This is an Addendum No. 1 issued by Hurtig, Gardner, Froelich, Architects, Inc. for the Lamar Community College Bowman Building Lecture Halls Remodel project located at 2602 N. Elizabeth Street, Pueblo, CO 81003, with construction to occur at 2401 S. Main Street, Lamar, CO 81052. The addendum establishes a mandatory pre-bid meeting sign-up sheet requirement and identifies three prime/general contractor bidders: Camp & Currell Construction, H&L Development, and Moncor, LLC. The addendum modifies drawing specifications by removing the requirement for the general contractor to remove rubber base from Lecture Halls 138 and 139, as this work will be performed by a separate asbestos abatement contractor. Requests for information and approval of "or equal" submissions must be submitted in writing to the architect by August 23, 2016 at 1:00 p.m., with all addenda to be issued no later than August 25, 2016 at 1:00 p.m.
The project involves two separate bid scopes: asbestos remediation/removal and general construction repair/remodel. The total combined available funds and estimated probable cost for both scopes is $542,000, with the asbestos remediation/removal component estimated at approximately $180,000 and the general construction repair/remodel base bid estimated at approximately $360,000. Bidders must acknowledge receipt of this addendum on the bid form and attach it to the scope of work. Separate bids are required for the asbestos remediation/removal work and the general construction repair/remodel work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Asbestos Abatement Bid Info and Document.doc | DOC document | |
| LCC Lecture Halls Addendum No 2 - 082416.pdf | ||
| LCC Lecture Halls Addendum No 3 - 0825816.pdf | ||
| Lecture Halls.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1 HURTIG, GARDNER, FROELICH, ARCHITECTS, INC.
Lamar Community College 2602 N. Elizabeth Street, Pueblo, CO 81003 Bowman Building Lecture Halls Remodel August 18, 2016 2401 S. Main Street Lamar, CO 81052 This Addendum consists of 1 page +1 attachment This Addendum is issued to all known bidders. Bidders shall attach this Addendum to the scope of work and acknowledge receipt on the Bid Form. All information and instructions given herein shall become a part of the contract documents.
SPECIFICATION ITEMS
Item No. 1: Pre-Bid Meeting Sign-up Sheet:
Add the attached Mandatory Pre-Bid Sign-up Sheet. ATTACHMENT NO. 1
The Prime/General Contractor Bidders shall be:
Camp & Currell Construction (719)336-2225 H&L Development (720)422-0578 Moncor, LLC (719)336-2691
DRAWING ITEMS
Item No. 1: Sheet D1.1, General Demo Notes:
Delete General Demo Note 2 “General Contractor shall remove all ruber base….” in its entirety.
NOTE: All rubber base in Lecture Hall 138 and in Lecture Hall 139 shall be removed by Asbestos Abatement Contractor under a separate contract. (Not included in this Bid Scope of Work.)
CLARIFICATION ITEMS
Item No. 1: Advertisement For Bids & Information For Bidders
Per Information For Bidders, requests for information (RFI) and requests for approval of “or equal” shall be made in writing to the Architect at least five (5) business days prior to bid opening.
On Advertisement For Bids, change due date for RFI’s and requests for approval of equals to
August 23, 2016 at 1:00 p.m. in lieu of August 25, 2016.
Per Information for Bidders, addenda shall be issued no later than two (2) business days prior to bid opening.
Last addendum shall be issued no later than August 25, 2016 at 1:00 p.m.
Total combined available funds and estimated opinion of probable cost of Asbestos Remediation/Removal scope of work (not included in this bid scope of work) plus General Construction Repair/Remodel scope of work is $542,000.
Estimated opinion of probable cost of Asbestos Remediation/Removal scope of work (Not included in this bid scope of work) is approximately $180,000.
Opinion of probable cost of General Construction Repair/Remodel Base Bid scope of work is approximately $360,000.
Per Advertisement for Bids, separate bids shall be required for:
-Asbestos Remediation/Removal (not included in this bid scope of work) -General Construction Repair/Remodel
File details come from the government source that posted it. Updated .