LMMH Water Source Heat Pump Replacement RFQ.docx

DOCX document 33 KB Posted

Attached to
HVAC Emer. Replacement at Logan Mingo Mental Health Facility
Solicitation number
ARFQ 0506 BHS1700000009 3
Issued by
Lincoln County, West Virginia

About this file

This Request for Quotation (RFQ BHS17*9) is issued by the West Virginia Department of Health and Human Resources, Bureau for Behavioral Health and Health Facilities, for an emergency one-time purchase to replace water source heat pumps and a water supply pump motor at The Logan Mingo Mental Health Facility in Logan, West Virginia. The scope of work includes the removal and replacement of seven wall-mounted water source heat pumps (7500 BTU, 208/230 Volt/60Hz/1 Phase), three ceiling-mounted water source heat pumps (7000 BTU, 208 Volt/60Hz/1 Phase), and one water supply pump motor (5HP, 1750 RPM, 208/230 Volt/60Hz/1 Phase, 184T Frame). The vendor must provide all labor, materials, equipment, and incidental work necessary to complete the installation, ensure all equipment is installed per manufacturers' recommendations, and perform final cleanup and site restoration. The document does not specify response dates, due dates, site visits, or bidders' conferences.

The contract will be awarded to the lowest qualified responsible bidder meeting the specified requirements. Vendors must possess a valid West Virginia Contractors License and demonstrate experience successfully completing at least five similar projects, which will be verified through references or documentation provided prior to contract award. Work shall be performed during standard hours of 7:00 AM to 4:00 PM, Monday through Friday, excluding state holidays, unless advance approval is granted by the Agency. The vendor is responsible for procuring all necessary permits and licenses, controlling access cards and keys, designating a primary contract manager available during normal business hours, and participating in a final inspection with the Agency's project manager. The document does not specify pricing terms, set-asides, incumbent information, or funding sources.

View the file

Other files

File Type Posted
TCP HVAC 2.pdf PDF
Final_ARFQ_0506_BHS1700000009_2_ARFQ_FORM.PDF PDF
Final_ARFQ_0506_BHS1700000009_3_ARFQ_FORM.PDF PDF
HVAC Addendum Docs.pdf PDF
pAffidavit.pdf PDF
Final_ARFQ_0506_BHS1700000009_1_ARFQ_FORM.PDF PDF
WV43 HVAC.pdf PDF
pricing page HVAC.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION ARFQ BHS17*9

Replacement of Water Source Heat Pumps

GENERAL CONSTRUCTION SPECIFICATIONS (No AIA Documents)

1. PURPOSE AND SCOPE: The West Virginia Department of Health and Human Resources, Bureau for Behavioral Health and Health Facilities is soliciting bids to establish an emergency contract for the following: One-time purchase to provide all labor, materials, equipment, and anything incidental to replace 7 wall mounted and 3 ceiling mounted water source heat pumps as well as replace a water supply pump motor located at The Logan Mingo Mental Health Facility located at Route 10 Three Mile Curve, Logan WV 25601.

The Vendor shall furnish all materials, labor, and equipment necessary to complete all Construction Services. The Vendor shall furnish any incidental work, materials, labor, and equipment that are necessary to complete the Construction Services, even if such incidental work is not explicitly included in the Project Plans.

2. DEFINITIONS: The terms listed below shall have the meanings assigned to them below. Additional definitions can be found in section 2 of the General Terms and Conditions and in the Project Plans as defined below.

2.1 “Construction Services” means replacement of existing water sourced heat pumps and water supply motor as more fully described in the Project Plans.

2.2 “Pricing Page” means the pages contained in wvOASIS, attached hereto as Exhibit A, or included in the Project Plans upon which Vendor should list its proposed price for the Construction Services.

2.3 “Solicitation” means the official notice of an opportunity to supply the State with Construction Services.

2.4 “Project Plans” means documents developed by an architect, an engineer, the Agency, or another design professional, which are attached hereto as Exhibit B, that provide detailed instructions on how the Construction Services are to be performed. In the event that Project Plans contain drawings or other documents too large to attach in Exhibit B, Vendors can obtain copies in accordance with Section 9 of these Specifications.

3. ORDER OF PRECEDENCE: This General Construction Specifications document will have priority over, and supersede, anything contained in the Project Plans.

4. QUALIFICATIONS: Vendor, or Vendor’s staff if requirements are inherently limited to individuals rather than corporate entities, shall have the following minimum qualifications:

4.1. Experience: Vendor, or Vendor’s supervisory staff assigned to this project, must have successfully completed at least five (5) projects that involved work similar to that described in these specifications or the Project Plans. Compliance with this experience requirement will be determined prior to contract award by the State through references provided by the Vendor upon request, through knowledge or documentation of the Vendor’s past projects, through confirmation of experience requirements from the architect assisting the State in this project, or some other method that the State determines to be acceptable. Vendor must provide any documentation requested by the State to assist in confirmation of compliance with this provision. References, documentation, or other information to confirm compliance with this experience requirement may be requested after bid opening and prior to contract award.

4.2. Valid West Virginia Contractors License

5. CONTRACT AWARD: The Contract is intended to provide Agency with a purchase price for the Construction Services. The Contract will be awarded to the lowest qualified responsible bidder meeting the required specifications. If the Pricing Pages contain alternates/add-ons, the Contract will be awarded based on the grand total of the base bid and any alternates/add-ons selected.

6. SELECTION OF ALTERNATES: If the Pricing Pages contain alternates/add-ons, the alternates/add-ons will be selected as follows. The alternate/add-on will be selected in the order of priority listed on the Pricing Pages. The first alternate/add-on must be selected before the second alternate/add-on can be selected and so on.

7. PERFORMANCE: Vendor shall perform the Construction Services in accordance with this document and the Project Plans.

8. SUBSTITUTIONS: Any substitution requests must be submitted in accordance with the official question and answer period described in the INSTRUCTIONS TO VENDORS SUBMITTING BIDS, Paragraph 4. Vendor Question Deadline. Vendors submitting substitution requests should submit product brochures and product specifications during the official question and answer period.

9. PROJECT PLANS: The checked box will apply to Project Plans for this solicitation.

No Additional Project Plan Documents: There are no additional Project Plans other than those attached hereto as Exhibit B or any subsequent addenda modifying Exhibit B.

□ Additional Project Plan Documents: There are additional Project Plan documents other than those attached as Exhibit B. Copies of the additional Project Plan documents not attached as Exhibit B can be obtained by contacting the entity identified below.

10. CONDITIONS OF THE WORK

10.1. Permits: The Vendor shall procure all necessary permits and licenses to comply with all applicable Federal, State, or Local laws, regulations and ordinances of any regulating body.

10.2. Existing Conditions: If discrepancies are discovered between the existing conditions and those noted in the specifications, Vendor must immediately notify the Agency's representative. Vendor must also immediately notify the Agency if suspected hazardous materials are encountered.

10.3. Standard Work Hours: The standard hours of work for this Contract will be 7AM-4PM Monday - Friday excluding holidays recognized by the State of West Virginia. Any work outside of the standard hours of work must be approved in advance at the Agency’s sole discretion. Authorization of work outside of the standard hours of work will not entitle Vendor to additional compensation.

10.4. Project Closeout: Project Closeout shall include the following:

10.4.1. Final Cleanup: Vendor shall perform the final cleanup activities listed below, along with any other final cleanup activities normally associated with the work performed under this Contract, prior to final inspection:

10.4.1.1. Vendor shall remove all debris associated with the replacement process as well as repair any damage to the surrounding grounds/grass/pavement/walls or ceilings.

10.4.2. Final Inspection: Vendor shall participate in a final inspection with the Agency’s project manager. The purpose of the final inspection will be to identify deficiencies that need to be remedied prior to Agency’s final acceptance of the work. Vendor shall at all times be obligated to perform in accordance with the Contract and must take all actions necessary to ensure that work complies with requirements of Contract prior to final acceptance. Final acceptance does not waive or release Vendor from its obligation to ensure that work complies with the Contract requirements. Vendor shall submit any warranty documents to the Agency project manager at final inspection.

11.2 11.3 11.4

11. FACILITIES ACCESS: Performance of Contract Services may require access cards and/or keys to gain entrance to Agency’s facilities. In the event that access cards and/or keys are required:

8.

9.

10.

11.

12.

11.1. Vendor must identify principal service personnel which will be issued access cards and/or keys to perform service.

11.2. Vendor will be responsible for controlling cards and keys and will pay replacement fee, if the cards or keys become lost or stolen.

11.3. Vendor shall notify Agency immediately of any lost, stolen, or missing card or key.

11.4. Anyone performing under this Contract will be subject to Agency’s security protocol and procedures.

11.5. Vendor shall inform all staff of Agency’s security protocol and procedures.

12. MISCELLANEOUS:

12.1. Contract Manager: During its performance of this Contract, Vendor must designate and maintain a primary contract manager responsible for overseeing Vendor’s responsibilities under this Contract. The Contract manager must be available during normal business hours to address any customer service or other issues related to this Contract. Vendor should list its Contract manager and his or her contact information below.

Contract Manager: _________________________________________________

Telephone Number: ________________________________________________

Fax Number: ______________________________________________________

Email Address: ____________________________________________________

EXHIBIT A – Pricing Page

EXHIBIT B – PROJECT PLANS

1. Contactor shall remove the existing units and dispose of off-site adhering to any local, state and federal law.

2. Contractor shall remove and replace seven (7) wall mounted water source heat pumps. Heat Pumps shall be 7500 BTU (British Thermal Units) 208/230 Volt/60Hz/1 Phase.

3. Contractor shall remove and replace three (3) ceiling mounted water source heat pumps. Heat Pumps shall be 7000 BTU (British Thermal Units) 208 Volt/60Hz/1Phase.

4. Contractor shall remove and replace the existing water supply pump motor. Motor shall be 5HP, 1750 RPM 208/230 Volt/60Hz/1Phase and 184T Frame.

5. Contractor shall ensure all equipment is installed per manufacturers’ recommendations and shall ensure system is operational only after all equipment is installed.

Revised 10/13/2016