CDRL_A0002-D0001.docx
DOCX document 120 KB Posted
- Attached to
- Range Control Facility Support Services Federal contract opportunity
- Solicitation number
- M67400-18-R-0009
- Issued by
- United States Marine Corps
About this file
Not Listed
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_Pricing_Worksheet.xlsx | XLSX spreadsheet | |
| CDRL-_A0001.docx | DOCX document | |
| M67400-18-R-0009-U0002.pdf | ||
| RCF_RFI_Questions_Responses_180614_(002).docx | DOCX document | |
| Attachment_1_Base_Contract_Matrix.docx | DOCX document | |
| Attachment_3_Task_Order_1_Matrix.docx | DOCX document | |
| SF30_Amendment.pdf | ||
| Attachment_2_Pricing_Worksheet.xlsx | XLSX spreadsheet | |
| Attachment_5_Wage_Determination.docx | DOCX document | |
| Attachment_4_Past_Performance_Questionnaire_KSH.docx | DOCX document | |
| Attachment_4_Wage_Determination.docx | DOCX document | |
| Attachment_3_Past_Performance_Questionnaire_KSH.docx | DOCX document | |
| Attachment_2_Task_Order_1_Matrix.docx | DOCX document | |
| Attachment_1_Base_Contract_Matrix.docx | DOCX document | |
| M67400-18-R-0009.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
RCF SUPPORT
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
TEST/INSPECTION REPORT
3. SUBTITLE
TRIP/INSPECTION REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
PWS 5.4.2, 5.3.3, 5.4.4
6. REQUIRING OFFICE
RTAM, MCIPAC RCO
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQUIRED
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable (Reference: DoD Instruction 5230.24 (28 Apr 2016):
“DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors, Administrative or Operational Use, 12 Apr 2017. Other requests for this document shall be referred to Commanding General, Training and Education Command, MCCDC (C465) 2300A Louis Road, Quantico, VA 22134.”
BLK 12 - Deliver 3 business days after completion of each Inspection.
BLK 14 – Draft copy shall be delivered in MS Office 2010 format to the requiring office.
RTAM
| Project Lead |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _2_ of _9_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
RCF SUPPORT
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
CONFERENCE AGENDA
3. SUBTITLE
MEETING AGENDA
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249B
5. CONTRACT REFERENCE
PWS par. 5.1, 5.5.4
6. REQUIRING OFFICE
RTAM, MCIPAC RCO
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQUIRED
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable (Reference: DoD Instruction 5230.24 (28 Apr 2016):
“DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors, Administrative or Operational Use, 12 Apr 2017. Other requests for this document shall be referred to Commanding General, Training and Education Command, MCCDC (C465) 2300A Louis Road, Quantico, VA 22134.”
BLK 12/13 - Deliver 5 calendar days prior to each conference, meeting, audit, or review. The Government requires 1 business day to review. The contractor shall deliver final 2 business days after receipt of Government comments.
RTAM
| Project Lead |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 1 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _3_ of _9_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
RCF SUPPORT
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
CONFERENCE/MEETING MINUTES
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250B
5. CONTRACT REFERENCE
PWS par. 5.1
6. REQUIRING OFFICE
RTAM, MCIPAC RCO
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQUIRED
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable (Reference: DoD Instruction 5230.24 (28 Apr 2016):
“DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors, Administrative or Operational Use, 12 Apr 2017. Other requests for this document shall be referred to Commanding General, Training and Education Command, MCCDC (C465) 2300A Louis Road, Quantico, VA 22134.”
BLK 12/13 - Deliver 2 business days after each conference, meeting, audit or review. The Government requires 2 business days to review. The contractor shall deliver final 2 business days after receipt of Government comments.
RTAM
| Project Lead |
| 1 |
| 1 |
Each Attendee
| 15. TOTAL --------- |
| 1 |
| 2 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _4_ of _9_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
RCF SUPPORT
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
QUALITY ASSESMENT REPORT
3. SUBTITLE
SYSTEM CHANGE REQUEST
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81187
5. CONTRACT REFERENCE
PWS 5.5.1
6. REQUIRING OFFICE
RTAM, MCIPAC RCO
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQUIRED
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable (Reference: DoD Instruction 5230.24 (28 Apr 2016):
“DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors, Administrative or Operational Use, 12 Apr 2017. Other requests for this document shall be referred to Commanding General, Training and Education Command, MCCDC (C465) 2300A Louis Road, Quantico, VA 22134.”
BLK 12 - Deliver 3 business days after completion of Technical Assist Visit in support of Range and Training Area system requirements.
BLK 13. Subsequent reports are required 15 calendar days prior to the quarterly Configuration Management Working Group meeting.
RTAM
Project Lead
| 15. TOTAL --------- |
| 0 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _5_ of _9_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
RCF SUPPORT
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT
3. SUBTITLE
MONTHLY REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80227
5. CONTRACT REFERENCE
PWS par. 2.4
6. REQUIRING OFFICE
RTAM, MCIPAC RCO
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
MTHLY
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4 - ***NOTE: Subject to Government approval, this DID may be tailored to require only what is necessary.***
BLK 9 - The following information shall be included on the deliverable (Reference: DoD Instruction 5230.24 (28 Apr 2016):
“DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors, Administrative or Operational Use, 12 Apr 2017. Other requests for this document shall be referred to Commanding General, Training and Education Command, MCCDC (C465) 2300A Louis Road, Quantico, VA 22134.”
BLK 12/13 - The reporting period will be from the first to last business day of each month, beginning 10 calendar days after Contract Award.
BLK 13 - Final report will be delivered 60 calendar days after close of the accounting period during which contract start is authorized.
BLK 14 - Final copy shall be delivered in MS Office 2010 format to the requiring office.
RTAM
Project Lead
| 15. TOTAL --------- |
| 0 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _6_ of _9_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
RCF SUPPORT
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
D001
2. TITLE OF DATA ITEM
RELIABILITY PREDICTION AND DOCUMENTATION OF SUPPORTING DATA
3. SUBTITLE
RFMSS REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-RELI-81497
5. CONTRACT REFERENCE
PWS par. 5.2.10, 5.3.5, 5.3.6, 5.4.6 5.2.3, 5.2.8, 5.2.9, 5.3.10, 5.5.5, 5.5.6, 5.6.6, 5.8.6
6. REQUIRING OFFICE
RTAM, MCIPAC RCO
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQUIRED
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION EOM
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable (Reference: DoD Instruction 5230.24 (28 Apr 2016):
“DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors, Administrative or Operational Use, 12 Apr 2017. Other requests for this document shall be referred to Commanding General, Training and Education Command, MCCDC (C465) 2300A Louis Road, Quantico, VA 22134.”
BLK 12 - Submit RFMSS reports on a monthly basis after award.
BLK 13 - The Government requires 2 business days to review. The contractor shall deliver final 2 business days after receipt of Government comments.
BLK 14 - Draft copy shall be delivered in MS Office 2010 format to the requiring office.
Contractor’s format acceptable.
Data Item shall be delivered electronically. The format shall be in standard MS Office applications and in Adobe Acrobat (as appropriate). Data Item shall be maintained in the electronic format (organized ISO-9001fashion) in an electronic storage area, or on a secured Web page, and submitted through electronic mail, or as directed by the Government representative. If applicable, drawings shall be developed and delivered in Visio/Visionael. In the event of discrepancy between statements in contract references of Block 5 or this CDRL and the Authority in Block 4, contract references and this CDRL govern.
RFMSS utilization reports are generated directly from RFMSS reports module or RFMSS Ad-Hoc WEB site https://rfmss.belvoir.army.mil/adhoc/.
RFMSS reports will depict the training facility management functions: scheduling, collecting and analyzing actual range usage data, Comparison of scheduled and actual activities for each range, collect range maintenance data, collect downtime data, collect and summarize the Range/Training Facility information.
RFMSS reports intended for HHQs will include a cover letter written in accordance with the references noted below:
MCO 5215.1K Marine Corps Directives Management Program SECNAVINST 5216.5 Correspondence Manual SECNAVINST 5210.2 SSIC Manual Joint Publication 1-02: DOD Dictionary of Military and Associated Terms
RTAM
Project Lead
Range Sched C.
| 15. TOTAL --------- |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _7_ of _9_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
F
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
RCF SUPPORT
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
C001
2. TITLE OF DATA ITEM
TECHNICAL REPORT - STUDY/SERVICES
3. SUBTITLE
SERVICE LEVEL REPORTS
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS par. 5.5.5, 5.5.6
6. REQUIRING OFFICE
RTAM, MCIPAC RCO
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQUIRED
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable (Reference: DoD Instruction 5230.24 (28 Apr 2016):
“DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors, Administrative or Operational Use, 12 Apr 2017. Other requests for this document shall be referred to Commanding General, Training and Education Command, MCCDC (C465) 2300A Louis Road, Quantico, VA 22134.”
BLK 12 - Submit Service Level Report in accordance with POA&M.
BLK 13 - The Government requires 15 calendar days to review. The contractor shall deliver final report 10 calendar days after receipt of Government comments.
BLK 14 - Draft, regular, and reproducible copy shall be delivered electronically (format noted below) and posted to a contractor established and maintained website/integrated data environment. The contractor shall notify the Government of deliverable availability.
Contractor’s Format acceptable.
Data Item shall be delivered electronically. The format shall be in standard MS Office application and in Adobe Acrobat (as appropriate). Data Item shall be maintained in the electronic format (in an organized ISO-9001 fashion) in an electronic storage area, or on a secured Web page, and submitted through electronic mail, or as directed by the Government representative. If applicable, drawings shall be developed and delivered in Visio/Visionael. In the event of discrepancy between statements in contract references of Block 5 or this CDRL and the Authority in Block 4, contract references and this CDRL govern.
Service Level Reports will be written in accordance with the references noted below:
MCO 5215.1K Marine Corps Directives Management Program Correspondence/MOAs/MOUs:
SECNAVINST 5216.5D (Correspondence Manual) SECNAVINST 5210.2 (SSIC Manual) Joint Publication 1-02: DOD Dictionary of Military and Associated Terms
RTAM
Project Lead
| 15. TOTAL --------- |
| 0 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _8_ of _9_ Pages |
File details come from the government source that posted it.