Amendment 0001 to EFRCE RFP M67854-14-R-1010

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment to the EFRCE Request for Proposal is to provide the latest "Question and Answ er" exchange betw een industry and the Government (Marine Corps Systems Command, PMM-113, PdM-ICE) and to make some revisions to the Purchase Description.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Apr-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M67854-14-R-1010

X 9B. DATED (SEE ITEM 11)

08-Apr-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Apr-2014

CODE

MCSC PDM ICE

2200 LESTER STREET

QUANTICO VA 22134

M67854 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M67854-14-R-1010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

Amendment 0001 to EFRCE Request for Proposal M67854-14-R-1010

Question #1: The material specification for the blouse and trouser body states “shall consist of a flame resistant cotton/nylon/meta-aramid twill cloth conforming to Milliken style ResQ II 6.7 oz/sq yd or equal”. Does the term “equal” refer to a fabric having “equal performance characteristics”, or, does the requirement mean that the material must be made up from the same fiber content (i. e. cotton/nylon/meta-aramid) as the Milliken material?

Answer #1: The term “equal” refers to the material in question having equal performance characteristics. Please refer to paragraphs L.3.2.3 and M.2.1.3 as well as the Purchase Description (Attachment 01) in the Request for Proposal for further details (e.g. data submission requirements for “equal” material to include but not limited to Antimicrobial Properties, Instrumented Manikin Test, Thermal Protective Performance, Thermal Shrinkage, etcetera).

Question #2: Do we need 6 PDMS per place of performance or 6 PDMS per submission?

Answer #2: In terms of Product Demonstration Model (PDM) submissions in support of an offered proposal, paragraph L.3.2.1 of the RFP states that: “Each Offeror may submit only one (1) full and complete proposal for the EFRCE.” As such, a single offeror, if intending to submit a proposal for the EFRCE, shall only submit one complete and full EFRCE proposal to include all content (Technical, Past Performance, and Business) as well as 6 PDMs. In terms of PDM submissions, how an offeror chooses to manufacture these items is at the offeror’s discretion.

However, in theory, these PDMs should be representative of the production line that the offeror intends to use to support subsequent EFRCE production quantities and corresponding delivery requirements. The Government intends on evaluating these PDM submissions based on the criteria outlined in Section M of the Request for Proposal.

In terms of post contract award First Article Testing (FAT) articles, the to-be-determined contractor shall provide 100 EFRCE end items produced via the holistic planned, primary production process to support all subsequent EFRCE production quantity orders (refer to Statement of Work, paragraph 5 on page 19 of the EFRCE RFP and FAR clause 52.209-4 Alt I on pages 39-40 of the EFRCE RFP).

Note, per the EFRCE RFP, page 19, Statement of Work, paragraph 6.1: “All production quantities submitted after approval of the First Article Test shall be produced using the same raw material suppliers, materials, processes, procedures, equipment and facilities that resulted in the manufacture of the acceptable First Article Test items. This includes all raw materials and/or sub-components. Contractors desiring to make changes to approved First Article Test items, to include raw material supplier and production processes, must request in writing and receive written approval from the Contracting Officer PRIOR to use. The Contracting Officer, along with the Government Project Officer, will determine if the request is approved or disapproved and if a new First Article Test is required.”

If, during post award, the to-be-determined contractor wishes to approve secondary and / or tertiary production processes (etc), above and beyond the holistic planned, primary production process as validated by the Government during FAT to support subsequent production articles, the to-be-determined contractor will have to comply with the Statement of Work language in paragraph 6, EFRCE RFP pages 19 through 20 referencing such topics as Deviations and Engineering Change Proposals in order to seek the required Government approval.

M67854-14-R-1010

Question #3: Page 16 of the Purchase Description “3.4.2.1.1 Thread colorfastness and color. All thread shall be non-staining and show good colorfastness to laundering when tested as specified in 4.4.2. The thread color shall be Khaki P-1 (C.A. 66019 or approximating color chip 30277 or FED STD-595) for Cloth Type I and IV and Camouflage Green 483 (approximating color chip 34094 of FED-STD-595) for Cloth Type II and III.”

Please reconfirm if you require Khaki P-1 for Cloth Type I & IV (Woodland) and Camo Green 483 for Cloth II & III (Desert), they seem to be inverted.

Answer #3: Industry is correct in identifying the inversion of thread colors and corresponding Cloth Types in paragraph 3.4.2.1.1 of the Purchase Description. As such, to correct the inversion and provide clarity, the following correction is made to page 16, paragraph 3.4.2.1.1 of the Purchase Description:

FROM: “Thread colorfastness and color. All thread shall be non-staining and show good colorfastness to laundering when tested as specified in 4.4.2. The thread color shall be Khaki P-1 (C.A. 66019 or approximating color chip 30277 or FED STD-595) for Cloth Type I and IV and Camouflage Green 483 (approximating color chip 34094 of FED-STD-595) for Cloth Type II and III.”

TO: “Thread colorfastness and color. All thread shall be non-staining and show good colorfastness to laundering when tested as specified in 4.4.2. The thread color shall be Khaki P-1 (C.A. 66019 or approximating color chip 30277 or FED STD-595) for Cloth Type II and III and Camouflage Green 483 (approximating color chip 34094 of FED-STD-595) for Cloth Type I and IV.”

Question #4: Page 17 of the Purchase Description “3.4.2.5 Zippers. The blouse front zipper shall finish 8-1/2 inches long and shall conform to A-A-55634, and shall be Coyote 498 in color.”

Is this zipper Type I Style 4 Size 3?

Answer #4: The following clarification is added to page 17, paragraph 3.4.2.5 of the Purchase Description:

FROM: “Zippers. The blouse front zipper shall finish 8-1/2 inches long and shall conform to A-A-55634, and shall be Coyote 498 in color.”

TO: “Zippers. The blouse front zipper shall finish 8-1/2 inches long and shall conform to A-A-55634, and shall be Coyote 498 in color. Zipper shall be Type I, Style 4, Size 3 Continuous element fastener according to A-A- 55634.”

(End of Summary of Changes)