandatory pre-bid walk is scheduled for Monday, June 22, 2026, at 1:00 p.m. at the school site. Sealed bids are due by 1:00 PM on Friday, July 10, 2026, at Mattawan Consolidated School, Central Office, 56720 Murray St., Mattawan, MI 49071, with public bid opening immediately following. Construction is scheduled to commence on August 31, 2026, and continue through March 31, 2028.

Bid security in the amount of not less than 5% of the bid amount is required with all submissions. Each bidder must submit sworn and notarized affidavits disclosing any familial relationships between the bidder and school board members or superintendent, certifying that the contractor is not barred from public contracting due to bid rigging or bid rotating convictions, and certifying that the business is not an "Iran-Linked Business" as defined under Michigan Act 517. All inquiries regarding the bid should be directed to AVB Construction at alafler@avbinc.com.

View the file

Other files for this state and local contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: MCS Middle School Additions & Renovations

Owner: Mattawan Consolidated School Design Professional: TowerPinkster Architect’s Project Number: 23-106.035

Bid Package 3 – MCS Middle School Additions & Renovations

Construction Manager: AVB Construction, LLC AVB Project Number: AVB 26-507

To potential bidders: The Owner is soliciting bids to construct an addition and renovations to the existing Mattawan Middle School. AVB Construction, LLC is the Construction Manager for the project and is seeking bids for the following:

02.400 Selective Demolition; 03.100 Concrete; 04.200 Masonry; 05.100 Structural Steel & Misc Metals; 06.800 General Trades;

07.460 Metal Panels; 07.530 Membrane Roofing; 08.340 OH Doors; 08.400 Aluminum, Glass Glazing; 09.910 Paint; 09.250 Studs, Insulation, Drywall, Ceilings; 09.600 General Flooring; 11.400 Kitchen Equipment; 21.100 Fire Protection; 22.100 Plumbing; 23.100

Mechanical; 26.100 Electrical; 27.100 Technology; 31.100 Sitework; 32.120 Asphalt & Paving; 32.310 Fences & Gates; 32.900

Landscaping

Pre-Bid Walk:

• A non-mandatory pre-bid walk is scheduled for Monday, June 22, 2026, at 1:00 p.m. at Mattawan Middle School.

Construction commencement:

• August 31, 2026 – March 31, 2028

Bids are due at 1:00 PM Friday, July 10, 2026 - Public Bid Opening immediately following.

Bid requirements include:

1. Submit clearly labeled sealed bids by Friday, July 10, 2026, by the 1:00 PM deadline, to Mattawan Consolidated School, Central Office, 56720 Murray St., Mattawan, MI 49071. (Bids received after the due date and time listed above shall not be considered or accepted.)

2. Bids submitted shall be accompanied by bid security in the amount of not less than 5% of the amount of the bid.

3. Each bid submitted shall be accompanied by the following sworn and notarized affidavits located in the Bidder’s Instructions:

a. Disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the board or the superintendent of the school district.

b. Certifying that contractor is not barred from public contracting due to bid rigging or bid rotating convictions; and

c. Certifying that it is not an “Iran-Linked Business” as defined in Act 517, Public Acts of Michigan, 2001, MCL 129.311, et seq.

Please direct any questions or inquiries pertaining to this bid to AVB at alafler@avbinc.com.

mailto:alafler@avbinc.com

• A non-mandatory pre-bid walk is scheduled for Monday, June 22, 2026, at 1:00 p.m. at Mattawan Middle School.

File details come from the government source that posted it. Updated .