This is Standard Form 30 Amendment 0001 to Solicitation M00264-26-Q-0092 for Fire Hose and Ground Ladder Testing services, issued by the Commander, Marine Corps Installations Command (MCINCR-MCBQ) at Quantico, Virginia on June 15, 2026.

The amendment incorporates Government responses to prospective offerors' questions regarding fire hose and ground ladder testing requirements and extends the solicitation response deadline from June 17, 2026 at 0800 EST to June 22, 2026 at 0800 EST (Local Time). The scope of work involves testing and inspection services for 29,160 feet of fire hose (ranging from 1-3/4" to 4" diameter) and 785 feet of ground ladders (approximately 39 different styles including attic, roof, and extension ladders). For fire hose, contractors must drain, dry, clean as required, and repack on racks, reels, or apparatus as directed, with hoses laid out in straight lines not exceeding 300 feet per test line. For ground ladders, contractors must clean rails and rungs and re-lubricate halyards and pawls as required by OEM specifications before returning equipment to apparatus or storage brackets. The Government clarified that all preventive maintenance will be performed by the fire department, with contractors only responsible for repairs required to pass testing, and that heat sensor label replacements should follow NFPA and/or manufacturer recommendations. This is a new project with some fire hose requiring initial testing as newly purchased equipment, while prior annual testing reports exist for some but not all assets.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): The purpose of Amendment 0001 to Solicitation M00264-26-Q-0092 is to accomplish the following:

Incorporate Questions and Answers (Q&A): Incorporate the Government's official responses to timely questions submitted by prospective offerors regarding the Fire Hose and Ground Ladder Testing requirements. The Q&A document is hereby attached and incorporated into the solicitation.

Extend the Solicitation Response Date: Extend the solicitation closing date and time to provide offerors sufficient time to review the Government responses and adjust their quotes accordingly. The response deadline is changed FROM: 17 June 2026 at 0800 EST TO: 22 June 2026 at 0800 EST (Local Time).

All other terms and conditions of the solicitation remain unchanged and in full force and effect. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation.

Solicitation/Contract Form Continuation

The following changes have been made:

INFORMATION FROM TO

Response Due Date 17 Jun 2026 22 Jun 2026

M0026426Q00920001

List of Contract Documents, Exhibits, or Attachments

Miscellaneous text in this section has been modified to:

Fire Ladder & Hose Testing (M00264-26-Q-0092)

Questions & Answers are in Red

1. What is the total length of hoses to be tested. 29,160 feet

2. What is the total length of ground ladders to be tested. 785 feet

3. The RFQ asks to make heat sensor label replacement part of the annual test. This is typically charged on an as needed basis. They both expire and turn color is exposed to heat. By making the contractor responsible, you are adding an additional cost to the Government. Can you confirm is this is something you will require the contractor to do or is this something the Government wants to be informed of? We would like them to be replaced with NFPA and/or Manufacture recommendations.

4. There is a section below which details some items which are preventative maintenance and are typically completed by the fire department on a monthly or as needed basis. This includes cleaning hose, cleaning rails and rungs and lubricating halyards and pawls. Are you sure that you wish for the contracting to perform these items at an additional cost to the Government. This is what is being requested at the end of the testing procedures? All preventive maintenance will be performed by the fire department. We would only want them to make repairs that would require the ladders to be passed for testing. This extra cost will be paid outside of the contract.

Fire Hose

29,160 feet

Drain, dry, and clean as required. Repack on racks, reels, or apparatus as directed. Lay out in straight lines not exceeding 300 ft per test line.

Ground Ladders

785 feet

Clean rails and rungs. Re-lubricate halyards and pawls as required by OEM. Return to apparatus or storage brackets as directed.

5. Is there any incumbent/recompete or this is a brand-new project? New project.

6. Total number of fire hose sections requiring inspection and testing. We have 29,160 feet of fire hose.

7. Breakdown of hose sections by type, diameter, and length, if available. Hose from 1-3/4" to 4".

8. Total number of ground ladders requiring inspection and testing. 785 feet of ground ladders

9. Breakdown of ladders by type, material, and length, if available. Approximately 39 different style ground ladders from attic, roof, and extension ladders.

10. Whether a current inventory manifest or prior annual testing report can be provided for reference. We have reports of some, but not all completed testing. There will be some fire hose will be the initial first test because they have just been purchased.

IDCode: J
Page: 1
Pages: 4
AmendNo: 0001
EffDate: 15 Jun 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: M00264
AdmCode:
IssuedBy: COMMANDER, MCINCR-MCBQ

ATTN: DIRECTOR REGIONAL CONTRACTING, 2010 HENDERSON RD

QUANTICO, VA 22134-5028

UNITED STATES

Edgar Clark, Email: edgar.clark@usmc.mil Telephone: 703-432-1926 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: M0026426Q0092
SolDate: 09 Jun 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Continuation
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Kellie E. Holley
ContDate:
CODate: 15 Jun 2026

File details come from the government source that posted it. Updated .