MCDD_PS 4_BidTabulation_10May2023.pdf
PDF 50 KB Posted
- Attached to
- PUMP STATION #4 TRASH RAKE REPLACEMENT PROJECT
- Solicitation number
- S-C26014-00005371
- Issued by
- Multnomah County, Oregon
About this file
This document is a Bid Tabulation for the Multnomah County Drainage District Pump Station #4 Trash Rake Replacement Project, which involves the demolition of the existing rake system and installation of a new trash rake system, hydraulic power units, control panels, hydraulic lines, and related equipment. The project is located in Portland, Oregon and is funded by Multnomah County. The bid opening was held on May 10, 2023, and the project includes 19 bid items with quantities ranging from 1 to 50. The bid prices from 5 different contractors are provided, with the total bid amounts ranging from $265,000 to $418,500.
The bid tabulation includes pricing details for various project components such as mobilization, demolition, new equipment installation, structural work, electrical work, start-up and testing, and additional line items. The project appears to be a public works contract, and the bids indicate a competitive environment with multiple qualified contractors submitting proposals. The project is funded by Multnomah County, and the successful contractor will be required to comply with any applicable funding source requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION
Multnomah County Drainage District
Pump Station #4 Trash Rake Replacement Project
Project No.: N223527OR.01
Bid Opening: Wednesday, May 10, 2023 at 1:00 PM
Item Description Units Quantity Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost
1 Mobilization LS 1 $21,200.00 $21,200.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $15,000.00 $15,000.00 $30,000.00 $30,000.00
2 Demolish Existing Rake System and Related Appurtenances LS 1 $8,769.28 $8,769.28 $16,885.00 $16,885.00 $25,000.00 $25,000.00 $70,000.00 $70,000.00 $38,000.00 $38,000.00
3 Install New Trash Rakes and Support Structure LS 1 $10,879.70 $10,879.70 $14,750.00 $14,750.00 $35,000.00 $35,000.00 $68,000.00 $68,000.00 $70,000.00 $70,000.00
4 Install Hydraulic Power Units, Including Conduit and Conductors EA 4 $2,777.71 $11,110.84 $4,400.00 $17,600.00 $5,000.00 $20,000.00 $1,750.00 $7,000.00 $2,500.00 $10,000.00
5 Install Interior and Exterior Control Panels, Including Conduit and Conductors LS 1 $6,436.30 $6,436.30 $12,500.00 $12,500.00 $25,000.00 $25,000.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00
6 Install Hydraulic Lines and Fittings LS 1 $77,020.76 $77,020.76 $45,550.00 $45,550.00 $25,000.00 $25,000.00 $9,000.00 $9,000.00 $30,000.00 $30,000.00
7 Furnish and Install Hydraulic Line Tray and Vertical Support in Debris Deck Area LS 1 $1,687.50 $1,687.50 $7,500.00 $7,500.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $9,000.00 $9,000.00
8 Furnish and Install Horizontal Supports for Hydraulic Lines EA 25 $177.67 $4,441.78 $260.00 $6,500.00 $2,000.00 $50,000.00 $500.00 $12,500.00 $100.00 $2,500.00
9 Furnish and Install Hydraulic Line Bulkhead in Pump Station Wall, Including 3” Wall Core EA 4 $961.36 $3,845.45 $3,200.00 $12,800.00 $5,000.00 $20,000.00 $500.00 $2,000.00 $1,000.00 $4,000.00
10 Remove Debris Deck Floor Hatches, Furnish and Install New Hatches EA 4 $5,539.46 $22,157.82 $3,500.00 $14,000.00 $6,500.00 $26,000.00 $5,000.00 $20,000.00 $1,500.00 $6,000.00
11 Structural Work for East and West Wing Walls EA 2 $1,550.98 $3,101.96 $2,200.00 $4,400.00 $10,000.00 $20,000.00 $4,000.00 $8,000.00 $3,000.00 $6,000.00
12 Structural Work for Intermediate Piers EA 3 $2,701.22 $8,103.65 $4,500.00 $13,500.00 $10,000.00 $30,000.00 $4,000.00 $12,000.00 $3,000.00 $9,000.00
13 Reinstall Existing Walkway and Guardrail; Furnish and Install Walkway Supports and Guardrail LS 1 $11,888.44 $11,888.44 $22,000.00 $22,000.00 $20,000.00 $20,000.00 $30,000.00 $30,000.00 $6,000.00 $6,000.00
14 Furnish and Install Level Transducers and Current Sensing Relays, Including Stilling Well and Related Appurtenances EA 4 $11,514.72 $46,058.90 $7,500.00 $30,000.00 $7,500.00 $30,000.00 $1,750.00 $7,000.00 $4,000.00 $16,000.00
15 Balance of Project Electrical LS 1 $7,199.40 $7,199.40 $45,100.00 $45,100.00 $25,000.00 $25,000.00 $7,000.00 $7,000.00 $4,000.00 $4,000.00
16 Start-up, Testing, Commissioning, and Training LS 1 $2,984.92 $2,984.92 $39,000.00 $39,000.00 $30,000.00 $30,000.00 $6,000.00 $6,000.00 $3,000.00 $3,000.00
17 Install Additional Hydraulic Lines and Fittings LF 50 $20.00 $1,000.00 $30.00 $1,500.00 $100.00 $5,000.00 $100.00 $5,000.00 $200.00 $10,000.00 *
18 Unload Trash Rake Equipment at Project Site LS 1 $4,550.00 $4,550.00 $2,500.00 $2,500.00 $5,000.00 $5,000.00 $3,000.00 $3,000.00 $7,000.00 $7,000.00
19 Furnish and Install Rake Extension Protection LS 1 $12,563.30 $12,563.30 $22,000.00 $22,000.00 $7,500.00 $7,500.00 $16,348.00 $16,348.00 $5,000.00 $5,000.00
TOTAL $265,000.00 $348,085.00 $418,500.00 $314,848.00 $272,500.00 *
*Denotes Math Error on Bid Form
Engineer's Estimate
Northbank Civil and Marine, Inc. ORR, Inc. Copper Mechanical LLC
Colton Homes, Inc. DBA
Colton Construction
Company
G:\PDX_Projects\22\N223527OR.01 - MCDD - TO5 PS4 Trash Rakes Final Design\500 Bid Period Svcs\Bid Tab\MCDD_PS#4_BidTabulation_10May2023.xlsxMCDD_PS#4_BidTabulation_10May2023.xlsx
File details come from the government source that posted it. Updated .