E1 - SF30 (Modified Copy).pdf

PDF 575 KB Posted

Attached to
Marine Barracks Washington Window Tint Federal contract opportunity
Solicitation number
M549004590712
Issued by
United States Marine Corps

About this file

This document is an amendment to a solicitation (M549004590712) for window tinting services at the Marine Barracks Washington (MBW) facility. The key details are:

The amendment changes the period of performance, adds 27 new basement windows to be tinted, removes the requirement for mirror privacy tint, and removes the corresponding CLIN 3. It also posts questions and answers, the proper wage determination document, and adds a sentence to the Instructions to Offerors. The required period of performance is from award to April 25, 2025. The contractor is tasked with applying specific types of tinting to designated windows on the east, south, and west sides of Building 8 at the MBW facility. Delivery and acceptance terms, security requirements, and a list of attachments with window details are provided. This is a Firm-Fixed Price contract type, with the contractor responsible for all travel and per diem expenses.

View the file

Other files for this federal contract opportunity

Other files attached to Marine Barracks Washington Window Tint, newest first.
File Type Posted
E1 - Questions and Answers.docx DOCX document
A1 - Window Layout (Final).pdf PDF
C - Wage Determination DC20230002 (Final).pdf PDF
A1 - Window Tinting Details (Final).xlsx XLSX spreadsheet
A1 - PWS (Final).docx DOCX document
E1 - SF30 (Conformed Copy).pdf PDF
E1 - Marine Barracks Washington Site Visit.docx DOCX document
A1 - Window Tinting Details.pdf PDF
A3 - Brand Name (Signed).pdf PDF
C - Wage Determination 2015-4281.pdf PDF
D1 - M0026424QD011.pdf PDF
A1 - Window Layout.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M549004590712

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to change the follow ing:

1.) Change period of perfromance.

2.) Add 27 new basement w indow s to be tinted w ithin PWS (Changes have been highlighted).

3.) Remove the need for Mirror Privacy Tint w ithin PWS(Changes have been highlighted).

4.) Remove CLIN 3 for privacy mirrored tint.

5.) Post Questions and Answ ers.

6.) Post proper Wage Determination document.

7.) Add one sentence in the 52.212-1 Instructions to Offerors Addendum.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Sep-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X M0026424QD011

X 9B. DATED (SEE ITEM 11)

06-Sep-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Sep-2024

CODE

MCINCR - RCO

2010 HENDERSON ROAD SGT RAMIIRO H. DIAZ

QUANTICO VA 22134

M00264 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M0026424QD011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0003

The CLIN description 3M Privacy Mirror Application has been deleted.

The CLIN extended description has changed from:

Application of 3M Privacy Mirror Tint IAW PWS

To:

The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

The unit of issue Each has been deleted.

The manufacturer part number 7100055482 has been deleted.

The MILSTRIP M549004590712 has been deleted.

The PSC code Z2JZ has been deleted.

The PROG code S10 has been deleted.

The NAICS code 238150 has been deleted.

The MDAP/MAIS Code 000 has been deleted.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 29-SEP-2024 TO

30-MAR-2025

N/A M67029 MAINTENANCE SECTION

MARINE BARRACKS 8TH & I STREETS,

SE

POC: JUAN LLANOS

WASHINGTON DC 20390

JUSTIN LABATE

202-433-2739 FOB: Destination

M67029

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 29-SEP-2024 TO

25-APR-2025

N/A M67029 MAINTENANCE SECTION

MARINE BARRACKS 8TH & I STREETS,

SE

POC: JUAN LLANOS

WASHINGTON DC 20390

JUSTIN LABATE

202-433-2739

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

POP 29-SEP-2024 TO

30-MAR-2025

N/A M67029 MAINTENANCE SECTION

MARINE BARRACKS 8TH & I STREETS,

SE

POC: JUAN LLANOS

WASHINGTON DC 20390

JUSTIN LABATE

202-433-2739

CAGE

POP 29-SEP-2024 TO

25-APR-2025

N/A M67029 MAINTENANCE SECTION

MARINE BARRACKS 8TH & I STREETS,

SE

POC: JUAN LLANOS

WASHINGTON DC 20390

JUSTIN LABATE

202-433-2739

The following Delivery Schedule for CLIN 0003 has been deleted:

CAGE

POP 29-SEP-2024 TO

30-MAR-2025

N/A M67029 MAINTENANCE SECTION

MARINE BARRACKS 8TH & I STREETS,

SE

POC: JUAN LLANOS

WASHINGTON DC 20390

JUSTIN LABATE

202-433-2739

INSPECTION AND ACCEPTANCE

The Acceptance/Inspection Schedule for CLIN 0003 has been changed from:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

To:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination N/A

The following have been modified:

PERFORMANCE WORK STATEMENT

Performance Work Statement (PWS) / Statement of Work (SOW) Building 8 Window Tinting

Marine Barracks Washington (MBW)

1. Background

The mission of Marine Barracks Washington (MBW) is to provide strategic support through ceremonial commitment and operational assistance to the Commandant of the Marine Corps, Military District Washington and Camp David.

Friday Evening Parades are performed for VIPs and guests throughout each summer with attendance throughout each season impacting upwards of over 60,000 people annually. Central to the backdrop of the parade deck is Building 8. This building has been recently renovated with a completely new set of windows. For the evening parades, guests take countless numbers of photos which reflect off the west-facing windows. Additionally, there are multiple bathrooms and locker rooms with windows.

2. Scope The contractor is tasked with applying tinting/glazing to select windows. Glare reduction tinting is to be used for the west-facing windows. Privacy tinting is to be used for bathrooms and locker rooms. All window tinting is to be designed for significant ultra-violet light reduction to reduce heating and therefore energy usage by lowering the overall demand on air conditioning for the facility.

3. Performance Requirements

3.1. Tasks: The Contractor shall, using industry standard techniques:

3.1.1. Install 3M Dusted Crystal window tinting on:

3.1.1.1. only pane of (1) window annotated as type H on east side.

3.1.1.2. only pane of (9) windows annotated as type K on east side.

3.1.1.3. only pane of (11) windows annotated as type J on east side.

3.1.1.4. only pane of (6) windows annotated as type L on east side.

3.1.1.5. both panes of (29) windows annotated as type C2/C2A on east side.

3.1.1.6. both panes of (20) windows annotated as type D2/D2A on east side.

3.1.1.7. both panes of (4) windows annotated as type F2 on east side.

3.1.1.8. both panes of (2) windows annotated as type E2 on east side.

3.1.1.9. both panes of (3) windows annotated as type F2 on south side.

3.1.1.10. both panes of (4) windows annotated as type F1 on west side.

3.1.2. Install 3M Prestige Exterior 20 window tinting on:

3.1.2.1. both panes of (37) windows annotated as type A1 on west side.

3.1.2.2. both panes of (6) windows annotated as type A2/A2A on west side.

3.1.2.3. both panes of (5) windows annotated as type B1 on west side.

3.1.2.4. both panes of (4) windows annotated as type E1 on west side.

3.1.2.5. both panes of (3) windows annotated as type G1 on west side.

Notes:

Attachment (1) MBW-8 Exterior Elevations with Window Types.pdf provides window types.

Attachment (2) Bldg 8 Windows.xlsx provides approximate dimensions of overall window sizes.

4. Applicable Information and/or Documents

4.1. Government Technical Point of Contact (TPOC):

TPOC contact information to be provided to the Contractor at time of award:

4.2. Period of Performance:

The required period of performance is from award to April 25, 2025.

4.3. Place of Performance:

Marine Barracks Washington 8th and I Streets SE Washington, DC 20390

4.4. List of Deliverables:

Deliverable Name

Description Frequency or Required Date Method of Delivery

Tinted Windows Window Tinting Materials and Services Work is to be conducted from award of the contract throguh April 30th 2024

Email to TPOC

4.5. Delivery Address:

See section 4.1 above for TPOC email address.

4.6. Hours of Operation:

On-site services must be performed during normal working hours in coordination with the TPOC, 7:30AM – 3:00PM, Monday – Friday, except U.S. Federal Holidays.

Visit Federal Holidays (opm.gov) to view the applicable listing of U.S. Federal Holidays.

4.7. Contractor Personnel / Qualifications:

☒ Not applicable

4.8. Travel:

The Government intends to award a Firm-Fixed Price (FFP) contract type. The Contractor is responsible for all travel/per diem related expenses required to perform this contract. Any anticipated travel costs in the performance of this contract shall be included as part of the quoted rate(s). Any travel matters associated with the performance of this contract are the sole responsibility of the Contractor. The Government shall not have any financial responsibility other than paying for the FFP on each line item.

4.9. Security Requirements:

Contractor shall obtain base access via MBW Physical Security. Access shall be coordinated via the TPOC listed in paragraph 4.1 above. To obtain base access clearance, each contractor must:

1. Complete pre-enrollment via the Defense Biometric Identification System (DBIDS) at:

https://dbids-global-enroll.dmdc.mil/preenrollui/#!/

2. Print a copy of the pre-enrollment form and complete the SECNAV Form 5512/1 found at:

https://www.secnav.navy.mil/doni/NFOL/SECNAV/SECNAV%20Forms/SECNAV%205512_1% 20%20RE.pdf

3. Bring the two forms and a Real ID or passport to MBW. TPOC will escort contractors to the Physical Security office to complete the credentialing process which will either result in a daily paper-pass or a DBIDS credential.

4.10. List of Attachments:

Attachment (1) MBW-8 Exterior Elevations with Window Types.pdf Attachment (2) Bldg 8 Windows.xlsx

(End)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .