Atch 3 - SOW Cross Reference Matrix_20220824.docx
DOCX document 30 KB Posted
- Solicitation number
- M6785422R2001
- Issued by
-
United States Marine Corps
About this file
This document contains a Statement of Work cross reference matrix and related solicitation for the Marine Corps Wideband Satellite - Light and Heavy systems. The Marine Corps Systems Command requires delivery of the Marine Corps Wideband Satellite Communications Light and Heavy systems to support the United States Marine Corps' access to worldwide web, Department of Defense information networks, and Marine Corps enterprise services via Department of Defense gateways using radio frequency and over-the-horizon transmission means. The work will be performed in two phases, with the first phase procuring test systems and the second phase conducting production, testing, and delivery of operational systems to support the Marine Corps' fielding requirements. Deliverables will include technical data, logistics data, training data and support, fielding support, and sustainment support as well as technology upgrades. The solicitation seeks a single contractor for a single-award, indefinite delivery/indefinite quantity contract over five, one-year ordering periods to meet these requirements.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Statement of Work (SOW) Cross Reference Matrix M67854-22-R-2001 Attachment 3 24 August 2022
MCWS-L/H SOW Cross Reference Matrix
| SOW Reference |
| Requirement |
| Proposal Reference |
| 4.4 |
| MCWS-L and MCWS-H Systems and Requirements |
| 4.5.1.1 |
| Non-Developmental Item Integration Review |
| 4.5.1.2 |
| Test Readiness Review |
| 4.5.1.3 |
| Functional Configuration Audit |
| 4.5.1.4 |
| Physical Configuration Audit |
| 4.5.2 |
| WGS Certification |
| 4.7 |
| Spectrum Certification |
| 4.8.3 |
| Technology Protection |
| 4.8.4 |
| Sustaining Engineering |
| 4.8.9 |
| Supply Chain Risk Management |
| 4.8.10.4 |
| System Security Plan |
| 4.10.1 |
| Safety Assessment Report |
| 4.11.1 |
| Contractor Testing |
| 4.11.1.1 |
| Test Asset Acceptance |
| 4.11.1.4 |
| Production Acceptance Testing |
| 4.12.1 |
| Objective Requirements Analysis |
| 4.12.2 |
| Protected Tactical Waveform Integration |
| 4.12.4 |
| SATCOM Management Graphical User Interface |
| 4.13.3 |
| Provisioning Parts Lists |
| 4.13.5 |
| Engineering Data for Provisioning |
| 4.13.7 |
| Bill of Materials (BOM) |
| 4.13.9 |
| Spares List |
| 4.13.10 |
| Level of Repair Analysis (LORA) |
| 4.13.11 |
| Power Source List |
| 4.13.12 |
| Item Unique Identification |
| 4.13.13 |
| Reliability and Maintainability Report |
| 4.13.15 |
| Diminishing Manufacturing Sources and Material Shortages |
| 4.13.16 |
| Failure Reporting, Analysis and Corrective Action System |
| 4.13.17 |
| Initial Manuals |
| 4.14 |
| New Equipment Training |
| 4.16 |
| Quality Management System (QMS) |
Controlled by: MARCORSYSCOM Controlled by: PfM CES CUI Category: PROCURE Dissemination Control: FEDCON POC: Major Patricia Ryder patricia.ryder@usmc.mil
CUI
File details come from the government source that posted it. Updated .