Sections L and M REVISED.pdf

PDF 467 KB Posted

Attached to
Davis-Monthan AFB MACC Draft Documents Federal contract opportunity
Solicitation number
MACC2024
Issued by
Department of the Air Force Air Combat Command

About this file

This document is Sections L and M from a solicitation for a Multiple Award Construction Contract (MACC) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract to support Davis-Monthan AFB and Luke AFB construction requirements. It is a Competitive 8(a) set-aside for construction work under NAICS code 236220 with a period of performance of 5 base years and two 1-year option periods. The Government plans to award contracts to the 5 highest technically rated offerors with fair and reasonable pricing, and identify the next 5 highest as on-boarding candidates. Offerors must submit up to 15 work samples demonstrating prior technical experience, a self-scoring worksheet, and other required documentation. The solicitation includes instructions for proposal submission, formatting, and content requirements. The Government intends to evaluate proposals and award without discussions, except for clarifications.

View the file

Other files for this federal contract opportunity

Other files attached to Davis-Monthan AFB MACC Draft Documents, newest first.
File Type Posted
MACC - T.O. Procedures.pdf PDF
DRAFT Solicitation - FA487724R0003.pdf PDF
DM MACC Statement of Work -17 April 2024.pdf PDF
Self Scoring Worksheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

FA487724R0003

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) INDEFINITE-

DELIVERY INDEFINITE-QUANTITY (IDIQ)

L-1 GENERAL INSTRUCTIONS

This solicitation is issued for the acquisition of a Multiple Award Construction Contract (MACC) to support Davis-Monthan AFB and Luke AFB construction requirements. The Government intends to execute a Multiple Award Indefinite Delivery, Indefinite Quantity Firm Fixed Price (FFP) contract. This acquisition is a Competitive 8(a) set aside. Proposals may only be submitted by 8(a) firms, registered in the North American Industrial Classification System Code (NAICS) of 236220, Commercial and Institutional Building Construction. This competitive acquisition will utilize the source selection procedures in accordance with 15.3 as supplemented by the DoD Source Selection Procedures referenced in DFARS 215.300 and the DAFFARS Mandatory Procedures 5315.3 to make an integrated assessment for a best value award decision.

The Government will award one contract from this solicitation to each of the five (5) highest technically rated offerors with fair and reasonable pricing (FAR 15.304(c)), who are also determined responsible (IAW FAR 9), after evaluation in accordance with the solicitation (FAR 52.215-1(f)). Additionally, the next five (5) highest technically rated offerors with fair and reasonable pricing will be identified as on-boarding candidates in accordance with (IAW) Section H. Future requirements will be competed among the awardees based on the work defined in individual task orders. Nonperforming contractors may be offboarded IAW Section H of the resulting contract. If an active contractor is off-boarded, an inactive contractor may be on-boarded. Future onboarding is based on CO discretion if the volume of requirements necessitates additional contractors. Period of performance for the MACC includes a five (5) year ordering period with two (2) one (1) year option periods. Awardees are required to recertify their small business status prior to the completion of the fifth year of the contract IAW FAR 52.219-28.

To determine an offeror’s price fair and reasonable, a fully designed sample project is included in the solicitation (FBNV190009 -- Construct SFS Addition Bldg. 1358). This project is for evaluation purposes only and is not presently funded. Each offeror will submit an AF 3052 (Attachment 16) to be evaluated in accordance with FAR 15.404-1.

The Government intends to evaluate proposals and award contracts without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a price and past performance standpoint.

However, the Contracting Officer may conduct discussions IAW DFARS 215.306, if it is determined to be in the best interest of the Government.

Offerors shall not submit more than one offer as the prime in response to this solicitation.

Offerors submitting a prime proposal are not permitted to submit a separate proposal as a subcontractor, or team member to another prime. Small business subcontractors are permitted to support multiple primes.

Only offers submitted in accordance with these instructions will be accepted. The Government will retain one copy of each Offeror’s proposal (FAR 4.8).

In accordance with FAR 52.204-7, System for Award Management, Offerors that do not have an active registration in System for Award Management (SAM.gov) at https://sam.gov at the time proposals are due will not be considered for award.

Proposals shall be clear and concise and shall include sufficient detail to permit the Government to adequately validate proposal statements.

The Government reserves the right to cancel this solicitation at any point before contract award.

In the event this solicitation is canceled, the Government has no obligation to reimburse Offerors for any costs incurred.

Post-award notices and debriefings will be conducted IAW FAR 15.505 and 15.506, as applicable.

L-1.1 REQUIRED DOCUMENTS FOR SUBMISSION

Proposals in response to this solicitation will include the following documentation completed per instructions in Section L:

a. SF1442 (see L-3.1.4)

b. AF3052 (see L-3.3.2)

c. Financial information (see L-3.1.2)

d. Self-Scoring Worksheet (see Attachment 4)

e. Industry Certifications (see L-3.2.5)

f. Any existing Joint Venture or Partnership agreements (see L-3.1.3)

g. Representations and Certifications

h. Up to 15 work samples with a 236 or 237 NAICS code category (see L-3.2.1 and L3.2.2)

i. Latest Contractor Performance Assessment Rating System (CPARS) evaluation or Past

Performance Questionnaire for each work sample (see 3.2.4)

L-2 PROPOSAL FORMAT AND SUBMISSION

Proposals in response to this solicitation shall be valid for 90 calendar days (FAR 52.215-1(d)).

L-2.1 Operating System and Applications Proposals will be accessed with the Microsoft Windows 10 Operating System. Proposal files shall be submitted using only the applications listed below:

Application / File Valid Extensions Portable Document Files .pdf Microsoft Word .docx Microsoft Excel .xlsx

L-2.2 File Naming Conventions Offerors shall follow the basic structure of the file naming convention below for file submissions, where "#" represents the sequential file number. Offerors shall keep the file name under 40 characters.

L-2.2, TABLE 1: NAMING CONVENTIONS

SECTION FILE NAME

Business Cover Letter Financial Information Pre-award Documentation Partnering Documentation Contract Documentation

Prime Offeror Name 24R0003 Business Section.pdf

Prior Technical Experience 15 Work Samples Self-Scoring Worksheet Cross Reference Worksheet

Prime Offeror Name 24R0003 PTE WS#.pdf Prime Offeror Name 24R0003 PTE Scoring Worksheet.xls Prime Offeror Name 24R0003 PTE CRM.xls

Sample Project SF 3052 Prime Offeror Name 24R0003 SF3052.xls

L-2.3 Hyperlinks Offerors may not use hyperlinks within and among work samples. Each work sample shall be on a stand-alone basis. Any information required for validation, and not found in its designated file, is assumed omitted from the proposal.

L-2.4 Virus Free Electronic Submission Offerors shall ensure that proposals are virus free. The Offeror shall certify, in the proposal cover letter, that all electronic proposal information delivered throughout the evaluation is virus free.

Offerors should specify the software, version, and virus definition used to check the data.

L-2.5 Multimedia and Graphics Sound and video (e.g., MPEG) files shall not be imbedded within the proposal. Offerors shall:

a. Avoid submitting large files;

b. Zip files are prohibited;

c. Simplify color palettes and minimize the use of color images or graphics; and

d. Use scanned images only if necessary for signature pages. Any scanned documents shall be OCR searchable.

L-2.6 Proposal Formatting Proposal formatting does not apply to the Work Samples addressed in Section L-3.2.1.

L-2.6.1 Fonts: Proposal text fonts shall not be smaller than Times New Roman or Arial 11-point font, single column, with normal character spacing and position. The text for charts, tables, graphs, and figures shall be no smaller than Times New Roman or Arial, 10-point font. Line spacing shall be at least single-spaced.

L-2.6.2 Pages: All pages shall be formatted as 8.5” x 11” letter size with one-inch margins all around. 11” x 17” is allowed for charts, tables, and graphs only. Any proposal text included on these pages, other than the information specific to the graphics, will not be considered in the evaluation. One 11” x 17” page will be counted as two pages. All material shall be contained within the page limits identified below for each section, and all appendices, charts, graphs, diagrams, tables, photographs, drawings, etc., are included in the page count. Not included in the page count are title pages, tables of content, glossaries of abbreviations, acronyms, or definitions, or copies of certificates (i.e. ISO9000). Evaluators will only evaluate up to the maximum number of pages specified in Section L-3.

L-2.6.3 Headers and Footers: Information contained in headers and footers shall only provide company name, solicitation number, disclosure markings (FAR 52.215-1(e)), dates, or page numbers. Text sizes shall be no smaller than Microsoft Word, Times New Roman or Arial Narrow, 9-point font.

L-2.7 Proposal Submission L-2.7.1 Questions Submission: Questions in response to this solicitation are due no later than the date and time specified in block 10 of the SF1442. All questions shall be submitted via email and only to the Points of Contact below. It is the Offeror’s responsibility to confirm receipt.

Joshua Drawdy, joshua.drawdy.2@us.af.mil Karl Knott, karl.knott@us.af.mil Reference: Solicitation FA487724R0003

Questions shall be submitted using the Request for Information (RFI) Log included with this solicitation as Attachment #2. All questions submitted by the deadline, and their responses, will be posted to the Government Point of Entry (GPE) as an amendment to this solicitation.

L-2.7.2 PIEE: All documents for this solicitation can be found on the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at https://piee.eb.mil. An overview of the PIEE Solicitation Module and instructions for submitting a proposal are available at:

https://dodprocurementtoolbox.com/site-pages/solicitation-module

Vendor Access Instructions/Registering for an Account:

https://dodprocurementtoolbox.com/uploads/PIIE_Solicitation_Module_Vendor_Access_Instruct ions_0_c6b0773c4b.pdf

Submitting a proposal:

https://dodprocurementtoolbox.com/uploads/PIEE_Solicitation_Module_FA_Qs_120e300325.pd f

All vendors can view the solicitation in the PIEE Solicitation Module by selecting “Solicitation Search” under the Support section at the bottom of the page. The SAM.gov site will reference back to this module.

Additional Resources:

Vendor Access Instructions and Account Support Contact Information:

https://www.acq.osd.mil/dpap/pdi/eb/docs/PIEE/PIEE_Solicitation_Module_Vendor_Access_Ins tructions.pdf

Proposal Manager Instructions in the Solicitation Module:

https://pieetraining.eb.mil/wbt/sol/Proposal_Manager.pdf

All PIEE Solicitation Module Web Based Training:

https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml

L-2.7.3 Proposal Submission: All proposals shall be submitted via the PIEE Solicitation Module.

Proposals are due no later than the date stated on Block 9 of the SF1442. Offerors shall establish a Proposal Manager account to access documents and submit proposals. The Solicitation Module automatically tracks the date and time of all submissions. Proposals not received by the designated submission deadline will be considered late and not evaluated.

L-3 PROPOSAL CONTENT

SECTION PROPOSAL SECTION TITLE

PAGE

LIMIT

L-3.1 Business

L-3.1.1 Cover Letter 1 page L-3.1.2 Financial Information 10 pages L-3.1.3 Pre-award Documentation 5 pages L-3.1.4 Partnering Documentation 10 pages L-3.1.5 Contract Documentation No limit

L-3.2 Prior Technical Experience L-3.2.1 L-3.2.2

15 Work Samples No Limit

L-3.2.4 Self-Scoring Worksheet 1

Worksheet

L-3.1 Business Section This section shall include all requirements listed below. Failure to address all required documentation (negative responses included) will render the proposal non-responsive.

L-3.1.1 Cover Letter. Includes:

(a) Name

(b) Address

(c) CAGE Code

(d) Unique Entity Identifier

(e) System for Award Management (SAM.gov) registration expiration date

(f) Proposal validity statement

(g) Virus free electronic submission statement (as required by Section L 2.4)

(h) POC authorized to obligate the company (name, email, and phone)

L-3.1.2 Financial Information. To expedite the responsibility determination required by FAR 9.103(b), provide documentation of the following:

(a) Offeror’s adequate financial resources, or the ability to obtain them (FAR 9.104-3(a)).

i. Evidence may include official letter(s) from financial institutions demonstrating that the Offeror has the financial resources required to cover all financial commitments.

(b) Offeror’s organization, experience, accounting, and operational controls, and technical skills, or the ability to obtain them (FAR 9.104-1(e)).

i. Evidence may include a list of organizational policies or Standard Operating Procedures (SOPs) which demonstrates the organizational controls and measures of the Offeror.

ii. If providing a list, include the title of each policy or SOP, the date of each document, a brief description of each, and state to which element of FAR 9.104(e) it applies.

(c) Each offeror is required to submit evidence of a minimum bonding capacity greater than $2M for a single project and greater than $15M aggregate (FAR 28.102-1).

L-3.1.3 Partnering Documentation. Provide documentation, including SBA letters (13 CFR 125.8) as applicable, identifying the arrangement, and disclosing company relationships (FAR 9.603) for any Joint Venture, Teaming Arrangement, Mentor-Protégé, etc. established for the purposes of this requirement. Provide the signature pages for any signed agreements as applicable.

L-3.1.4 Contract Documentation. Provide the following:

(a) SF 1442 blocks 14 through 20. Block 17 shall be filled in with the proposal validity date.

Signature by the Offeror on the SF 1442 constitutes an offer, which the Government may accept. Information provided must match that in SAM.gov and the proposal cover letter.

(b) SF 30. In the event this Request for Proposal (RFP) is amended, Offerors shall acknowledge all amendments and submit signed copy(ies) of all SF30s.

L-3.2 Prior Technical Experience (PTE)

L-3.2.1 Work Samples. The Offeror shall submit a maximum of 15 unique work samples which demonstrate their prior technical experience against the required Highest Technically Rated Offeror (HTRO) scoring elements, and which comply with the work sample qualifications established in Section L-3.2.3 below. Each individual work sample is not required to apply to all scoring categories listed in the Self-Scoring Worksheet to meet the qualifications as a work sample.

3.2.1.1 When referring to work samples, the terms “contract” and “task order” are not interchangeable. The term “contract” shall refer to a stand-alone contract action and the term “task order” shall refer to an order issued under an Indefinite Delivery Indefinite Quantity (IDIQ) contract under FAR 16.505 ordering procedures. IDIQ contracts and Blanket Purchase Agreements (BPAs) shall not be counted as a valid work sample. Orders against IDIQs/BPAs do count as a valid work sample. Multiple task orders issued against IDIQs or BPAs cannot be combined to count as one sample.

3.2.1.2 Work samples shall consist of official contract documentation (e.g. Performance

Work Statements, Contract Data Requirement Lists [CDRLs], Contract Section A, etc.), or official corporate documentation (e.g. payroll data, company SOPs, HR manuals, etc.). When contracts are submitted as work samples, the Offeror shall include the signed first page of the contract. The Government will accept a Statement of Fact from the cognizant Government Contracting Officer (CO) or Contracting Officer’s Representative (COR) to confirm missing information, should contractual documents not carry all the information necessary to substantiate the Offeror's scores.

Work samples shall include sufficient information to substantiate each scoring element. If a work sample substantiates multiple scoring elements, each element must be identified within the work sample. Work samples shall be submitted by the Prime Offeror. Subcontractor proprietary information may be redacted. The redacted work sample must stand on its own.

3.2.1.3 Offerors shall give each work sample an identifier (i.e., WS1-WS15). All pages within each of the work samples shall be numbered. Work samples shall be provided in their original format; page numbers may be added. Font, text size, and margin requirements established in Section L-2.6 do not apply to work sample submissions.

Work samples shall be in English.

3.2.1.4 Offerors shall furnish the following information for each contract referenced:

(a) Prime Contractor on Project (Company/Division):

(b) CAGE Code:

(c) Unique Entity ID:

(d) Role of Offeror in Effort (Prime Contractor, Sub Contractor, Joint Venture (JV)

Partner, Teaming Partner, Predecessor Company, Consultant, Key Personnel)

(e) Project Title:

(f) Contract Specifics:

(g) Complete Name of Customer:

(h) Customer Address and Telephone #:

(i) Contract Number or Citation:

(j) Type of Contract (Design-Build, Design-Bid-Build):

(k) Preponderance of Work (Existing Whole Building Renovation, Utility Infrastructure

Repair/Construction, or Other):

(l) Period of Performance (Calendar Days):

(m) Place of Performance (City, State) :

(n) Initial Contract Price: $

(o) Final Amount Invoiced/Invoiced to Date: $ Original Contract Completion Date:

(p) Current Sched Contract Completion Date:

(q) If complete, Final Completion Date:

OR Estimated Percent Completion:

(r) Description of Work:

Relevance: Describe how the work under this contract relates to the relevancy (scope, magnitude, and complexity) to the effort of individual task orders contemplated to be issued on this contract. Indicate the role of the offeror and the percentage of the project actually performed by the offeror and the type of work that was performed. If the offeror performed as part of a teaming arrangement or joint venture, indicate the names of all team members and the work performed by each. If necessary, the offeror may include additional comments to clarify the relevancy of the project.

(s) Project Manager and/or Technical Representative Name:

Office:

Address:

Telephone:

E-Mail:

(t) Contracting Officer and/or Procurement Manager Name:

Office:

Address:

Telephone:

E-Mail:

L-3.2.2 Work Sample Qualifications. Contracting documentation work samples that do not meet the minimum qualifications below will not be considered by the Government in validating their associated self-rated score.

(a) Will have at least six months of active performance within the last five years, as of the proposal due date.

(b) Will fall under NAICS categories 236 or 237.

The Government will evaluate recent and relevant performance relative to the requirements of this solicitation. The Government will use information submitted by the offeror. Provide no more than fifteen contracts total. Provide a list of no more than fifteen of the relevant contracts performed for Government agencies and commercial customers within the last five (5) years.

Subject to the limitations in this paragraph, the following criteria shall be considered more relevant, and will receive additional points if the submitted contracts meet at least one of the listed criteria below:

(a) Contracts with a minimum 50% of work associated with existing facility whole building renovation work involving Mechanical, Electrical, Plumbing, Fire Protection, Building Envelope, and other systems, and with values equaling or exceeding $250K.

(b) Contracts with a minimum 50% of work associated with Water or Electrical utility infrastructure, and with values equaling or exceeding $250K.

(c) Design Build contracts with a minimum 50% of work associated with existing facility whole building renovation work and/or utility infrastructure work with values equaling or exceeding $250K.

Work samples will fall into one of the following categories:

(a) Prime Offeror work samples. If a company is proposing as a Joint Venture, work samples will be considered from either member or from the JV.

(b) Subcontractor work samples. The Subcontractor will have acted as the Subcontractor on the submitted work sample.

L-3.2.3 Self-Scoring Worksheet. The Self-Scoring Worksheet shall be submitted by the Prime Offeror only. The Offeror shall complete the Self-Scoring Worksheet in Section L. Self-rated scores shall be verifiable using the work samples provided. The burden of proof to substantiate the Offeror’s self-rated score rests with the Offeror. The work samples shall include all the evidence required to validate the proposed self-score.

3.2.3.1 The Offeror shall complete the “Offeror Response” columns (in green) on the Self-

Scoring Worksheet. The Offeror’s Score will be calculated automatically based on these inputs. Unless stated otherwise, the Offeror shall not change, adjust, or manipulate any other cells within the Worksheet. The Offeror shall not unprotect the spreadsheet or add any tabs to the file. The Offeror shall accurately rate itself using the scoring instructions found within the self-scoring worksheet.

3.2.3.2 Self-Scoring Worksheet Instructions

(a) The Offeror shall submit Section J Attachment 4, titled “Self-Scoring Worksheet.” No other format or additional proposal documentation will be considered.

(b) Do not alter rows or columns of the Self Scoring Worksheet.

(c) The Work Samples One (1) through fifteen (15) in the Self-Scoring Worksheet must fall under NAICS groups 236 and 237 and comply with the requirements for submission listed in Section L 3.2.2 Work Sample Qualifications.

(d) The Offeror must only fill in columns which are highlighted green, to include the names of work samples in Column A. In Column B, the Offeror will type “Yes” or “No” in all designated green blocks, with the exception of the “Past Performance Ratings” section where a score will be calculated using the provided scale and input into the green blocks. Do not leave any elements blank.

Note: The scoring elements are not minimum requirements. Column E will be filled with the applicable file name for the referenced line. Column F will be filled with the specific page and specific paragraph numbers where relevant information for the scoring element can be found.

(e) Instructions for each factor are found in the top of each section, as well as in Sections L and M.

(f) The value of points assigned to each element will be based on answers provided on the self-scoring worksheet. The Government will assess validity of supporting documentation and make a downward adjustment to scores accordingly if the documentation does not support the score provided on the self-scoring worksheet. Scoring will not be adjusted upward.

(g) See Section M.2 for additional scoring details. The following shall be used for each section of the self-scoring worksheet:

a. Volume 1- Business Section. The listed documents must be provided. No points will be awarded for this section, but the Government will document in Column B whether or not the documents listed were included in the package.

b. Volume 2- Relevant Experience.

i. NAICS Group Relevant Experience Projects. Applicable to fifteen (15) work samples.

Column B- ANSWER Yes = Five Hundred (500) Points No = Zero (0) Points

ii. NAICS Group Relevant Project Size & Complexity. Applicable to the fifteen (15) previously listed work samples. Points will only be awarded for the highest scoring category for each NAICS group.

Column B- ANSWER Project Value >250K and <$1M = Five Hundred (500) Points Project Value >$1M and <$5M = One Thousand (1,000) Points Project Value >5 and <10M = Two Thousand (2,000) Points

iii. Relevant Project Experience with Federal, State, or Local

Government. Applicable to the fifteen (15) previously listed work samples. Points will only be awarded for the highest scoring category.

Column B- ANSWER One (1) to five (5) samples from Government = Two Hundred

(200) Points Six (6) to ten (10) samples from Government = Five Hundred

(500) Points Eleven (11) to fifteen (15) samples from Government = One Thousand (1,000) Points

iv. Relevant Experience as a Prime Contractor. Applicable to the fifteen (15) previously listed work samples. Points will only be awarded for the highest scoring category.

Column B- ANSWER Project Value >250K and <$1M = Two Thousand (2,000) Points Project Value >$1M and <$5M = Four Thousand (4,000) Points Project Value >5 and <10M = Six Thousand (6,000) Points

v. Relevant Experience as a Subcontractor. Applicable to the awarded for the highest scoring category.

Column B- ANSWER Project Value >250K and <1M= Two Hundred Fifty (250) Points Project Value >$1M and <$5M = Five Hundred (500) Points Project Value >5 and <10M = One Thousand (1,000) Points

vi. Experience on Design-Build Projects. Applicable to the fifteen

(15) previously listed work samples. Points will only be awarded for the highest scoring category.

Column B- ANSWER One (1) to five (5) Projects as a Prime = Two Thousand (2,000) Points Six (6) to ten (10) Projects as a Prime = Four Thousand (4,000) Points More than ten (10) Projects as a Prime= Six Thousand (6,000) Points

vii. Experience on Utility Infrastructure Projects. Applicable to the awarded for the highest scoring category.

Column B- ANSWER One (1) to five (5) Projects as a Prime = Two Thousand (2,000) Points Six (6) to ten (10) Projects as a Prime = Four Thousand (4,000) Points

viii. Experience with Whole Building Renovation. Applicable to the awarded for the highest scoring category.

Column B- ANSWER One (1) to five (5) Projects as a Prime = Two Thousand (2,000) Points Six (6) to ten (10) Projects as a Prime = Four Thousand (4,000) Points

ix. Current Distance from the Davis-Monthan AFB, AZ Visitor

Center (By Radius from the corner of Craycroft Rd and Golf Links Rd). Indicated the distance of your company office from Davis-Monthan AFB. Points will only be awarded for the highest scoring category.

Column B- ANSWER Greater than 450 miles = One Hundred (100) Points Between 150 and 450 miles = One Thousand Five Hundred (1,500) Points Less than 150 miles = Five Thousand (5,000) Points

x. Experience in Desert Climate (Climate Zone 2B per

International Energy Conservation Code). Applicable to the fifteen (15) previously listed work samples. Points will only be awarded for the highest scoring category.

Column B- ANSWER One (1) to Five (5) Projects = One Thousand (1,000) Points Six (6) to ten (10) Projects = One Thousand Five Hundred (1,500) Points More than ten (10) Projects = Two Thousand (2,000) Points

xi. Past Performance Ratings. Applicable to the fifteen (15) previously listed work samples. Points will be awarded for each rating and must be manually calculated, and input based upon adding together points for each category listed as found in CPARS or the Past Performance Questionnaire. Categories for which scores will be added together for the work sample total score are Quality, Schedule, Management, and Regulatory Compliance.

Column B- ANSWER Exceptional = One Thousand (1,000) Points Very Good= Five Hundred (500) Points Satisfactory = One Hundred (100) Points Marginal = Minus One Hundred (-100) Points Unsatisfactory = Minus Five Hundred (-500) Points

c. Volume 3- Systems, Certifications, and Clearances

i. Certified Construction Manager. Points will only be awarded for the highest scoring certification.

Column B- ANSWER Certified Const Manager = One Thousand Five Hundred (1,500) Points Certified Associate Const Manager = One Thousand (1,000)

Construction Manager in Training = Five Hundred (500) Points

ii. Certified Professional Constructor. Points will only be awarded for the highest scoring certification.

LVL II = One Thousand Five Hundred (1,500) Points LVL I = One Thousand (1,000) Points

iii. Minimum Two Superintendents. Points will only be awarded for having two superintendents on staff.

Certified = One Thousand Five Hundred (1,500) Points

iv. Certified Safety Manager. Points will only be awarded for having a certified safety manager on staff.

v. Certified Project Manager Professional. Points will only be awarded for having a certified project manager professional on staff.

vi. Green Business Certification (LEED). Points will only be awarded for having a certified Green Business professional on staff.

L-3.2.4 CPARS and Past Performance Questionnaires. The offeror will submit the latest CPARS evaluation for work samples in which a CPARS evaluation was performed. If a CPARS was not performed on the work sample project, the contractor will submit a Past Performance Questionnaire (Attachment 5). In the event that a CPARS evaluation or Past Performance Questionnaire is not submitted for a work sample, the work sample will be invalidated.

L-3.2.5 Industry Certifications. The Self-Scoring Worksheet contains multiple certification categories available for scoring as listed in L 3.2.3.2(g)(c). This area is not mandatory;

however, certifications provided for the listed categories will contribute towards total validated points. Documents submitted will demonstrate that the offeror maintains individuals on staff who possess the certifications.

L-3.3 Price Proposal

L-3.3.1 Completion of Price Proposal. The offeror must complete the following sections:

(a) Section A (SF 1442): complete Blocks 14, 15, 16, 17, 19, 20A, 20B, and 20C. In doing so, the offeror accedes to the contract terms and conditions as written in solicitation Sections A through K. This constitutes the model contract.

(b) Pricing Schedule: Insert proposed unit and extended prices in Section B for the Price Evaluation Project in the Contract Line Item Number (CLIN). The total price shall then be inserted into the fill-in positions for each CLIN.

(c) Complete the necessary fill-ins and certifications in section I through K. Section K shall be returned in its entirety. For sections C through I, the offeror shall submit only those pages that require a fill-in.

L-3.3.2 AF3052. Price will be evaluated using techniques established in FAR 15.404-1(e) to ensure the Government receives a fair and reasonable, balanced price. The contractor shall include on the AF3052 (Attachment 16) prices for the items listed in Section B for all costs for work associated in the statement of work, whether or not specifically listed in the Schedule B.

Pricing will be broken out by Division (as defined by the Construction Specifications Institute) for the evaluation project The Government reserves the right to request data other than certified cost or pricing data.

SECTION M

EVALUATION FACTORS FOR AWARD

FA487724R0003

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) INDEFINITE-

DELIVERY INDEFINITE-QUANTITY (IDIQ)

M-1 GENERAL INFORMATION

M-1.1 Basis for Award This is a best value source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15.3 and DoD Source Selection Procedures, as supplemented. In this procurement, the Government will determine best value based on an objective assessment and validation of the HTRO. Price will be evaluated during this source selection for evaluation purposes only (FAR 15.304) for fair and reasonableness. Additionally, price will be evaluated at the individual task order level.

M-1.1.1 Number of Contracts to be Awarded. The Government intends to award to five (5) 8(a) businesses who are validated as the highest technically rated, have a fair and reasonable evaluated price, and are also determined responsible IAW FAR 9. Additionally, the next five (5) highest technically rated offerors, who are also determined responsible IAW FAR 9, will be available for on-boarding if the Government requires additional vendors.

M-1.1.2 IDIQ Ceiling. The overall ceiling of the IDIQ is estimated at $350M for five (5) years with two (2) option years. The total value of all task orders awarded under the IDIQ will not exceed this amount. Funding will be determined at the individual task order level.

M-1.1.3 Minimum Quantity Task Order. An initial task order will be awarded to each IDIQ contractor for the Post-Award Conference Meeting. The dollar value is set at $250.00 and will satisfy the minimum quantity requirement. There is no guarantee of any task order beyond the minimum task order.

M-1.2 Proposal Compliance and Offeror Responsibility

M-1.2.1 Proposal Substantiation. Unsubstantiated or misleading claims for any Prior Technical Experience evaluation element could result in the Government determining that the Offeror’s proposed self-rated score is artificially inflated. If this were to occur, the Government will unilaterally downward adjust the Offeror’s score, potentially down to zero points.

M-1.2.2 Proposal Compliance. Offerors shall meet all solicitation requirements, such as terms and conditions, submission requirements, representations and certifications, and other instructions identified within the solicitation. Offerors shall comply with content required within each of the proposal sections. Failure to comply with any requirement of the solicitation may result in the Government determining the Offeror to be unresponsive and ineligible for award.

The Government will review each Offeror’s proposal to ensure all required documentation was provided in response to the solicitation. The Government will rely on the documentation provided by the Offeror to facilitate the Contracting Officer’s determination of proposal compliance.

M-1.2.3 Offeror Responsibility. No award shall be made to an Offeror unless the Contracting Officer determines them to be responsible. To be determined responsible, an Offeror shall meet the general standards described in FAR 9.104-1. The Contracting Officer may consider information provided within any section of the proposal, and other information, not limited to proposal information, when making the determination of responsibility.

M-2 EVALUATION FACTORS AND METHODOLOGY

The Government will evaluate quality (FAR 15.304(c)(2)) in this source selection through consideration of the Offeror’s Prior Technical Experience (PTE) as a factor. A two-step process will be used to determine which Offeror’s proposals are responsive and qualified to receive an award.

M-2.1 Step One – Business Section

The Government will review the entire proposal for compliance with Section L. Any work samples submitted that do not meet the criteria of Section L-3.2.1-3.2.4 will either be eliminated entirely or have non-complaint pages removed prior to evaluation. Once the Government has determined the proposal to be responsive, the Government will then evaluate the Offeror's self-rated technical proposal.

M-2.2 Step Two – Scoring Validation

The HTRO methodology requires the Offeror to submit a self-rated score based on the objective criteria described in Section L. Assessing technical excellence is inherent to the HTRO methodology with price. The Government will evaluate the Offeror's self-rated technical proposal by validating the proposed Self-Scoring Worksheet. The Government will validate the Offeror's self-rated scores using the work samples provided. If the Government is unable to find the substantiating information within the referenced page, paragraph, table, etc., the Government will not search further for the substantiating information. If the Government is unable to validate that Offeror's self-rated score based on the work samples, the Government will unilaterally downward adjust the Offeror's self-rated score, potentially down to zero points. The Government will only adjust the Offeror's self-rated score downward, not upward. Such adjustments are within the sole discretion of the Government and are based upon the substantiation of the self-rated score provided by the Offeror. Further, the Government will evaluate the contractor's price proposal for fair and reasonableness as a pass/fail criteria. Awards will be made to the top five

(5) Government-validated technical proposal scorers with fair and reasonable pricing, with the next top five (5) scorers being available for on-boarding.

In the event of a tie, the Offeror with the lowest fair and reasonable pricing will be ranked higher.

M-2.3 Point Accumulation

The maximum number of points a contractor can receive is 115,500.

The maximum number of points in Volume 1- Business Section is 0.

The maximum number of points in Volume 2- Relevant Experience is 104,500.

The maximum number of points in Volume 3- Systems, Certifications, and Clearances is 9,000.