Attachment_13_Production_Facility_Readiness_Report.Site_Survey_Checklist_Final.docx

DOCX document 26 KB Posted

Attached to
Shoulder-Launched Multi-Purpose Assault Weapon
Solicitation number
M67854-15-R-1000
Issued by

About this file

Production Facility Readiness Report/Site Survey Checklist

View the file

Other files

File Type Posted
M67854-15-R-1000-0002.pdf PDF
Attachment_17_-_SMAW_Mod_2_Vendor_QA_Combined_021315.xlsx XLSX spreadsheet
M67854-15-R-1000-0001.pdf PDF
Attachment_8_ICS_Comp_Matrix_Final.xlsx XLSX spreadsheet
Exhibit_1_SMAW_MOD_2_CDRLS_12015.pdf PDF
Attachment_10_GFP_List_Part_B_Final.xls XLS spreadsheet
Attachment_5_GFP_Part_A_Final.xls XLS spreadsheet
Attachment_12_Staffing_Matrix_Final.xlsx XLSX spreadsheet
Attachment_9_PTD_Spares_Repair_Parts_List_Template_Final.xlsx XLSX spreadsheet
Attachment_15_MT_SE_Template_Final.xlsx XLSX spreadsheet
Attachment_6_E7901_EO-TK_SL3_Final.pdf PDF
M67854-15-R-1000.doc DOC document
Attachment_11_Past_Performance_Questionnaire_Final.doc DOC document
Attachment_7_SOW_Comp_Matrix_PSPEC_Comp_Matrix_Final.xlsx XLSX spreadsheet
Attachment_01_SMAW_MK-153_Mod_2_SOW_1.20.15.docx DOCX document
Attachment_16_SMAW_Mod_2_Stepladder_Pricing_Matrix.xls XLS spreadsheet
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMAW MK-153 Mod 2 Production Facility Readiness Report / Site Survey

Site Survey

The purpose of this form is to record data and information obtained during the site survey of the listed facility. The facilities Administrative Contracting Officer (ACO) is requested to assist with its completion.

The release of this completed form is governed by the Federal Acquisition Regulations Part 15.3. Its release can only be authorized by the Procuring Contracting Officer (PCO).

Facility Name: ________________________________________________

Address: ________________________________________________

Point of Contact: ________________________________________________

Security Point of Contact: ________________________________________________

Production Manager: ________________________________________________

The Offeror is requested to provide access to all information requested in this report to a designated Government Official, the Offeror will be notified should an inspection of production facilities become required. The information contained herein will be provided to the source selection board. If any information contained in the report is proprietary, please identify it so it can be properly handled.

1.Does the facility have a production line capability for the SMAW MK-153 Mod 2?
2.Is the production manager for the SMAW MK-153 Mod 2 currently on site?
3.Has the manufacturer developed a bill-of-materiel (BOM) required for production of the SMAW MK-153 Mod 2? Inspect the BOM, quantities and deliveries and determine its adequacy to meet the production schedule and the delivery schedule.
4.Does the manufacturer have a plan to aquire materiel to validate the start-up time for production. Is it adequate?
5.Assess the manufacturer’s compliance with Part 22 and Part 23 of the Federal Acquisition Regulation?
6.What is the manpower turnover rate within the manufacturer’s facility?
7.What manufacturer planning has taken place to ramp up production if a contract is awarded?
8.Examine the manufacturer’s quality assurance program. Do they have the necessary programs in place? Who will and how will they conduct required inspections?
9.What are the Manufacturer’s training policies for new and current employees?
10.Does the Manufacturer have a dedicated packaging and shipping department?
11.Does the manufacturer’s facility have storage areas that meet the security criteria for storage of Class III weapon systems in accordance with DOD 5100.76M?

(Print) Name / Date

Signature

File details come from the government source that posted it. Updated .