This is a construction plans document for the City of Beaverton, Oregon, detailing the Erickson Avenue Waterline Replacement project (CIP Project 4373) in Beaverton, Oregon. The project involves replacing approximately 1,060 linear feet of an existing 1940s-era 8-inch cast iron water main with new ductile iron water main, consisting of 1,020 feet of 12-inch pipe and 40 feet of 8-inch pipe. The work extends from 2nd Street to 5th Street along Erickson Avenue and includes two connections to the existing system, one fire hydrant assembly, two water service connections, and associated valves, fittings, and appurtenances. The project is located in a residential area adjacent to Beaverton High School, which is currently undergoing renovations. Construction must account for coordination with the school site contractor to maintain access throughout the project duration. The plans were prepared by Matthew Charles Palmer, a licensed professional engineer in Oregon (License No. 84675, expiring December 31, 2026), with a plot date of September 24, 2026.
The construction plans specify detailed requirements for materials, installation procedures, testing protocols, and restoration standards. All water main pipe must be Class 52 thickness, cement-lined, zinc-coated ductile iron pipe with push-on restrained gaskets, manufactured in the United States as new material. The pipe must be wrapped in 8 mil thick polyethylene encasement. New water pipe must be flushed, pressure tested at a minimum of 150 PSI for 60 minutes, and disinfected before connection to the existing system. Trench backfill must use 3/4" to 1" crushed aggregate compacted to 92% maximum density per AASHTO T-180, with asphalt restoration consisting of 6 inches of Level 2, 1/2" dense graded hot mix asphalt concrete. The contractor must request utility locates prior to excavation, coordinate with affected utility providers (Clean Water Services, NW Natural, PGE, Comcast, Ziply Fiber, and Tualatin Valley Water District), and comply with Oregon Utility Notification Center regulations. Additional requirements include maintaining erosion and sediment control measures, protecting existing utilities and property, obtaining necessary permits, and providing as-built information upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Erickson_Ave_Waterline_Replacement_(2nd_St_to_5th_St).pdf | ||
| Construction_Contract_-_Sample.docx | DOCX document | |
| Locates.docx | DOCX document | |
| Notice_to_Proceed.docx | DOCX document | |
| Laws_to_be_Observed.docx | DOCX document | |
| Performance_Bond.docx | DOCX document | |
| LABOR_AND_MATERIAL_PAYMENT_BOND.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
DesignedAppv'd
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G001 COVER SHEET.DWG
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
G001
--MP
W A
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
C O
VE
R S H
EE
T
CITY OF BEAVERTON
CIP 4373 - ERICKSON AVE WATERLINE REPLACEMENT
1S1W16, COB INDEX 3516, 3616
VICINITY MAP
N.T.S.
Scholls Ferry Rd
Barrows Rd
Tile Flat Rd
5t h Av e
Weir Rd
Brockman St
Allen Blvd
Denney Rd
M ur ra y
Bl vd Hall Blvd
Barnes Rd
Cornell Rd Sunset Hwy
Walker Rd
Jenkins Rd
BH Hwy
Canyon Rd
0t h Av e
Hart Rd
Davis Rd
Nora Rd
Garden Home Rd
Farmington Rd
TV Hwy
Ced ar
H ills
B lvd
Scholls Ferry Rd
CITY OF BEAVERTON PHONE NUMBER
Project Engineer - Matt Palmer (971) 806-2536 (C)
Public Works Main (503) 526-2261
Water Operations - Troy Pierson (971) 246-0223 (C)
COMPANY PHONE NUMBER
Clean Water Services (503) 681-3600
Clean Water Services - Emergencies (503) 681-5175
NW Natural - Austin Jauregui (971) 202-3930
NW Natural - Emergencies (800) 822-3377
PGE - Dispatch & Emergencies (503) 464-7777 or (503) 736-5602
Comcast Dispatch (503) 617-1212
Ziply Fiber - Elliot Hougardy (971) 337-4529
Verizon - Scott Christenson (503) 723-8300
Tualatin Hills Parks & Recreation (503) 645-6433
Tualatin Valley Water District (503) 848-3000
ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility
Notification Center. Those rules are set forth in OAR 952-001-0001 through
952-001-0090. You may obtain copies of the rules by calling the center.
NOTE: The telephone number for the Oregon Utility Notification Center is (503) 232-1987.
SHEET INDEX
Sheet # Sheet Title
G001 COVER SHEET
G002 GENERAL NOTES
G003 ABBREVIATIONS
G004 SYMBOLOGY
G005 KEY PLAN
C101–C107 WATER PLAN AND PROFILES
D101-D112 STANDARD DETAILS
PROJECT SITE MAP
Pressure Zone 410 Approximate Static Pressure: 90 - 100 psi
PROJECT SITE
BID
S
ET
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G002 GENERAL NOTES.DWG
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
G002
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
G
EN
ER
A L N O
TE
GENERAL CONSTRUCTION
1. CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH 2024 OREGON STANDARD
SPECIFICATIONS FOR CONSTRUCTION, THE CURRENT VERSION OF THE CITY OF BEAVERTON
ENGINEERING DESIGN MANUAL, CLEAN WATER SERVICES STANDARDS, AMERICAN WATER
WORKS ASSOCIATION STANDARDS, OREGON ADMINISTRATION RULES CHAPTER 333, AND THE
UNIFORM PLUMBING CODE WHEN APPLICABLE, UNLESS OTHERWISE NOTED OR SPECIFIED.
2. CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE AT LEAST TWO (2) WORKING DAYS
PRIOR TO BEGINNING WORK.
3. CONTRACTOR AND/OR SUB-CONTRACTORS SHALL HAVE A MINIMUM OF ONE (1) SET OF
APPROVED PLANS ON THE JOB SITE AT ALL TIMES WHILE CONSTRUCTION IS ACTIVE.
4. MATERIALS DELIVERED TO THE PROJECT SITE MUST MEET OR EXCEED THOSE IDENTIFIED ON
THE PLANS OR IN THE SPECIFICATIONS, OR AS IDENTIFIED IN APPROVED SUBMITTALS. ANY
MATERIAL NOT CONFORMING SHALL BE REMOVED FROM THE PROJECT SITE AT NO ADDITIONAL
COST TO THE OWNER.
5. REQUEST UTILITY LOCATES PRIOR TO COMMENCING ANY EXCAVATION. WORK MUST ADHERE TO
OAR 952-001-0010 THROUGH 952-001-0090. CONTACT THE OREGON UTILITY NOTIFICATION
CENTER AT 811 OR (503) 232-1987.
6. POTHOLE AND VERIFY THE HORIZONTAL LOCATION AND DEPTH OF ALL EXISTING UTILITIES AT CROSSING POINTS AT LEAST 200 FEET IN ADVANCE OF PIPE INSTALLATION. NOTIFY OWNER’S
REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS TO ALLOW FOR DESIGN ADJUSTMENTS
PRIOR TO CONSTRUCTION IN THE AFFECTED AREA.
7. OWNER WILL PROVIDE SURVEYING AS REQUIRED FOR NEW WATERLINE CONSTRUCTION.
8. REPAIR DISTURBED EXISTING UTILITIES IMMEDIATELY AND NOTIFY THE AFFECTED UTILITY
OWNER WITHOUT DELAY. ALL REPAIRS SHALL COMPLY WITH THE RESPECTIVE UTILITY
COMPANY'S STANDARDS.
9. DO NOT DAMAGE OR CUT EXISTING ASBESTOS CEMENT PIPE. EXCAVATE AND EXPOSE EXISTING
ASBESTOS CEMENT PIPE UNTIL APPROPRIATE JOINTS ARE EXPOSED. DISCONNECT THE
ASBESTOS CEMENT PIPE JOINT AND REMOVE THE APPROPRIATE SECTIONS OF ASBESTOS
CEMENT PIPE WITHOUT CUTTING OR DAMAGING THEM. DISPOSE OF REMOVED ASBESTOS
CEMENT PIPE IN A LEGAL MANNER AND IN CONFORMANCE WITH THE REQUIREMENTS OF
AUTHORITIES CONTROLLING AIR POLLUTION AND SOLID WASTE DISPOSAL. CONTRACTOR SHALL
COMPLY WITH APPLICABLE REQUIREMENTS OF ORS 468A.700 THROUGH 468A.760.
10. FINAL LOCATIONS OF VALVES AND VALVE BOXES, FIRE HYDRANTS, AIR RELEASE ASSEMBLIES, SERVICE CONNECTION CORPORATION STOPS, SHALL BE FIELD LOCATED. COORDINATE FINAL
LOCATIONS OF THE DESCRIBED ITEMS WITH THE CITY'S REPRESENTATIVE.
11. UTILITY CONSTRUCTION SEQUENCING WILL BE REQUIRED IN ORDER TO PREVENT CONFLICTS
WITH EXISTING UTILITIES REMAINING IN SERVICE UNTIL NEWLY INSTALLED UTILITIES ARE
CONNECTED AND IN SERVICE. CONTRACTOR SHALL SEQUENCE UTILITY WORK INCLUDING
TEMPORARY CONNECTIONS AND BYPASSES AS REQUIRED SUCH AS TO MINIMIZE DISRUPTION OF
SERVICES. SEE SECTION 105.4.01 OF THE SPECIFICATIONS REGARDING CONSTRUCTION
SEQUENCING REQUIREMENTS FOR THIS PROJECT.
12. MAINTENANCE OF THE WORK AREA AND APPROACH ROADS IS THE RESPONSIBILITY OF THE
CONTRACTOR. THE WORK AREA AND APPROACH ROADS SHALL BE MAINTAINED IN A CLEAN
CONDITION, FREE FROM OBSTRUCTIONS AND HAZARDS.
13. AT THE END OF EACH WORK DAY ALL TRENCHES SHALL BE BACKFILLED AND ALL TRENCHES
WITHIN STREETS SHALL BE TEMPORARY PAVED OR COVERED TO THE SATISFACTION OF THE
OWNER'S REPRESENTATIVE. STEEL SHEET PLACEMENTS SHALL BE LIMITED TO 36 HOURS IN ANY
ONE LOCATION. BEYOND 36 HOURS, EXCAVATIONS SHALL BE PAVED. ASPHALT PAVEMENT,
EITHER TEMPORARY OR PERMANENT, SHALL BE HOT MIX BITUMINOUS ASPHALT. NO TRENCH,
ON-SITE OR OFF-SITE, SHALL BE LEFT AT ANY TIME IN AN UNSAFE CONDITION. THE
CONTRACTOR IS RESPONSIBLE FOR AND IS LIABLE FOR HAZARDS OR DAMAGE RESULTING FROM
THE PROSECUTION OF THE WORK.
14. PROTECT ALL PROPERTY WITHIN RIGHTS-OF-WAY AND EASEMENTS ALONG THE IMPROVEMENT ROUTE, INCLUDING BUT NOT LIMITED TO: TREES, LAWNS, SHRUBS, FENCES, DRAINAGE LINES, MAILBOXES, DRIVEWAYS, SIDEWALKS, AND IRRIGATION SYSTEMS. ANY PROPERTY DISTURBED
MUST BE RESTORED TO ITS ORIGINAL CONDITION OR REPLACED IN KIND.
15. LOCATE AND PROTECT SURVEY MONUMENTS, UNLESS OTHERWISE DIRECTED BY THE ENGINEER
OR CITY SURVEYOR.
16. SUBMIT AS-BUILT INFORMATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION.
17. LEAVE THE PROJECT AREA FREE OF DEBRIS AND UNUSED MATERIALS UPON COMPLETION OF
THE WORK.
WATER SYSTEM CONSTRUCTION
1. WATER MAIN MUST BE DOMESTIC AND SHALL HAVE DOCUMENTATION PROVIDING EVIDENCE
THAT THE MATERIALS USED WERE MANUFACTURED IN THE UNITED STATES. NO FOREIGN
MANUFACTURED WATER MAIN WILL BE ALLOWED.
2. ALL MATERIALS SHALL BE OF NEW MANUFACTURE. NO REBUILT OR USED MATERIALS WILL BE
ALLOWED.
3. WATER MAIN SHALL BE CLASS 52 THICKNESS, CEMENT-LINED, ZINC-COATED DUCTILE IRON PIPE.
JOINT TYPE SHALL BE PUSH ON WITH RESTRAINED GASKETS MANUFACTURED FOR EITHER
TYTON OR FASTITE JOINTS. RESTRAINING GASKETS MUST BE FURNISHED WITH THE PIPE.
4. WATER MAIN PIPE SHALL BE WRAPPED IN 8 MIL THICK MINIMUM POLYETHYLENE ENCASEMENT
PER REQUIREMENTS OF COB STD DETAIL 680-3. POLYETHYLENE ENCASEMENT SHALL BE V-BIO
ENHANCED, AS MANUFACTURED BY MCWANE DUCTILE.
5. UNLESS OTHERWISE STATED, VALVES AND FITTINGS SHALL BE MECHANICAL JOINT TYPE.
6. OPERATION OF EXISTING VALVES SHALL ONLY BE PERFORMED BY CITY STAFF.
7. EXISTING WATER MAINS AND SERVICES SHALL BE KEPT IN OPERATIONS UNTIL NEW WATER
MAINS ARE CONNECTED AND IN SERVICE.
8. PROTECT WATER PIPE ENDS FROM CONTAMINATED WATER AND OTHER DEBRIS AT ALL TIMES.
CONTRACTOR SHALL CAP AND/OR COVER PIPE ENDS UNTIL JUST PRIOR TO INSTALLATION.
9. FIRE HYDRANTS SHALL BE LOCATED TO ALLOW A MINIMUM CLEAR SPACE SURROUNDING ALL
PORTIONS OF THE HYDRANT PER THE REQUIREMENTS OF COB STD DETAIL 650-1. THERE SHALL ALSO BE NO OBSTRUCTIONS DIRECTLY IN LINE WITH ANY OF THE PORTS OF THE HYDRANT FOR
A DISTANCE OF 5 FEET.
10. FURNISH AND INSTALL WATER SERVICE AS SPECIFIED IN THE PLANS IN ACCORDANCE WITH COB
STD DETAILS 660-3 OR 660-5. PROVIDE NEW COPPER TUBING, METER ASSEMBLY HARDWARE,
AND OTHER FITTINGS AND APPURTENANCES TO FACILITATE NEW WATER SERVICE
INSTALLATION, ACCORDING TO THE APPLICABLE STANDARD DETAIL.
11. UPON ACCEPTANCE OF THE WATER MAINS AND SERVICES, COORDINATE SERVICE CONNECTION
TRANSFERS WITH CITY WATER OPERATIONS DEPARTMENT. CITY WATER OPERATIONS
DEPARTMENT WILL INSTALL NEW METERS AT THE TIME OF SERVICE TRANSFERS.
12. RECONNECT CUSTOMER'S PRIVATE BACKSIDE PLUMBING CONCURRENT WITH SERVICE
TRANSFER. BACKSIDE PLUMBING MUST BE PERFORMED BY A LICENSED PLUMBER. OBTAIN ALL
NECESSARY PLUMBING PERMITS FOR WORK ON PRIVATE PROPERTY.
13. INSTALL AND ADJUST NEW WATER METER BOXES TO FINAL LINE AND GRADE. REMOVE AND
DISPOSE OF THE OLD METER BOXES AND OTHER EXCESS MATERIALS. CITY WILL FURNISH NEW
METER BOXES AS REQUIRED.
WATER SYSTEM TESTING
1. NEW WATER PIPE SHALL BE FLUSHED, PRESSURE TESTED, AND DISINFECTED BEFORE
CONNECTION TO THE EXISTING SYSTEM AND BEFORE ANY SERVICE CONNECTIONS ARE MADE.
2. TEMPORARY BLOW-OFF ASSEMBLIES: CONTRACTOR SHALL INSTALL TEMPORARY BLOW-OFF
ASSEMBLIES FOR THE PURPOSES OF PRESSURE TESTING AND CHLORINATION.
3. FLUSHING: PRIOR TO PRESSURE TESTING, WATER PIPE SHALL BE FLUSHED THOROUGHLY TO
REMOVE ALL FOREIGN MATERIAL AT A MINIMUM VELOCITY OF 3 FEET PER SECOND. THE
CONTRACTOR SHALL PROVIDE ALL HOSES, TEMPORARY PIPES, AND OTHER MATERIALS
REQUIRED TO DISPOSE OF FLUSHING WATER WITHOUT DAMAGE TO ADJACENT PROPERTIES.
4. PRESSURE TESTING: NEW WATER PIPE, INCLUDING SERVICES TO CURB STOPS, SHALL BE
PRESSURE TESTED PRIOR TO CONNECTION TO THE EXISTING SYSTEM. THE MINIMUM TEST
PRESSURE SHALL BE 150 PSI, OR 1.5 TIMES THE OPERATING PRESSURE IF OPERATING
PRESSURES EXCEED 100 PSI. THE DURATION OF EACH TEST SHALL BE 60 MINUTES. IF THE LINE
PRESSURE DROPS MORE THAN 1 PSI, LOCATE AND REPAIR DEFECTS AND REPEAT THE TEST
UNTIL A ZERO (0) PSI LOSS IS ACHIEVED FOR A FULL 60-MINUTE PERIOD. A CITY WATER
OPERATIONS REPRESENTATIVE MUST BE PRESENT TO MONITOR ALL TESTS
5. DISINFECTION AND SAMPLING: PROVIDE 1" TEMPORARY CORPORATION STOP TAPS FOR
CHLORINATION INJECTION AS REQUIRED. DISINFECT IN COMPLIANCE WITH AWWA C651, OREGON HEALTH DIVISION GUIDELINES, AND DEQ REQUIREMENTS. SUCCESSFUL BACTERIOLOGICAL TEST
RESULTS ARE REQUIRED PRIOR TO CONNECTING TO THE EXISTING SYSTEM. SAMPLES WILL BE
COLLECTED BY CITY OPERATIONS WATER QUALITY STAFF. PLUG TEMPORARY TAPS WITH BRASS
PLUGS UPON ACCEPTANCE.
6. DISINFECTION AT TIE-INS: DISINFECT PIPING AND FITTINGS USED FOR FINAL CONNECTIONS TO
EXISTING MAINS PER CITY STANDARDS. SECTIONS 20 FEET OR LESS SHALL BE CLEANED OF
DEBRIS AND CONTINUOUSLY SPRAYED WITH TWO COATS OF A 300 MG/L FREE CHLORINE
SOLUTION WHILE ROTATING THE PIPE TO ENSURE FULL COVERAGE; A MINIMUM 30-MINUTE
CONTACT TIME IS REQUIRED. CONNECTIONS GREATER THAN 20 FEET SHALL BE DISINFECTED
ABOVE GROUND WITH SEALED ENDS FOR A MINIMUM OF TWO HOURS. ENSURE NO
CONTAMINATED WATER ENTERS THE PUBLIC SYSTEM DURING THE CONNECTION PROCESS. ALL
CLEANING AND DISINFECTION WORK MUST BE WITNESSED BY THE ENGINEER OR CITY WATER
REPRESENTATIVE.
7. DISPOSAL OF CHLORINATED TESTING WATER: DISPOSE OF CHLORINATED TEST WATER TO THE
SANITARY SEWER SYSTEM AS DIRECTED BY THE ENGINEER. UNLESS OTHERWISE PERMITTED,
DO NOT ALLOW CHLORINATED WATER TO FLOW INTO THE STORM SYSTEM OR OTHER
WATERWAY. DISPOSAL AND DE-CHLORINATION PROCEDURES SHALL BE SUBMITTED TO AND
APPROVED BY THE ENGINEER PRIOR TO FLUSHING THE SYSTEM.
WATER SYSTEM SHUTDOWN REQUIREMENTS
1. CONTRACTOR SHALL INFORM THE ENGINEER AND OWNER'S REPRESENTATIVE FIVE (5) WORKING
DAYS IN ADVANCE OF CONSTRUCTION AND/OR PLANNED DISRUPTION OF WATER SERVICE.
CONTRACTOR SHALL NOT ASSUME SHUTDOWN TIMES, BUT WILL RATHER SCHEDULE AND
COORDINATE SHUTDOWNS WITH AFFECTED UTILITIES.
2. CITY WILL PROVIDE NOTIFICATION TO AFFECTED WATER USERS FOR ANY PLANNED SERVICE
DISRUPTIONS.
ASPHALT REMOVAL, TRENCH BACKFILL, AND ASPHALT
RESTORATION
1. ASPHALT SAWCUTTING AND REMOVAL: PERFORM FULL-DEPTH SAWCUTS THROUGH EXISTING
ASPHALT AS REQUIRED TO INSTALL WATER MAINS, SERVICES, AND OTHER APPURTENANCES
PER COB STD DETAIL 620-1. SAWCUTS MUST PENETRATE THE ENTIRE PAVEMENT SECTION TO
ENSURE A CLEAN, VERTICAL FACE. REMOVE AND DISPOSE OF EXISTING ASPHALT MATERIALS
THROUGH APPROVED METHODS.
2. TRENCH BACKFILL: BACKFILL TRENCH WITH 3/4"-0 OR 1"-0 CRUSHED AGGREGATE. REFER TO COB
STD DETAIL 620-1 FOR SPECIFIC TRENCH BACKFILL REQUIREMENTS.
3. COMPACTION TESTING: COMPACT BACKFILL TO 92% MAXIMUM DENSITY PER AASHTO T-180.
PROVIDE CITY REPRESENTATIVE TWENTY-FOUR (24) HOURS NOTICE PRIOR TO SCHEDULED
COMPACTION TESTING. CITY REPRESENTATIVE MUST BE PRESENT AT TIME OF COMPACTION
TESTING. THIRD PARTY TESTING COMPANY SHALL PROVIDE CITY WITH TESTING REPORTS FOR
REVIEW AND APPROVAL.
4. ASPHALT CONCRETE PAVEMENT (ACP) AND SAND SEAL: PLACE 6 INCHES OF LEVEL 2, 1/2” DENSE GRADED HMAC, 64-22 ACP. SAND SEAL CUT EDGES OF ACP WITH CRS-1 OR CRS-2 EMULSIFIED
ASPHALT OR EQUAL.
5. PLACING AND COMPACTING ACP: PLACE ACP IN TWO THREE (3) INCH LIFTS. COMPACT BASE LIFT TO 91 PERCENT AND TOP LIFT TO 92 PERCENT OF RICE DENSTIY. UTILIZE PAVING MACHINES FOR
TRENCH WIDTHS FOUR (4) FEET AND WIDER.
6. T-CUT REQUIREMENTS: PERFORM T-CUTS AFTER TRENCH BACKFILL IS COMPLETED AND
COMPACTION TESTING IS APPROVED BY THE CITY. IF T-CUT EDGES FALL WITHIN 3' OF AN
EXISTING PATCH, CURB, OR STREET EDGE, REPLACE ALL INTERVENING PAVEMENT. IF MORE
THAN ONE PRE-EXISTING PATCH EDGE IS WITHIN 3' OF THE T-CUT, RESTORATION MUST EXTEND
TO THE FAR EDGE OF THE FURTHEST PRE-EXISTING PATCH.
7. REFER TO COB STD DETAIL 2052-3 FOR ASPHALT RESTORATION REQUIREMENTS.
CURB, SIDEWALK, AND DRIVEWAY REPLACEMENT
1. FIELD VERIFICATION: THE CONTRACTOR SHALL COORDINATE WITH THE CITY INSPECTOR TO
VERIFY AND MARK REMOVAL LIMITS PRIOR TO COMMENCING SAW CUTTING OR DEMOLITION.
2. PROTECTION OF EXISTING STRUCTURES: THE CONTRACTOR SHALL PROTECT ALL ADJACENT
SIDEWALK PANELS, CURBS, DRIVEWAYS, AND CURB RAMPS NOT DESIGNATED FOR REMOVAL.
ANY DAMAGE TO EXISTING CONCRETE STRUCTURES RESULTING FROM THE CONTRACTOR’S
OPERATIONS SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE CITY.
3. CURB DRAINAGE AND WEEP HOLES: THE CONTRACTOR SHALL IDENTIFY AND MARK ALL EXISTING
CURB WEEP HOLES AND DRAIN LINES WITHIN THE LIMITS OF SIDEWALK AND CURB
REPLACEMENT PRIOR TO DEMOLITION. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL
AND REINSTALLATION OF ALL IMPACTED DRAIN LINES TO ENSURE CONTINUITY OF FLOW AND
POSITIVE DRAINAGE TO THE GUTTER LINE. REINSTALLED LINES SHALL MEET THE
REQUIREMENTS OF COB STANDARD DETAILS 2020 AND 2023 AS APPLICABLE.
4. FORM INSPECTION: ALL CONCRETE FORMWORK AND SUBGRADE PREPARATION MUST BE
INSPECTED AND APPROVED BY THE CITY INSPECTOR PRIOR TO PLACING CONCRETE. PROVIDE A
MINIMUM OF 24-HOUR NOTICE TO THE CITY INSPECTOR TO SCHEDULE THE INSPECTION.
5. WORK ADJACENT TO MONOLITHIC DRIVEWAY APPROACHES: WHEN TRENCHING OR WORKING
ADJACENT TO AN EXISTING MONOLITHIC DRIVEWAY APPROACH, A FULL-DEPTH SAW CUT SHALL
BE MADE ALONG THE "PROJECTED BACK OF CURB" LINE. TO ESTABLISH THIS LINE THROUGH THE DRIVEWAY THROAT AND WING PANELS, CHALK A STRAIGHT LINE EXTENDING FROM THE VISIBLE
BACK OF CURB UPSTREAM TO THE VISIBLE BACK OF CURB DOWNSTREAM. THE EXISTING CURB
AND GUTTER SECTION SHALL NOT BE REMOVED UNTIL AFTER TRENCH BACKFILL IS COMPLETED.
REPLACE CURB AND GUTTER PER DETAIL J002, SHEET C106.
6. CURB STAMPING: WHERE NEW CURBING CROSSES AN EXISTING OR PROPOSED WATER SERVICE, IMPRINT THE TOP OF THE CURB WITH A TWO-INCH (2") "W" STAMP DIRECTLY ABOVE THE WATER
SERVICE LINE CROSSING. THE STAMP SHALL BE CENTERED ON THE CURB CAP AND IMPRESSED
TO A MINIMUM DEPTH OF ONE-HALF INCH (1/2"). ALTERNATIVE METHODOLOGIES REQUIRE PRIOR
APPROVAL BY THE CITY ENGINEER AND MUST BE EXPLICITLY NOTED ON THE APPROVED
CONSTRUCTION PLANS.
1.0'
5.0'
10.0'
1.5'
CONFLICTS WITH SANITARY SEWER LINES
1. IN SITUATIONS INVOLVING WATER LINES RUNNING PARALLEL TO A SEWER MAIN OR LATERAL, SEPARATION BETWEEN THE TWO SHALL BE AS FOLLOWS:
ZONE 1: PARALLEL WATER LINES PERMITTED. CROSSING RESTRICTIONS ONLY.
ZONE 2: NOT ALLOWED, UNLESS APPROVED BY OHA AND CITY ENGINEER.
ZONE 3: PARALLEL WATER LINES PROHIBITED.
ZONE 4: PARALLEL WATER LINES PROHIBITED.
2. IN SITUATIONS INVOLVING WATER LINES CROSSING A SEWER MAIN OR LATERAL, SEPARATION
SHALL BE AS FOLLOWS:
2.A. WHENEVER POSSIBLE, THE BOTTOM OF WATER LINES SHALL BE 1.5 FEET OR MORE
ABOVE THE TOP OF SEWER MAINS AND LATERALS WITH ONE FULL LENGTH OF PIPE
CENTERED AT THE CROSSING.
2.B. WHERE WATER LINES CROSS OVER SEWER MAINS OR LATERALS WITH CLEARANCE OF
LESS THAN 1.5 FEET: CENTER ONE FULL LENGTH OF WATER PIPE AT THE CROSSING AND
THE SEWER LINE SHALL BE REPLACED WITH A FULL LENGTH OF PIPE (MIN. 18 FEET)
CENTERED AT THE CROSSING POINT WITH C900, HDPE SDR 17, OR CLASS 52 DUCTILE
IRON PIPE.
2.C. WHERE WATER LINES CROSS UNDER SEWER MAINS OR LATERALS: FOLLOW
REQUIREMENTS AS DESCRIBED IN 2.B. BACKFILL SHALL BE 100 PSI CONTROLLED
LOW-STRENGTH MATERIAL (CLSM).
3. REFER TO OAR 333-061-0050(9) FOR FULL NOTES ON WATER LINE CROSSING REQUIREMENTS.
CONFLICTS WITH GAS LINES
1. INSTALL FIBERGLASS SHEATHING MATERIAL PROVIDED BY NW NATURAL WHERE PROPOSED
WATER LINES OR SERVICES CROSS EXISTING GAS LINES WITHIN 12 INCHES OF VERTICAL
SEPARATION. PLACE PROTECTIVE MATERIAL BETWEEN THE GAS AND WATER LINES AND
EXTEND IT 18 INCHES HORIZONTALLY ON EACH SIDE OF THE GAS LINE.
EX GROUND
EX SEWER MAIN
OR LATERAL
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
TRAFFIC CONTROL REQUIREMENTS
1. PERFORM ALL TRAFFIC CONTROL IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) AND OREGON AMENDMENTS. INSTALL ADDITIONAL TRAFFIC CONTROL
MEASURES AS DIRECTED BY THE CITY TO PROVIDE FOR PUBLIC SAFETY.
2. PROVIDE ALL REQUIRED TRAFFIC CONTROL FOR WORK WITHIN THE PUBLIC RIGHT-OF-WAY ON
RESIDENTIAL LOCAL STREETS.
3. SUBMIT ALL TRAFFIC CONTROL MEASURES TO THE CITY OF BEAVERTON FOR REVIEW AT LEAST 5 WORKING DAYS PRIOR TO CONSTRUCTION. OBTAIN APPROVAL FROM THE CITY TRAFFIC ENGINEER
FOR ALL STREET CLOSURES AT LEAST 5 WORKING DAYS IN ADVANCE
4. NOTIFY THE BEAVERTON POLICE DEPARTMENT, TUALATIN VALLEY FIRE AND RESCUE, AND THE BEAVERTON SCHOOL DISTRICT TRANSPORTATION OFFICE AT LEAST 48 HOURS IN ADVANCE OF ANY
APPROVED STREET CLOSURE.
5. COMPLY WITH THE ODOT "SHORT TERM TRAFFIC CONTROL HANDBOOK" FOR ALL TRAFFIC
CONTROL PLANS. ENSURE ALL DEVICES COMPLY WITH THE LATEST REVISION OF THE MUTCD.
ADHERE TO ALL CONDITIONS SPECIFIED IN ISSUED ROAD PERMITS.
6. COORDINATE STREET AND SIDEWALK CLOSURES WITH THE CITY. SUPPLY SIGNING AND
BARRICADES AS REQUIRED TO ENSURE AUTOMOTIVE AND PEDESTRIAN SAFETY.
7. MAINTAIN ACCESS TO ALL DRIVEWAYS. NOTIFY HOMEOWNERS, APARTMENT MANAGERS, AND/OR
BUILDING OWNERS 24 HOURS IN ADVANCE IF A DRIVEWAY MUST BE BLOCKED. DURING ACTIVE
CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE IMMEDIATE ACCESS FOR OWNERS TO ENTER
OR EXIT THEIR DRIVEWAYS UPON REQUEST. RESTORE ACCESS TO ALL DRIVEWAYS AT THE END OF
EACH WORK DAY.
EROSION PREVENTION & SEDIMENT CONTROL
1. PROVIDE EFFECTIVE EROSION, SEDIMENT, DUST, AND DRAINAGE CONTROL AT ALL TIMES. PROTECT
ALL WORK, ADJACENT PROPERTIES, AND DOWNSTREAM FACILITIES FROM EROSION AND SILTATION.
CORRECT ANY DAMAGE RESULTING FROM EROSION OR SILTATION AT NO EXPENSE TO THE CITY.
2. APPROVAL OF THIS EROSION PREVENTION AND SEDIMENTATION CONTROL (ESC) PLAN DOES NOT
CONSTITUTE APPROVAL OF THE PERMANENT ROADWAY OR DRAINAGE DESIGN, INCLUDING BUT
NOT LIMITED TO: ROAD DIMENSIONS, PIPE SIZES, RESTRICTORS, CHANNELS, RETENTION
FACILITIES, OR UTILITIES.
3. IMPLEMENT, CONSTRUCT, MAINTAIN, REPLACE, AND UPGRADE ESC FACILITIES UNTIL ALL
CONSTRUCTION IS APPROVED AND VEGETATION IS FULLY ESTABLISHED.
4. CONSTRUCT ESC FACILITIES IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES.
PREVENT SEDIMENT-LADEN WATER FROM ENTERING THE DRAINAGE SYSTEM OR VIOLATING
WATER QUALITY STANDARDS.
5. ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIRED. UPGRADE ESC FACILITIES AS
NEEDED FOR UNEXPECTED STORM EVENTS TO ENSURE SEDIMENT-LADEN WATER DOES NOT
LEAVE THE SITE.
6. INSPECT ESC FACILITIES DAILY AND MAINTAIN THEM TO ENSURE CONTINUED FUNCTIONING.
7. INSPECT AND MAINTAIN ESC FACILITIES ON INACTIVE SITES AT LEAST ONCE A MONTH OR WITHIN 24
HOURS OF A STORM EVENT.
8. REMOVE SEDIMENT FROM TRAPPED CATCH BASINS BEFORE IT REACHES ONE FOOT IN DEPTH.
CLEAN ALL CATCH BASINS AND CONVEYANCE LINES PRIOR TO PAVING. DO NOT FLUSH
SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM DURING CLEANING.
9. INSTALL STABILIZED CONSTRUCTION ENTRANCES AT THE START OF CONSTRUCTION AND MAINTAIN THEM FOR THE DURATION OF THE PROJECT. IMPLEMENT ADDITIONAL MEASURES AS REQUIRED TO
KEEP ALL PAVED AREAS CLEAN.
10. APPLY FOR AND OBTAIN A CLEAN WATER SERVICES DISCHARGE PERMIT BEFORE DISCHARGING
CHLORINATED WATER INTO THE STORM SYSTEM.
BID
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G003 ABBREVIATIONS.DWG
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
G003
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
A B B R
EV
IA
TI
O N
ABAN ABANDON
ABND ABANDONED
AC ASBESTOS CEMENT, ASPHALTIC CONCRETE
AD ALGEBRAIC DIFFERENCE
ADA AMERICANS WITH DISABILITIES ACT
ADD'L ADDITIONAL
APPROX APPROXIMATELY
APPVD APPROVED
APWA AMERICAN PUBLIC WORKS ASSOCIATION
ARV AIR RELEASE VALVE
ASSY ASSEMBLY
AUX AUXILIARY
AVE AVENUE
AVG AVERAGE
AWG AMERICAN WIRE GAGE
AWWA AMERICAN WATER WORKS ASSOCIATION
BC BEGIN CURVE, BACK OF CURB
BCR BEGIN CURVE RETURN
BF BLIND FLANGE
BFV BUTTERFLY VALVE
BLDG BUILDING
BLVD BOULEVARD
BO BLOW OFF
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
C/L CENTERLINE
CARV COMBINATION AIR & VACUUM RELEASE VALVE
COB CITY OF BEAVERTON
COMM COMMUNICATIONS
COT CITY OF TIGARD
CB CATCH BASIN
CF CUBIC FEET
CFS CUBIC FEER PER SECOND
CIP CAST IRON PIPE
CL CLASS
CLSM CONTROLLED LOW STRENGTH MATERIAL
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CONC CONCRETE
CPLG COUPLING
CTR CENTER
CU COPPER, CUBIC
CULV CULVERT
CWS CLEAN WATER SERVICES
CY CUBIC YARD
DEFL DEFLECT
DTL DETAIL
DIA DIAMETER
DIP DUCTILE IRON PIPE
EA EACH
ECC ECCENTRIC
EG EXISTING GRADE, EXISTING GROUND
ESMT EASEMENT
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
EL, ELEV ELEVATION
ELL ELBOW
EMBED EMBEDDED
EOP EDGE OF PAVEMENT
EQ EQUAL
EQUIP EQUIPMENT
EX, EXTG EXISTING
FF FINISHED FLOOR
FG FINISH GRADE
FH FIRE HYDRANT
FITG FITTING
FLEX FLEXIBLE
FLG FLANGE
FLR FLOOR
FL FLOW LINE
FO FIBER OPTIC
FOC FACE OF CURB
FOG FACE OF GUTTER
FPS FEET PER SECOND
FPT FEMALE PIPE THREAD
FT FOOT, FEET
G GAS
GAL GALLON
GALV GALVANIZED
GB GRADE BREAK
GPM GALLONS PER MINUTE
GV GATE VALVE
HDPE HIGH DENSITY POLYETHLENE
HORIZ HORIZONTAL
HYD HYDRANT
HWY HIGHWAY
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH
INV INVERT
IP IRON PIPE
IR IRON ROD
IRR IRRIGATION
JB JUNCTION BOX
JT JOINT
K RATE OF CURVATURE
LAT LATERAL
LF LINEAL FEET
LT LEFT
LVC LENGTH OF VERTICAL CURVE
MAX MAXIMUM
MATL MATERIAL
MFR MANUFACTURER
MGD MILLION GALLONS PER DAY
MH MANHOLE
MIN MINIMUM
MJ MECHANICAL JOINT
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
N NORTH
NA, N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
P POWER
PSF POUNDS PER SQUARE FOOT
PL, P/L PROPERTY LINE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PT POINT
PVI POINT OF VERTICAL INTERSECTION
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
PWR POWER
ROW, R/W RIGHT-OF-WAY
RCP REINFORCED CONCRETE PIPE
RDCR REDUCER
REQ'D REQUIRED
RESTR RESTRAINED
RIM RIM ELEVATION
RT RIGHT
S, SAN SANITARY SEWER
SCH SCHEDULE
SD, STM STORM
SLV SLEEVE
SPEC SPECIFICATIONS
SS SAMPLING STATION
STA STATION
STD STANDARD
STL STEEL
SVC SERVICE
S/W SIDEWALK
TBC TOP BACK CURB
TBD TO BE DETERMINED
TFC TOP FACE CURB
T, TEL TELEPHONE
TEMP TEMPORARY
THRD THREAD(ED)
TL TAXLOT
TOC TOP OF CURB
TOP TOP OF PIPE
TVWD TUALATIN VALLEY WATER DISTRICT
TYP TYPICAL
UGD UNDERGROUND
UNK UNKNOWN
VERT VERTICAL
VIF VERIFY IN FIELD
VLV VALVE
W, WAT WATER
XCOMM EXISTING COMMUNICATIONS
XFO EXISTING FIBER OPTIC
XNG EXISTING NATURAL GAS
XP EXISTING POWER
ABBREVIATIONS
BID
BUILDING OUTLINE
CONCRETE SURFACE
BUILDING OVERHANG
ELECTRICAL LINE
SANITARY SEWER LINE
G
W
GAS LINE
WATER LINE
OHU OVERHEAD UTILITY LINES
STORM LINE
CURB LINE
E
CHAIN LINK FENCE
EDGE OF ASPHALT
BRUSH LINE
ELECTRICAL VAULT
TRANSFORMER
CURB INLET
STORM MANHOLE
SANITARY/STORM CLEAN OUT
BOLLARD
GAS METER
ELECTRICAL METER
TELECOMMUNICATIONS MANHOLE
POWER POLE
WATER VALVE
WATER METER
FIRE HYDRANT
FIRE DEPARTMENT CONNECT
WATER VAULT
CATCH BASIN
SIGN
SANITARY MANHOLE
OVERHEAD LIGHT
LUMINAIRE
POWER POLE/OVERHEAD LIGHT
GUY ANCHOR
HOSE BIB
ELECTRICAL CABINET
ELECTRICAL RISER
IRRIGATION CONTROL VALVE
FLAG POLE
TELECOMMUNICATIONS RISER
TELECOMMUNICATIONS VAULT
ELECTRICAL JUNCTION BOX
GAS VALVE
GUY POLE
ROOF DRAIN
FOUND MONUMENT
SS
SD
AREA DRAIN
LOT LINE
EASEMENT LINE
RIGHT-OF-WAY LINE
T TELECOMMUNICATIONS LINE
ASPHALT SURFACE
DECIDUOUS TREE
-PERIMETER REPRESENTS DRIPLINE
CONIFEROUS TREE
-PERIMETER REPRESENTS DRIPLINE
TRASH CAN
BIKE RACK
VEGETATED STORMWATER FACILITY
WALL
DRINKING FOUNTAIN
GREASE TRAP
UNKNOWN UTILITY MANHOLE
UNKNOWN UTILITY VAULT
WROUGHT IRON FENCE
WOOD FENCE
PROPERTY LINE
MAILBOX
G
B
ER
FP
E
GV
TR
TR
HB
ICV
DF
U
W
UVLT
RD
T
MB
CO
EC
S
G
JB
ELECTRICAL MANHOLEE
D
W
WATER VALVE
FIRE HYDRANT
BLOWOFF ASSEMBLY
REDUCER
CAP
COMBINATION AIR RELEASE/VACUUM RELEASE VALVE
WATER LINE
WATER VALVE
FIRE HYDRANT
WATER LINE
WATER METER
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G004 SYMBOLOGY.DWG
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
G004
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
SY
M B O
LO
G Y
SYMBOLOGY (EXISTING) SYMBOLOGY (PROPOSED WATER)
SYMBOLOGY (ABANDON WATER)
BID
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G005 KEY PLAN.DWG
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
G005
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
K
EY
P
LA
N
SCALE
0 16080
KEY PLAN TABLE
Sheet # Sheet Title
WATER PLAN AND PROFILES
C101 ERICKSON AVE - STA 0+00E TO 1+50E
C102 ERICKSON AVE - STA 1+50E TO 3+50E
C103 ERICKSON AVE - STA 3+50E TO 5+50E
C104 ERICKSON AVE - STA 5+50E TO 7+50E
C105 ERICKSON AVE - STA 7+50E TO 9+50E
C106 ERICKSON AVE - STA 9+50E TO 10+75E
C107 HIGH SCHOOL SVC CONNECTION - STA 0+00HS TO 0+34HS
BID
15''SD
30''SD 30''SD 30''SD 30''SD 30''SD
2''G2''G2''G2''G
OHUOHUOHUOHUOHUOHUOHUOHUOHU
O
HU
O
HU
O
HU
O
HU
O
HU
O
HU
21''SS
18''SS
21''SS
21''SS
12''SS
12''SS
30''SD
18''SD18''SD
12''SD
[W
[W
[T][T][T][T][T][T][T][T][T]
[W
[W
ICV(4)
W
T T
E
E
S
S
S
D
[W][W][W][W][W][W]
[W
[W][W]
W M
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\PLAN AND PROFILE.DWG
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
SCALE
0 2010
WATER CONSTRUCTION NOTES
STA 0+11E, INSTALL:
(1) – 12" DI SLEEVE
APPROX STA 0+16E, 6' R, INSTALL:
(1) – 12" DI CAP OR CONCRETE PLUG
APPROX STA 1+32E, 12' L, INSTALL:
(1) – 1" WATER SERVICE (IRRIGATION) PER COB STD
DETAIL 660-3
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
C101
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
W A
TE
R P
LA
N A N D P R O
FI
LE
S
ER
IC
K
SO
N A
VE
ST
A +0 0E
T O +5 0E
GENERAL CONSTRUCTION NOTES
REPLACE EXISTING STOP BAR PER 00850.
PROTECT STORM INLET PER COB STD
DETAIL 920
A
B
A
PROFILE "E"
1" = 5' V 1" = 20' H
PLAN "E"
1" = 20'
B
B
B
BID
30''SD 30''SD 30''SD 30''SD
2''G2''G2''G
2''G2''G
OHUOHUOHUOHUOHUOHUOHUOHU
54''SD
48''SD
48''SD
48''SD
48''SD
[T] [T] [T][T][T][T][T][T][T]
B
T
EEEE
E
E
E
E E E
B
T
D
[W][W][W][W][W][W][W][W][W][W]
D
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\PLAN AND PROFILE.DWG
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
SCALE
0 2010
WATER CONSTRUCTION NOTES
APPROX STA 2+75E, INSTALL:
(1) – 12" DI 45° BEND
APPROX STA 2+78E, INSTALL:
(1) – 12" DI 45° BEND
APPROX STA 3+04E, INSTALL:
(1) – 12"X6" DI TEE
(1) – 6" DI GATE VALVE (W)
APPROX STA 3+04E, 6' L, INSTALL:
(1) – FIRE HYDRANT ASSEMBLY
APPROX STA 3+24E, INSTALL:
(1) – 12" DI 45° BEND
APPROX STA 3+27E, INSTALL:
(1) – 12" DI 45° BEND
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
C102
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
W A
TE
R P
LA
N A N D P R O
FI
LE
S
ER
IC
K
SO
N A
VE
ST
A +5 0E
T O +5 0E
1 2 5 6
1 2 5 6
GENERAL CONSTRUCTION NOTES
PROTECT STORM INLET PER COB STD DETAIL 920
PROTECT WQ FACILITY INLET PER COB STD
DETAILS 905 AND/OR 915.
PLACE CLSM FULL WIDTH OF TRENCH, APPROX
STA 2+76E TO 2+93E, FROM SPRINGLINE OF
WATER PIPE UP TO AN ELEVATION 12" ABOVE IE
OF ARCH CMP PIPE. PRIOR TO PLACING CLSM,
WRAP WATER PIPE IN POLYETHYLENE
ENCASEMENT PER SPECIFICATIONS, AND WRAP
ARCH CMP PIPE IN 8-MIL MIN PLASTIC FULL WIDTH
OF TRENCH.
B
C
D
D
DPROFILE "E"
1" = 5' V 1" = 20' H
PLAN "E"
1" = 20'
BEDDING, BACKFILL, AND CONDITION OF EX ARCH
PIPE IS UNKNOWN. CONTRACTOR SHALL
DETERMINE EXISTING CONDITIONS PRIOR TO
EXCAVATION AND SHALL PROVIDE TEMPORARY
SUPPORT FOR THE EXISTING PIPE DURING ALL
EXCAVATION BENEATH OR ADJACENT TO IT. DO NOT
UNDERMINE THE EXISTING PIPE WITHOUT SUPPORT
IN PLACE. NOTIFY THE ENGINEER IMMEDIATELY IF
THE PIPE IS FOUND DAMAGED OR DETERIORATED.
12" SD
12" SD
B
C C C C
C
BID
2''G2''G2''G2''G2''G2''G2''G
[T] [T] [T] [T] [T] [T] [T] [T] [T]
HB
TR
E E E
T T T
T T T T T T T
[W][W][W][W][W][W][W][W][W]
D
D
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\PLAN AND PROFILE.DWG
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
SCALE
0 2010
WATER CONSTRUCTION NOTES
APPROX STA 4+81E, INSTALL:
(1) – COMBINATION AIR RELEASE/AIR VACUUM VALVE
ASSEMBLY. TAP AT LOCAL HIGH SPOT.
APPROX STA 4+92E, INSTALL:
(1) – 12" DI 45° BEND
APPROX STA 5+00E, INSTALL:
(1) – 12" DI 45° BEND
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
C103
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
W A
TE
R P
LA
N A N D P R O
FI
LE
S
ER
IC
K
SO
N A
VE
ST
A +5 0E
T O +5
PROFILE "E"
1" = 5' V 1" = 20' H
PLAN "E"
1" = 20'
2 3
2 3
" S
D
12" SD12" SD
C C
C
GENERAL CONSTRUCTION NOTES
PROTECT WQ FACILITY INLET PER COB STD
DETAILS 905 AND/OR 915.C
BID
4''G4''G4''G4''G4''G4''G
E E E E
O
HU
O
HU
O
HU
EE EE
8''SS
8''SS
8''SS
8''SS
8''SS
CO
[T] [T] [T] [T] [T] [T] [T] [T] [T] [T]T T
GV
GV
B
TR
T
T
T T T
T
G G
G
GV
E E
T T T T T
T T T
W
S
DD
D
[W][W][W][W][W]
[W][W]
W M
D
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\PLAN AND PROFILE.DWG
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
SCALE
0 2010
WATER CONSTRUCTION NOTES
APPROX STA 6+08E, INSTALL:
(1) – 12" DI GATE VALVE
APPROX STA 6+45E, INSTALL:
(1) – 12"X8" DI TEE
(1) – 8" DI GATE VALVE (E)
APPROX STA 6+63E, 6' L, INSTALL:
(1) – 2" WATER SERVICE PER COB STD
DETAIL 660-5
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
C104
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
W A
TE
R P
LA
N A N D P R O
FI
LE
S
ER
IC
K
SO
N A
VE
ST
A +5 0E
T O +5 0E
PROFILE "E"
1" = 5' V 1" = 20' H
PLAN "E"
1" = 20'
2 3
312"SD 12"SD
"S
D
10"SD (FU
TU
RE)
10"SD (FU
TU
RE)
C C
CC
GENERAL CONSTRUCTION NOTES
PROTECT WQ FACILITY INLET PER COB STD
DETAILS 905 AND/OR 915.C
BID
4''G 4''G4''G4''G4''G4''G4''G4''G
OHU
OHU
OHU
EEE
E E E E
E E
E E E E
E
[T] [T] [T] [T] [T] [T] [T] [T] [T]
HB
T T T T T T T T
E
E E
T T T T T T T T
T
T
[W][W][W][W][W][W][W][W][W]
D
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\PLAN AND PROFILE.DWG
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
SCALE
0 2010
WATER CONSTRUCTION NOTES
APPROX STA 8+32E, INSTALL:
(1) – COMBINATION AIR RELEASE/AIR VACUUM VALVE
ASSEMBLY PER COB STD DETAIL 640-5. TAP AT
LOCAL HIGH SPOT.
APPROX STA 8+83E, INSTALL:
(1) – 12" DI 45° BEND
APPROX STA 8+98E, INSTALL:
(1) – 12" DI 45° BEND
APPROX STA 9+24E, INSTALL:
(1) – 12" DI 45° BEND
APPROX STA 9+36E, INSTALL:
(1) – 12" DI 45° BEND
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
C105
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
W A
TE
R P
LA
N A N D P R O
FI
LE
S
ER
IC
K
SO
N A
VE
ST
A +5 0E
T O +5 0E
4 5
PROFILE "E"
1" = 5' V 1" = 20' H
PLAN "E"
1" = 20'
1 2 3
12" SD
10"SD (FUTURE)
GENERAL CONSTRUCTION NOTES
PROTECT STORM INLET PER COB STD DETAIL 920
COORDINATE FIRE SERVICE/VAULT
ABANDONMENT WORK WITH BEAVERTON HIGH
SCHOOL SITE CONTRACTOR
B
E
B
E
BID
E
4''G4''G4''G4''G
4''G
1''G
E E
EE
E
E
T
T T
T T
T
[W] [W]
8''W 8''W
8''SD
[SD]
[T] [T] [T] [T] [T] [T]
E E
E
E
T
T T
E
E
T
TTTTTT
T
T T
D
[W]
[W][W]
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\PLAN AND PROFILE.DWG
M
AT
C H
LI
N
E
ST
A:
+5 0E
SE
E
SH
EE
T C
SCALE
0 2010
WATER CONSTRUCTION NOTES
APPROX STA 10+11E, 6' R, INSTALL:
(1) – 12" DI CAP OR CONCRETE PLUG
APPROX STA 10+24E, 3' R, INSTALL:
(1) – 12" DI CAP OR CONCRETE PLUG
APPROX STA 10+25E, INSTALL:
(1) – 12"X8" DI REDUCER
111111111111111111111111
333333333333333333333333
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
C106
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
W A
TE
R P
LA
N A N D P R O
FI
LE
S
ER
IC
K
SO
N A
VE
ST
A +5 0E
T O 0+ E
PROFILE "E"
1" = 5' V 1" = 20' H
PLAN "E"
1" = 20'
C
GENERAL CONSTRUCTION NOTES
PROTECT NEXT TWO WESTERNLY WQ FACILITY
INLETS PER COB STD DETAILS 905 AND/OR 915.C
BID
4''G
E
E
E
E E
E
CO
12''SD
[T] [T]
[T] [T]
BT
GG
GGG
GV
E E E
E E E E
T T
T
T T
W W W
D D
[W
[W
[W
[W
[W
WM
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\PLAN AND PROFILE.DWG
SCALE
0 105
WATER CONSTRUCTION NOTES
STA 0+00HS (STA 6+43E), INSTALL:
(1) – 12"X8" DI TEE
(1) – 12" DI GATE VALVE (N)
(1) – 8" DI GATE VALVE (E)
CONFIRM WITH BEAVERTON HIGH SCHOOL SITE
CONTRACTOR THAT TEE AND VALVE ARE LOCATED
OUTSIDE OF FUTURE RAISED CROSSWALK RAMP.
APPROX STA 0+10HS INSTALL:
(1) – 8" DI 45° BEND
APPROX STA 0+13HS INSTALL:
(1) – 8" DI 45° BEND
APPROX STA 0+34HS:
CONNECT TO EXISTING 8" GATE VALVE. COORDINATE
WITH BEAVERTON HIGH SCHOOL SITE CONTRACTOR
TO DETERMINE LOCATION AND DEPTH OF VALVE.
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMBER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
C107
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
W A
TE
R P
LA
N A N D P R O
FI
LE
S H
IG
H S C H O O L
SE
R
VI
C E
- S
TA
+0 0H
S
TO
+3 7H
S
1 2 3
GENERAL CONSTRUCTION NOTES
PLACE CLSM FULL WIDTH OF TRENCH, APPROX STA
0+13HS TO 0+33HS, FROM SPRINGLINE OF WATER
PIPE UP TO BOTTOM OF CONCRETE BANKS. PRIOR
TO PLACING CLSM, WRAP WATER PIPE IN
POLYETHYLENE ENCASEMENT PER
SPECIFICATIONS.
D
PROFILE "E"
1" = 5' V 1" = 10' H
PLAN "E"
1" = 10'
D
WIDTH, DEPTH AND COVER OF EXISTING
COMMUNICATION BANKS ARE UNKNOWN.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING
WITH UTILITY OWNER(S) TO DETERMINE EXISTING
CONDITIONS. REPORT INFORMATION TO ENGINEER
ONCE KNOWN.
BID
CoB Revised Jan 2026Drawing No. 2052-3
ASPHALT TRENCH CUT
Notes:
1. T-cut to be done after excavation & backfill of trench, and the sanitary sewer or storm drain pipe TV scan is done and pipe installation is determined to be acceptable to the City or District.
2. See Standard Drawing 590 for bedding, pipe zone, and trench backfill.
3. Refer to EDM Section 192 and the approved plans for surface restoration requirements.
4. Base course shall be 3 4"-0" aggregate compacted to 92% of T-180. See Standard Drawing 590 for compaction requirements. Minimum thickness shall be 8" under AC pavement and 2" under PCC pavement.
5. All cut edges of AC shall be sand sealed with CRS-1 or CRS-2 emulsified asphalt or equal.
6. If new edge of pavement is less than 3' from another patch, curb or edge of street, replace the pavement in between.
7. If any part of more than one pre-existing patch edge is within 3' of the T-cut, remove and restore the pavement to the far edge of the furthest pre-existing patch.
8. On longitudinal pavement cuts, the edge of the T-cut shall not lie in a wheel path. Width of T-cut shall be widened where necessary to move the edge out of the wheel path and either to parallel and 6" from the nearest lane line, or to the location required by note 6 or 7 above as applicable, whichever is the furthest from the pavement cut.
9. If an edge of a T-cut will be within 5' or less of an area of stressed existing pavement, the length and width of the pavement restoration shall be determined by road owner/agency.
Trench width 12"12"T-Cut widening area
See notes 6-9 Sawcut, see notes
Existing AC
92% compaction
AASHTO T-180
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\DETAIL SHEETS.DWG
D101
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
ST
A N D A R D D
ET
A
IL
EXISTING GROUND
CLASS 'B' BACKFILL
CLASS 'A' BACKFILL
"A"
EXISTING A.C.
6"
12"
DIM "B" DIM "B"
24" MINIMUM
OUTSIDE STREET RIGHT-OF-WAY
AS APPROVED BY ENGINEER WITHIN STREET RIGHT-OF-WAY
NOTES:
1. "A" = NOMINAL PIPE DIAMETER
2. SEE "CITY OF BEAVERTON ENGINEERING DESIGN MANUAL" FOR
ADDITIONAL REQUIREMENTS.
3. RESTORE LANDSCAPE TO PRE-EXISTING CONDITIONS OR BETTER.
MOUND EXCESS NATIVE
MATERIAL TO ALLOW FOR
SETTLEMENT. SEE NOTE 3.
MIN. 5" OF DENSE GRADED
HMAC (2 LIFTS) OR MATCH EXIST.
A.C. SAND SEAL ALL EDGES
SAW CUT FOR TRENCH
2ND SAW CUT FOR A.C.
REPAIR - 12" MIN OR TRIM
EDGES TO SOUND PAVEMENT
EXISTING SUBGRADE MATERIAL
TABLE A
"A" (IN) "B" (IN)
4 10
PIPE BEDDING MATERIAL (CLASS 'B'
MATERIAL) DEPTH BELOW OUTSIDE
OF PIPE BELL, SEE TABLE A.
TRENCH FOUNDATION
STABILIZATION, AS
REQUIRED
PIPE ZONE MATERIAL
(CLASS 'B' MATERIAL)
12"
CLASS 'A' NATIVE
MATERIAL BACKFILL,
90% COMPACTION,
AASHTO T-99
TRENCH BACKFILL -
CLASS 'B' MATERIAL
4"-0" CRUSHED ROCK -
92% COMPACTION,
FILTER FABRIC
(WHEN REQUIRED)
MIN. DEPTH:
36" FOR PIPES ≤ 12" DIA;
48" FOR PIPES > 12" DIA &
IN UNIMPROVED AREAS
DATE: FEB 2026
TYPICAL WATER LINE
TRENCH BACKFILL 620-1
SCALE: NONE
ENGINEERING
E O
OREGON
84675PE
RPDE
E
ETS
GER
I NG
R
NI
F
L
NAOE R
ISS
E
EXPIRES 12/31/26
S E P T EMB ER 1 1 ,
2 0
18M A
TTHEW CHARLES PA
LM
ER
BID
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\DETAIL SHEETS.DWG
D102
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
ST
A N D A R D D
ET
A
STRADDLE BLOCKS 630-8
SCALE: NONE
DATE: JAN 2026
SECTION
PLAN
2'-0" MIN 18" MIN 4'-0" MAX
"B"
"D"
"D"
TRENCH WIDTH
"A"
MEGALUG (DUCTILE IRON
ONLY) OR UG PIPE CLAMP
(REQUIRED FOR CAST IRON)
EXISTING
MAIN
NEW
MAIN
4" ALL-THREAD
MJ FITTING WITH
MEGALUG JOINT.
RESTRAINT AS
REQUIRED.
NOTES:
1. STRADDLE BLOCKS SHALL BE USED ONLY ON EXISTING PIPE WITH
NO MECHANICAL RESTRAINTS OR AT LOCATIONS WHERE
MECHANICAL PIPE JOINT RESTRAINTS ARE NOT FEASIBLE.
2. THIS DRAWING IS APPLICABLE TO 10" AND SMALLER WATER MAINS.
CONCRETE STRADDLE BLOCKS FOR 12" AND LARGER WATER MAINS
SHALL BE DESIGNED AND STAMPED BY THE ENGINEER OF RECORD.
3. ANY FIELD MIXING OF CONCRETE SHALL BE APPROVED BY THE
ENGINEER OF RECORD.
4. MINIMUM 7' CLEARANCE REQUIRED BETWEEN FACE OF STRADDLE
BLOCK AND NEAREST PIPE ALIGNMENT CHANGE OR INTERSECTING
TRENCH, UNLESS OTHERWISE APPROVED BY THE ENGINEER OF
RECORD.
ENGINEERING
NOM PIPE OD
MINIMUM STRADDLE BLOCK DIMENSIONS
PIPE SIZE
(INCHES)
TRENCH
WIDTH "A"
(INCHES)
"B"
(INCHES)
"D"
(INCHES)
4 24 12 12
6 26 15 12
8 28 24 12
10 30 30 15
"B"
#4 REBAR @ 12" O.C.,
EACH WAY, TYP
3" MIN CLEAR, ALL
BARS, TYP
3,000 PSI COMPRESSIVE STRENGTH PCC
THRUST BLOCK AGAINST UNDISTURBED
EARTH (BEARING AREA) ON BOTH SIDES
OF PIPE
"B"
KEYNOTES:
NOTES: (TAPPING CONTRACTOR ONLY)
TABLE 1
BRANCH
PIPE DIA (IN)
THRUST BLOCK
BEARING AREA
(MIN SF)
THRUST BLOCK
CONCRETE
(MIN CY)
4 1.3 0.05 6 2.8 0.10 8 5.0 0.18
10 11.3 0.42 12 20.1 0.75 18 26.0 0.97
CONCRETE THRUST BLOCK POURED AGAINST UNDISTURBED EARTH. THRUST BLOCK SIZE SHALL BE PER TABLE 1 AND SHALL NOT BE LESS THAN ONE FOOT IN ANY DIMENSION. CONCRETE SHALL BE CLASS 3000. FIELD MIXING OF CONCRETE FOR THRUST ALLOWED ONLY WITH PRIOR WRITTEN APPROVAL FROM CITY OF BEAVERTON. CITY REPRESENTATIVE CAN MANDATE CONCRETE CYLINDER TESTING. FIELD MIXED CONCRETE MUST BE CLASS 5000 PER EDM 630.3.3.
COVER TAPPING SLEEVE WITH 8 MIL PLASTIC MATERIAL AS SHOWN PRIOR TO POURING THRUST BLOCK AND BACKFILLING
STAINLESS STEEL TAPPING SLEEVE WITH GASKET AND FLANGED CONNECTION
GATE VALVES 10" AND LARGER WITH LESS THAN 24" BETWEEN THE OPERATING NUT AND FINISHED GRADE WILL REQUIRE A HORIZONTAL BEVEL GEAR ACTUATOR. INSTALL 12"x12"x8" CONCRETE PIER BLOCK AS VALVE SUPPORT.
ALL JOINTS ON SHALL BE RESTRAINED AND WRAPPED IN POLYETHYLENE ENCASEMENT PER STANDARD DRAWING 680-3
1. BEFORE INSTALLING TAPPING SLEEVE, CONTRACTOR SHALL THOROUGHLY CLEAN PIPE TO REMOVE ALL DIRT, ROCKS, AND OTHER FOREIGN MATERIAL FROM PIPE WHERE SLEEVE WILL BE INSTALLED. THOROUGHLY DISINFECT ALL PARTS
PRIOR TO ASSEMBLY/INSTALLATION.
2. SLEEVE BOLTS SHALL BE TIGHTENED TO MANUFACTURER'S TORQUE SPECIFICATIONS
3. CONTRACTOR SHALL ENSURE THAT GASKET IS PROPERLY ALIGNED AND FREE OF FOREIGN MATERIAL PRIOR TO
TIGHTENING SLEEVE BOLTS
4. SLEEVE LOCATION AND INSTALLATION SHALL BE APPROVED BY WATER OPERATIONS INSPECTOR PRIOR TO TAPPING
5. CONTRACTOR SHALL AIR TEST SLEEVE TO 40 PSI PRIOR TO TAPPING
6. CONTRACTOR SHALL FLUSH VALVE PRIOR TO PIPE CONNECTION
7. EDGE OF TAPPING SLEEVE SHALL BE A MINIMUM OF 18" FROM BEND, JOINT, TAP, FITTING, OR ANY APPURTENANCES.
TAPPING SLEEVE 630-2
SCALE: NONE
DATE: JAN 2025
BEARING SURFACE
ENGINEERING
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\DETAIL SHEETS.DWG
D103
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
ST
A N D A R D D
ET
A
2" STANDARD BLOW-OFF
ASSEMBLY - FUTURE EXPANSION 630-3
SCALE: NONE
DATE: JAN 2026
NOTES:
1. THIS DETAIL APPLICABLE FOR WATER LINES 12" DIAMETER OR SMALLER.
2. THIS DETAIL APPLICABLE TO DEAD END LINES SERVING CUSTOMERS WHICH MAY/WILL BE EXTENDED IN THE FUTURE.
3. FULLY RESTRAINED LINE SIZE GATE VALVE.
KEYNOTES:
SEE NOTE 8
4"-6"
2"x12" COPPER OR BRASS PIPE NIPPLE
MJ RESTRAINED JOINT W/ MEGALUG, CAP TAPPED 2" IP THREAD
2" THREADED COPPER OR BRASS PIPE (LENGTH WILL VARY) W/COUPLER AND BRASS OR PLASTIC PLUG
2" CTS x CTS 90° ELBOW
PIPE BEDDING AND BACKFILL MATERIAL PER DRAWING 620-1
2" FIPT x CTS ADAPTOR W/ 2" MIPT BRASS PLUG (HAND TIGHT)
6" PVC ASTM D-3034, LENGTH AS REQUIRED
VALVE BOX & LID. SEE STANDARD DRAWING 640-2.
MIP x CTS ADAPTER
GATE
VALVE
ENGINEERING
2'-0" MIN.
1. VALVES SHALL BE SAME SIZE AS WATER MAIN BEING
SUPPLIED
2. GATE VALVES 12" AND SMALLER. BUTTERFLY VALVES 16"
AND LARGER
3. FOR MAINS GREATER THAN 16" IN DIAMETER, MAXIMUM
VALVE SPACING SHALL BE COORDINATED WITH CITY OF
BEAVERTON WATER ENGINEERING
4. VALVES SHALL NOT BE LOCATED IN CURB, GUTTER, OR
SIDEWALK AREA OR WHEEL PATH OF STREETS.
5. SEE DRAWING 640-2 FOR VALVE BOX REQUIREMENTS
6. ALL MECHANICAL JOINTS SHALL BE RESTRAINED
7. FOSTER ADAPTOR OPTION REQUIRES PRIOR APPROVAL BY
THE CITY ENGINEER.
MJ TEE
MJ CROSS
MJ GATE VALVE
MJ BUTTERFLY VALVE
RESTRAINED DIP SPOOL PLAIN END: 2'-0" MIN
500' MAX
FOR MAINS < 16"
TYPICAL WATER VALVE
LOCATION 640-1
SCALE: NONE
DATE: JAN 2026
NOTES:
KEYNOTES:
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\DETAIL SHEETS.DWG
D104
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
ST
A N D A R D D
ET
A
FINISHED GRADE
WATER
1. CENTER VALVE BOX ON AXIS OF OPERATING NUT AND SET PLUMB WITH FINISHED GRADE
2. OPERATOR EXTENSION REQUIRED WHEN VALVE NUT IS DEEPER THAN 6 FEET FROM FINISHED GRADE. REFER TO
DRAWING 640-4
TOP VIEW
4" MIN
12" MAX
VARIES
SEE NOTE 2
TYP WATER MAIN
18" No. 4 REBAR. REBAR SHALL
HAVE 3" COVER ON TOP,
BOTTOM, AND SIDES (TYP).
(THIS IS FOR UNPAVED AREAS
ONLY, SEE KEYNOTE 2).
VALVE BOX & COVER WITH "WATER" CAST IN THE TOP SURFACE. USE CITY APPROVED PRODUCT LIST.
UNPAVED AREAS ONLY: PROVIDE 24" SQUARE BY 61
2" THICK CONCRETE PAD (TO ACCOMMODATE 3" COVER
REQUIREMENTS NOTED ABOVE), CENTERED ON VALVE BOX. INSTALL OVER 4" COMPACTED 34"-0" CRUSHED ROCK
6" D3034 PVC PIPE RISER WITH END CUT TO FIT OVER VALVE HOUSING, LENGTH AS NECESSARY
MJ GATE VALVE. IF BUTTERFLY VALVES ARE INSTALLED, PROVIDE MIN. 6" CLEARANCE FROM OUTSIDE OF VALVE TO
TRENCH WALL.
PIPE BEDDING AND CLASS B BACKFILL, SEE STANDARD DRAWING 620-1.
24"
24"
NOTES:
2 1
TYPICAL STANDARD VALVE
BOX SETTING 640-2
SCALE: NONE
DATE: JAN 2025
KEYNOTES:
ENGINEERING
VALVE OPERATOR EXTENSION 640-4
SCALE: NONE
DATE: JAN 2025
2" SQUARE STEEL STOCK 2" LONG
4" STEEL PLATE ROCK GUARD SHALL BE 3 8" SMALLER DIAMETER THAN ID OF PIPE RISER (TYP) 2"x2"x.120 WALL SQUARE TUBE OR 1" SCH 80 STEEL PIPE, HOT DIP GALVANIZED AFTER FABRICATION
6" D3034 PVC PIPE RISER, ONE CONTINUOUS LENGTH AS REQUIRED
2" SQUARE SOCKET MADE WITH 14" THICK STEEL PLATE OR 21
2"x21
2"x.180 WALL T.S.
1. OPERATOR EXTENSION REQUIRED WHEN VALVE NUT IS DEEPER THAN 6 FT FROM FINISHED GRADE
2. STEEL MATERIALS SHALL BE GRADE ASTM A36 OR EQUIVALENT
FINISHED GRADE
24" MIN
6" MAX
6 FT MAX
BETWEEN PLATES
SEE NOTE 1
E70 TYP3/16
E70 1/4
E70 1/4
KEYNOTES:
NOTES:
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\DETAIL SHEETS.DWG
D105
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
ST
A N D A R D D
ET
A
48"
6"-8"
12" MIN
18" MAX
A I R
R E L E A S E
V A L V E
1" CORP STOP CCxCTS
1 14"- 34" GRANULAR DRAIN MATERIAL, 2 CU. FT.
1" TYPE K SOFT COPPER TUBING
1" ANGLE METER STOP BALL VALVE W/ CTS INLET
1"x3" BRASS NIPPLE
1" BRASS 90° ELBOW
1"x3" BRASS NIPPLE W/ BRASS COUPLER
1" COMB. AIR VALVE (CARV)
WATTS MODEL A-387A NYLON 12" BARB TO 38" MIPT
ADAPTOR * TORO FUNNY PIPE (FP) #53265 * FP #53306
2" FEMALE ELBOW & #53388
2" MALE ADAPTOR *
FP #53389 34" MALE ADAPTOR *
4" GALV TEE
4" GALV PIPE
4" SCREENED TANK VENT
INSTALL 5 LB ZINC ANODE UNDER COPPER SERVICE
PIPE AND CONNECT TO SERVICE PIPE W/ COPPER
PIPE GROUNDING CLAMP. INSTALL ON NATIVE SOIL.
1. IN UNDEVELOPED AREAS: INSTALL BLUE-COLORED CARSONITE STAKE WITH "AIR RELEASE VALVE" IN
1" BLACK LETTERS ON BOTH SIDES. LOCATE POST WITHIN 3' OF THE METER BOX
2. *ALTERNATE: WATTS MODEL A-785 BRASS 38" x CLOSE NIPPLE, WATTS A-815 (103-R) REDUCING COUPLING, 12" FIPT x 38" FIPT, & FP #53388 12" MALE ADAPTOR
3. A MINIMUM 1% UPWARD SLOPE SHALL BE MAINTAINED ON THE COPPER TUBING FROM THE WATER
MAIN TO THE CARV
NOTES:
KEYNOTES:
WATER
MAIN
5 6 7
1" COMBINATION AIR & VACUUM
VALVE (CARV) BELOW GRADE 640-5
SCALE: NONE
DATE: JAN 2025ENGINEERING
12"
1. THE FOLLOWING ITEMS ARE PROHIBITED WITHIN THE CLEAR ZONE:
· VEHICLE PARKING
· FENCES
· TREES
· LARGE SHRUBS
· RETAINING WALLS
· STREET LIGHTS
· SIGNS & SIGN POSTS
· ANY OBJECT OR ITEM THAT MAY INTERFERE WITH THE OPERATION OF THE HYDRANT
2. THE FOLLOWING ITEMS ARE ALLOWED WITHIN THE CLEAR ZONE:
· LAWN GRASS
· MULCH
· BARKDUST
· GROUND COVER
· PAVEMENT
10'10'
5'
3'
BACK OF CURB
5'
NOTES:
LIMIT OF
REQUIRED
CLEAR ZONE
FIRE HYDRANT CLEAR ZONE 650-1
DATE: JAN 2025ENGINEERING
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 9/24/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4373 - ERICKSON AVE WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\DETAIL SHEETS.DWG
D106
TE
R
LI
N E R
EP
LA
C
EM
EN
T
ER
IC
K
SO
N A
VE
N U E
MP--
ST
A N D A R D D
ET
A
FIRE HYDRANT ASSEMBLY PER APPROVED PRODUCTS LIST
GRANULAR DRAIN BACKFILL 11
4" TO 34", 4 CU. FT. MINIMUM
TYPICAL 6" MEGALUG RETAINER OR EQUAL AT EACH PIPE FITTING, ORIENT BOLTS SO ONE BOLT IS AT THE TOP
12"x12"x8" CONCRETE PIER BLOCK INSTALL ON UNDISTURBED NATIVE SOIL OR ON COMPACTED GRANULAR CLASS B BACKFILL
6" MJxMJ GATE VALVE, SEE NOTE 4. USE MJ x FLG FOR TAPPING SLEEVE
WATER MAIN SIZE MJ x 6" MJ TAPPING SLEEVE (FOR HYDRANT INSTALLATION ON EXISTING WATER MAIN), SEE DETAIL 630-2
IF TAPPING SLEEVE IS USED (SEE NOTE 6), CONCRETE THRUST BLOCK REQUIRED, SEE DETAIL 630-2
VALVE BOX, SEE DETAIL 640-2
GRANULAR CLASS B BACKFILL MATERIAL, 6" MINIMUM DEPTH
1. REFER TO DETAIL 650-1 FOR HYDRANT CLEAR ZONE REQUIREMENTS
2. HYDRANT BURY DEPTH: 30" MINIMUM, 4 FT MAXIMUM (BURY DEPTHS GREATER THAN 4 FT REQUIRE APPROVAL FROM CITY
OF BEAVERTON PUBLIC WORKS)
3. WHEN FINAL LIFT OF HMAC IS PLACED, CONTRACTOR TO SET A BLUE REFLECTOR BUTTON FOR THE FIRE DEPARTMENT.
SEE DETAIL 650-4 FOR PLACEMENT
4. USE MJ OR FLG VALVE & TEE AS NEEDED TO PLACE VALVE BOX OUTSIDE OF WHEEL PATH
CURBSIDE SIDEWALK
PROPERTY LINE SIDEWALK WITH PLANTER STRIP
6" DI PIPE
6"
MIN.
PLANTER
STRIP AREA
3" MIN
6" MAX
18"-24"
18"-24"
18"-24"
18"-24"
3" MIN
6" MAX STANDARD CURB &
GUTTER
RESTRAIN
ALL JOINTS
NOTES:
KEYNOTES:
STANDARD
CURB & GUTTER
FIRE HYDRANT ASSEMBLY
INSTALLATION 650-2
SCALE: NONE
DATE: JAN 2025
6"
MIN.
ENGINEERING
TYPICAL HYDRANT
MARKER LOCATIONS 650-4
SCALE: NONE
DATE: JAN 2025
A
FIGURE 1
TWO LANE STREET
B C
A B
A B
1. IF HYDRANT IS LOCATED WITHIN THE RADIUS OF AN INTERSECTION, PLACE A MARKER ON EACH ROADWAY IN
THE CENTER LANES CLOSEST TO THE HYDRANT.
2. PLACE MARKER PERPENDICULAR (90°) TO HYDRANT
3. CONTRACTOR TO SUPPLY BLUE REFLECTORS. CONTRACTOR SHALL SUPPLY MELT DOWN THERMOPLASTIC PADS IF 10 OR MORE ARE REQUIRED. WATER OPERATIONS SHALL SUPPLY IF FEWER THAN 10 ARE REQUIRED.
CONTRACTOR TO INSTALL.
CENTERLINE OR
LANE STRIP
FIGURE 2
MULTI-LANE STREET
FIGURE 3
TWO LANE STREET
AT INTERSECTION
FIGURE 4
ONE-WAY STREET
FIGURE 5
MULTI- LANE STREET
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .