M6890917Q7628_Amendment_0003_.pdf
PDF 256 KB Posted
- Attached to
- Emergency Medical Personnel
- Solicitation number
- M6890917Q7628
- Issued by
-
United States Marine Corps
About this file
M6890917Q7628 Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry_Questions_and_Government_Answers.pdf | ||
| M6890917Q7628_Amendment_04.pdf | ||
| Attachment_1_PWS_23_MAY_2017.pdf | ||
| Attachment_4_Past_Performance_Questionnaire.docx | DOCX document | |
| Exhibit_A_CDRLs_23_MAY_2017.pdf | ||
| M6890917Q7628_Q.A_23_MAY_2017.pdf | ||
| M6890917Q7628_Amendment_0002.pdf | ||
| M6890917Q7628_Amendment_01.pdf | ||
| Attachment_1_PWS.docx | DOCX document | |
| Exhibit_A_CDRLs.docx | DOCX document | |
| Attachment_4_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_5_Past_Performance_Reference.docx | DOCX document | |
| M6890917Q7628_RFQ_AVTB_EMS.pdf | ||
| Attachment_3_DRAFT_QASP_PRS.docx | DOCX document | |
| Attachment_2_Wage_Determination.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
This solicitation is no longer on hold. The solicitation due date has been extended to 22 June 2017 at 2:00PM PDT. Questions regarding the
RFQ are due by 02 June 2017 at 2:00PM PDT. The purpose of this amendment is to :
(a)incorporate the Industry questions and Government answ ers;
(b) update FAR Clauses 52.212-1 Instructions to Offerors - Addendum and 52.212-2 Evaluation -- Commercial Items;
(c) add revised PWS and Exhibit-1 CDRLs;
(d) w ithdraw the small business set-aside for SDVOSBs to solicit on an unrestricted basis; and
(e) change the Government POCs for this effort from Kathleen Ruyle to Rosemarie Mendoza and Sandra Ingram.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-May-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M6890917Q7628
X 9B. DATED (SEE ITEM 11)
20-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-May-2017
CODE
COMMANDING OFFICER
CONTRACTS, MCTSSA
BOX 555171
CAMP PENDLETON CA 92055-5171
M68909 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M6890917Q7628
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The set aside percentage 100.00% has been deleted.
The required response date/time has changed from 19-May-2017 02:00 PM to 22-Jun-2017 02:00 PM.
The Acquisition Set Aside has changed from SVC-DISABLED VET-OWNED SB to No Preference / Not
Listed.
The following have been modified:
52.212-1 ADDENDUM
General Instructions
The vendor shall submit no more than one quote in response to this solicitation. The quote shall be concise, comprehensive, and clear without the need for additional explanation or information. The quote shall provide sufficient detail and scope to permit the Government to evaluate with respect to the evaluation factors of the solicitation.
Solicitation due date: 22 June 2017, 2:00PM, Pacific Daylight Time (PDT). Quotes shall be valid for
60 days from the solicitation due date.
Questions regarding the RFQ are due on 02 June 2017, 2:00PM, PDT. Questions shall be emailed to rosemarie.e.mendoza1@usmc.mil and sandra.ingram@usmc.mil. Telephone inquiries will not be accepted or addressed. Questions received after the above due date may not be addressed.
Quote Format
The quote shall be submitted in two volumes:
Volume I: Technical Quote
Volume II: Price Quote
Quote Instructions
The vendor shall submit the signed SF1449, signed amendment(s), technical and price quotes. The SF1449, any amendments, and quotes must be submitted via email to rosemarie.e.mendoza1@usmc.mil and sandra.ingram@usmc.mil. Each volume shall be saved as a separate file. No hardcopies shall be submitted in response to this RFQ.
The technical quote volume shall be no more than 15 pages and shall be prepared using Times New Roman font in
12 point type with an 8 ½”x 11” page size and one inch margins. Tables and illustrations may use a reduced font size of no less than 8 point font; however, the Government reserves the right not to evaluate tables or illustrations if used to circumvent the page limitation. Pages in excess of the page limit will not be evaluated by the Government.
The Title Page, Table of Contents, Past Performance References and Questionnaires do not count towards the technical volume page limit.
The technical quote shall NOT contain pricing information. Inclusion of cost or pricing information or from which cost or pricing could be reasonably concluded in Volume I shall render the quote non-compliant and ineligible for evaluation and award. There is no page limit for the price volume. The vendor shall ensure that the submitted files/documents are accessible and legible for the Government. In the event that a file cannot be opened or read, the
Government reserves the right to find the submission non-compliant and ineligible for evaluation and award.
The vendor shall submit all volumes formatted with the products contained Microsoft Office Professional (2010) for mailto:rosemarie.e.mendoza1@usmc.mil mailto:sandra.ingram@usmc.mil mailto:sandra.ingram@usmc.mil
Windows 7 and Adobe Acrobat XI (PDF) format. Price quote spreadsheets shall be submitted in Microsoft Excel
Version 2010/or above. Any price spreadsheet submitted in PDF format shall be also be submitted in Excel format.
If the vendor does not use Microsoft products in the preparation of its quote, he shall be responsible for converting the documents into the requested format.
All or part of the successful Vendor’s quote may be incorporated into any contract resulting from this solicitation, including the proposed staff qualifications and experience. Nothing contained in the successful Vendor’s quote shall constitute a waiver of any requirement of the contract. In the event of any conflict between the successful Vendor’s quote and any portion of the contract, the conflict shall be resolved in favor of the contract.
Volume I: Technical Quote
Factor 1: Technical Understanding and Personnel Qualifications. The vendor shall:
- Discuss their technical understanding and approach to performing the tasks identified in the PWS.
- Submit a staffing plan which explains in detail how the vendor will provide personnel that meet or exceed the qualifications specified in the PWS.
- Discuss their experience, if any, providing emergency medical services in a developmental testing or amphibious environment, including experience with related medical conditions and the demands of such environments.
- Discuss their ability and approach to providing the required services given the schedule fluctuations inherent in a developmental test environment.
Factor 2: Management Approach. The vendor shall submit a detailed and comprehensive response that includes:
- A clear explanation of the vendor’s management approach in meeting the requirements of the PWS that explains how the company will oversee and manage the contract effort, maintain medical oversight in accordance with San Diego County EMS policies, procedures, and protocols, and communicate with the
Government.
- A Quality Control Plan that, at a minimum, explains how the vendor will maintain proper oversight over to the contract effort, ensure that staff maintain current certifications and licensure throughout performance of the contract, and ensure that EMT support is provided as ordered by the Government, addressing issues including, but not limited to employee turnover, absenteeism, and tardiness.
Factor 3: Past Performance – Vendors shall provide no more than three references of past performance similar in size, scope, and/or complexity. References may be either as a prime or subcontractor, but must include at least 12 months of performance occurring in the 36 months preceding the quote submission date. The past performance references shall address the information included in Attachment 5 – Past Performance Reference. Each past performance reference shall be limited to five pages in length and do not count towards the total page limit for the technical volume.
The completed past performance reference is considered source selection information in accordance with FAR 2.101 and 3.104. Vendors are responsible for ensuring that the telephone numbers provided for the customer’s point of contact included in each of the past performance references are accurate and that the representative is aware that he or she may be contacted by MCTSSA regarding the questionnaire and the Vendor’s past performance.
The Vendor shall submit a Past Performance Questionnaire, Attachment 4, for each of the three past performance references submitted. The Vendor shall complete Section 1 on the form, and the client’s representative most knowledgeable of the past performance effort shall complete Sections 2, 3 and 4 on the form and submit the Past
Performance Questionnaires directly to Rosemarie Mendoza at rosemarie.e.mendoza1@usmc.mil and Sandra
Ingram at Sandra.ingram@usmc.mil no later than the solicitation due date and time specified above. Past
Performance Questionnaires do not count towards the total page limit for the technical volume.
mailto:Sandra.ingram@usmc.mil
The Government may contact references during the evaluation process to verify relevant experience and level of performance. The Government may, at its discretion, obtain and evaluate information from sources other than those provided by the Vendor, such as:
- Past Performance Information Retrieval System (PPIRS)
- Past Performance Questionnaires (PPQs)
- Contractor Performance Assessment Reporting System (CPARS) in addition to all recent and relevant past performance data provided by the Vendor
- Past performance on contracts not submitted by the Vendor
- Personal knowledge
Volume II: Price Quote
Price quote shall be submitted in MS Excel. The vendor shall submit firm fixed hourly price for every Contract Line
Item (CLIN) of the RFQ. The vendor shall provide at minimum substantiating price information of the labor categories, number of personnel per labor category, fully burdened hourly rates, and number of hours which shall correlate to the PWS requirements. Contract Data Requirement Lists (CDRLs) will not be separately priced.
GOVERNMENT POINTS OF CONTACT
Contracting Officer:
Rosemarie Mendoza
Phone: 760-725-9208
Email: rosemarie.e.mendoza1@usmc.mil
Contracting Officer’s Representative (COR):
Capt William Lambuth
Phone: 760-763-4360
Email: william.lambuth@usmc.mil
LIST OF ATTACHMENTS:
Attachment 1 – Performance Work Statement, dated 23 May 2017
Attachment 2 – Wage Determination
Attachment 3 – DRAFT QASP/PRS
Attachment 4 – Past Performance Questionnaire
Attachment 5 – Past Performance References
LIST OF EXHIBITS:
Exhibit A – CDRLs, dated 23 May 2017
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible vendor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes, listed in descending order of importance:
Factor 1: Technical Understanding and Personnel Qualifications
Factor 2: Management Approach
Factor 3: Past Performance
Factor 4: Price
Technical understanding and personnel qualifications, management approach and past performance, when combined, are more important than price.
The Government intends to evaluate quotes to assess the vendor’s technical understanding and personnel qualifications, management approach, and understanding of the requirements as referenced in the PWS.
Technical Factors 1 and 2 for the quote will be evaluated using the adjectival ratings and applicable definitions included in the tables below:
Table 1. Combined Technical/Risk Rating
Color Rating Adjectival Rating Description
Blue Outstanding
Quote indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good
Quote indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable
Quote meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Quote has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable
Quote does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Quote is unawardable.
Table 2. Risk Rating Definitions
Adjectival
Rating
Description
Low
Quote may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal
Government monitoring will likely be able to overcome any difficulties.
Moderate
Quote contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High
Quote contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Quote contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
Table 3. Observation Definitions
Observation Definition
Significant An aspect of a Vendor's quote that has appreciable merit or appreciably exceeds
Strength specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
Strength
An aspect of a Vendor's quote that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness A flaw in the quote that increases the risk of unsuccessful contract performance.
See FAR 15.001.
Significant
Weakness
A flaw that appreciably increases the risk of unsuccessful contract performance.
See FAR 15.001.
Deficiency
A material failure of a quote to meet a Government requirement or a combination of significant weaknesses in a quote that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
Uncertainty Aspects of the quote that make it impossible to determine if a requirement will be met.
Risk
The potential for unsuccessful contract performance. The consideration of risk assesses the degree to which a Vendor’s quoted approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, degredation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.
(1) Factor 1: Technical Understanding and Personnel Qualifications. The Government will evaluate the following:
- The Vendor’s technical understanding and approach to performing the tasks identified in the PWS.
- The Vendor’s staffing plan which explains in detail how the Vendor will provide personnel that meet or exceed the qualifications specified in the PWS.
- The Vendor’s experience, if any, providing emergency medical services in a developmental testing or amphibious environment, including experience with related medical conditions and the demands of such environments.
- The Vendor’s ability and approach to providing the required services given the schedule fluctuations inherent in a developmental test environment.
(2) Factor 2: Management Approach. The Government will evaluate the following:
- The Vendor’s management approach in meeting the requirements of the PWS and how the company will oversee and manage the contract effort, maintain medical oversight in accordance with San Diego County
EMS policies, procedures, and protocols, and communicate with the Government.
- A Quality Control Plan that, at a minimum, explains how the vendor will maintain proper oversight over to the contract effort, ensure that staff maintain current certifications and licensure throughout performance of the contract, and ensure that EMT support is provided as ordered by the Government, addressing issues including, but not limited to employee turnover, absenteeism, and tardiness.
(3) Factor 3: Past Performance. The Government will evaluate past performance by reviewing each past performance reference or other source of past performance information to determine recency and relevancy. Recency and relevancy will be determined as follows:
Recency: Recency is assessed to ensure vendor past performance is considered based on information that is sufficiently current to allow for meaningful predictive value. References for contracts or task orders with at least 12 months of performance in the last 36 months will be considered to be recent.
Relevancy: Relevancy is assessed so that contract performance may be weighed in relation to its predictive value. To determine relevancy, the Government will consider the magnitude, scope, and complexity of each past performance reference.
Then the Government will weigh the quality of the performance on each effort in relation to the effort’s relevancy in order to determine a single rating for each Vendor from the Past Performance Acceptable/Unacceptable Rating
Method table below.
Table 4. Past Performance Acceptable/Unacceptable Rating Method
Adjectival Rating Description
Acceptable Based on the vendor’s performance record, the Government has a reasonable expectation that the vendor will successfully perform the required effort, or the vendor’s performance record is unknown.
Unacceptable Based on the vendor’s performance record, the Government does not have a reasonable expectation that the vendor will be able to successfully perform the required effort.
In the case of a vendor without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the vendor may not be evaluated favorably or unfavorably on past performance. Therefore, the vendor shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”
(4) Factor 4: Price. The Government will evaluate the vendor’s price quote to determine fair and reasonableness using price analysis techniques and procedures. Price will be evaluated but not rated.
(b) Options. The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
The resultant task order will include FAR 52.217-8. As part of the price evaluation, the Government will evaluate its option to extend services by adding a six month option period, calculated using half of the quantity in the final option year at the vendor’s final option period price, to the vendor’s total price. Accordingly, a separate evaluation for fair and reasonableness will be completed for this option and will be part of the above price evaluation.
(c) A written notice of award or acceptance of a quote, mailed or otherwise furnished to the successful vendor within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party.
Before the vendor's specified expiration time, the Government may accept a quote (or part of a quote), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(d) Vendors must propose for all CLINs. Partial quotes will not be accepted.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .