Self Scoring Worksheet.xlsx
XLSX spreadsheet 89 KB Posted
- Attached to
- Davis-Monthan AFB MACC Draft Documents Federal contract opportunity
- Solicitation number
- MACC2024
About this file
This document is a Self Scoring Worksheet related to a federal contract opportunity for a Multiple Award Construction Contract (MACC) at Davis-Monthan Air Force Base in Arizona. The MACC will cover various construction disciplines including electrical, mechanical, painting, architectural/engineering design, paving, flooring, roofing, HVAC, plumbing, and utility systems.
The worksheet is used by offerors to self-score their qualifications across several criteria, including relevant experience, past performance, industry certifications, and distance from the project site. The total self-scored points are validated by the government. The contract opportunity is being considered as a set-aside for eligible 8(a) small businesses with a NAICS code of 236220 and a $45 million size standard. The period of performance is a 5-year base period with two 1-year option periods, estimated to start in April 2024. Offerors are instructed to submit company information and capability statements to the government by March 6, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MACC - T.O. Procedures.pdf | ||
| DRAFT Solicitation - FA487724R0003.pdf | ||
| Sections L and M REVISED.pdf | ||
| DM MACC Statement of Work -17 April 2024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Original Version_A2
| Solicitation No.: FA487724R0003 |
| Section J Attachment 3 |
| Self Scoring Worksheet |
OFFEROR NAME: [FILL IN OFFEROR NAME HERE]
| Element | Enter Yes OR No for each question as applicable | Point Value | Score | List ALL relevent File Name(s), e.g.,PrimeOfferorName 24R0003.pdf Reference L 2.2 File Naming Conventions | List Page and Paragraph Numbers of File Information Where Information Can Be Found in the Relevant File | GOVERNMENT USE ONLY | |
| FOR VALIDATION COMMENTS | GOVERNMENT USE ONLY |
VALIDATED SCORE
| VOLUME 1 – BUSINESS SECTION (For Government Use) | |||||
| Proposals in response to this solicitation will include the following documentation completed per the instructions in Section L: SF1442, AF3052 with pricing broken out by Division for the evaluation project, financial information to include single and aggregate bonding capacity, the Self-Scoring Worksheet, Industry Certifications as outlined in this worksheet, any existing Joint Venture or Partnership agreements, Representations and Certifications, up to 15 work samples in NAICS groups 236 and 237, and the latest CPARS or Past Performance Questionnaire for each work sample | |||||
| Table of Contents | N/A | N/A | |||
| SF1442 (name, address, and acknowledgement of all amendments) | N/A | N/A | |||
| Financial Information (Including Bonding Capacity) | N/A | N/A | |||
| Self Scoring Worksheet | N/A | N/A | |||
| Industry Certifications | N/A | N/A | |||
| Existing Joint Venture or Partnership Agreements | N/A | N/A | |||
| Representations and Certifications | N/A | N/A | |||
| VOLUME 2 – RELEVANT EXPERIENCE | |||||
| NAICS Group Relevant Experience Projects: | |||||
| NAICS Groups 236 and 237 | |||||
| Is EACH Project submitted below under one of the NAICSs listed in NAICS Code Table 236 or 237? Type the word Yes or No in Column B for EACH project. | |||||
| Work Sample #1: | 500 | 0 | |||
| Work Sample #2: | 500 | 0 | |||
| Work Sample #3: | 500 | 0 | |||
| Work Sample #4: | 500 | 0 | |||
| Work Sample #5: | 500 | 0 | |||
| Work Sample #6: | 500 | 0 | |||
| Work Sample #7: | 500 | 0 | |||
| Work Sample #8: | 500 | 0 | |||
| Work Sample #9: | 500 | 0 | |||
| Work Sample #10: | 500 | 0 | |||
| Work Sample #11: | 500 | 0 | |||
| Work Sample #12: | 500 | 0 | |||
| Work Sample #13: | 500 | 0 | |||
| Work Sample #14: | 500 | 0 | |||
| Work Sample #15: | 500 | 0 | |||
| SUBTOTAL SCORE FOR SECTION: | 0 | ||||
| NAICS Group Relevant Project Size & Complexity | |||||
| Does the value of any single work sample project meet the dollar value listed below? Points assigned for only the highest project value for each NAICS group. Type the word Yes or No in Column C. Fill in the referenced Work Sample # documents in Column E | |||||
| NAICS Projects 236 | |||||
| Project Value greater than or equal to $250 Thousand but less than $1 Million | 500 | 0 | |||
| Project Value greater than or equal to $1 Million but less than $5 Million | 1000 | 0 | |||
| Project Value greater than or equal to $5 Million but less than $10 Million | 2000 | 0 | |||
| NAICS Project 237 | |||||
| Project Value greater than or equal to $250 Thousand but less than $1 Million | 500 | 0 | |||
| Project Value greater than or equal to $1 Million but less than $5 Million | 1000 | 0 | |||
| Project Value greater than or equal to $5 Million but less than $10 Million | 2000 | 0 | |||
| SUBTOTAL SCORE FOR SECTION: | 0 | ||||
| Relevant Project Experience With Federal, State, or Local Government | |||||
| Do the submitted projects demonstrate relevant construction experience with Government contracts? Points assigned for only the highest project value. Type the word Yes or No in Column C. Fill in the referenced Work Sample # documents in Column E | |||||
| 1 to 5 work samples were for Federal, State, or Local Government Entities | 200 | 0 | |||
| 6 to 10 work samples were for Federal, State, or Local Government Entities | 500 | 0 | |||
| 11 to 15 work samples were for Federal, State, or Local Government Entities | 1000 | 0 | |||
| SUBTOTAL SCORE FOR SECTION: | 0 | ||||
| Relevant Experience as Prime Contractor | |||||
| Are any work sample projects where Offeror Performed as the Prime Contractor? Points assigned for only the highest project value. Fill in the referenced Work Sample # documents in Column E. | |||||
| Project Value greater than or equal to $250 Thousand but less than $1 Million | 2000 | 0 | |||
| Project Value greater than or equal to $1 Million but less than $5 Million | 4000 | 0 | |||
| Project Value greater than or equal to $5 Million but less than $10 Million | 6000 | 0 | |||
| Relevant Experience as Subcontractor | |||||
| Are any work sample projects where Offeror Performed as the Subcontractor? Points assigned for only the highest project value. Fill in the referenced Work Sample # documents in Column E. | |||||
| Project Value greater than or equal to $250 Thousand but less than $1 Million | 250 | 0 | |||
| Project Value greater than or equal to $1 Million but less than $5 Million | 500 | 0 | |||
| Project Value greater than or equal to $5 Million but less than $10 Million | 1000 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||||
| Experience on Design-Build Projects | |||||
| Do the submitted projects demonstrate relevant construction experience with design-build projects? Points assigned for only the highest project value. Type the word Yes or No in Column C. Fill in the referenced Work Sample # documents in Column E | |||||
| 1-5 Projects as a Prime | 2000 | 0 | |||
| 6-10 Projects as a Prime | 4000 | 0 | |||
| >10 Projects as a Prime | 6000 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||||
| Experience on Utility Infrastructure Projects | |||||
| Do the submitted projects demonstrate relevant construction experience with utility infrastructure projects? Points assigned for only the highest project value. Type the word Yes or No in Column C. Fill in the referenced Work Sample # documents in Column E | |||||
| 1-5 Projects as a Prime | 2000 | 0 | |||
| 6-10 Projects as a Prime | 4000 | 0 | |||
| >10 Projects as a Prime | 6000 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||||
| Experience with Whole Building Renovation | |||||
| Do the submitted projects demonstrate relevant construction experience with whole building renovation projects? Points assigned for only the highest project value. Type the word Yes or No in Column C. Fill in the referenced Work Sample # documents in Column E | |||||
| 1-5 Projects as a Prime | 2000 | 0 | |||
| 6-10 Projects as a Prime | 4000 | 0 | |||
| >10 Projects as a Prime | 6000 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||||
| Current Distance from the Davis-Monthan AFB, AZ Visitor Center (By Radius from the corner of Craycroft Rd and Golf Links Rd) | |||||
| Indicate distance from Davis-Monthan AFB.. Type the word Yes or No in Column C. Fill in the referenced Work Sample # documents in Column E | |||||
| >450 miles | 1000 | 0 | |||
| 150-450 miles | 1500 | 0 | |||
| <150 miles | 2000 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||||
| Experience In Desert Climate (Climate Zone 2B per International Energy Conservation Code) | |||||
| Do the submitted projects demonstrate relevant experience working in desert climate zone 2B? Points assigned for only the highest project value. Type the word Yes or No in Column C. Fill in the referenced Work Sample # documents in Column E | |||||
| 1-5 Projects as a Prime | 1000 | 0 | |||
| 6-10 Projects as a Prime | 1500 | 0 | |||
| >10 Projects as a Prime | 2000 | 0 | |||
| ] | 0 | ||||
| Past Performance Ratings | |||||
| Using the following scale, insert a total score rating for CPARS categories titled Quality, Schedule, Management, and Regulatory Compliance. The total score should be the cumulative total of all categories for each work sample. Satisfactory = 100, Very Good = 500, Exceptional = 1000, Marginal = -100, Unsatisfactory= -500 | |||||
| Work Sample #1 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #2 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #3 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #4 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #5 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #6 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #6 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #7 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #8 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #9 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #10 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #11 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #12 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #13 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #14 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| Work Sample #15 Cumulative CPARS or Performance Questionnaire Score | 0 | ||||
| SUBTOTAL SCORE FOR SECTION: | 0 | ||||
| VOLUME 3 – SYSTEMS, CERTIFICATIONS, AND CLEARANCES | |||||
| Industry Certifications: | |||||
| Does the Offeror have each of the following on staff? Type the word Yes or No in Column C. | |||||
| CCM - Certified Construction Manager | |||||
| Certified Const Manager | 1500 | 0 | |||
| Certified Associate Const Manager | 1000 | 0 | |||
| Construction Manager in Training | 500 | 0 | |||
| Certified Professional Constructor | |||||
| LVL-II | 1500 | 0 | |||
| LVL-I | 1000 | 0 | |||
| Minimum Two Superintendents | |||||
| Certified | 1500 | 0 | |||
| Certified Safety Manager | |||||
| Certified | 1500 | 0 | |||
| Certified Project Manager Professional | |||||
| Certified | 1500 | 0 | |||
| Green Business Certification (LEED) | |||||
| Certified | 1500 | 0 | |||
| SUBTOTAL SCORE FOR SECTION: | 0 | ||||
| TOTAL POINTS SCORED: | - 0 | VALIDATED POINTS SCORED: | - 0 |
File details come from the government source that posted it. Updated .