This document is an amendment to the Invitation to Bid (ITB) for the Pump Station #4 Trash Rake Replacement Project in Portland, Oregon. The project is managed by the Multnomah County Drainage District No. 1. The amendment modifies the original solicitation by providing additional supplemental information, revising the bid form, and clarifying requirements for the owner-supplied equipment, unloading, hydraulic lines, and rake extension protection. The anticipated equipment delivery date is on or before August 22, 2023, and the equipment will be delivered directly to the project site. The contract includes 19 bid items for demolition, installation, electrical work, testing, and other related tasks. The bid opening is scheduled for May 10, 2023. Liquidated damages of $2,275 per day will be assessed if the work is not completed by the substantial completion date.
The bid form includes unit prices and estimated quantities for the various bid items. The owner will supply the trash rake equipment and related appurtenances, and the contractor is responsible for unloading, handling, and installing the equipment. The contract requires compliance with Oregon prevailing wage rates. A bid bond is required, and the successful bidder must provide performance, payment, and warranty bonds.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT NO. 3 May 4, 2023
ITB # S-C26014-00005371
Pump Station #4 Trash Rake Replacement Project
This addendum modifies the solicitation document(s) only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force.
This addendum shall be added as a part of the original solicitation document and shall become part of the work required.
Description of Change(s) and Clarifications:
1. Item #1: Supplemental Information
a. District Response: Invitation to Bid, Section 00000 Cover Page is revised to change
“SUPPLEMENTAL INFORMATION
Trash Rake Equipment Shop Drawings Bound Separately” to
“SUPPLEMENTAL INFORMATION
Trash Rake Equipment Shop Drawings Bound Separately Pump Stations Drawings:
1960 Pump Station Plans, and 1997 Pump Station No. 1 and Pump Station No. 4 Expansion Bound Separately”
2. Item #2: Supplemental Information
a. District Response: Add attached additional Supplemental Information (87 pages). Clarification: The original 1960 pump station and subsequent 1997 expansion drawings have been added to the OregonBuys solicitation record https://oregonbuys.gov/bso/
3. Item #3: Invitation to Bid document Section 00400 Bid Form
a. District Response: Replace Section 00400 Bid Form with Attachment 1: Section
00400 Revised Bid Form. Clarification: Bid Items 17 and 18 are revised; and Bid Item 19 is added via this amendment.
4. Item #4: Invitation to Bid Document Section 00800 Supplemental Conditions
a. District Response: Delete paragraph 8.9 in Section 00800 Supplemental Conditions and replace with the following:
“8.9 OWNER SUPPLIED EQUIPMENT
The trash rake equipment and related appurtenances are supplied by Owner.
Approved shop drawing submittals are included in the Supplemental Information for reference. Contractor is responsible for unloading the equipment from the Project Site. Contractor shall coordinate inspection of the equipment with the Owner or Owner’s Representative and document any deficiencies.”
Clarification: Trash rake equipment is being shipped to the project site, not Owner’s main office.
5. Item #5: Technical Specifications, Section 01 10 00 Summary of Work
a. District Response: Delete paragraph 1.5 in Section 01 10 00 Summary of Work and replace with the following:
“1.5 OWNER-FURNISHED PRODUCTS
A. Owner's Responsibilities:
1. Arrange for and deliver Owner-reviewed Shop Drawings and Product Data to Contractor.
2. Arrange and pay for delivery of trash raking equipment and related appurtenances to the project Site.
3. Upon delivery, inspect products jointly with Contractor.
4. Submit claims for transportation damage and replace damaged, defective, or deficient items.
5. Arrange for Manufacturers' warranties in coordination with Contractor.
B. Contractor's Responsibilities:
1. Review Owner-reviewed Shop Drawings and Product Data.
2. Receive and unload products at project Site; inspect for completeness or damage jointly with Owner.
3. Handle, store, and install products. At Contractor's request, Owner will consider storage of Owner supplied equipment inside the PS#4 pump station building or at their main office until Site is ready for installation.
4. Repair or replace items damaged after receipt. Contractor is responsible for equipment supplied by Owner after initial inspection during unloading. Damage incurred during unloading, storage, or installation of the equipment shall be repaired or replaced by Contractor.
C. Items furnished by Owner for installation by Contractor:
1. Mechanical trash rake system including hydraulic power units;
hydraulic lines and fittings; interior and exterior control panels;
and related appurtenances.”
6. Item #6: Technical Specifications, Section 01 22 50 Measurement and Payment
a. District Response: Delete paragraphs Q and R in Part 2 of Section 01 22 50 Measurement and Payment and replace with the following:
“Q. Install Additional Hydraulic Lines and Fittings (Bid Item No. 17)
1. Method of Payment – Foot
2. Method of Measurement – Per each foot installed
3. Description: Payment for installation of additional hydraulic lines and fittings will be made on a per foot basis as needed. Work includes but is not limited to installation of hydraulic lines and fittings that are supplemental to the lines and fittings provided by the Equipment Manufacturer. Owner shall provide the additional hydraulic lines and fittings. This bid item will be used on an as-needed basis to accommodate field changes or insufficient material quantities received from the Equipment Manufacturer. As such, the quantity for this bid item is not based on actual lines and fittings shown on the Drawings.
R. Unload Trash Rake Equipment at Project Site (Bid Item No. 18)
1. Method of Payment – Lump Sum
2. Method of Measurement – Percent Complete
3. Description: Payment for unloading the trash rake equipment at the project site will be made on a lump sum basis. Work includes but is not limited to unloading the trash rake equipment from shipping containers at the project site.
For the basis of the bid price, Contractor shall assume the equipment will be packaged in two (2) 40-ft containers with delivery staggered (i.e., One arrives in the morning with the second arriving in the afternoon). The containers shall be unloaded immediately in the timeframe dictated by the shipping company.”
Clarification: The description for Bid Item 17 is revised to furnishing labor only, not materials. The description for Bid Item 18 is revised to unloading the rake equipment at the project site, not transporting from Owner’s main office.
b. District Response: Add the following paragraph to the end of Part 2 of Section 01 22 50 Measurement and Payment:
“S. Furnish and Install Rake Extension Protection (Bid Item No. 19)
1. Method of Payment – Lump Sum
2. Method of Measurement – Percent Complete
3. Payment for furnishing and installation of the rake extension protective plates will be made on a lump sum basis. Work includes but is not limited to removing the existing steel plates welded to the north side of the trash racks, and furnishing and installation of fabricated steel elements along the top and north sides of the trash racks to protect the rake bases and keep debris from falling behind the racks.”
Clarification: A description for Bid Item 19 is added for the Rake Extension Protection work.
7. Item #7: Technical Specifications, Section 46 21 71 Trash Raking Equipment
a. District Response: Delete paragraph 3.1.A in Section 46 21 71 Trash Raking Equipment and replace with the following:
“3.1 EQUIPMENT DELIVERY
A. The anticipated equipment delivery date is on or before August 22, 2023 and equipment will be delivered to the project Site. Owner will coordinate early or late shipments with Contractor as soon as this information is available.”
8. Item #8: Drawing Sheet M-110 Mechanical Details
a. District Response: Drawing Sheet M-110 Mechanical Details, Stilling Well Detail (Detail 2) add the following sentence at the end of Note 2:
“INSTALL PIPE STRAPS EVERY 2’ O.C. (MIN)”
9. Item #9: Drawing Sheet S-112 Structural Details 3 of 3
a. District Response: Drawing Sheet S-112 Structural Details 3 of 3, Rake Extension Protection Detail (Detail 4) add the following note:
“NOTES
1. REMOVE EXISTING STEEL PLATE BACKING ON NORTH SIDE
OF TRASH RACKS PRIOR TO INSTALLATION OF NEW RACK
EXTENSION AND PROTECTIVE PLATES. REMOVE PLATES AND
ANY SUPPORT FRAMING ATTACHED TO SLAB. DO NOT
DAMAGE EXISTING SLAB OR TRASH RACK FRAMING. CLEAN
OR GRIND DOWN WELD SPOTS AS REQUIRED FOR NEW
PLATES.“
Item #10: Pre-Bid Project Site Visit Notes: Questions and Answers
District Response: See Attachment 2 Project Site Visit Notes including contractor questions, answers, general comments made during the optional project site visits, and follow-up questions and answers.
Item #11: Liquidated Damages
District Response: The Invitation To Bid document, Section 00720 8.08 CONTRACT TIME TO COMPLETE WORK is revised as follows:
Subsection C is replaced with this language:
Contractor shall provide the necessary labor, Equipment and Materials to ensure that Work is completed within the Contract Time. If the Contractor does not complete the Work within the Contract Time, Owner is entitled to impose liquidated damages in addition to any other remedies Owner may have under the Contract Documents. Liquidated damages will be assessed at the rate of $2,275 per day, after the agreed-upon Substantial Completion Date for each day the system is not operable.
Multnomah County Drainage District No. 1 Section 00400
ITB No. S-C26014-00005371 Pump Station #4 Trash Rake Replacement Project
ATTACHMENT 1:
REVISED BID FORM
PROJECT: ITB S-C26014-00005371: Pump Station #4 Trash Rake Replacement
Project
MCDD Project No. 85037
BID OPENING: May 10, 2023 1:00 PM Pacific Time
LOCATION: Opening to be conducted via an online video platform. The Microsoft TEAMS link is provided in Section 200, 1.3(h).
Bid From (Contractor Name): __________________________________________________ The undersigned hereby proposes to provide to the District all materials, services, and labor necessary to perform all work in connection with the project described in the Invitation to Bid in strict accordance with the terms of the Invitation to Bid.
The Bid Item Descriptions summarize the measurement and payment provisions for each of the bid items included the Bid Schedule for the Pump Station #4 Trash Rake Replacement Project.
The Bid Item Descriptions are included in Technical Specification Section 01 22 50 Measurement and Payment.
In submitting this Bid, the undersigned agrees:
(A) To provide all goods, equipment, and services to perform under the Contract.
(B) To hold this Bid open for ninety (90) calendar days after the Bid Due Date (unless a longer or shorter period is specified in the Invitation to Bid) and to accept the provisions of the Invitation to Bid regarding bid security.
(C) To execute the Contract relating to this Bid if the Bid is selected.
(D) To perform under the Contract according to the agreed-upon schedule, including the dates set forth in the Bid Schedule.
NO.
ITEMS OF WORK AND
MATERIALS
ESTIMATED
QUANTITY UNIT
UNIT
PRICE
TOTAL
AMOUNT
1. Mobilization 1 LS
2. Demolish Existing Rake System and Related Appurtenances 1 LS
3. Install New Trash Rakes and Support Structure 1 LS
4.
Install Hydraulic Power Units, Including Conduit and Conductors
4 EA
5.
Install Interior and Exterior Control Panels, Including Conduit and Conductors
1 LS
NO.
ITEMS OF WORK AND
MATERIALS
ESTIMATED
QUANTITY UNIT
UNIT
PRICE
TOTAL
AMOUNT
6. Install Hydraulic Lines and Fittings 1 LS
7.
Furnish and Install Hydraulic Line Tray and Vertical Support in Debris Deck Area
8. Furnish and Install Horizontal Supports for Hydraulic Lines 25 EA
9.
Furnish and Install Hydraulic Line Bulkhead in Pump Station Wall, Including 3” Wall Core
10.
Remove Debris Deck Floor Hatches, Furnish and Install New Hatches
11. Structural Work for East and West Wing Walls 2 EA
12. Structural Work for Intermediate Piers 3 EA
13.
Reinstall Existing Walkway and Guardrail; Furnish and Install Walkway Supports and Guardrail
14.
Furnish and Install Level Transducers and Current Sensing Relays, Including Stilling Well and Related Appurtenances
15. Balance of Project Electrical 1 LS
16. Start-up, Testing, Commissioning, and Training 1 LS
17. Install Additional Hydraulic Lines and Fittings 50 LF
18. Unload Trash Rake Equipment at Project Site 1 LS
19. Furnish and Install Rake Extension Protection 1 LS
TOTAL BID
• Units abbreviations: EA = Each
LS = Lump Sum FT = Feet
Bid Price: (Lump-sum cost for the proposed project)
Dollars
($____________________________). The amount must be written in both words and figures.
If there is a discrepancy between the two, the amount written in words will govern.
EXCEPTIONS: Any exceptions or stipulations to any of the requirements of this solicitation must be submitted in accordance with Section 00200, 1.1(h), Protest or Request for Changes of Specifications and/or Bidding Requirements. Exceptions that are not submitted in compliance with Section 00200, 1.1(h), may cause your bid to be ruled non-responsive.
RESIDENT STATUS: Each bidder must identify whether the bidder is a resident bidder as defined in ORS 279A.120. Bidder certifies that bidder is a “resident bidder” as defined in ORS 279A.120:
YES ______ NO ______
ACKNOWLEDGMENT OF RECEIPT OF ADDENDA TO BID DOCUMENTS: Bidder acknowledges receipt of Addenda and agrees to be bound by their contents.
Circle each BID addendum received: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 Check if no addenda were received: ___
CCB/LCB REGISTRATION:
(A) Construction Contracts. The District shall not consider a Person's Offer to do Work as a contractor, as defined in ORS 701.005(2), unless the Person has a current, valid certificate of registration issued by the Construction Contractors Board at the time the Offer is made.
(B) Landscape Contracts. The District shall not consider a Person's Offer to do Work as a landscape contractor as defined in ORS 671.520(2), unless the Person has a current, valid landscape contractors license issued pursuant to ORS 671.560 by the State Landscape Contractors Board at the time the offer is made.
(C) Non-complying Entities. The District shall deem an Offer non-responsive if it is received from a Person that fails to comply with this rule and shall reject the Offer as stated in ORS 279C.365(1)(k), unless contrary to federal law or subject to different timing requirements set by federal funding agencies.
Bidder certifies that Bidder is in compliance with the requirements of and is registered and bonded with the State of Oregon Construction Contractor's Board or Landscape Contractors Board as follows:
Registration Classification: ____________________________
Registration No.: Expiration Date: ________________
ASBESTOS LICENSING: Contractor and subcontractors under the Contract are not required to be licensed under ORS 468A.720 regarding asbestos abatement projects.
RESPONSIBILITY: Prior to awarding a Contract, the District shall determine whether the lowest responsible Bidder meets the standards of responsibility as defined in ORS 279C.375.
NONDISCRIMINATORY SUBCONTRACTOR PARTICIPATION: Bidder certifies that it has not and will not discriminate against a disadvantaged business enterprise, a minority-owned, women-owned, service-disabled-veteran-owned business, or an emerging small-business enterprise in awarding any subcontract relating to the Invitation to Bid or any contract awarded under it.
NON-COLLUSION: ORS 279A.010 and 279A.990 By signing and submitting a Bid, Bidder certifies that:
(A) Bidder has arrived at the specifics of the Bid, including price and amounts, independently and without communication or agreement with another Bidder, except as disclosed in a separately attached statement;
(B) The Bidder is not submitting the Bid in the interest of or on behalf of any undisclosed person;
(C) The Bidder has not directly or indirectly induced or solicited another Bidder, in order to benefit a third person, to submit a false or sham Bid, to refrain from bidding or to change a Bid;
(D) The Bidder has not directly or indirectly disclosed the Bidder's bid price, a breakdown of the price, the contents of the price or information or data related to the price to another Bidder;
(E) The Bidder has not sought through communication or agreement with a person to fix the Bid price of the Bidder or another Bidder, to fix an overhead, profit or cost element of the bid price of the Bidder or another Bidder or to secure any advantage against the contracting agency or any other person interested in the public contract;
(F) The Bidder has not directly or indirectly expressed an interest or lack of interest in the public contract, or paid or offered to pay a fee to a person, to cause a collusive or sham bid;
(G) All statements in the Bid are true; and
(H) The Bid is genuine and not collusive or a sham.
EXAMINATION: The Bidder declares that he/she has carefully examined the terms of the Contract and has personally inspected and is satisfied with conditions at the Project site.
PREVAILING WAGES: The Contract calls for payment of the Oregon Prevailing Wage, as determined by the Commissioner of the Bureau of Labor and Industries (“BOLI”). The prevailing wage rates for public works contracts in Oregon are contained in the following publications: The January 5, 2023 Prevailing Wage Rates for Public Works Contracts in Oregon, the January 11, 2023 Prevailing Wage Rate Amendments, the April 5, 2023 Apprenticeship Rates, and the April 5, 2023 Prevailing Wage Rate Amendment.
If payment of the Oregon Prevailing Wage is required, the Bidder hereby acknowledges and agrees to be bound by, and to comply with, the provisions of 279C.838 to 279C.840. The Contract does not call for payment of federal Davis-Bacon Prevailing Wages. If payment of the federal Prevailing Wage is required, the Bidder hereby acknowledges and agrees to be bound by, and to comply with, the provisions of 40 U.S.C. 3141 to 3148. If both Oregon and federal Prevailing Wage provisions apply, Bidder certifies that Bidder will pay the higher of the federal Prevailing Wage rate or the Oregon Prevailing Wage rate.
BONDS: A Bid Bond is required from all Bidders. (The successful Bidder must provide a Performance Bond, Payment Bond, and Warranty Bond.) The Bidder encloses with this bid acceptable security in the amount of ten percent (10%) of the total amount of the bid, made payable to the District. The bid security shall be forfeited as liquidated damages if the Bid is accepted by the District and Bidder fails to execute the Contract, fails to provide the Performance and Payment Bonds in the amount of 100% of the total amount of the Bid, or fails to provide the required evidence of insurance within the time allowed.
BIDDER’S SIGNATURE AND IDENTIFICATION: I hereby certify that this Bid is genuine.
Name of Proprietor, Partnership, or Corporation: _____________________________________
Authorized Official Name and Title (Please Print): ____________________________________
Signature of Authorized Official: ____________________________ Date:________________
Street Address City, State, Zip Code
Phone Number Employer Federal ID Number
End of Section 00400
ATTACHMENT 2: PRE-BID SITE VISIT NOTES: QUESTIONS AND ANSWERS
Ques�ons and Responses:
1. Q: Are record drawings/as-builts from construc�on of the pump sta�on available?
a. District Response (Aus�n): Yes, these are addressed in Amendment 3 Item #2
Supplemental Informa�on. Drawings can be found on the OregonBuys solicita�on record https://oregonbuys.gov/bso/
2. Q: Can a crane be set up on the east side of the site adjacent to the ramp that leads to the debris deck?
a. District Response (Aus�n): Not sure, there are u�li�es underground. The site plan on drawing G-002 shows u�li�es found by a loca�ng service.
3. Q: Will the support equipment and debris be removed prior issuance of No�ce to Proceed?
a. District Response (Josh): District will disassemble the safety system including poles and cables on the east and west side of the slough and will clean accumulated debris from debris deck prior to issuance of the no�ce to proceed.
4. Q: Will the District need to perform work at the pump sta�on during this trash rake replacement project?
a. District Response (Josh): The District is not planning to use the pump sta�on during the construc�on window unless there is an emergency.
5. Q: What is the required spacing between the support brackets for the s�lling wells?
a. District Response (Aus�n): This can be found in Amendment 3 Item #8: Drawing Sheet
M-110 Mechanical Details.
6. Q: Do the steel plates on the north side of the trash racks need to be removed for the new rake base protec�on plate? The drawings do not iden�fy these for removal.
a. District Response (Aus�n): This can be found in Amendment 3 Item #9: Drawing Sheet S-
112 Structural Details 3 of 3.
7. Q: Regarding unloading the rake equipment, what is the single heaviest item? How heavy are the
HPUs?
a. Supplier Response (Lakeside): The heaviest part is the telescope, which weights 1,897 lbs. The HPUs weigh 75 lbs. each.
b. District Response: District Opera�ons staff used a 4X4 telescoping forkli� to unload similar trash rake equipment for Pump Sta�on #1.
8. Q: How long can the shipping containers stay onsite?
a. District Response (Josh): For the delivery at PS#1, the freight company had an unloading window prior to charging addi�onal fees. The District’s opera�ons team had no issues unloading within the alloted �meframe.
9. Q: Are there liquidated damages on this project?
a. See Item #11 in Amendment 3.
10. Q: Is dewatering needed for the level transducers and s�lling well installa�on?
a. District Response (Aus�n): No dewatering allowed. Divers can enter the pump bays from the hatches in the debris deck.
11. Q: Are there any restric�ons on working hours/days?
a. District Response (Aus�n): These are defined in Technical Specifica�on Sec�on 01 10 00
- Summary of Work, paragraph 1.6.E.
12. Q: The informa�on provided for the hydraulic piping and fi�ngs is not sufficient to order materials, as there are op�ons. More details are needed to get price and lead �mes. If lead �mes are long, materials may need to be ordered early and have onsite. The materials will likely not be returnable, if so, will the District purchase the materials from the contractor?
a. District Response (Aus�n): This is for the piping and fi�ngs not supplied by Lakeside, related to Bid Item 17. The intent with this bid item is to capture any addi�onal piping and fi�ngs required to complete the project in the event the materials from Lakeside fall short.
b. District Response (Josh): We have boxes of fi�ngs and several sec�ons of hydraulic piping le�over from the Pump Sta�on #1 trash rake project. A�er checking the remaining boxes, there are approximately 25 90-degree fi�ngs and 12 sec�ons of piping that are approximately 15-� long each.
c. District Response (Aus�n): Bid Item #17 is revised. This can be found in Amendment 3, Item #6(a). (See Atachment 1: Sec�on 00400 Revised Bid Form)
Ques�ons via Email:
1. Q: On Drawing S-111, the hatches are called out to be Bilco K model. Speaking with the local Bilco rep, these are not available in custom sizes. Other models may be. I measured one of the openings as approximately 29” x 35”. A K model will not work in this opening.
a. District Response (Aus�n): The Bilco rep (800) 366-6530 said the dimensions are customizable and to call for a special pricing quote.
2. Q: In the Measurement and Payment sec�on for Bid Item 16, it says to perform debris removal for the pump bay inspec�on. Please clarify the scope of this to include just construc�on debris and not exis�ng debris.
a. District Response (Aus�n): This is intended to inspect the pump bays and remove any debris from construc�on.
3. Q: Please provide a model number for the bulkhead fi�ngs required at the wall penetra�on.
a. District Response (Aus�n): Parker BCM12-316-NC
4. Q: Will the hydraulic fluid for the system be provided by the supplier/owner?
a. District Response (Aus�n): Yes
5. Q: Does the trash rake supplier furnish hoses to make final connec�ons to the rakes and HPU’s, or is the piping hard lined full length?
a. District Response (Aus�n): Hoses will be furnished by the Equipment Manufacturer.
Contractor shall provide the necessary labor, Equipment and Materials to ensure that Work is completed within the Contract Time. If the Contractor does not complete the Work within the Contract Time, Owner is entitled to impose liquidated damages in ...
File details come from the government source that posted it. Updated .