This is a Bid Book (Part VII) issued by the Lehigh-Northampton Airport Authority for the LNAA-CO-26-001 Parking Garage/Walkway Program at Lehigh Valley International Airport in Allentown, Pennsylvania. The project is a multi-prime construction initiative with separate bid packages for General Contractor, Pre-cast Concrete Contractor, Electrical Contractor, Mechanical Contractor, and Plumbing Contractor positions. A mandatory pre-bid meeting is required on August 4, 2026, at 1:00 p.m. at the Airport Authority Boardroom, with at least one company representative required to attend in-person to be eligible for proposal submission. Sealed proposals must be submitted by 4:00 p.m. on September 10, 2026, via PennBid, with public opening occurring the same date and time at the Boardroom. The General Contractor, Electrical Contractor, Mechanical Contractor, and Plumbing Contractor positions allow 735 consecutive calendar days from the Construction Notice to Proceed for project completion, while the Pre-cast Concrete Contractor has 500 consecutive calendar days. All bid prices must remain firm for 120 calendar days from the bid opening date, and contract award is expected within 120 calendar days of bid opening, with formal contract execution required within 10 calendar days of written notice of award.
Bidders must submit bid security bonds equal to 10 percent of their total base bid, with successful bidders required to provide performance and payment bonds equal to 100 percent of the contract amount. Liquidated damages are set at $4,500 per consecutive calendar day or part thereof for failure to meet project completion deadlines. Bidders are required to submit comprehensive documentation including affirmations regarding collusion and bribery convictions, contractor certification of eligibility, subcontractor lists, bidder and subcontractor utilization summary forms, and small business participation utilization plans with letters of intent. The Authority requires all bidders to identify their Pennsylvania Construction Firm License number, Federal Employer Identification Number or Social Security Number, and must comply with Title VI of the Civil Rights Act of 1964 and Title 49 Code of Federal Regulations nondiscrimination provisions. Prevailing wage rates apply to this project. All bids must be accompanied by a detailed Schedule of Values and must include all unit prices, add or deduct alternatives, and self-performance percentages as specified in Section GI-1.05.14 of the General Information document.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART VII: BID BOOK
LNAA-CO-26-001
PARKING GARAGE / WALKWAY PROGRAM
ALL ENCLOSED FORMS MUST BE COMPLETED
AND SUBMITTED WITH THE BID PROPOSAL
LEHIGH-NORTHAMPTON AIRPORT AUTHORITY
LEHIGH VALLEY INTERNATIONAL AIRPORT
4TH Edition July 2026
LEHIGH VALLEY INTERNATIONAL AIRPORT LNAA-CO-26-001
PARKING GARAGE / WALKWAY PROGRAM ISSUED FOR BID
JULY 21, 2026
BID BOOK BID FORMS – BF.2
THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK
BID BOOK BID FORMS – BF.3
Contents
Signature to Bids ..................................................................................... BF.5 thru BF.14 Affirmation Regarding Collusion ..............................................................................BF.15 Affirmation Regarding Bribery Convictions ..............................................................BF.16 Contractor’s Certification of Eligibility.......................................................................BF.17 Bidder’s List Collection Form ...................................................................................BF.18 Subcontractor’s List Collection Form ..................................................... BF.19 thru BF.20 Bidder & Subcontractor Utilization Summary Form ............................... BF.21 thru BF.22 Small Business Participation Utilization Plan ...........................................................BF.23 Small Business Participation Letter of Intent Form ..................................................BF.24 Contractor’s Qualification Statement & Certification (Under Separate Cover) ......................................................................................................... BF.25 thru BF.34
BID BOOK BID FORMS – BF.4
THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK
(This form must be completed and submitted with the Bid Proposal.)
BID BOOK BID FORMS – BF.5
SIGNATURE TO BIDS
NOTE: Bidders shall use this page as a cover page when submitting his/her bid.
Each bid must show the full business address and telephone number of the Bidder and be signed by the person legally authorized to sign contracts. All correspondence concerning the bid and contract, including Notice of Award, copy of contract and purchase order, will be provided via electronic correspondence to the authorized individual shown on the bid forms, in the absence of written instructions from the Bidder to the contrary. Bids by partnerships must be signed in the partnership name by one of the members of the partnership or by an authorized representative, followed by the signature and designation of the person signing, who shall also state the names of the individuals composing the partnership. Bids by corporations must be signed with the name of the corporation, followed by the signature and designation of the officer having authority to sign. When requested, satisfactory evidence of authority of the officer signing on behalf of the corporation shall be furnished. Anyone signing the bid as agent shall file satisfactory evidence of his/her authority to do so.
All documents, materials, or data developed as a result of this contract are the Authority’s property. The Authority has the right to use and reproduce any documents, materials, and data, including confidential information, used in or developed as a result of this contract.
The Authority may use this information for its own purposes or use it for reporting to Federal agencies. The Bidder warrants that it has title to or right of use of all documents, materials, or data used or developed in connection with this contract. The Bidder must keep confidential all documents, materials, and data prepared or developed by the Bidder or supplied by the Authority. All erasures and/or changes shall be initialed by the individual making modifications to the proposal.
BIDDER MUST SIGN THE APPLICABLE PAGES, RELATED TO THE
TRADE/CONTRACT BEING BID ON, WITHIN THE BID BOOK AND UPLOAD THE
COMPLETED FORMS TO PENNBID WITH THE BID SUBMISSION. FAILURE TO
PROVIDE THESE DOCUMENTS CAN RESULT IN A NON-RESPONSIVE BID.
By signing where indicated on these forms, Bidder does hereby attest that he/she has fully read and understands the general conditions and instructions, specifications, and any other bid documents herein contained, and will furnish and deliver all labor and materials in accordance with the specifications for the price as listed on the proposal form.
BID BOOK BID FORMS – BF.6
Bidder acknowledges receipt of Contract Materials by initialing the following:
Technical Provisions, Part I, General Information _____
Technical Provisions, Part II, General Provisions _____
Technical Provisions, Part III, General Specifications for Overall Program _____
Technical Provisions, Part IV, Wage Rates _____
Technical Provisions, Part V, Airport Authority Documents _____
Technical Provisions, Part VI, Agreement _____
Technical Provisions, Part VII, Bid Book _____
Contractor’s Qualification Statement & Certification _____
Bid Tabulation Form _____
Construction Plans for Package A, Parking Garage Development _____
Technical Specifications for Package A, Parking Garage Development _____
Geotechnical Report for Package A, Parking Garage Development _____
Construction Plans for Package B, Elevated Pedestrian Walkway _____
Technical Specifications for Package B, Elevated Pedestrian Walkway _____
Geotechnical Report for Package B, Elevated Pedestrian Walkway _____
Bidder acknowledges receipt of Addenda by initialing the following:
Addendum No. 1 _____ Addendum No. 2 _____ Addendum No. 3 _____
Addendum No. 4 _____ Addendum No. 5 _____ Addendum No. 6 _____
BID BOOK BID FORMS – BF.7
BIDDER INFORMATION
Company Name*:
Contact Name:
Title:
Address:
E-Mail Address:
*Insert corporation, partnership or individual as applicable.
Gentlemen/Ladies:
The Bidder, in compliance with the Invitation for Bids has examined the plans and specifications with related documents and the size of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment, plant and services, and to construct the project in accordance with the Contract Documents and Addenda within the time set forth therein, and at the total sum base bid stated below. These prices are to cover all expenses incurred in performing the work required under the Contract Documents, of which this proposal is a part.
The Bidder intends for the following bid to be submitted for the following contract within the overall multi-prime project:
General Contractor _____ Pre-cast Concrete Contractor _____
Electrical Contractor _____ Mechanical Contractor _____
Plumbing Contractor _____
Each bidder must choose one of the above contractor fields, and then complete the corresponding bid total items from the following sheets. The total sum should be the combination of items as applicable.
BID BOOK BID FORMS – BF.8
1. GENERAL CONTRACTOR:
A. TOTAL SUM BASE BID
To furnish labor, materials, equipment, plant and services necessary to properly complete the work required under the TOTAL SUM BASE BID, based on the unit prices set forth in the required Schedule of Values (attached by reference) in strict accordance with the aforesaid documents. Any add or deduct alternatives should only be shown on the Schedule of Values and not included in the total sum below.
Dollars $
(Written) (Figures)
(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)
It is understood that the bid price will be firm for a time period of one hundred twenty (120) calendar days from the bid opening date and that if the undersigned is notified of acceptance of this proposal within this time period, the firm shall complete the total work within a maximum seven hundred th i r ty - f ive
(735) consecutive calendar days from the date of "Construction Notice to Proceed" for construction and to complete the work in accordance with the provisions of the Contract Documents. If this work is not completed within the time period specified, the Contractor will be liable for liquidated damages of four thousand five hundred ($4,500.00) dollars per consecutive calendar day or part thereof will be applied as identified in Section GI-1.05.11.
BID BOOK BID FORMS – BF.9
2. PRECAST CONCRETE CONTRACTOR:
A. TOTAL SUM BASE BID
To furnish labor, materials, equipment, plant and services necessary to properly complete the work required under the TOTAL SUM BASE BID, based on the unit prices set forth in the required Schedule of Values (attached by reference) in strict accordance with the aforesaid documents. Any add or deduct alternatives should only be shown on the Schedule of Values and not included in the total sum below.
Dollars $
(Written) (Figures)
(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)
It is understood that the bid price will be firm for a time period of one hundred twenty (120) calendar days from the bid opening date and that if the undersigned is notified of acceptance of this proposal within this time period, the firm shall complete the total work within a maximum f ive hundred (500) consecutive calendar days from the date of "Construction Notice to Proceed" for construction and to complete the work in accordance with the provisions of the Contract Documents. If this work is not completed within the time period specified, the Contractor will be liable for liquidated damages of four thousand five hundred ($4,500.00) dollars per consecutive calendar day or part thereof will be applied as identified in Section GI-1.05.11.
BID BOOK BID FORMS – BF.10
3. ELECTRICAL CONTRACTOR:
A. TOTAL SUM BASE BID
To furnish labor, materials, equipment, plant and services necessary to properly complete the work required under the TOTAL SUM BASE BID, based on the unit prices set forth in the required Schedule of Values (attached by reference) in strict accordance with the aforesaid documents. Any add or deduct alternatives should only be shown on the Schedule of Values and not included in the total sum below.
Dollars $
(Written) (Figures)
(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)
It is understood that the bid price will be firm for a time period of one hundred twenty (120) calendar days from the bid opening date and that if the undersigned is notified of acceptance of this proposal within this time period, the firm shall complete the total work within a maximum seven hundred th i r ty - f ive
(735) consecutive calendar days from the date of "Construction Notice to Proceed" for construction and to complete the work in accordance with the provisions of the Contract Documents. If this work is not completed within the time period specified, the Contractor will be liable for liquidated damages of four
BID BOOK BID FORMS – BF.11
4. MECHANICAL CONTRACTOR:
A. TOTAL SUM BASE BID
To furnish labor, materials, equipment, plant and services necessary to properly complete the work required under the TOTAL SUM BASE BID, based on the unit prices set forth in the required Schedule of Values (attached by reference) in strict accordance with the aforesaid documents. Any add or deduct alternatives should only be shown on the Schedule of Values and not included in the total sum below.
Dollars $
(Written) (Figures)
(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)
It is understood that the bid price will be firm for a time period of one hundred twenty (120) calendar days from the bid opening date and that if the undersigned is notified of acceptance of this proposal within this time period, the firm shall complete the total work within a maximum seven hundred th i r ty - f ive
(735) consecutive calendar days from the date of "Construction Notice to Proceed" for construction and to complete the work in accordance with the provisions of the Contract Documents. If this work is not completed within the time period specified, the Contractor will be liable for liquidated damages of four
BID BOOK BID FORMS – BF.12
5. PLUMBING CONTRACTOR:
A. TOTAL SUM BASE BID
To furnish labor, materials, equipment, plant and services necessary to properly complete the work required under the TOTAL SUM BASE BID, based on the unit prices set forth in the required Schedule of Values (attached by reference) in strict accordance with the aforesaid documents. Any add or deduct alternatives should only be shown on the Schedule of Values and not included in the total sum below.
Dollars $
(Written) (Figures)
(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)
It is understood that the bid price will be firm for a time period of one hundred twenty (120) calendar days from the bid opening date and that if the undersigned is notified of acceptance of this proposal within this time period, the firm shall complete the total work within a maximum seven hundred th i r ty - f ive
(735) consecutive calendar days from the date of "Construction Notice to Proceed" for construction and to complete the work in accordance with the provisions of the Contract Documents. If this work is not completed within the time period specified, the Contractor will be liable for liquidated damages of four
BID BOOK BID FORMS – BF.13
6. ALL BIDDERS:
A. SUBCONTRACTORS:
All Bidders shall submit their list of subcontractors list as part of their bid packet.
No change or deviation from this list shall be allowed except as determined by the Owner or the Owner's Representative.
B. AWARD: Award of the bid can be made by the Owner to the responsive, responsible low bidder based on the Total Sum Bid.
C. BIDDER'S STATE OF PENNSYLVANIA REGISTRATION NUMBER:
Construction Firm License No. Date Issued Place of Issuance
Federal Employer Identification Number (FEIN) or Social Security No. if no FEIN
Bid Security Bonds shall be submitted with each proposal in the amount of ten percent (10%) of the Total Base Bid. Originals will be provided by the lowest responsive bidder upon notice of award.
If no bid has been accepted within one hundred twenty (120) calendar days after the bid opening, then any bond may be returned upon demand of the bidder.
Upon receipt of written notice of the acceptance of this bid, bidder will execute the formal contract within ten (10) calendar days. The Bid Security attached, in the sum of:
Dollars $
(Written) (Figures) is to become the property of the Owner in the event the Contract and Bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.
Failure to properly and completely fill in all blanks may be cause for rejection of this proposal. All alternates and unit prices called for in the Contract Documents must be submitted herewith.
BID BOOK BID FORMS – BF.14
I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE
PENALTIES OF PERJURY THAT THE CONTENTS OF THE
AFFIDAVITS AND BID SUBMISSION DOCUMENTS ARE TRUE AND
CORRECT TO THE BEST OF MY KNOWLEDGE, INFORMATION AND
BELIEF AND THAT I AM THE DULY AUTHORIZED REPRESENTATIVE
OF THE BELOW BUSINESS AND THAT I POSSESS THE LEGAL
AUTHORITY TO MAKE THE AFFIDAVITS ON BEHALF OF MYSELF
AND THE BUSINESS FOR WHICH I AM ACTING.
BY:
(Signature of Authorized Representative and Affiant)
(Name & Title Printed)
(Business Address)
(Phone Number) (Fax Number)
(Federal Employer Identification Number)
(SEAL) If bid is by corporation.
BID BOOK BID FORMS – BF.15
AFFIRMATION REGARDING COLLUSION
I AFFIRM THAT:
Neither I nor, to the best of my knowledge, information, and belief, the below stated business has:
(a) Agreed, conspired, connived, or colluded to produce a deceptive show of competition in the compilation of the accompanying bid or offer that is being submitted;
(b) In any manner, directly or indirectly, entered into any agreement of any kind to fix the bid price or price proposal of the Bidder or Offeror or of any competitor, or otherwise taken any action in restraint of free competitive bidding in connection with the contract for which the accompanying bid or offer is submitted.
That the information above is true and complete to the best of my knowledge.
Printed Name and Title
Signature Date
BID BOOK BID FORMS – BF.16
AFFIRMATION REGARDING BRIBERY CONVICTIONS
I FURTHER AFFIRM:
Neither I nor, to the best of my knowledge, information, and belief, the below-named business, nor any of its officers, directors, partners, or any of its employees directly involved in obtaining or performing contracts with public bodies has been convicted of, or has pleaded nolo contendere to a charge of, bribery, attempted bribery, or conspiracy to bribe in violation of Pennsylvania law, or of the law of any other State or federal law, except as follows (indicate the reasons why the affirmation cannot be given and list any conviction, plea, or imposition of probation before judgment with the date, court, official or administrative body, the sentence or disposition, the name(s) of person(s) involved, and their current positions and responsibilities with the business).
Bidder’s Company/Firm:
Address:
Authorized Signature:
Name & Title Printed:
Telephone & Fax Number: /
E-Mail Address:
Date:
Federal Employer’s Identification No.:
BID BOOK BID FORMS – BF.17
CONTRACTOR'S CERTIFICATION OF ELIGIBILITY
The bidder/offeror certifies, by submission of this proposal or acceptance of this contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency.
The bidder/offers or further agrees by submitting this proposal that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts. Where the bidder/offer/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/proposal.
That the information above is true and complete to the best of my knowledge.
Printed Name and Title
Signature Date
NOTE: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001.
The full names and residences of all persons interested in this proposal as principals are as follows:
BID BOOK BID FORMS – BF.18
BIDDER’S LIST COLLECTION FORM
LNAA is required by CFR Title 49, Subtitle A, Part 26, subpart A, § 26.11(c) to collect bidders list information from all bidders at the time of bid submittal. The data must be collected for all firms who bid as prime contractors or subcontractors. Please list yourself (bidder) and all firms that provided a quote (successfully or not).
As such, it is the responsibility of the bidder to complete the following information as a condition of submitting a proposal for this project. The sponsor will consider incomplete information to be an irregular proposal.
Airport Name: Lehigh Valley International Airport Bid Date:
AIP No.:
Project Name: Parking Garage / Walkway Program
Bidder’s Information
Bidders Name:
Firm Address, Zip Code, Phone No.
DBE/ SBE, or Non-DBE
Status
NAICS Code(s) of Scope(s) Bid Age of Firm
Annual Gross Receipts
DBE
SBE
Less than 1 year
3 years
4-7 years
8-10 years
More than 10 years
Less than $1 million
$1-3 million
$3-6 million
$6-10 million
Over $10 million
BID BOOK BID FORMS – BF.19
SUBCONTRACTOR’S LIST COLLECTION FORM
LNAA is required by CFR Title 49, Subtitle A, Part 26, subpart A, § 26.11(c) to collect bidders list information from all bidders at the time of bid submittal. The data must be collected for all firms who bid as prime contractors or subcontractors. Please list yourself (bidder) and all firms that provided a quote (successfully or not).
As such, it is the responsibility of the bidder to complete the following information as a condition of submitting a proposal for this project. The sponsor will consider incomplete information to be an irregular proposal.
Airport Name: Lehigh Valley International Airport Bid Date:
AIP No.:
Project Name: Parking Garage / Walkway Program
Subcontractor’s Information
Bidders Name:
Status
NAICS Code(s) of Scope(s) Bid Age of Firm
Annual Gross Receipts
DBE
BID BOOK BID FORMS – BF.20
Status
NAICS Code(s) of Scope(s) Bid Age of Firm
Annual Gross Receipts
DBE
Status
NAICS Code(s) of Scope(s) Bid Age of Firm
Annual Gross Receipts
DBE
(Copy this form and submit with your original proposal if more space is needed.)
BID BOOK BID FORMS – BF.21
BIDDER & SUBCONTRACTOR UTILIZATION SUMMARY FORM
As outlined in the bid documents and Contract Summary, the Owner requires the Bidder to provide their project utilization summary of all work to be self-performed and / or designated to the identified subcontractors (listed on the bidder and subcontractor collection forms included in this
Bid Book). The project utilization percentage (%) should be based on the estimated contract value of each contractor’s estimated work in relation to the total sum Base Bid value submitted by the
Bidder. For this project, a bidder’s self-performance goal is as requested in Section GI-
1.05.14. The Owner will consider incomplete information to be a non-responsive bid.
Airport Name: Lehigh Valley International Airport
AIP No.:
Project Name: Parking Garage / Walkway Program
Bidder / Prime Contractor Utilization Summary
Firm Name Estimated Contract
Value Contract %
Subcontractor’s Utilization Summary
Estimated Contract
Value
(based on value)
BID BOOK BID FORMS – BF.22
Estimated Contract
Value
(Copy this form and submit with your original proposal if more space is needed.)
BID BOOK BID FORMS – BF.23
SMALL BUSINESS PARTICIPATION UTILIZATION PLAN
Contractor must submit this form and attach one letter of intent (see next page) for each small business subcontractor, supplier or manufacturer that you are committed to utilizing on this project.
LNAA encourages participation of all small businesses in the performance of this project.
AIRPORT NAME: Lehigh Valley International Airport
PROJECT NAME: Parking Garage / Walkway Program
NAME OF BIDDERS FIRM:
STREET ADDRESS:
CITY: STATE: ZIP CODE:
PRINTED NAME OF SIGNER:
EMAIL ADDRESS:
TOTAL BID AMOUNT:
SMALL BUSINESS UTILIZATION SUMMARY
Small Business Firm Scope of Work Amount
SMALL BUSINESS PARTICIPATION: $
Affirmation:
The undersigned hereby assures that the information included herein is true and correct, and that the Small Business firm(s) listed on the attached Letter of Intent Forms have agreed to perform a commercially useful function in the work items noted for each firm.
By:
Signature of Bidder’s Representative Title
BID BOOK BID FORMS – BF.24
SMALL BUSINESS PARTICIPATION LETTER OF INTENT FORM
Submit one letter of intent for each small business subcontractor, supplier or manufacturer if the Contractor is completing the Small Business Participation Plan Form on the following page.
AIRPORT NAME: Lehigh Valley International Airport
PROJECT NAME: Parking Garage / Walkway Program
NAME OF BIDDERS FIRM:
CITY: STATE: ZIP CODE:
NAME OF SMALL BUSINESS:
CITY: STATE: ZIP CODE:
CONTACT PERSON:
EMAIL ADDRESS:
PROOF ATTACHED OF SMALL BUSINESS ELIGIBILITY
_____ Certification Included: _______________________________________ Or
_____ Verification of Gross Revenue form
CLASSIFICATION (Check one):
___ PRIME CONSULTANT ___ SUBCONSULTANT ___ JOINT VENTURE
___ PRIME CONTRACTOR ___ SUBCONTRACTOR ___ MANUFACTURER
___ BROKER ___ SUPPLIER/DEALER ___ SUPPLIER/DISTRIBUTOR
DESCRIPTION OF WORK ITEMS TO BE PERFORMED:
NAICS Scope of Work to be performed Dollar Value
File details come from the government source that posted it. Updated .