08-T-9020 Site Visit Instructions.doc

DOC document 33 KB Posted

Attached to
Air Compressor Dryer & Piping Replacement
Solicitation number
M00146-08-T-9020
Issued by

About this file

Site Visit Instructions for upcoming site visit on 22 April 2008 at Cherry Point MCAS.

View the file

Other files

File Type Posted
updated drawings as of 4-29-2008 for FEMA 19949.pdf PDF
DSC_8609.JPG JPG image
DSC_8614.JPG JPG image
DSC_8615.JPG JPG image
Recommended Spare Parts List for Spares DI-ILSS-80293B.pdf PDF
DSC_8617.JPG JPG image
CDRLS FOR REPLACEMENT 300 PSIG DRYER AND PIPING SYSTEM -10-24-2007--FEMA 19949.doc DOC document
DSC_8606.JPG JPG image
DSC_8618.JPG JPG image
DSC_8605.JPG JPG image
Maintenance Test and Support Equipment Requirements List DI-ILSS-80294A.pdf PDF
DSC_8611.JPG JPG image
Past Performance Questionnaire —
Test Procedure DI-NDTI-80603.pdf PDF
Test Report DI-NDTI-80604.pdf PDF
Acceptance Test Plan DI-QCIC-80553.pdf PDF
M00146-08-T-9020 Client Auth Ltr.doc DOC document
Equipment Calibration Procedure DI-R-7065.pdf PDF
DSC_8608.JPG JPG image
Manuals Technical Modified Commercial DI-M-2071.pdf PDF
Design Review Data Package DI-E-5423.pdf PDF
Sample Lockout tagout procedure.pdf PDF
DSC_8607.JPG JPG image
DSC_8619.JPG JPG image
DSC_8604.JPG JPG image
Site Preparation Requirements and Installation Plan DI-MGMT-80033.pdf PDF
M00146-08-T-9020 Official Solicitation.doc DOC document
DSC_8610.JPG JPG image
DSC_8612.JPG JPG image
DSC_8613.JPG JPG image
DSC_8616.JPG JPG image
M00146-08-T-9020 Client Auth Ltr.doc DOC document
M00146-08-T-9020 Draft Solicitation.doc DOC document
CDRLS FOR REPLACEMENT 300 PSIG DRYER AND PIPING SYSTEM -10-24-2007--FEMA 19949.doc DOC document
Past Performance Questionnaire —
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIR COMPRESSOR PRE-SOLICITATION CONFERENCE AND SITE VISIT

Solicitation No. M00146-08-T-9020

1. A Site Visit relating to the above requirement is scheduled to be conducted on Tuesday, April 22, 2008 at 9:00 a.m. at the Fleet Readiness Center (FRC) East, MCAS Cherry Point, NC. Interested contractors are to assemble in the FRC East main lobby (Building 137) at least 15 minutes prior to the start of the conference/site-visit where a Government representative will be available to escort attendees to the appropriate location(s).

2. Offerors planning to attend the site visit must submit requests for access to both the Air Station and FRC East as follows:

(a) Access to MCAS Cherry Point: Contractors must submit a list of the names of company officials who plan to attend to the conference to john.lawrence@usmc.mil three (3) business days prior to the date of the conference. Upon arriving at the Air Station, contractors must check in at the Station Pass and ID office located adjacent to the main gate.

(b) Access to FRC East: For security purposes, visitors to the FRC East are required to provide a letter requesting access on official company/activity letterhead. An official of the requesting organization (other than the visitor) must sign the request. Visitors without proper vehicle identification must obtain entry authorization at the main gate of Marine Corps Air Station Cherry Point. FRC East visit requests must include the following information:

· Name of Visitor (Last, First, MI) and Social Security Number

· Date and Place of Birth

· Proof of Citizenship

· FRC East point of contact and telephone number (Sheila Cuthbertson, 252 464-7935)

· Date and duration of visit

· Company telephone and FAX numbers and contract number and dates

Visit requests should be addressed to:

Commanding Officer

Attn: Visitor Control (Code 6.5.2)

Fleet Readiness Center East

PSC Box 8021

Cherry Point, NC 28533-0021

Visit request should be faxed to 252-464-8867 at least three working days before the visit.

Additional information regarding access to the Air Station is available by phone at (252) 464-7397/9665 or by accessing the FRC East web-site at www.nadepcp.navy.mil/FRC_visitors.htm .

3. Failure of a prospective offeror to attend the Site Visit will be construed to mean that the offeror fully understands all requirements of this solicitation. In no event will failure of a prospective offeror to attend the conference to inspect the site or to submit questions regarding this procurement constitute grounds for a claim after contract award.

4. Safety glasses and proper hearing protection will be required for this site visit. Prospective offeror should bring all necessary safety equipment.

File details come from the government source that posted it. Updated .