A001 Phase-Out Transition Plan

View the file

Other files for this federal contract opportunity

Other files attached to Range Control Facility Support Services, newest first.
File Type Posted
Attachment_2_Pricing_Worksheet.xlsx XLSX spreadsheet
M67400-18-R-0009-U0002.pdf PDF
CDRL_A0002-D0001.docx DOCX document
RCF_RFI_Questions_Responses_180614_(002).docx DOCX document
Attachment_1_Base_Contract_Matrix.docx DOCX document
Attachment_3_Task_Order_1_Matrix.docx DOCX document
SF30_Amendment.pdf PDF
Attachment_2_Pricing_Worksheet.xlsx XLSX spreadsheet
Attachment_5_Wage_Determination.docx DOCX document
Attachment_4_Past_Performance_Questionnaire_KSH.docx DOCX document
Attachment_4_Wage_Determination.docx DOCX document
Attachment_3_Past_Performance_Questionnaire_KSH.docx DOCX document
Attachment_2_Task_Order_1_Matrix.docx DOCX document
Attachment_1_Base_Contract_Matrix.docx DOCX document
M67400-18-R-0009.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP

TM OTHER

Administrative/Management Data

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

RCF Support

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
B005Phase-Out Transition Plan
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-81945PWS par. 2.8.2MCIPAC RCO

7. DD 250 REQ

9.

DIST STATEMENT REQUIRED

10. FREQUENCY

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

C

)LT ONE/R SEE BLK 16

b. COPIES

8. APP CODE

AD

16. REMARKS

11. AS OF DATE

13.

DATE OF SUBSEQUENT SUBMISSION

a.

ADDRESSEE

Draft

Final Reg Repro

BLK 4 - Section 2 of DI-MGMT-81945 is tailored as below:

The Contractor shall prepare and deliver to the Government a Phase-Out Plan that facilitates its best efforts and cooperation to effect an orderly and efficient transition to a successor at the expiration of the final task order. The plan shall specify a training program and a date for transferring responsibilities for each division of work described in the plan, and shall be subject to the Government’s approval. The plan shall be submitted not less than 90 days prior to the expiration of the final task order. The plan should include:

· A detailed methodology in logical sequence to ensure a smooth transition of tasks

· A flexible and adaptive approach to accommodate the successor

· Inventory of all services and materials required to fully perform the task order requirements

· Actions required of the Government

BLK 9 - The following information shall be included on the deliverable (Reference: DoD Instruction 5230.24 (28 Apr 2016):

Project Lead 1

“DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors, Administrative or Operational Use, 12 Apr 2017.”

BLK 12 – No less than 90 days prior to the expiration of the final task order.

BLK 13 - The Government requires 15 calendar days to review. The contractor shall deliver final report 10 calendar days after receipt of Government comments.

BLK 14 - Draft, regular, and reproducible copy shall be delivered electronically (format noted below) and posted to a contractor established and maintained website/integrated data environment. The contractor shall notify the Government of deliverable availability.

15. TOTAL

0 0 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17.

PRICE

GROUP

18.

ESTIMATED

TOTAL

PRICE

)DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE USED.

Page of Pages Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.
B. EXHIBIT

B

C. CATEGORY:

Administrative/Management Data

TDP TM OTHER

D. SYSTEM/ITEM

RCF Support

E. CONTRACT/PR NO.
F. CONTRACTOR

16. REMARKS (Continued) Data Item shall be delivered electronically. The format shall be in standard MS Office application and in Adobe Acrobat (as appropriate). Data Item shall be maintained in the electronic format (in an organized ISO-9001 fashion) in an electronic storage area, or on a secured Web page, and submitted through electronic mail, or as directed by the Government representative. If applicable, drawings shall be developed and delivered in Visio/Visionael. In the event of discrepancy between statements in contract references of Block 5 or this CDRL and the Authority in Block 4, contract references and this CDRL govern.