Exhibit A-F CDRLs MCWS-L H_24May22.docx
DOCX document 1 MB Posted
- Solicitation number
- M6785422R2001
- Issued by
-
United States Marine Corps
About this file
This is a request for proposal for the Marine Corps Wideband Satellite Communications Light and Heavy Systems. The Marine Corps Systems Command requires delivery of MCWS-L and MCWS-H systems to provide beyond line of sight satellite communications capabilities to the Marine Corps via the World Wide Web, DoD information network services, and Marine Corps enterprise services. The work includes procuring test systems, production, testing, fielding, technical data, logistics data, training, fielding support, and sustainment support. Technology upgrades and engineering changes will also be provided to maintain system relevance. The contract will be a single-award IDIQ for five one-year ordering periods. The NAICS code is 517410. This will be a full and open competition utilizing best value tradeoff for selection. Technical requirements are in the RFP, which is available on SAM.gov and the solicitation module. No paper copies will be issued. Interested parties must register in SAM to be eligible for award.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L and MCWS-H
E. CONTRACT/PR NO
TBD
F. CONTRACTOR
TBD17. PRICE GROUP
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Data Accession List
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81453B
5. CONTRACT REFERENCE
SOW Para 4.3.3
6. REQUIRING OFFICE
PM CS, PMM 162.318. ESTIMATED TOTAL PRICE
7. DD 250 REQ
NO
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
QRTLY
12. DATE OF 1ST SUBMISSION
At the PAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION QUARTERLY AFTER PAC
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 8 - The Government has fifteen (15) business days to review. If disapproved, the Contractor shall resubmit ten (10) business days after receipt of Government’s comments.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – The Data Accession List for the Light and the Heavy variants separately will be required at their respective Intitial PACs. This CDRL will result in two (2) total deliverables. One for the Light and one for the Heavy.
Block 14 - The Contractor shall deliver all copies in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «0» |
| «1» |
| «0» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _X _ TM _ _ OTHER ____
D. SYSTEM/ITEM
MCWS-L and MCWS-H
E. CONTRACT/PR NO
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Technical Data Package (TDP)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776B
5. CONTRACT REFERENCE
SOW Para 4.5.1.1, 4.5.1.2, & 4.5.1.3
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
30 Days prior to the applicable SETR event
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION 10 days after receipt of Government comments
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 8 – The Government has fifteen (15) business days to review. If disapproved, the Contractor shall resubmit ten (10) business days after receipt of Government’s comments.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – A TDP will be required for both the Light and the Heavy variants separately. Each TDP will be due 30 days prior to their respective Systems Engineering Technical Review event.
Block 13 - Subsequent submissions will be needed 10 days after receiot of Government comments.
Block 14 - The Contractor shall deliver all copies in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. Distribution shall be accomplished electronically using Microsoft Office 2016 or later (.docx for Word files) file formats. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «0» |
| «1» |
| «0» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L and MCWS-H
E. CONTRACT/PR NO
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Technical Report – Study/Service
3. SUBTITLE
Initial Product Baseline
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Para 4.5.1.1 & 4.5.1.2
6. REQUIRING OFFICE
7. DD 250 REQ
No
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ONE/P
12. DATE OF 1ST SUBMISSION
30 Days Prior To The Applicable SETR Event
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION 10 days following receipt of Gov Comments
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 13: The Government has fifteen (15) business days to review the first submission. If disapproved, the Contractor shall resubmit ten (10) business days after receipt of Government’s comments.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – The draft iPBLs for the Light and the Heavy variants will be required at their respective Design Reviews. This CDRL will result in two (2) total deliverables. One for the Light and one for the Heavy.
Block 14 - The Contractor shall deliver all copies in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. Distribution shall be accomplished electronically using Microsoft Office 2016 or later (.docx for Word files) file formats. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «0» |
| «1» |
| «0» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L and MCWS-H
E. CONTRACT/PR NO
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
System/Subsystem Design Description (SSDD)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81432A
5. CONTRACT REFERENCE
SOW Para 4.5.1.4 & 4.6
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
30 Days Prior to PCA
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION 10 days after receipt of Gov Review comments
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4: As a part of the SSDD, the contractor shall deliver a complete Product Level Drawing Package in accordance with MIL-STD-31000A, that completely documents the system designs. All drawings shall comply with ASME Y14.100, ASME Y14.24 and ASME Y14.34. This drawing package shall include assembly drawings and detail drawings down to the piece part for all items designed and developed at Government expense and provide all design, engineering, manufacturing, and quality assurance requirements necessary to enable the procurement or manufacture of an interchangeable item which duplicates the physical and performance characteristics of the original product, without additional design, engineering or recourse to the original design activity. This drawing package shall also include control drawings for all COTS items that do not conform to recognized Government or industry specifications, NDI, and items developed at private expense for which the Government has not acquired unlimited rights. The control drawings shall provide the applicable performance specification, form, fit, function and interface information needed for competitive re-procurement of that item or an interchangeable item. The contractor shall also deliver any digital modeling data files developed in support of this Product Drawing Package or the System design. The contractor shall include a production-level drawing of the System data plate that will facilitate reproduction/fabrication in support of future repair/replacement activities. The contractor shall include a full functional description of each LRU which clearly describes all the functions it performs when operating, as would be required to develop the necessary functional tests and to identify areas where functions need not be tested if they are not used by the system. The contractor shall deliver a pin list which lists all pins, each pin’s functions, signal characteristics, and signal tolerances, as would be required to duplicate the signal in a system environment. Input power pin information should include the required voltage level, current requirement, and associated tolerances. Analog input information should list the input voltage range, tolerances, current requirement, and frequency. The contractor shall deliver a system interconnects diagram, as required to aid in the understanding of the system operation. The contractor shall deliver Full descriptions of each external data bus (i.e. RS-232, CAN, Mil-Std-1553, non-standard, etc.) in terms of hardware requirements, to include all the command and response words utilized by the unit as well as timing and voltage level requirements
Block 8: The Government has fifteen (15) business days to review. If disapproved, the Contractor shall resubmit ten (10) business days after the receipt of Government’s comments.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – This CDRL shall be delivered separately for the Light and Heavy variants. This CDRL will be delivered a total of two (2) times, plus subsequent revisions.
Block 14 - The Contractor shall deliver all copies in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. Distribution shall be accomplished electronically using Microsoft Office 2016 or later (.docx for Word files) file formats. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «0» |
| «1» |
| «0» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L and MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Software Version Description (SVD)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81442A
5. CONTRACT REFERENCE
SOW Para 4.5.1.4 & 4.6
6. REQUIRING OFFICE
PM CS, PMM 162.3
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
1TIME
12. DATE OF 1ST SUBMISSION
30 Days Prior To PCA
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION 10 days after receipt of Gov Review comments
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 – The contractor shall provide any LRU that has embedded software, an Interface Control Document that describes how the software communicates with the hardware and interfaces to other LRUs. The contractor shall provide full descriptions of each external data bus (i.e. RS-232, CAN, Mil-Std-1553, non-standard, etc.) in terms of software requirements, to include all the command and response words utilized by the unit as well as timing and voltage level requirements.
Block 7 - The Contractor shall provide a Letter of Transmittal via e-mail to the Project Officer when the copies are being delivered via secure means.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – This CDRL shall result in a separate deliverable for each the Light and Heavy MCWS variant. This CDRL will be delivered a total of two (2) times, plus subsequent revisions.
Block 14 - The Contractor shall deliver all copies via secure means in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «TOTALDR» |
| «TOTALREG» |
| «TOTALREPR» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Technical Report – Study/Service
3. SUBTITLE
Final Product Baseline
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Para 4.5.1.4
6. REQUIRING OFFICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
1TIME
12. DATE OF 1ST SUBMISSION
30 Days prior to PCA
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION 15 days post PCA Confirmation Brief
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – This CDRL shall be delivered separately for both the Light and Heavy variants. This will result in a total of two (2) initial deliveries.
Block 14 - The Contractor shall deliver all copies in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «TOTALDR» |
| «TOTALREG» |
| «TOTALREPR» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L and MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Spectrum Certification Spectral Characteristics Data
3. SUBTITLE
WGS Phase 0 Terminal Certification Tracking Form Data
4. AUTHORITY (Data Acquisition Document No.)
DI-EMCS-81827
5. CONTRACT REFERENCE
SOW Para 4.5.2.1
6. REQUIRING OFFICE
PM CS, PMM 162.3
7. DD 250 REQ
NO
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
1TIME
12. DATE OF 1ST SUBMISSION
60 days after Contract Award
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – This CDRL shall be delivered separately for the x-band and ka-band for the Light, Heavy (Pri), and Heavy (Sec) variants. This CDRL will be delivered a total of six (6) times, plus subsequent revisions.
Block 14 - The Contractor shall deliver all copies via secure means in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «TOTALDR» |
| «TOTALREG» |
| «TOTALREPR» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Spectrum Certification Spectral Characteristics Data
3. SUBTITLE
WGS Phase 1 Terminal Certification Tracking Form Data
4. AUTHORITY (Data Acquisition Document No.)
DI-EMCS-81827
5. CONTRACT REFERENCE
SOW Para 4.5.2.2
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
PM CS, PMM 162.3
7. DD 250 REQ
No
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
1TIME
12. DATE OF 1ST SUBMISSION
60 days prior to NIR
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – This CDRL shall be delivered separately for the x-band and ka-band for the Light, Heavy (Pri), and Heavy (Sec) variants. This CDRL will be delivered a total of six (6) times, plus subsequent revisions.
Block 14 - The Contractor shall deliver all copies via secure means in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «TOTALDR» |
| «TOTALREG» |
| «TOTALREPR» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Spectrum Certification Spectral Characteristics Data
3. SUBTITLE
WGS Phase 2 Terminal Certification Tracking Form Data
4. AUTHORITY (Data Acquisition Document No.)
DI-EMCS-81827
5. CONTRACT REFERENCE
SOW Para 4.5.2.3
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
No
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
1TIME
12. DATE OF 1ST SUBMISSION
60 days prior to FCA
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – This CDRL shall be delivered separately for the x-band and ka-band for the Light, Heavy (Pri), and Heavy (Sec) variants. This CDRL will be delivered a total of six (6) times, plus subsequent revisions.
Block 14 - The Contractor shall deliver all copies via secure means in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «TOTALDR» |
| «TOTALREG» |
| «TOTALREPR» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST18. ESTIMATED TOTAL PRICE
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Technical Report – Study/Service
3. SUBTITLE
Equipment Location-Certification Information Database Data File
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Para 4.7
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
45 days after the Conclusion of NIR Closure
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION 60 days before DT&E
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 8 - The Government requires 30 calendar days to review the draft copy of the 1st submission. The Government will provide any comments to the draft copy of the 2nd submission within 14 calendar days after the PCA to identify any required corrections. Comments will be provided to subsequent submissions in accordance with the schedule in the approved ECP(s). The Contractor shall deliver final copies within 14 calendar days of receipt of Government comments.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 10 - EL CID data is required in support of the various stages of the frequency authorizaion process in accordance with the Contract Reference and as defined in MIL-HDBK-237.
Block 12 - The Contractor shall submit the draft copy of the 1st submission Equipment Location-Certification Information Database (EL CID) data in support of Stage 3 Frequency Authorization (if not already obtained) no later than 45 days after closure of the NIR. This CDRL shall be delivered separately for both the Light and Heavy variants. This will result in a total of two (2) initial deliveries.
Block 13 - The Contractor shall submit a 2nd submission of EL CID data in support of Stage 4 Frequency Authorization at least 60 calendar days prior to the DT&E event. Additional subsequent submissions may be required in conjunction with approved ECP(s). If required, subsequent submissions shall be delivered in accordance with the schedule included in the approved ECP.
Block 14 - The Contractor shall deliver all copies in editable electronic MS Excel 2016 format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «0» |
| «1» |
| «0» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Technical Report – Study/Services
3. SUBTITLE
Program Protection Plan (PPP) Documentation
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Para 4.8.2
6. REQUIRING OFFICE
MCSC, PM CS, PMM 162.318. ESTIMATED TOTAL PRICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
45 Days Prior to NIR
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 - This CDRL shall be delivered separately for both the Light and Heavy variants. This will result in a total of two (2) initial deliveries.
Block 14 - The Contractor shall deliver all copies via secure means in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer . See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 4 |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Program Protection Implementation Plan (PPIP)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMIN-81306
5. CONTRACT REFERENCE
SOW Para 4.8.3
6. REQUIRING OFFICE
MCSC, PM CS, PMM 162.3
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ONE/P
12. DATE OF 1ST SUBMISSION
45 Days Prior To NIR
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION 14 DAYS POST RECEIPT OF GOV REVIEW COMMENTS
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 8 - The Government will provide any comments to the draft copy of the 1st submission within 14 calendar days after the NIR event. The Contractor shall deliver final copies within 14 calendar days of receipt of Government comments.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 - This CDRL shall be delivered separately for both the Light and Heavy variants. This will result in a total of two (2) initial deliveries.
Block 14 - The Contractor shall deliver all copies via secure means in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer . See Section 'G' of the contract for distribution address, method, and contact information.
Project Officer
| 1 |
| 0 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 4 |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST18. ESTIMATED TOTAL PRICE
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Technical Report – Study/Service
3. SUBTITLE
Investigation and Analysis Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Para 4.8.4
6. REQUIRING OFFICE
MCSC, PM CS, PMM 162.3
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
90 days post PAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION At the NIR
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 - Specific data required will be confirmed by the Project Officer as an output of the Cybersecurity IPT discussed in the Contract Reference.
Block 7 - The Contractor shall provide a Letter of Transmittal via e-mail to the Project Officer when the copies are being delivered via secure means.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – This CDRL shall be delivered separately for both the Light and Heavy variants. This will result in a total of two (2) initial deliveries.
Block 14 - The Contractor shall deliver all copies via secure means in editable electronic .xlsx format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
Project Officer
Lead ISSM
| 15. TOTAL --------- |
| 0 |
| 1 |
| 4 |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Technical Report – Study/Service
3. SUBTITLE
Engineering Change Proposal
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639E
5. CONTRACT REFERENCE
SOW Para 4.8.5
6. REQUIRING OFFICE
MCSC, PM CS, PMM 162.3
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
ASREQ
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION ASREQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 - The Government will provide comments or approval to the draft copies after a Configuration Control Board is conducted. The Contractor shall deliver final copies within 14 calendar days of receipt of Government comments.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 10-13- Requirement to deliver specific Government directed ECP(s) will be identified by the Project Officer once the CLIN(s) associated with the Contract Reference has been awarded. The Contractor may deliver Contractor proposed ECP(s) at no cost to the Government.
Block 14 - The Contractor shall deliver all copies via secure means in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
Project Officer
| 15. TOTAL --------- |
| 0 |
| 1 |
| 4 |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
Technical Report – Study/Service
3. SUBTITLE
Software Patch Disk
4. AUTHORITY (Data Acquisition Document No.)
N?A
5. CONTRACT REFERENCE
SOW Para 4.8.6
6. REQUIRING OFFICE
MCSC, PM CS, PMM 162.3
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
See BLK 16
12. DATE OF 1ST SUBMISSION
See BLK 16
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4 - The patch disk shall be in a format that can be installed in an MCWS- L or MCWS-H System.
BLK 8 - The Government will provide comments or approval to the draft copies after completion of Government Testing. The Contractor shall deliver final copies within calendar 14 days of receipt of Government comments.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
BLK 10 - The Contractor shall deliver copies on a quarterly basis after the Authority to Operate is granted in accordance with the Contract Reference.
BLKs 12 and 13 - The Contractor shall deliver draft copies no later than 45 calendar days after receipt of the approved ECP.
BLK 14 - The Contractor shall deliver all copies in a disk format that can be reproduced by the Government for installation on all MCWS-L and MCWS-H Systems. See Section 'G' of the contract for distribution address, method, and contact information.
Project Officer
| 15. TOTAL --------- |
| 0 |
| 1 |
| 4 |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Publications, Technical, Instruction-Type, Preparation of, Modification Instruction
3. SUBTITLE
Modification Instruction
4. AUTHORITY (Data Acquisition Document No.)
MIL-DTL-28999D
5. CONTRACT REFERENCE
SOW Para 4.8.6
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASGEN
12. DATE OF 1ST SUBMISSION
ASREQ
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION ASREQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 8 - The Government will provide comments or approval no later than 45 days after the draft copy Modification Instruction has been verified. The Contractor shall deliver final copies within 30 calendar days of receipt of Government comments.
BLKs 10-13 - Requirement to deliver Modification Instruction(s) will be identified in the ECP(s) approved for implementation in accordance with the Contract Reference. Modification Instructions associated with IAVM ECPs shall be delivered on a periodic basis as identifed in the Contract and Contract Reference.
BLK 14 - The Contractor shall deliver all copies in editable electronic MS Office 2016 format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
BLK 16 – The Contractor shall mark the deliverable as follows:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only, (EXPT), [Date of Contract Award]. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: Portfolio Manager Command Element Systems), 2200 Lester St., Quantico, VA 22134.
| Project Officer |
| 0 |
| 1 |
| 0 |
| 15. TOTAL --------- |
| «TOTALDR» |
| «TOTALREG» |
| «TOTALREPR» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-L & MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
Technical Report – Study/Service
3. SUBTITLE
Security Requirements Traceability Matrix (SRTM)
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Para 4.8.10.8
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
90 days post PAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION At the NIR
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 7 - The Contractor shall provide a Letter of Transmittal via e-mail to the Project Officer when the copies are being delivered via secure means.
Block 9 - Use Attachment 8 - MCSC CUI Training brief as a reference tool; Identify and mark CUI in accordance with this guidance.
Block 12 – This CDRL shall be delivered separately for both the Light and Heavy variants. This will result in a total of two (2) initial deliveries.
Block 14 - The Contractor shall deliver all copies via secure means in editable electronic .xlsx format unless otherwise agreed to by the Project Officer. See Section 'G' of the contract for distribution address, method, and contact information.
| Project Officer |
| 0 |
| 1 |
| 0 |
Lead ISSM
| 15. TOTAL --------- |
| «TOTALDR» |
| «TOTALREG» |
| «TOTALREPR» |
G. PREPARED BY
Maj Patricia Ryder
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _«PAGE»_ of _«PAGES»_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
TBD
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
MCWS-H
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A018
2. TITLE OF DATA ITEM
Technical Report – Study/Service
3. SUBTITLE
Authorization Boundary Diagram
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-82190
5. CONTRACT REFERENCE
SOW Para 4.8.10.9
6. REQUIRING OFFICE
MCSC, PM CS, PMM 162.318. ESTIMATED TOTAL PRICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
10 post PAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION 15 days after Gov Review
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 - Specific data required will be confirmed by the Project Officer as an output of the Cybersecurity IPT discussed in the Contract Reference.
Block 7 - The Contractor shall provide a Letter of Transmittal via e-mail to the Project Officer when the copies are being delivered via secure means.
Block 9 - Use Attachment 8…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .