This is a bid document package issued by the Lehigh-Northampton Airport Authority (LNAA) for construction contract LNAA-CO-26-001, the Parking Garage/Walkway Program at Lehigh Valley International Airport in Allentown, Pennsylvania. The project encompasses two packages: Package A (Parking Garage Development) and Package B (Elevated Pedestrian Walkway), involving comprehensive construction work including civil, structural, architectural, plumbing, mechanical, and electrical components. The scope includes pavement demolition, utility relocation, asphalt paving, concrete sidewalks, grading, storm drainage, steel framing, precast concrete structures, glazed aluminum curtain walls, interior finishes, HVAC systems, plumbing systems, electrical installation, fire suppression systems, and elevator/escalator installation. A mandatory pre-bid conference is scheduled for Tuesday, August 4, 2026, at 1:00 PM at the airport's main terminal boardroom, with at least one representative required to attend in-person to be eligible to submit a proposal. Site inspections are available by appointment only following the pre-bid conference. Questions must be submitted by Thursday, August 27, 2026, at 4:00 PM via www.PennBid.net, and sealed proposals are due by Thursday, September 10, 2026, at 4:00 PM through the same platform, with public bid opening at 4:00 PM on the same date. The contract duration is 765 consecutive calendar days from the Administrative Notice to Proceed and 735 days from the Construction Notice to Proceed, with substantial completion required for the parking facility to be open for public use.

Bidders must provide a bid bond equal to 10 percent of the total proposal price and a performance bond equal to 100 percent of the award amount. Prevailing wage rates apply to this contract as it exceeds $25,000 per the Pennsylvania Prevailing Wage Act of 1961, with both Davis-Bacon wage rates and Pennsylvania prevailing wage rates incorporated into the technical provisions. The contractor self-performance goals require the general contractor to self-perform not less than 60 percent of the contract price, while electrical, mechanical, and plumbing contractors must each self-perform 85 percent, and the precast concrete contractor must self-perform 75 percent. Liquidated damages are assessed at $4,500 per day for failure to achieve substantial completion or open the parking garage for public use after the specified contract duration, with additional damages for unscheduled utility outages ($1,000 per hour for parking facility outages and $1,000 per 15 minutes for terminal/concourse outages) and roadway closures ($350 per 15 minutes). The project is subject to Title VI of the Civil Rights Act of 1964, Americans with Disabilities Act requirements, and Pennsylvania nondiscrimination provisions. Award will be made to the lowest qualified bidder whose proposal conforms to LNAA requirements within 120 calendar days of the bid opening date. Special construction requirements include phasing schedule approval, time restrictions subject to airline and airport operations, TSA badging requirements for air operations area access, haul route restrictions with specific height clearances (17'-5" on departures ramp, 13'-6" on arrivals ramp, 14'-6" on main parking lot entrance ramp), and FAA crane height restrictions (300 feet maximum for Package A and 150 feet for Package B).

View the file

Other files

File Type Posted
LNAA-CO-26-001 Package A Parking Garage Development Technical Specifications.pdf PDF
LNAA-CO-26-001 Part IV, Wage Rates.pdf PDF
LNAA-CO-26-001 Package A Parking Garage Development Geotechnical Report.pdf PDF
LNAA-CO-26-001 Package A Parking Garage Development Construction Plans.pdf PDF
LNAA-CO-26-001 Part V, Airport Authority Documents.pdf PDF
Contractors Qualification Cert. - GENERAL BIDDERS ONLY.pdf PDF
Contractors Qualification Cert. - MECHANICAL BIDDERS ONLY.pdf PDF
LNAA-CO-26-001 Package B Elevated Pedestrian Walkway Technical Specifications.pdf PDF
LNAA-CO-26-001 Package B Elevated Pedestrian Walkway Construction Plans.pdf PDF
Legal Advertisment.pdf PDF
Contractors Qualification Cert. - PRECAST BIDDERS ONLY.pdf PDF
LNAA-CO-26-001 Part II, General Provisions.pdf PDF
LNAA-CO-26-001 Part III, General Specifications.pdf PDF
LNAA-CO-26-001 Part VII, Bid Book.pdf PDF
LNAA-CO-26-001 Part VI, Agreement.pdf PDF
LNAA-CO-26-001 Package B Elevated Pedestrian Walkway Geotechnical Report.pdf PDF
Contractors Qualification Cert. - PLUMBING BIDDERS ONLY.pdf PDF
Contractors Qualification Cert. - ELECTRICAL BIDDERS ONLY.pdf PDF
1-PCAAdvertisement.pdf PDF
2-PCA - BidBook.pdf PDF
4-LNAA - ABE - PCA Schedule of Values - Locked.xlsx XLSX spreadsheet
3-PCAFrontEndProvisionsTechnicalSpecifications.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL PROVISIONS

BID DOCUMENTS

PARTS I THRU VI

STANDARD PROCUREMENT

LNAA-CO-26-001

PARKING GARAGE / WALKWAY PROGRAM

If indicated below (√) and not waived by the Authority, Bidders shall be required to provide the following:

√ A Bid Bond, in the amount of ten (10%) percent of the bid amount for construction contracts See “Bid Bonds – Section GP3.01” of the General Provisions for Bidding of Construction Contracts.

√ A Performance Bond for 100% of bid award on construction contracts and on contracts for services, supplies, or construction related services. See “Bid Bonds – Section GP3.01” of the

General Provisions for Bidding of Construction Contracts.

Prepared by:

AIRPORT DESIGN CONSULTANTS, INC.

AECOM

LEHIGH-NORTHAMPTON AIRPORT AUTHORITY

LEHIGH VALLEY INTERNATIONAL AIRPORT

4th Edition July, 2026

LEHIGH VALLEY INTERNATIONAL AIRPORT LNAA-CO-26-001

PARKING GARAGE / WALKWAY PROGRAM ISSUED FOR BID

JULY 21, 2026

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.2

TABLE OF CONTENTS

LNAA-CO-26-001

PARKING GARAGE / WALKWAY PROGRAM

Part I General Project Information GI.1 thru GI.22

Part II General Provisions for Bidding of Construction Contracts GP.1 thru GP.32 Federal Contract Provisions FCP.1 thru FCP.30 General Contract Provisions GCP.1 thru GCP.48

Part III General Specifications (Division 00 and 01) GS.1 thru 018113.12

Part IV Davis-Bacon Wage Rates WR.3 thru WR.10 Pennsylvania Prevailing Wage Rates WR.11 thru WR.16

Part V Airport Authority Documents AAD.1 thru AAD.66

Part VI Agreement Between Airport Authority and Contractor SA.1 thru SA.30

Part VII (Under Separate Cover) Bid Book BF.1 thru BF.34

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.3

PART I

GENERAL PROJECT INFORMATION

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.4

PART I

GENERAL PROJECT INFORMATION

LNAA-CO-26-001

GI-1.01 Contract Summary

GI-1.02 Notice to Contractors

GI-1.03 Non-Discrimination and Affirmative Action

GI-1.04 Description of Project

GI-1.05 Special Construction Requirements

GI-1.05.1 Phasing

GI-1.05.2 Time Restrictions

GI-1.05.3 Badging Process/Restrictions

GI-1.05.4 Deliveries/Haul Route

GI-1.05.5 Site Restrictions

GI-1.05.6 Access to the Site

GI-1.05.7 Equipment Staging Area

GI-1.05.8 Load & Height Restrictions

GI-1.05.9 Permits, Licensing, and Crane Height Restrictions

GI-1.05.10 Contract Duration

GI-1.05.11 Liquidated Damages

GI-1.05.12 Project Coordination

GI-1.05.13 Shop Drawings

GI-1.05.14 Contractor Self-Performance Goal

GI-1.05.15 Public Safety and Protection of Property

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.5

GI-1.01 Contract Summary

ITEM DESCRIPTION

Contract Title PARKING GARAGE / WALKWAY PROGRAM

Contract Number LNAA-CO-26-001

AIP Contract Number N/A

Applicable Standard Provisions Standard Provisions, 1st Edition, September 9, 2020

Contractor Self-Performance Goal See Section GI-1.05.14

Wage Rates Required* YES X NO

Project Location ABE X Queen

City Braden

Contract Drawings and Technical Provisions Cost

N/A

Contract Duration 765 Consecutive Calendar Days

Liquidated Damages See Section GI-1.05.11

Pre-Bid Conference

Tuesday, August 4, 2026 at 1:00 PM Local Time

Invitation information to follow

Site Inspection Following the Pre-Bid Conference and

By Appointment Only with LNAA

Questions Due Thursday, August 27, 2026 at 4:00 PM Local Time via www.PennBid.net

Bids Due Thursday, September 10, 2026, no later than 4:00 PM Local Time via www.PennBid.net

Bid Opening Thursday, September 10, 2026 at 4:00 PM Local Time via www.PennBid.net

*Wage Rates are required for bids in excess of $25,000 per the Pennsylvania Prevailing Wage Act of 1961)

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.6

GI-1.02 Notice to Contractors

The Standard Provisions for Construction Contracts and the Technical Provisions are intended to describe and establish all requirements and standards for this construction

Contract and shall be binding upon the parties’ signatory to the Contract. By submitting a bid for this Contract, the Contractor agrees to adhere to the requirements of all these

Provisions. Lehigh-Northampton Airport Authority shall henceforth also be referred to as

“The Airport Authority” or “LNAA”.

Sealed bids for the project entitled:

Parking Garage / Walkway Program at Lehigh-Valley International Airport

Construction Contract No. LNAA-CO-26-001

Sealed bids will be received online via www.PennBid.net by:

Thursday, September 10, 2026, at 4:00 PM Local Time

Positively no bids will be accepted after Thursday, September 10, 2026, at 4:00 PM Local Time.

Interested bidders need to register at the PennBid website. Once registered, bidders can obtain all project documents and submit and update their bids online.

The proposals require a Certified Check or Bid Bond in the amount of ten percent

(10%) of the total proposal price. Such proposal security shall be made payable to

“Lehigh-Northampton Airport Authority” as a guarantee of good faith and is to secure the Lehigh-Northampton Airport Authority from any loss by failure to comply with any of the terms of the proposal, and is to become the property of the

Lehigh-Northampton Airport Authority as just and liquidated damages in case the successful bidder refuses or fails to enter into such contract or fails or refuses to furnish a performance bond within twenty (20) days of the award. The Airport

Authority has the right at its sole discretion to reject any or all bids. The award of each bid package, if it is to be awarded, shall be made within one hundred twenty

(120) calendar days of the date specified for publicly opening proposals, unless otherwise specified herein. Award of each bid package shall be made by LNAA to the lowest, qualified bidder whose proposal conforms to the cited requirements of LNAA for each individual bid package. Bidders are not required to bid on all bid packages;

however, they are required to bid on all items in each bid package submitted. Where discrepancies in the unit bid prices occur, and where discrepancies in the product of the quantities and unit bid prices occur, and where discrepancies in the summation of the products occur, LNAA will make the necessary corrections, and the corrected values will be used in LNAA’s consideration of proposals.

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.7

The successful bidder will be required to provide performance security in forms satisfactory to the Authority Solicitor consisting of either a performance bond or irrevocable letter of credit in the amount of 100% of the proposal. The Proposer shall be responsible for obtaining and maintaining the performance security in force from the date of execution until the date of the contract termination. All Bonds shall be secured by a guaranty or Surety Company listed in the latest edition of

U.S. Treasury Circular 570, and the bond amount must be within the maximum amount specified for such company in Circular 570.

The work under this contract includes, but is not limited to temporary erosion controls, pavement removal, earthwork, utility relocation, concrete sidewalks, asphalt paving, micropile foundations, a precast concrete parking garage structure, a structural steel and glazed aluminum curtain wall building, elevator and escalator installation, mechanical, electrical, and plumbing work to produce a functional parking garage and elevated pedestrian walkway. See paragraph GI-1.04 for additional description.

Plans, Specifications and other contract documents may be secured electronically through the PennBid website.

Pre-Bid Conference Meeting will be held:

Tuesday, August 4, 2026, at 1:00 PM Local Time

Attendance at the Pre-Bid Conference is mandatory. Each bidder must have at least one representative in person at the Pre-Bid Conference Meeting to be eligible to submit a bid. Each bidder will also be allowed additional representatives in person or via virtual attendance through a virtual conference call. Appropriate auxiliary aids and service for qualified individuals with disabilities will be provided upon request. Please call the Airport

Authority Offices at least five business days in advance of the meeting.

Please Note: Only attendees attending the pre-bid will be allowed to schedule a Site

Inspection, by appointment only.

Your scheduled Site Inspection will be the only time to inspect the site. Please bring valid identification, either a driver’s license or passport.

GI-1.03 Non-Discrimination and Affirmative Action

The Bidder agrees, unless exempt, to comply with any applicable federal regulation pertaining to nondiscrimination and affirmative action (generally Part 60-1 of Title 41 of the Code of Federal Regulations), but not limited to the Equal Opportunity Clause (41

C.F.R. Paragraph 60-1.4). which is incorporated by reference, the Affirmative Action

Clause for Handicapped Workers (41 C.F.R. Paragraph 60-741.4) which is incorporated by reference, and the Americans with Disabilities Act, 42 U.S.C., Section 12101 et seq.

and the applicable Federal regulations. Bidder further agrees, unless exempt, to comply

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.8

with the Pennsylvania Nondiscrimination Clause (16 Pennsylvania Code Paragraph

49.101 (D), which is incorporated by reference. Pursuant to the provisions of Act No. 222, October 27, 1955, as amended by Act No. 19, February 28, 1961, and in accordance with the provisions of the Governor's Code of Fair Practice, effective June 6, 1963, and the

Regulations of the Pennsylvania Human Relations Commission, as approved by the

Public Works Project will contain the following items:

A. Bidder agrees that it will comply with the provisions of the Pennsylvania Human Relations Act in providing equal employment opportunities in connection with all work performed by the Bidder or any subcontractor or supplier at the job site pursuant to the Contract.

B. Bidder agrees that it will comply with the Non-Discrimination Policy of the Authority which provides that in the performance of the Contract, the Bidder will provide equal opportunity for all citizens regardless of race, color, religion, sex, sexual orientation, gender, gender expression, gender identity, national origin, or handicap/disability.

The Lehigh-Northampton Airport Authority must comply with the provisions of Title VI of the Civil Rights Act of 1964 (42 U.S.C. §§ 2000d et seq) and implementing regulations

(49 CFR part 21) including amendments thereto, the Airport and Airway Improvement Act of 1982 (49 U.S.C. § 47123), the Age Discrimination Act of 1975 (42 U.S.C. 6101 et seq.), Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. § 794 et seq.), the Americans with Disabilities Act of 1990 (42 U.S.C. § 12101, et seq.), U.S. Department of

Transportation and Federal Aviation Administration (FAA) Assurances, and other relevant civil rights statutes, regulations, or authorities, including any amendments or updates thereto. LNAA thus notifies all Bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, Small Businesses will be afforded full opportunity to submit proposals in response to this request and will not be discriminated against on the grounds of race, color, religion, sex, or national origin in consideration for an award.

The requirements of 49 CFR Part 26 including any amendments thereto apply to this contract. It is the policy of the LNAA to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. The Owner encourages participation by all firms qualifying under this solicitation regardless of business size or ownership.

Compliance with Regulations: The Contractor (hereinafter includes consultants) will comply with the Title VI List of Pertinent Nondiscrimination Acts and the Authority’s (latest edition), which are herein incorporated by reference and made a part of this contract.

Solicitations for Subcontracts, Including Procurements of Materials and

Equipment: In all solicitations, either by competitive bidding, or negotiation made by the

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.9

contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor’s obligations under this contract and the

Nondiscrimination Acts And Authorities on the grounds of race, color, or national origin.

Information and Reports: The Contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Authority to be pertinent to ascertain compliance with such Nondiscrimination Acts. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the

Contractor will so certify to the Authority, as appropriate, and will set forth what efforts it has made to obtain the information.

Sanctions for Noncompliance: In the event of a Contractor’s noncompliance with the

Non-discrimination provisions of the contract, the Authority will impose such contract sanctions as may be determined to be appropriate, including, but not limited to:

a. Withholding payments to the contractor under the contract until the contractor complies; and/or

b. Cancelling, terminating, or suspending a contract, in whole or in part.

Incorporation of Provisions: The Contractor will include the provisions included herein

Section GI1.03 in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The Contractor will take action with respect to any subcontract or procurement as the Authority may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the Contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the Contractor may request the Authority to enter into any litigation to protect the interests of the

Authority. In addition, the Contractor may request the United States to enter into the litigation to protect the interests of the United States.

GI-1.04 Description of Project

The work to be done under this contract includes the furnishing of all supervision, labor, materials (including furnishing, delivery, testing, sampling/certifying, storage, handling, and installation of those materials), equipment, tools, and associated work necessary for the completion of both Package A: Parking Garage Development and Package B:

Elevated Pedestrian Walkway. Additional descriptions of this contract’s scope of work in

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.10

as written in Specification Section 011000, Paragraph 1.5. In summary, work is comprised of the following items:

A. Civil

a. Pavement demolition

b. Utility relocation

c. Asphalt paving

d. Concrete curb and sidewalk paving

e. Grading and storm drainage

f. Electric and communication concrete ductbank installation

g. Micropile foundations installation

h. Earthwork and dewatering

B. Structural

a. Steel framing and decking

b. Metal stairs and railing

c. Concrete unit masonry

d. Prestressed, precast concrete structural members

C. Architectural

a. Interior finishes

i. Glazed aluminum curtain wall

ii. Gypsum board

iii. Acoustical panel ceilings

iv. Resilient tile flooring

v. Resinous flooring

vi. Terrazzo flooring

vii. Paints and coatings

viii. Doors, storefronts, and glazing

b. Thermal and moisture protection

c. Column covers and decorative railings

d. Polyvinyl-chloride and standing-seam metal roofing

e. Metal composite material wall panels

f. Sheet metal flashing and and trim

g. Elevators and escalators

D. Plumbing

a. Fire suppression system

b. Valves, meters, and gauges

c. Hangers and supports

d. Domestic water supply

e. Sanitary waste and vent piping

f. Storm drainage piping

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.11

g. Sump pumps

E. Mechanical

a. HVAC equipment and installation

i. Ducts, accessories, and insulation

ii. Dampers, meters, and flow, gas, pressure and temperature instruments

iii. Hydronic and refrigerant piping

iv. Fans, ventilators, and air diffusers

v. Variable refrigerant flow and split-system HVAC units

vi. Heaters

b. Testing, balancing, adjusting, and commissioning

F. Electrical

a. Utility relocation

b. Low and Medium voltage installation

c. Diesel-engine-driven generator

d. Panelboards, wiring devices, and breakers

e. Lighting, lighting controls, and surge protection

f. Communication installation including cable trays, hangers, and public address

g. Electronic safety and security including video surveillance and fire alarm

Coordination with the Engineer, Airport Authority and all other stakeholders as denoted within the contract drawings.

GI-1.05 Special Construction Requirements

GI-1.05.1 Phasing

The Contractor is required to submit a fully detailed schedule for the entire work that shall include all phase milestones and tasks required to achieve those milestones as required under Section GP-2.00 of the Airport Authority’s General Bid Provisions, Specification

Section 011000, Paragraph 1.6, and Specification Section 013200, Paragraph 1.6 through 1.9. This phasing schedule shall include specific descriptions of each phase, anticipated dates, anticipated work hours, and any other information necessary to clearly describe and delineate the intention of work. The Contractor’s baseline schedule must be approved by the CM before CNTP is issued. The Airport Authority reserves the right to interchange the sequence of phases as well as break out sub-phases for separate construction, without entitling the Contractor to additional costs.

The Airport Authority will execute, and the contractor will receive an Administrative Notice to Proceed (ANTP) to initiate Project CPM Schedule development. After acceptance of these requirements, a Construction Notice to Proceed (CNTP) for construction of the

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.12

project will be issued. Anticipated dates for each are as written in Specification Section

011000, Paragraph 1.3.

GI-1.05.2 Time Restrictions

Time restrictions are as shown on the contract drawings and written in Specification Section 011000, Paragraph 1.14. Time restrictions are subject to change as required to accommodate airline, tenant, TSA, and airport operations. All partial and full closures of roadways, sidewalks, or other pedestrian or vehicular pathways shall be scheduled, coordinated with, and approved by the CM at least two weeks in advance of implementation.

GI-1.05.3 Badging Process/Restrictions

Portions of this project are located within the Air Operations Area (AOA) and the successful bidder is required to obtain an ABE Airport Security ID Badge for key personnel as necessary for the hauling of materials to the identified earthwork material stockpile site, and any infrastructure tie-ins within the secured area of the Terminal. Not all contractors and subcontractors will be required to obtain badging; however, all contractors must provide a full list of employees prior to Construction Notice-to-Proceed.

A. Badging:

All personnel requesting unescorted access to the Airport Operations Area (AOA) must apply for and successfully complete a TSA Criminal History Record Check (CHRC) and participate in the required training to receive an Airport ID badge.

Badged individuals should be listed on the Emergency Contact list for the project;

however, if multiple workers are badged only the supervisor should be listed as an emergency contact. To begin the badging process, the individual responsible for the project coordination must notify the LNAA project representative, who will notify the LNAA badging office. All employees that require a badge must go through the badging process in person at the Authority office and online through AirBadge. All workers that will be badged must partake in LNAA training videos (SIDA training and driver training); additional in-person training session is also required for those that will be driving within the AOA. This training must be scheduled and completed within the two-week period from the first visit to the actual distribution of badging.

Receiving a badge must be done in person.

B. Restrictions:

All persons working within the AOA must stay within the designated site boundaries and all non-badged individuals must always remain under the supervision of a badged individual while in the AOA. If site work requires access to the Aircraft Movement Area or Runway Safety Area (RSA), all persons must remain under Airport escort supervision for the entirety of this work.

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.13

In the case of an active haul route through the AOA fence/gate, a badged supervisor must also remain at the open gate/section for the entirety of relevant work. In this case, badged drivers may pass through the gate and proceed along haul route within the AOA, but non-badged drivers must remain under either Airport escort or vehicle escort by badged individuals with driving privileges.

All relevant requirements for holding an Airport ID badge are included in Part V: Airport Authority Documents.

GI-1.05.4 Deliveries/Haul Route

The contractor shall have access to the site via the airport’s main entrance roadway and shall abide by the haul routes shown on the contract drawings. Haul routes will vary depending on the portion of the site being accessed, but will include the Main Parking Lot

Entrance Ramp, the Departures Ramp, and the Arrivals Ramp. General deliveries and debris/trash removal shall occur only during hours designated by the Construction

Manager.

Deliveries and haul routes that involve oversized equipment or materials, temporary closure of the airport’s main entrance roadways and/or intersection, crossing of an operational pedestrian crosswalk, or operation on partially or fully closed terminal access ramps shall be managed in accordance with PennDOT Publication 408, Section 901.3 and implemented by members of a licensed traffic control team meeting the minimum training requirements outlined in Section 901.3(y). Oversized equipment or material deliveries, or deliveries that require the temporary closure of the airport’s main entrance roadways and/or intersection shall be scheduled, coordinated with, and approved by the

CM at least four weeks in advance. In all cases, traffic control plans shall ensure the safety of pedestrian traffic across all haul route vehicle lanes and around construction closure areas, and shall ensure the safety of public vehicle traffic around construction closure areas and in parallel with haul route traffic.

All haul routes shall always be kept free and clean of debris at all times and shall be maintained in good repair by the Contractor. The contractor shall be required to keep a vacuum/sweeper truck on site at all times to be used as needed and as directed by the Construction Manager. All damage to the haul routes caused by the actions of the Contractor or its agents shall be immediately repaired to the satisfaction of the Construction Manager.

GI-1.05.5 Site Restrictions

The contractor shall be permitted use of the site as written under Specification Section

011000, Paragraph 1.12.

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.14

The entire project site and any area occupied by the Contractor shall be maintained in a clean and orderly condition satisfactory to the CM. Particular attention shall be given to the elimination of combustible rubbish, foreign object debris (FOD), or bird/wildlife attractants such as food scraps in the areas and none shall be left exposed overnight or at other periods of time when the work is shut down.

The Contractor is required to distinguish the project area from publicly accessible areas.

Perimeter fencing and gates shall be placed prior to the start of each phase of construction and remain in place continuously throughout the completion of each phase.

Fencing and gates shall be continuously secured to prevent public access into any portion of the work site, and gates shall be locked at the conclusion of each work shift. Barricades, barrels, cones, temporary signage and other maintenance of traffic devices shall be placed prior to the start of each work shift imposing closures on the roadways serving the main terminal. Once maintenance of traffic features are in place, construction may occur inside an enclosed and protected area within the approved work hours for the given work area. Maintenance of traffic devices shall remain in place until the work area is suitable for vehicular and pedestrian traffic and as approved by the CM. Fire hydrants shall remain accessible to emergency vehicles at all times.

Should any disruptions or outages to major building or site services such as power, lights, heating/air conditioning, water, fire detection/alarms, network cabling, parking access and revenue control systems, and security systems be required, those disruptions or outages shall occur during an agreed upon time period with prior approval from the CM.

Material stockpiling will be permitted in locations as noted on the General Project Layout.

Stockpiling on the non-secure, landside of the AOA fence will be allowed in the existing gravel lot located between the Terminal Loop Roadway and Postal Road. Stockpiling on the secure, airside of the AOA fence will be allowed beyond AOA Gate 37 and shall be limited to earth stockpile material only. All material stockpiles are subject to the height restrictions outlined in Section GI-1.05.8.

GI-1.05.6 Access to the Site

Contractor’s access to the work site may be adjusted by airport operations to coordinate with concurrent projects. Concurrent projects are noted on the General Project Layout and written in Specification Section 011000.

All persons entering upon airport property must have the proper identification and vehicle registration specified in applicable articles of the Standard Provisions for Construction

Projects and must adhere to the Lehigh-Northampton Airport Authority Rules and

Regulations (See Part V: Airport Authority Documents for Airport Rules and Regulations).

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.15

Within the landside portion of the project site, the following security requirements shall be met:

• All contractor employees shall have government-issued identification on their person at all times.

• Contractor shall provide a list of personnel working at the site. This list shall be updated as needed throughout the duration of the project.

For access to the airside material stockpile area, hauling shall occur through AOA Gate

37. For access via this gate or any location with the AOA, contractor employees must be badged or escorted by badged employees as outlined in Section GI-1.05.3.

The Contractor’s employees shall be required to park personal vehicles in the designated parking areas. Personal vehicles of employees and vehicles operated by vendors of goods or services will not be permitted beyond the Contractor’s designated parking area.

GI-1.05.7 Equipment Staging Area

The Contractor will be given authorization to utilize an area or areas that will be available for the duration of this project as equipment staging and mobilization areas. Equipment staging areas will be allotted for the storing, servicing, repairing, and parking of construction equipment, and shall be located as shown on the Contract Drawings or as directed by the CM. These areas shall not be used as stockpile areas for storing materials.

All staging areas are subject to the height restrictions outlined in Section GI-1.05.8. The contractor must provide trailers and construct/establish electric and communication utility connections for their personnel. The contractor will be required to relocate trailer staging and mobilization areas as directed by the CM.

The Contractor will be required to return all equipment to the appropriate Contractor’s staging area at the end of work each day, unless otherwise approved by the CM. All equipment booms shall be lowered at the close of each day’s work. All equipment will be parked in the staging area at the close of work each day and whenever it is not in use.

The Contractor (and his subcontractors) shall provide all necessary temporary fencing and gates to protect materials and equipment from pilferage. LNAA will not be responsible for any vandalized equipment or material stored on the airport’s property.

At the completion of the contract, all Contractor’s and subcontractor’s facilities will be removed promptly from the site in a workmanlike manner, the area left clean and free of all debris or surplus material, and the area returned to the condition as it existed prior to the start of the contract.

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.16

LNAA reserves the right to discontinue use of these staging areas at any time during the contract.

GI-1.05.8 Load & Height Restrictions

The Contractor shall comply with all legal load restrictions imposed by the Pennsylvania

Department of Transportation, the Airport Authority, or other authorities having jurisdiction, in the hauling of materials on public roadways and bridges beyond the limits of the work. Special permits will not relieve the Contractor of its liability for damages resulting in the moving of materials, spoils, or equipment.

Height restrictions on staged equipment and stockpiled materials shall be governed by the elevations shown on the Maximum Equipment Height Plan included in the construction plan drawing set. Equipment (without operators), materials, and temporary stockpiles shall not penetrate the Part 77 height restrictions.

In the site’s existing condition, the haul routes use the departures ramp which has an overhead clearance restriction of 17’-5”, the arrivals ramp which has an overhead clearance restriction of 13’-6”, and the main parking lot entrance ramp which has an overhead clearance restriction of 14’-6”. As the vertical clearance of each roadway changes throughout the life of the contract, the contractor shall be responsible for updating and maintaining signage and other high visibility warnings to avoid accidental impact. All construction vehicles shall be verified for height clearance prior to entering.

GI-1.05.9 Permits, Licensing, and Crane Height Restrictions

Prior to breaking ground, the Contractor shall be responsible for securing all necessary permits from Hanover Township, Lehigh County, PA and the Township’s engineer. Prior to contract bidding, the Lehigh-Northampton Airport Authority has submitted for building code review, but all other permits, the contractor shall be responsible for all application forms, submittals, fees, and other requested materials. Anticipated permits for this project include:

• Zoning – Building Permit

• Electrical Permit

• Mechanical Permit

• Plumbing Permit

• Temporary Storage Office Permit

To comply with federal and state regulations regarding erosion and sediment control and stormwater management, the Engineer of Record has applied for and has secured the

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.17

National Pollutant Discharge Elimination System (NPDES) permit from the Lehigh County

Conservation District (LCCD) on behalf of the Lehigh-Northampton Airport Authority. Prior to the performance of any earth disturbing activities, the Contractor shall be responsible for applying as co-permittee to that existing permit and upholding all regulations and requirements of that permit throughout the duration of the contract.

To comply with federal regulations regarding the protection of airspace, the Engineer of

Record has also submitted with the Federal Aviation Administration (FAA) two

Obstruction Evaluation/Airport Airspace Analysis (OE/AAA) cases for the use of a crane no taller than 300 feet in height within the site of Package A: Parking Garage Development

(Aeronautical Study Number 2026-AEA-___-NRA) and a crane no taller than 150 feet in height within the site of Package B: Elevated Pedestrian Walkway (Aeronautical Study

Number 2026-AEA-___-NRA). The contractor shall be required to adhere to all requirements and restrictions imposed by the FAA’s findings in each case.

In accordance with LNAA requirements, contractors shall be required to apply for and secure the following permits from LNAA Aircraft Rescue and Fire Fighting (ARFF) to perform various types of hazardous work. All requirements and restrictions imposed by the approving authority shall be adhered to at all times, including by not limited to atmospheric testing, ventilation, energy isolation, fire watch, safety gear use, equipment inspection, development of emergency and rescue protocols, etc.

• Hot Work Permit – Requires a site-specific permit for any work involving open flames, welding (gas or arc), cutting, grinding, brazing, soldering, or spark-producing operations.

• Confined Space Entry Permit – Requires a weekly signed entry permit for any work to be performed in confined spaces that are large enough for an employee to enter and perform work, has limited or restricted means for entry/exit, and not designed for continuous employee occupancy.

GI-1.05.10 Contract Duration

The overall duration for this contract shall be for a maximum period of seven hundred sixty-five (765) consecutive calendar days from the date the Administrative Notice to

Proceed (ANTP) is issued, and a construction duration of seven hundred thirty-five

(735) consecutive calendar days from the date the Construction Notice to Proceed

(CNTP) is issued. Contract durations are representative of final completion of all trades of construction. Each prime contract will be allotted 765 consecutive calendar days, however, each prime contractor is required to coordinate with the CM on the development of the detailed schedule. Detailed schedules must consider the timing of the scope of each prime contract with all other preceding, concurrent, and sequential construction

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.18

elements to ensure all milestones are achieved through all prime contracts. This shall include all owner-furnished equipment and installation durations. Construction phasing requirements and milestones will be as required under Section GP-2.00 of the Airport

Authority’s General Bid Provisions, Specification Section 011000, Paragraph 1.6, and

Specification Section 013200, Paragraph 1.6 through 1.9.

Following ANTP, the contractor will be allotted 30 calendar days for mobilization.

GI-1.05.11 Liquidated Damages

Failure by the Contractor to complete work on the Project within the time specified will impact airport operations and increase construction management and inspection costs.

Therefore, the Contractor and his surety will be liable for liquidated damages as follows.

Pursuant to General Conditions of Bidding, commence Work on the date specified in the

ANTP and complete the specified portions of the work within the contract durations specified above. In the event the Contractor fails to complete the specified Work within the specified number of days after the (with the exception of extensions granted by

Change Orders), liquidated damages (not as a penalty) will be assessed pursuant to

General Provisions and as specified herein for each calendar day the completion of the specified work is delayed.

The Contractor acknowledges and agrees that the work timeframes specified are critical and the contract duration and completion is of the essence. If the Contractor shall neglect, fail, or refuse to achieve Substantial Completion by the date set forth above, as may be extended by written Change Order, the Contractor does herby agree, as part of the consideration for the awarding of this Contract, to pay to the Owner, as liquidated damages and not as a penalty, the sum amount as described below for each calendar day or time increments specified beyond the date or hour of completion of the appropriate construction phase, other item identified, or Substantial Completion. Said amount of liquidated damages is agreed upon because of the impracticality and difficulty of fixing and ascertaining the true value of damage which the Owner will sustain by failure of the

Contractor to complete the Work in a timely fashion.

A summary of the liquidated damages is as follows:

1. Parking Facility Outages: For unscheduled/unplanned outages of the parking facility’s electric or communications service or failure to restore electric or communications service beyond the permitted outage window, the

Contractor and his Surety will be liable for liquidated damages in the amount

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.19

of $1,000 for each hour (or portion thereof) that the downstream equipment remains inoperable.

2. Terminal and Concourse Outages: For unscheduled/unplanned outages of any Main Terminal or Concourse Facility utility service or failure to restore utility service beyond the permitted outage window, the Contractor and his

Surety will be liable for liquidated damages in the amount of $1,000 for each

15 minutes (or portion thereof) that the utility or downstream facilities remain out of service.

3. Roadway Closures: For work involving roadway closures, the Contractor and his Surety will be liable for liquidated damages in the amount of $350 for each 15 minutes (or portion thereof) that the closure is extended for delayed reopening of the roadway beyond the permitted roadway closure window or beyond the permitted number of days allotted for each roadway closure.

4. Project Completion: Contractor will be assessed liquidated damages in the amount of $4,500 per day (or portion thereof) if not substantially complete or parking garage not open for public use after the specified contract duration

(See GI-1.05.10).

GI-1.05.12 Project Coordination

Contractor shall not begin active construction until necessary shop drawings, cut sheets, etc. are approved or as directed / approved by the CM. Preparatory meetings as dictated in each contractor’s approved QC plan shall be held prior to each major work activity. This meeting will confirm that all required shop drawings are approved, and that each contractor has a clear plan for the work activities that does not conflict with the activities of other contractors, airlines, airport operations, or other stakeholders. Attendance at each meeting is mandatory for the prime contractors and major subcontractors involved in the activities. The list of preparatory meetings will be as approved in each contractor’s

QC plan.

Coordinate scheduling prior to starting work, submittals, and coordination of all long-lead materials, and Work of the various Sections of the Technical Specifications to assure timely and orderly sequence of installation of interdependent construction elements.

Where scale of Contract Drawings is too large to show details clearly prepare small scale coordination drawings and submit to the CM for approval.

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.20

Coordinate completion and cleanup of the work of separate areas in preparation of the

Final Acceptance Review Inspection.

Other construction contracts may be underway during the life of this project. These other projects may occur adjacent to and, at times, within the project boundary for this contract.

Concurrent work will be performed by the owner, other contractors under this contract, and other contractors under separate contracts. The Contractor shall cooperate and coordinate fully its work with the owner, all tenants, other contractors, and utilities companies via the CM as necessary and as required under Specification Section 011000, Paragraphs 1.7 and 1.8. Additionally, the contractor shall be responsible for installation of all owner-furnished, contractor-installed products listed under Specification Section

011000, Paragraph 1.10. In all cases, coordination shall involve incorporation and consideration of concurrent work into the overall construction schedule for this contract.

All roadways, parking lots, and pedestrian pathways shall remain open at all times unless specifically noted. The Contractor shall yield to all ARFF movements and activities. Public vehicular access into and out of the main parking lot shall be maintained at all times. The contractor shall create and maintain a temporary pedestrian path to provide continuous access between all portions of the parking lot and the main terminal. Any closures and impacts to the parking lot entrance lanes and gates, exit lanes and gates, parking stalls, and parking lot interior aisles shall be coordinated with the CM at least two weeks in advance. Coordination with occupants shall be as required under Specification Section

011000, Paragraph 1.13.

GI-1.05.13 Shop Drawings

The Contractor shall submit complete shop drawing packages for each item of work as required in the applicable Technical Specification Sections. Delays caused by incomplete submittals by the Contractor will not be accepted and the Contractor will be required to recover lost time at no expense to the LNAA.

GI-1.05.14 Contractor Self-Performance Goal

The self-performance goal establishes the minimum percentage of work a contractor must execute using its own direct labor and forces rather than subcontractors. The Contractor shall self-perform with its own organization, direct labor, and forces, Work amounting to the percentages outlined below:

• The General Contractor shall self-perform not less than sixty percent (60%) of the total General Contractor Contract Price.

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.21

• The Electrical Contractor shall self-perform not less than eighty-five percent

(85%) of the total Electrical Contractor Contract Price.

• The Mechanical Contractor shall self-perform not less than eighty-five percent

(85%) of the total Mechanical Contractor Contract Price.

• The Plumbing Contractor shall self-perform not less than eighty-five percent

(85%) of the total Plumbing Contractor Contract Price.

• The Precast Concrete Contractor shall self-perform not less than seventy-five percent (75%) of the total Precast Concrete Contractor Contract Price.

"Own organization" and "direct labor" shall mean workers employed directly on the

Contractor’s payroll. They must be under the Contractor's direct supervision and utilization of equipment owned or leased directly by the Contractor. The calculation to determine compliance with the respective self-performance requirement shall be executed as follows:

• Formula: (Total Cost of Direct Labor + Total Cost of Contractor-Owned/Leased

Materials and Equipment) ÷ (Total Contract Price).

• Exclusions: The cost of any work performed by subcontractors, independent consultants, or lower-tier sub-subcontractors shall be completely excluded from the self-performance numerator.

GI-1.05.15 Public Safety and Protection of Property

The Contractor shall assume sole, comprehensive, and continuous responsibility for initiating, maintaining, and supervising all safety precautions and programs in connection with the Work. The obligation to protect shall apply within the project site as well as any area adjacent to the project site that may be affected by the contractor’s activities.

The Contractor shall take all necessary precautions to ensure the absolute safety of the public, pedestrians, motorists, and adjacent property structures throughout the duration of the Project. The Contractor shall be solely responsible for developing, obtaining approvals for, implementing, and maintaining all temporary traffic control plans and maintenance and protection of traffic operations. All traffic control measures must ensure the safe, continuous, and efficient movement of vehicular and pedestrian traffic around the perimeter of the project site.

The Contractor shall strictly comply with all applicable federal, state, and local laws, ordinances, rules, and regulations, including but not limited to:

• The Pennsylvania Construction Code Act (PCCA) (35 P.S. §§ 7210.101-

7210.1103) and the Uniform Construction Code (UCC).

TECHNICAL PROVISIONS GENERAL PROJECT INFORMATION – GI.22

• The Williams-Steiger Occupational Safety and Health Act of 1970 (OSHA), with specific adherence to 29 CFR Part 1926 (Safety and Health Regulations for

Construction).

• The Pennsylvania Department of Transportation (PennDOT) Publication 213

(Temporary Traffic Control Guidelines).

The Contractor shall design, erect, and maintain heavy-duty pedestrian protection bridges, covered walkways, and debris netting over all adjacent sidewalks, public rights-of-way, and active driving lanes as needed to provide protection based on the nature of the work being performed. All overhead protection structures must meet or exceed local engineering and municipal design standards for falling object impact resistance.