Past Performance Questionnaire

124 KB Posted

Attached to
Air Compressor Dryer & Piping Replacement
Solicitation number
M00146-08-T-9020
Issued by

About this file

Past Performance Questionaire

Text of this file

Performance Evaluation Survey M00146-08-Q-9004

CONTRACTOR PERFORMANCE EVALUATION SURVEY

COVER SHEET

For Request for Quotation M00146-08-T-9020

Name and address of offeror questionnaire is being completed for:

Name of company completing questionnaire: ________________________________________

Contract Number: _____________________________________________________________ Contract Type: ______________________________________________________________

Contract Amount: ______________________________________________________________

Contract Period of Performance ___________________________________________________

(including all options)

Product/Service Description: _____________________________________________________

Name, title and phone number of person completing questionnaire: _______________________

Length of time your firm has been involved with this company:___________________________

Submit completed Cover Sheet and Survey via facsimile or e-mail to:

CONTRACTING DEPARTMENT

Supply MCAS, Cherry Point, NC

Attn: John K. Lawrence, Contract Specialist

Phone: (252) 466-7504

Fax: (252) 466-3571 e-mail: john.lawrence@usmc.mil

Request return by COB on: 6 June 2008

CONTRACTOR PERFORMANCE EVALUATION SURVEY RATING SHEET

RATING SCALE

Please use the following ratings to answer the questions. If you are unable to rate an item because it was not a requirement, never an issue, or you have no knowledge of the item in question, then you should mark “N/A”.

EVALUATION CRITERIA

Excellent - The company’s performance was consistently superior.

Good -

The company’s performance was better than average or the contractual performance was mostly favorable and corrective actions taken by the contractor were effective.

Satisfactory - The company’s performance was satisfactory or there were minor performance problems which were satisfactorily corrected.

Marginal- The company’s performance was mostly unsatisfactory or there were minor performance problems which were not satisfactorily corrected.

Unsatisfactory - The company’s performance was entirely unsatisfactory or there were serious performance issues with the contractor for which the contractor’s corrective actions were ineffective.

NOTE:

For statements indicating “Unsatisfactory,” “Marginal,” or “Excellent”, please provide an explanation in the comments section of this survey.

N/A
UNSATIS-FACTORY
MARGINAL
SATIS-FACTORY
GOOD
EXCELL-ENT

.(5) The Contractor’s ability to sell advertising and successfully recoup publication costs based on their past performance.

a.) QUALITY OF PRODUCT OR SERVICE:

(1) The Contractor provided a product or service that conformed to contract requirements, specifications, and standards of good workmanship

(2) The Contractor submitted accurate reports

(3) The Contractor utilized personnel that were appropriate to the effort performed.

b.) COST CONTROL:

(1) The Contractor performed the effort within the estimated cost/price.

(2) The Contractor submitted accurate invoices on a timely basis.

(3) The Contractor demonstrated cost efficiencies in performing the required effort.

(4) The actual costs/rates realized closely reflected the negotiated costs/rates.

c.) SCHEDULE:

(1) The tasks required under this effort were performed in a timely manner and in accordance with the period of performance of the contract.

(2) The Contractor was responsive to technical and/or contractual direction.

d.) BUSINESS RELATIONSHIPS:

(1) The Contractor demonstrated effective management over the effort performed.

(2) The Contractor maintained an open line of communication so that the Contracting Officer's Representative (COR) and/or Technical Point of Contact (TPOC) were apprised of technical, cost, and schedule issues.

(3) The Contractor presented information and correspondence in a clear, concise, and businesslike manner.

(4) The Contractor promptly notified the COR, TPOC, and/or Contracting Officer in a timely manner regarding urgent issues.

(5) The Contractor cooperated with the Government in providing flexible, proactive, and effective recommended solutions to critical program issues.

(6) The Contractor made timely award to, and demonstrated effective management of its subcontracts.

e.) CUSTOMER SATISFACTION:

(1) The products/services provided adequately met the needs of the program.

(2) The Contractor was able to perform with minimal or no direction from the COR or the TPOC.

(3) I am satisfied with the performance of the Contractor under this effort.

f.) KEY PERSONNEL:

(1) The labor turnover in key personnel labor categories was minimal and did not adversely affect Contractor performance.

(2) The Contractor proposed qualified personnel to fulfill the requirements of the contract.

g.) COMPLIANCE WITH SUBCONTRACTING PLAN GOALS:

h.) OTHER:

(1) Would you award this firm another contract? ( ) Yes ( )No If you answered "No" provide an explanation.

(2) Was the contract terminated for default? ( )Yes ( ) No

If you answered "Yes", provide an explanation.______________________________________________

COMENTS: (Required for ALL Poor and Excellent Ratings)

Attachment 2

Attachment 2

Other files

File Type Posted
updated drawings as of 4-29-2008 for FEMA 19949.pdf PDF
DSC_8609.JPG JPG image
DSC_8614.JPG JPG image
DSC_8615.JPG JPG image
Recommended Spare Parts List for Spares DI-ILSS-80293B.pdf PDF
DSC_8617.JPG JPG image
CDRLS FOR REPLACEMENT 300 PSIG DRYER AND PIPING SYSTEM -10-24-2007--FEMA 19949.doc DOC document
DSC_8606.JPG JPG image
DSC_8618.JPG JPG image
DSC_8605.JPG JPG image
Maintenance Test and Support Equipment Requirements List DI-ILSS-80294A.pdf PDF
DSC_8611.JPG JPG image
Past Performance Questionnaire —
Test Procedure DI-NDTI-80603.pdf PDF
Test Report DI-NDTI-80604.pdf PDF
Acceptance Test Plan DI-QCIC-80553.pdf PDF
M00146-08-T-9020 Client Auth Ltr.doc DOC document
Equipment Calibration Procedure DI-R-7065.pdf PDF
DSC_8608.JPG JPG image
Manuals Technical Modified Commercial DI-M-2071.pdf PDF
Design Review Data Package DI-E-5423.pdf PDF
Sample Lockout tagout procedure.pdf PDF
DSC_8607.JPG JPG image
DSC_8619.JPG JPG image
DSC_8604.JPG JPG image
Site Preparation Requirements and Installation Plan DI-MGMT-80033.pdf PDF
M00146-08-T-9020 Official Solicitation.doc DOC document
DSC_8610.JPG JPG image
DSC_8612.JPG JPG image
DSC_8613.JPG JPG image
DSC_8616.JPG JPG image
M00146-08-T-9020 Client Auth Ltr.doc DOC document
M00146-08-T-9020 Draft Solicitation.doc DOC document
CDRLS FOR REPLACEMENT 300 PSIG DRYER AND PIPING SYSTEM -10-24-2007--FEMA 19949.doc DOC document
08-T-9020 Site Visit Instructions.doc DOC document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .