Locates.docx

DOCX document 13 KB Posted

Attached to
Erickson Ave Waterline Replacement (2nd St to 5th St)
Solicitation number
27-009
Issued by
Washington County, Barlow City, Oregon

About this file

This is a utility locates instruction document for the City of Beaverton, Oregon, related to the Erickson Avenue Waterline Replacement project (2nd Street to 5th Street). The document provides comprehensive guidance for contractors performing utility locating and protection work in connection with the replacement of an existing 1940s-era 8-inch cast iron water main with approximately 1,060 linear feet of new ductile iron pipe. The project scope includes installing 1,020 feet of 12-inch pipe and 40 feet of 8-inch pipe, along with two system connections, one fire hydrant assembly, two water services, and associated valves and fittings. Work will occur within the roadway in a residential area adjacent to Beaverton High School, which is currently undergoing renovations. Contractors must coordinate with the school site contractor to maintain access throughout construction.

The document requires contractors to provide 48 hours' notice prior to excavation through the One Call System at (503) 246-6699, which covers multiple utilities including Frontier Communications, Northwest Natural Gas, Qwest, U.S. Sprint, Tualatin Valley Water, City of Beaverton, Portland General Electric, Clean Water Services, and Cable Television. Contractors must comply with Oregon Revised Statutes 757.541 to 757.571 and Oregon Administrative Rules 952-001-0010 through 952-001-0090 regarding utility protection and notification. Street closures require express approval from the City Traffic Engineer and notification to Beaverton School District Transportation at least 24 hours in advance. Contractors must maintain the project area free of debris and unused materials upon completion. Contact information is provided for emergency repairs for each utility provider.

View the file

Other files

File Type Posted
Erickson_Ave_Waterline_Replacement_(2nd_St_to_5th_St).pdf PDF
G_-_Construction_Plans.pdf PDF
Construction_Contract_-_Sample.docx DOCX document
Notice_to_Proceed.docx DOCX document
LABOR_AND_MATERIAL_PAYMENT_BOND.docx DOCX document
Laws_to_be_Observed.docx DOCX document
Performance_Bond.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATES

LOCATES (48 HOURS NOTICE REQUIRED PRIOR TO EXCAVATION)

ONE CALL SYSTEM(503) 246-6699
(FRONTIER COMMUNICATIONS, NORTHWEST NATURAL
GAS, QWEST, U.S. SPRINT, TUALATIN
VALLEY WATER, CITY OF BEAVERTON
PORTLAND GENERAL ELECTRIC,
CLEAN WATER SERVICES, CABLE TELEVISION)

REPAIR OR EMERGENCIES

NORTHWEST NATURAL GAS(503) 226-4211, EXT. 4413
FRONTIER COMMUNICATIONS(503) 629-2121
TUALATIN VALLEY WATER(503) 642-1511
CITY OF BEAVERTON UTILITIES(503) 526-2220
PORTLAND GENERAL ELECTRIC(503)-736-5662
CABLE TELEVISION(503) 644-4300

CONTRACTOR, IN LOCATING AND PROTECTING UNDERGROUND UTILITIES, MUST COMPLY WITH THE REGULATIONS OF ORS 757.541 TO 757.571.

DURING THE LOCATING WORK, CONTRACTOR SHALL TAKE PRECAUTION TO PROTECT AND MAINTAIN EXISTING PUBLIC AND PRIVATE UTILITY LINES AND OTHER UTILITY STRUCTURES.

UPON COMPLETION OF THE LOCATING WORK, CONTRACTOR IS TO LEAVE THE PROJECT AREA FREE OF DEBRIS AND UNUSED MATERIALS.

NO STREET SHALL BE CLOSED FOR LOCATING AND/OR PROTECTING UTILITIES WITHOUT THE EXPRESS APPROVAL OF THE CITY TRAFFIC ENGINEER. CONTRACTOR SHALL NOTIFY BEAVERTON SCHOOL DISTRICT TRANSPORTATION AT (503)-649-0361 AT LEAST 24 HOURS IN ADVANCE OF ANY STREET CLOSURE.

OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. NOTE: THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987.