Amendment 2 PS 4 Trash Rake Replacement ITB.pdf
PDF 226 KB Posted
- Attached to
- PUMP STATION #4 TRASH RAKE REPLACEMENT PROJECT
- Solicitation number
- S-C26014-00005371
- Issued by
- Multnomah County, Oregon
About this file
This document is an Amendment No. 2 to the Invitation to Bid (ITB) for the Pump Station #4 Trash Rake Replacement Project issued by the Multnomah County Drainage District No. 1. The amendment revises the anticipated substantial completion date from October 10, 2023, to October 1, 2023, while the final completion date remains unchanged at October 31, 2023. Additionally, the amendment adds a new Section 01010 Warranty Bond to the contract documents. The project involves the replacement of trash rakes at Pump Station #4 and is located within the jurisdictions of Multnomah County and the City of Portland, Oregon.
The amendment does not provide any details regarding pricing, set-asides, incumbents, funding requirements, or other salient information. The key changes are the revised substantial completion date and the addition of the Warranty Bond section to the contract documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT NO. 2 April 18, 2023
ITB # S-C26014-00005371
Pump Station #4 Trash Rake Replacement Project
This addendum modifies the solicitation document(s) only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original solicitation document and shall become part of the work required.
Description of Change(s) and Clarifications:
1. Item #1: Substantial Completion Date
a. District Response: Section 200 Instructions to Bidders, section 1.0 Bid Schedule, is revised to change the Anticipated Project Substantial Completion Date from October 10, 2023, to October 1, 2023. The Anticipated Project Final Completion Date remains unchanged, as October 31, 2023.
2. Item #2: Warranty Bond
a. District Response: Section 00000 Cover Page is revised to change
“Contract Documents Section 01000 Sample Construction Contract To Follow Warranty Bond” to
“Contract Documents Section 01000 Sample Construction Contract Section 01010 Warranty Bond”
A new Section 01010 Warranty Bond has been added to the Invitation to Bid document and is attached as a part of this Amendment 2.
CLOSING DATE AND TIME:
Closing date and time remains unchanged.
RECEIPT OF THIS ADDENDUM BY THE BIDDER IS TO BE ACKNOWLEDGED BY ENTERING THE
ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Jim Kanoff, Procurement and Contract Specialist Multnomah County Drainage District No. 1
MAINTENANCE/WARRANTY BOND
KNOW ALL PERSONS BY THESE PRESENTS that we, , as Principal, and ____________________________a corporation organized and existing under the laws of the State of________
, and duly authorized to transact a surety business in the State of Oregon, as surety, are held and firmly bound unto the MULTNOMAH COUNTY DRAINAGE DISTRICT, a municipal corporation of the State of Oregon, in the penal sum of:_____________________________ Dollars ($___ ), lawful money of the United States of America, for the payment whereof well and truly to be made, we and each of us, jointly and severally, bind ourselves, our and each of our heirs, executors, administrators, successors and assign, firmly by these presents.
THE CONDITION OF THIS BOND IS SUCH:
THAT WHEREAS the Principal did on the ( ), enter into Contract with the MULTNOMAH COUNTY DRAINAGE DISTRICT for (the “Agreement”), that was completed on (__________), which requires a one-year Maintenance and Warranty Bond as specified in Section
5.013 of MULTNOMAH COUNTY DRAINAGE DISTRICT’S General Conditions (Specification Section 00720), and which, together with the Agreement hereby is made a part hereof as if fully copied herein;
NOW THEREFORE, if the Principal herein shall truly observe the terms, provisions, conditions, stipulations, directions, and requirements of said contract and shall in all respects, whether the same be enumerated herein or not, comply with the same and shall assume the defense of indemnify and save harmless the MULTNOMAH COUNTY DRAINAGE DISTRICT, its officers, agents, and employees from all claims, liabilities, loss, damage or injury which may have been suffered or claimed to have been suffered to persons or property directly or indirectly resulting from or arising out of the operations or conduct of said Principal or any subcontractor in the performance of the work under said contract and shall indemnify and make whole the MULTNOMAH COUNTY DRAINAGE DISTRICT for any injury or damage to any street, highway, avenue, or road or any part thereof, resulting from the operations or conduct of said Principal or any subcontractor in connection with performance or conduct of the work under said contract, and shall in all respects keep and observe all of said terms, provision, conditions, stipulations, directions, and requirements, then this obligation is void, otherwise, it shall remain in full force and effect.
WITNESS our hand and seals this day of , 20
CONTRACTOR SURETY
BY:
TITLE:
BY: __________
Attorney-In-Fact
Section 01010