CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

Attachment 2

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

M40 MODULAR STOCK

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0001

2. TITLE OF DATA ITEM

LOGISTICS MANAGEMENT INFORMATION (LMI) DATA

PRODUCT

3. SUBTITLE

PROVISIONING PARTS LIST

4. AUTHORITY (Data Acquisition Document No.)

DI-ALSS-81529(PPL)

5. CONTRACT REFERENCE

SOW para 4.3

6. REQUIRING OFFICE

MARCORSYSCOM PDM IW

7. DD 250 REQ

DD

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION SEE BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government Agencies and their contractors.

Other requests for this document shall be referred to PMM-133.3 Infantry Weapons, MARCORSYSCOM

BLK 12 - Report due 15 calendar days prior to Provisioning Conference. Government will review and provide comments at the Conference. The contractor shall incorporate comments and resubmit within 15 days following the Conference.

BLK 13 - Final submission of data due 15 calendar days after Provisioning Conference. The Provisioning Parts List (PPL) shall contain the end item, component or assembly and shall include items such as parts and materials required for the operation and maintenance of the end item, component, or assembly. The PPL shall contain repair kits and repair parts sets required to maintain the end item, component, or assembly equipment unless excluded by provisioning requirements. The list shall include the following information for each component and spare/repair part used in the Modular Stock:

- name of Original Equipment Manufacturer (OEM)

- OEM Commercial and Government Entity (CAGE) code

- Prime manufacturer's and Contractor's part number, revision level, reference designator or next higher assembly

- Nomenclature

- Quantity used in the Modular Stock

- National Item Identification Number (NIIN) and

- Unit of Issue

- Line drawings for each component

- Appropriate assembly views

BLK 14 - Copies shall be delivered electronically in MS Office 2003 format or later, or Portable Document Format (PDF).

MCSC:

PM-133.3

Marian.beeman@usmc.mil 1 1

Christian.stier@usmc.mil 1 1

Anita.norris@usmc.mil 1 1

Erik.ladd@usmc.mil 1 1

Wilson.staggers@usmc.mil 1 1

15. TOTAL --------- 1 0 0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page __ of __ Pages

18. ESTIMATED

TOTAL PRICE

17. PRICE

GROUP

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

Attachment 2

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

A0002

ENGINEERING CHANGE PROPOSAL (ECP)

DI-CMAN-80639C

5. CONTRACT REFERENCE

SOW para 3.4.2

6. REQUIRING OFFICE

MARCORSYSCOM PDM IW

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

Final

Other requests for this document shall be referred to PMM-133.3 Infantry Weapons, MARCORSYSCOM

BLK 12/13 - ECP's shall be submitted for all changes which affect Government established baselines. The opportunity to submit ECP's shall extend through contract finalization. In addition, ECP's shall be submitted at the request of the Government. Upon submission of an ECP, the Government has 15 days to respond.

BLK 14 - Copies shall be delivered electronically in MS Office 2003 format or later, or Portable Document Format (PDF).

MCSC:

PM-133.3

Marian.beeman@usmc.mil 1 1

Jason.gammon@usmc.mil 1 1

Salvatore.fanelli@usmc.mil 1 1

Erik.ladd@usmc.mil 1 1

Christian.stier@usmc.mil 1 1

Anita.norris@usmc.mil 1 1

15. TOTAL --------- 0 0 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

Attachment 2

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

A0003

REQUEST FOR DEVIATION (RFD)

DI-CMAN-80640C

5. CONTRACT REFERENCE

SOW para 3.4.2.

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION Draft

Final

Other requests for this document shall be referred to PMM-133.3 Infantry Weapons, MARCORSYSCOM

BLK 12/13 – Upon submission, the Government has 15 days to respond.

BLK 14 - Copies shall be delivered electronically in MS Office 2003 format or later, or Portable Document Format (PDF).

MCSC:

(PM)

Marian.beeman@usmc.mil 1 1

Jason.gammon@usmc.mil 1 1

Salvatore.fanelli@usmc.mil 1 1

Erik.ladd@usmc.mil 1 1

Christian.stier@usmc.mil 1 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

A0004

NOTICE OF REVISION (NOR)

DI-CMAN-80642C

5. CONTRACT REFERENCE

SOW para 3.4.2

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

Final

Other requests for this document shall be referred to PMM-133.3 Infantry Weapons, MARCORSYSCOM

BLK 12/13 - Upon submission of revision concurrent with an ECP, the Government has 15 days to respond.

BLK 14 - Copies shall be delivered electronically in MS Office 2003 format or later, or Portable Document Format (PDF).

MCSC:

(PM)

Marian.beeman@usmc.mil 1 1

Jason.gammon@usmc.mil 1 1

Salvatore.fanelli@usmc.mil 1 1

Erik.ladd@usmc.mil 1 1

Christian.stier@usmc.mil 1 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting

Attachment 2

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

A0005

TECHNICAL REPORT - STUDY/SERVICES

ENVIRONMENTAL CONSIDERATIONS

DI-MISC-80508B(EC)

5. CONTRACT REFERENCE

SOW para 3.3.1

6. REQUIRING OFFICE

MARCORSYSCOM PDM IW

7. DD 250 REQ

LT

1TIME

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION N/A Draft

Final

Other requests for this document shall be referred to PMM-133.3 Infantry Weapons, MARCORSYSCOM

BLK 12 - The contractor shall provide informaiton on the potential for any adverse safety and environmental impacts from the manufacturing, operation, maintenance, and disposal of the Modular Stock (see Attachment 6). This information will be used to assist the Government in making a preliminary National Environmental Policy Act (NEPA) decision and in the preparation of formal NEPA documents. Such environmental impacts include emissions and toxic waste resulting from development, maintenance (coatins and primers), operation, and disposal.

BLK 14 - Copies shall be delivered electronically in MS Office 2003 format or later, or Portable Document Format (PDF).

MCSC:

(PM)

Marian.beeman@usmc.mil 1 1

Jason.gammon@usmc.mil 1 1

Salvatore.fanelli@usmc.mil 1 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting

TDP _X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

A0006

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED

LISTS

DI-SESS-81003D

5. CONTRACT REFERENCE

SOW para 3.4.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

DD

ONE/R

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

Final

Other requests for this document shall be referred to PMM-133.3 Infantry Weapons, MARCORSYSCOM

BLK 12 - Drawings due 15 calendar days prior to Provisioning Conference. Government will review and provide comments at the Conference. The contractor shall incorporate comments and resubmit within 15 days following the Conference.

BLK 13 - Final submission of data due 15 calendar days after Provisioning Conference. The data shall consist of commercial drawings which identify each replaceable part and assembly of the Modular Stock. All replaceable parts/assemblies in the drawings shall be assigned Part Identification Numbers (PINs). These drawings need not comply with Government or nationally recognized industry association specifications and standards, but must contain sufficient detail to enalbe critical support tasks such as provisioning, technical manuals, and configuration management. The drawings must disclose sufficiet engineering information to ensure identification and procurement of interchangeable items. The drawings shall include as applicable:

- Configuration, defined pictorially or by description;

- Dimensions of parts, assemblies, and sub-assemblies;

- Mountaing and mating dimensions and tolerances;

- Schematic, interconnection, or other appropriate diagrams to define item function or provide interconnecting information;

- A manufacturer and item identification listed as a source of supply

BLK 14 - Copies shall be delivered electronically in MS Office 2003 format or later, or Portable Document Format (PDF).

MCSC:

(PM)

Marian.beeman@usmc.mil 1 1

Jason.gammon@usmc.mil 1 1

Salvatore.fanelli@usmc.mil 1 1

Erik.ladd@usmc.mil 1 1

Christian.stier@usmc.mil 1 1

15. TOTAL --------- 2 2 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting

TDP _X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

A0007

TECHNICAL DATA PACKAGE FOR MODULAR STOCK

5. CONTRACT REFERENCE

SOW para 3.4.3

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

DD

ONE/R

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

Final

STATEMENT F: Distribution Statement F: Further Dissemination only as directed by PM Infantry Weapons, Marine Corps Systems Command or higher DoD authority.

BLK 12 – TDP due to the Government 30 days following exercise of CLIN 0007.

BLK 14 - Copies shall be delivered electronically in a CAD format to be negotiated between the Contractor and the Government.

MCSC:

(PM)

Marian.beeman@usmc.mil 1 1

Jason.gammon@usmc.mil 1 1

Salvatore.fanelli@usmc.mil 1 1

15. TOTAL --------- 3 3